CN105155569A - 一种后打桩海上风机基础的施工装置及施工方法 - Google Patents
一种后打桩海上风机基础的施工装置及施工方法 Download PDFInfo
- Publication number
- CN105155569A CN105155569A CN201510481801.9A CN201510481801A CN105155569A CN 105155569 A CN105155569 A CN 105155569A CN 201510481801 A CN201510481801 A CN 201510481801A CN 105155569 A CN105155569 A CN 105155569A
- Authority
- CN
- China
- Prior art keywords
- pipe casing
- wind turbine
- offshore wind
- turbine foundation
- leveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/60—Piles with protecting cases
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
Abstract
Description
Claims (8)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510481801.9A CN105155569B (zh) | 2015-08-03 | 2015-08-03 | 一种后打桩海上风机基础的施工装置及施工方法 |
US15/750,277 US10253475B2 (en) | 2015-08-03 | 2016-07-18 | Construction device and method for offshore wind turbine foundation with piling performed later |
PCT/CN2016/090331 WO2017020697A1 (zh) | 2015-08-03 | 2016-07-18 | 一种后打桩海上风机基础的施工装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510481801.9A CN105155569B (zh) | 2015-08-03 | 2015-08-03 | 一种后打桩海上风机基础的施工装置及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105155569A true CN105155569A (zh) | 2015-12-16 |
CN105155569B CN105155569B (zh) | 2017-05-31 |
Family
ID=54796587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510481801.9A Active CN105155569B (zh) | 2015-08-03 | 2015-08-03 | 一种后打桩海上风机基础的施工装置及施工方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US10253475B2 (zh) |
CN (1) | CN105155569B (zh) |
WO (1) | WO2017020697A1 (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971000A (zh) * | 2016-06-16 | 2016-09-28 | 江苏海上龙源风力发电有限公司 | 一种海上风机嵌岩单桩基础临时施工平台 |
WO2017020697A1 (zh) * | 2015-08-03 | 2017-02-09 | 广东明阳风电产业集团有限公司 | 一种后打桩海上风机基础的施工装置及施工方法 |
CN106759312A (zh) * | 2017-03-08 | 2017-05-31 | 中交第三航务工程局有限公司宁波分公司 | 钢套筒的安装方法 |
CN107859051A (zh) * | 2017-10-26 | 2018-03-30 | 中交第三航务工程局有限公司宁波分公司 | 调平装置及导管架的调平方法 |
CN107938699A (zh) * | 2017-11-13 | 2018-04-20 | 中交第三航务工程局有限公司宁波分公司 | 一种升压站基础的施工方法 |
CN110004961A (zh) * | 2019-05-17 | 2019-07-12 | 中交一航局第二工程有限公司 | 套箱施工系统及其施工方法 |
CN110241823A (zh) * | 2019-05-10 | 2019-09-17 | 江苏华西村海洋工程服务有限公司 | 一种海上桩基施工的调平工艺 |
CN111373101A (zh) * | 2017-12-07 | 2020-07-03 | Ihc荷兰Ie有限公司 | 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件 |
CN111472382A (zh) * | 2020-04-28 | 2020-07-31 | 中山大学 | 一种带抗拔钢管桩的吸力桶基础及其安装方法 |
CN111648396A (zh) * | 2019-06-28 | 2020-09-11 | 熊翱 | 一种带施工吸力筒的导管架及其施工方法 |
CN112081133A (zh) * | 2020-08-06 | 2020-12-15 | 中国科学院力学研究所 | 一种海上风机的基座固定结构及基础安装方法 |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11286684B2 (en) * | 2018-06-26 | 2022-03-29 | Sa-Ra Enerjiinsaat Ticaret Ve Sanayi Anonim Sirketi | Connection apparatus for mounting a guyed mast |
DK3887602T3 (en) * | 2018-11-28 | 2023-01-30 | Imenco Corrosion Tech As | A device for securing a connection to be formed between a leg of a marine structure and a pile of a fundament fastened in a seabed |
CN109518711B (zh) * | 2018-12-24 | 2025-03-11 | 熊翱 | 一种导管腿柱分叉的导管架基础及其施工方法 |
CN110206056A (zh) * | 2019-05-14 | 2019-09-06 | 中交第一航务工程局有限公司 | 一种用于海上风电的中心桩加负压筒复合基础及操作方法 |
CN109989403B (zh) * | 2019-05-20 | 2024-09-20 | 华电重工股份有限公司 | 一种沉桩定位工装 |
EP3754116B1 (en) | 2019-06-21 | 2024-04-10 | Saipem S.p.A. | System and method for levelling and gripping a jacket leg into a hollow foundation pile |
CN110468818A (zh) * | 2019-07-19 | 2019-11-19 | 中国能源建设集团广东火电工程有限公司 | 一种海上风电机组定位支撑导向架 |
CN111119223B (zh) * | 2020-01-13 | 2024-09-24 | 天津大学 | 椭圆形多筒导管架基础结构 |
NL2025306B1 (en) * | 2020-04-08 | 2021-10-25 | Heerema Marine Contractors Nl | Devices and methods for installing piles into the ground or seabed |
CN111365196A (zh) * | 2020-04-16 | 2020-07-03 | 常熟风范电力设备股份有限公司 | 一种可调式风电基座 |
CN111995339A (zh) * | 2020-07-16 | 2020-11-27 | 天津大学前沿技术研究院有限公司 | 一种海洋平台抗冲刷的固化土及其制备方法 |
JP2024517828A (ja) | 2021-05-06 | 2024-04-23 | フリーデ・アンド・ゴールドマン・リミテッド・ライアビリティ・カンパニー・ディ/ビー/エイ・フリーデ・アンド・ゴールドマン・リミテッド | 洋上自昇式船舶とともに使用することに適合した輸送船舶用のラック構造体のためのシステムおよび方法 |
CN113373967A (zh) * | 2021-06-10 | 2021-09-10 | 天津港航工程有限公司 | 一种基于门架式多桩风机基础的风机安装施工方法 |
CN114016539A (zh) * | 2021-12-01 | 2022-02-08 | 珠海巨涛海洋石油服务有限公司 | 一种深水风电用上部导管架及建造工艺 |
CN115012396A (zh) * | 2022-06-20 | 2022-09-06 | 中交第三航务工程局有限公司宁波分公司 | 一种密排桩沉桩施工工艺 |
CN115125989B (zh) * | 2022-08-15 | 2023-08-08 | 湖南恒岳重钢钢结构工程有限公司 | 一种海上风力发电机组的导管架调平装置 |
CN115874577A (zh) * | 2022-12-02 | 2023-03-31 | 中国电建集团福建省电力勘测设计院有限公司 | 一种海上风电phc高桩承台风机基础靠泊构件及其施工方法 |
CN118793053A (zh) * | 2023-04-14 | 2024-10-18 | 上海佳豪船海工程研究设计有限公司 | 一种打桩导向架及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4422806A (en) * | 1981-02-17 | 1983-12-27 | Chevron Research Company | Sliding tension leg tower |
AU680244B2 (en) * | 1993-06-11 | 1997-07-24 | Kvaerner H&G Offshore Ltd | Foundation and method of installation |
CN201649118U (zh) * | 2010-04-07 | 2010-11-24 | 中国水电顾问集团华东勘测设计研究院 | 导管架式海上风电机组基础结构 |
CN102587405A (zh) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及分离式导管架装置 |
CN202730790U (zh) * | 2012-08-13 | 2013-02-13 | 天津市海王星海上工程技术有限公司 | 外挂裙桩式筒柱结构 |
CN202767094U (zh) * | 2012-10-09 | 2013-03-06 | 国电联合动力技术有限公司 | 一种海上风机裙桩基础 |
CN204825955U (zh) * | 2015-08-03 | 2015-12-02 | 浙江华蕴海洋工程技术服务有限公司 | 一种后打桩海上风机基础的施工装置 |
Family Cites Families (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1718006A (en) * | 1928-08-15 | 1929-06-18 | Jesse W Reno | Landing platform for airplanes |
US2997852A (en) * | 1954-12-30 | 1961-08-29 | De Long Corp | Apparatus and method for reecting a supporting structure over a body of water |
US3029608A (en) * | 1956-12-28 | 1962-04-17 | Beulah Perkins | Platform for off shore drilling and supporting columns therefor |
US3326006A (en) * | 1964-05-01 | 1967-06-20 | Tecon Corp | Pile shells and couplings |
US3457728A (en) * | 1968-03-26 | 1969-07-29 | Texaco Inc | Replaceable pile sleeve insert |
US3646947A (en) * | 1969-04-04 | 1972-03-07 | Brown & Root | Jacket pile cleanout apparatus |
US3922869A (en) * | 1972-06-30 | 1975-12-02 | Orb Inc | Pumped evacuated tube water hammer pile driver method |
US3851483A (en) * | 1972-12-12 | 1974-12-03 | M Holley | Sleeved-pile structure |
US3991581A (en) * | 1975-06-02 | 1976-11-16 | Brown & Root, Inc. | Method and apparatus for handling piling and anchoring an offshore tower |
US4212562A (en) * | 1978-07-31 | 1980-07-15 | Lynes, Inc. | Method and apparatus for leveling templates for offshore subterranean wells |
US4405115A (en) * | 1981-02-20 | 1983-09-20 | Varco International, Inc. | Gripping jack system |
US4589802A (en) * | 1981-08-11 | 1986-05-20 | Sedco, Inc. | Slip assembly for subsea template |
FR2536826B1 (fr) * | 1982-11-26 | 1986-06-20 | Spie Offshore | Procede d'ancrage de conduite immergee, dispositif pour sa mise en oeuvre et ancrage ainsi realise |
IT1172825B (it) * | 1983-04-18 | 1987-06-18 | Tecnomare Spa | Dima sottomarina per la perforazione di pozzi per lo sfruttamento di giacimenti di idrocarburi in mare |
US4740110A (en) * | 1987-04-06 | 1988-04-26 | Shell Offshore Inc. | Platform grouting system and method |
GB2238816B (en) * | 1989-12-06 | 1993-05-12 | Marathon Oil Co | Offshore jacket having increased buoyancy |
US6494644B1 (en) * | 1991-01-02 | 2002-12-17 | Foundation Systems Of Louisiana, Inc. | Pile connector and method of installation |
CA2084792C (en) * | 1991-05-10 | 1996-11-19 | Osamu Kiyomiya | Water area structure using placing member for underwater ground |
US5755533A (en) * | 1994-12-16 | 1998-05-26 | Shell Oil Company | Tendon foundation guide cone assembly and method |
US6299385B1 (en) * | 1999-08-04 | 2001-10-09 | Paragon Engineering Services Incorporated | Mini-jacket and method for installation using caisson |
US7044686B2 (en) * | 2002-07-22 | 2006-05-16 | Donald May | Apparatus and method for supporting a structure with a pier |
US7416367B2 (en) * | 2005-05-13 | 2008-08-26 | St Onge Gene | Lateral force resistance device |
GB0520891D0 (en) * | 2005-10-14 | 2005-11-23 | Tidal Generation Ltd | Foundation structure for water current energy system |
EP2402511B1 (en) * | 2010-07-02 | 2016-03-02 | IHC Holland IE B.V. | Template for and method of installing a plurality of foundation elements in an underwater ground formation |
US20120107055A1 (en) * | 2010-08-20 | 2012-05-03 | Hilgefort Gmbh Anlagenkomponenten Und Apparatebau | Base structure for off-shore wind turbines and method for building thereof |
BE1019832A4 (nl) * | 2011-02-22 | 2013-01-08 | Geosea N V | Inrichting voor het vervaardigen van een fundering voor een zich op hoogte bevindende massa, bijbehorende werkwijze en samenstel van de inrichting en een opvijzelbaar platform. |
BE1019834A4 (nl) * | 2011-02-22 | 2013-01-08 | Geosea N V | Inrichting voor het vervaardigen van een fundering voor een zich op hoogte bevindende massa, bijbehorende werkwijze en samenstel van de inrichting en een opvijzelbaar platform. |
US9181674B2 (en) * | 2011-06-27 | 2015-11-10 | Hubbell Incorporated | Seismic restraint helical pile systems and method and apparatus for forming same |
EP2623675A1 (de) * | 2012-02-03 | 2013-08-07 | Nordic Yards Holding GmbH | Plattform-Oberteil (Topside) für eine Offshore-Plattform und Verfahren zum Installieren eines derartigen Plattform-Oberteils |
NL2008279C2 (en) * | 2012-02-13 | 2013-08-14 | Ihc Holland Ie Bv | A template for and method of installing a plurality of foundation elements in an underwater ground formation. |
EP2834423B1 (en) * | 2012-03-29 | 2019-10-23 | W3g Piling Noise Mitigation Ltd. | Offshore structures and associated apparatus and methods |
FR2989097B1 (fr) * | 2012-04-05 | 2016-10-14 | Dcns | Fondation d'eolienne off-shore, eolienne off-shore correspondante, et leur procede de mise en place |
US9725868B2 (en) * | 2014-05-23 | 2017-08-08 | Keystone Engineering Inc. | Offshore support structure |
CN105155569B (zh) * | 2015-08-03 | 2017-05-31 | 浙江华蕴海洋工程技术服务有限公司 | 一种后打桩海上风机基础的施工装置及施工方法 |
-
2015
- 2015-08-03 CN CN201510481801.9A patent/CN105155569B/zh active Active
-
2016
- 2016-07-18 US US15/750,277 patent/US10253475B2/en not_active Expired - Fee Related
- 2016-07-18 WO PCT/CN2016/090331 patent/WO2017020697A1/zh active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4422806A (en) * | 1981-02-17 | 1983-12-27 | Chevron Research Company | Sliding tension leg tower |
AU680244B2 (en) * | 1993-06-11 | 1997-07-24 | Kvaerner H&G Offshore Ltd | Foundation and method of installation |
CN201649118U (zh) * | 2010-04-07 | 2010-11-24 | 中国水电顾问集团华东勘测设计研究院 | 导管架式海上风电机组基础结构 |
CN102587405A (zh) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | 海上风机导管架基础安装方法及分离式导管架装置 |
CN202730790U (zh) * | 2012-08-13 | 2013-02-13 | 天津市海王星海上工程技术有限公司 | 外挂裙桩式筒柱结构 |
CN202767094U (zh) * | 2012-10-09 | 2013-03-06 | 国电联合动力技术有限公司 | 一种海上风机裙桩基础 |
CN204825955U (zh) * | 2015-08-03 | 2015-12-02 | 浙江华蕴海洋工程技术服务有限公司 | 一种后打桩海上风机基础的施工装置 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017020697A1 (zh) * | 2015-08-03 | 2017-02-09 | 广东明阳风电产业集团有限公司 | 一种后打桩海上风机基础的施工装置及施工方法 |
US10253475B2 (en) | 2015-08-03 | 2019-04-09 | Ming Yang Smart Energy Group., Ltd. | Construction device and method for offshore wind turbine foundation with piling performed later |
CN105971000A (zh) * | 2016-06-16 | 2016-09-28 | 江苏海上龙源风力发电有限公司 | 一种海上风机嵌岩单桩基础临时施工平台 |
CN106759312A (zh) * | 2017-03-08 | 2017-05-31 | 中交第三航务工程局有限公司宁波分公司 | 钢套筒的安装方法 |
CN106759312B (zh) * | 2017-03-08 | 2019-04-02 | 中交第三航务工程局有限公司宁波分公司 | 钢套筒的安装方法 |
CN107859051A (zh) * | 2017-10-26 | 2018-03-30 | 中交第三航务工程局有限公司宁波分公司 | 调平装置及导管架的调平方法 |
CN107938699A (zh) * | 2017-11-13 | 2018-04-20 | 中交第三航务工程局有限公司宁波分公司 | 一种升压站基础的施工方法 |
CN111373101A (zh) * | 2017-12-07 | 2020-07-03 | Ihc荷兰Ie有限公司 | 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件 |
CN111373101B (zh) * | 2017-12-07 | 2023-08-29 | 机械设备控股有限公司 | 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件 |
CN110241823A (zh) * | 2019-05-10 | 2019-09-17 | 江苏华西村海洋工程服务有限公司 | 一种海上桩基施工的调平工艺 |
CN110004961A (zh) * | 2019-05-17 | 2019-07-12 | 中交一航局第二工程有限公司 | 套箱施工系统及其施工方法 |
CN110004961B (zh) * | 2019-05-17 | 2024-05-10 | 中交一航局第二工程有限公司 | 套箱施工系统及其施工方法 |
CN111648396A (zh) * | 2019-06-28 | 2020-09-11 | 熊翱 | 一种带施工吸力筒的导管架及其施工方法 |
CN111472382A (zh) * | 2020-04-28 | 2020-07-31 | 中山大学 | 一种带抗拔钢管桩的吸力桶基础及其安装方法 |
CN112081133A (zh) * | 2020-08-06 | 2020-12-15 | 中国科学院力学研究所 | 一种海上风机的基座固定结构及基础安装方法 |
CN112081133B (zh) * | 2020-08-06 | 2021-06-25 | 中国科学院力学研究所 | 一种海上风机的基座固定结构及基础安装方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2017020697A1 (zh) | 2017-02-09 |
CN105155569B (zh) | 2017-05-31 |
US10253475B2 (en) | 2019-04-09 |
US20180223497A1 (en) | 2018-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155569A (zh) | 一种后打桩海上风机基础的施工装置及施工方法 | |
CN101215834A (zh) | 支腿式地下连续墙施工工法 | |
CN106013052A (zh) | 钢板桩与沉井组合式地下停车库及其施工方法 | |
CN101864765A (zh) | 基于双向搅拌的smw施工工法及三轴搅拌设备 | |
CN105780779A (zh) | 外设压密注浆的拉森钢板桩复合支护结构及其使用方法 | |
CN102134853A (zh) | Ct式锁口钢管桩基坑止水支护装置及工法 | |
CN103015429A (zh) | 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法 | |
CN110359476A (zh) | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 | |
CN106609509A (zh) | 自平衡基坑围护结构及其施工方法 | |
CN204825955U (zh) | 一种后打桩海上风机基础的施工装置 | |
CN112878375A (zh) | 一种适用于硬质地层的水下隧道内垂直顶升实施工法及结构 | |
CN208545763U (zh) | 一种用于桥梁深水基础的钢管桩围堰 | |
CN102839691A (zh) | 无砂水泥管深井降水井口快速封堵方法及其装置 | |
CN107964971B (zh) | 一种采用pba工法施工的地铁车站的降水方法 | |
CN205000332U (zh) | 一种后打桩海上风机基础施工装置与桩套管连接结构 | |
CN102888847A (zh) | 电梯井局部深基坑免降水施工方法 | |
CN108797653A (zh) | 一种利用深基坑围护桩进行结构抗浮的施工方法 | |
CN113638448B (zh) | 工井及其施工方法以及地下管道工井装置及其施工方法 | |
CN106120811A (zh) | 一种基坑周边预防变形和纠偏施工方法 | |
CN104074234B (zh) | 电厂循环水系统的内河水取水口结构及其施工方法 | |
CN212641468U (zh) | 坑中坑快速施工结构 | |
CN108729457A (zh) | 一种用于桥梁深水基础的钢管桩围堰及其施工方法 | |
CN214363441U (zh) | 岩溶地区人工挖孔桩 | |
CN206591535U (zh) | 组合式围堰 | |
CN116517600A (zh) | 一种隧道分期施工的临时封堵结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201130 Address after: Room 604, building 5, No. 998, Wenyi West Road, Wuchang Street, Yuhang District, Hangzhou City, Zhejiang Province Patentee after: ZHEJIANG HUAYUN OCEAN ENGINEERING TECHNOLOGY SERVICE Co.,Ltd. Patentee after: Zhu Ronghua Patentee after: Zhoushan Huayun Marine Technology Co.,Ltd. Address before: 311100 room 4, building 20, No. 213 Longtan Road, Hangzhou District, Yuhang, Zhejiang Patentee before: ZHEJIANG HUAYUN OCEAN ENGINEERING TECHNOLOGY SERVICE Co.,Ltd. Patentee before: Zhu Ronghua |