CN105155569A CN201510481801.9A CN201510481801A CN105155569A CN 105155569 A CN105155569 A CN 105155569A CN 201510481801 A CN201510481801 A CN 201510481801A CN 105155569 A CN105155569 A CN 105155569A
Authority
CN
China
Prior art keywords
pipe casing
wind turbine
offshore wind
turbine foundation
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510481801.9A
Other languages
English (en)
Other versions
CN105155569B (zh
Inventor
朱荣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HUAYUN OCEAN ENGINEERING TECHNOLOGY SERVICE Co.,Ltd.
Zhoushan Huayun Marine Technology Co.,Ltd.
Original Assignee
Zhejiang Rich Marine Engineering Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Rich Marine Engineering Technology Service Co Ltd filed Critical Zhejiang Rich Marine Engineering Technology Service Co Ltd
Priority to CN201510481801.9A priority Critical patent/CN105155569B/zh
Publication of CN105155569A publication Critical patent/CN105155569A/zh
Priority to US15/750,277 priority patent/US10253475B2/en
Priority to PCT/CN2016/090331 priority patent/WO2017020697A1/zh
Application granted granted Critical
Publication of CN105155569B publication Critical patent/CN105155569B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

本发明提供了一种后打桩海上风机基础的施工装置及施工方法,属于海上风机基础施工技术领域,该施工装置包括海上风机基础、桩套管以及套筒,桩套管用于安装钢桩,桩套管设置于海上风机基础的底部,套筒的下端与桩套管的上端可拆卸连接。本发明提供的后打桩海上风机基础的施工装置及施工方法,通过增加临时施工用的套筒,保证海上风机基础的调平及灌浆连接工作无需人员水下作业,完全采用干法作业,安全可靠;将传统的湿法灌浆改造成干法灌浆,施工人员在桩套管平台实时监控,施工精度易控制;并且,便于进行海上嵌岩施工。

Description

一种后打桩海上风机基础的施工装置及施工方法
技术领域
本发明涉及海上风机基础施工技术领域,具体而言,涉及一种后打桩海上风机基础的施工装置及施工方法。
背景技术
现目前海上风机基础的施工分为先打桩和后打桩两种施工方案。先打桩安装方案一般先将钢管桩打入海底,再将海上风机基础的桩腿插入钢桩,再进行灌浆连接作业;后打桩海上风机基础是一种传统的海上风机基础方案,其在海上风机基础的底端设计了插桩施工的若干桩套管,对于该类带桩套管的海上风机基础,传统施工方法为:先将海上风机基础置于海底,然后从桩套管中插入钢桩至设计深度,然后进行水下调平和灌浆。该方案中水下调平和水下灌浆需要水下机器人或者潜水员下水作业,难度较大;尤其中国的大多数海域淤泥较厚,海底浑浊,水下调平和水下灌浆难度更大。同时该传统施工方案对于海底岩石地质,水下嵌岩桩施工非常困难,必须要借助非常先进的设备。
发明内容
本发明提供了一种后打桩海上风机基础的施工装置,旨在改善上述问题,可以不需要水下调平和水下灌浆工作。
本发明是这样实现的:
一种后打桩海上风机基础的施工装置,包括海上风机基础、桩套管以及套筒,所述桩套管用于安装钢桩,所述桩套管设置于所述海上风机基础的底部,所述套筒的下端与所述桩套管的上端可拆卸连接。
进一步地,所述桩套管包括桩套管灌浆段竖管、桩套管内平台和桩套管上端套管,所述桩套管上端套管的下端与所述桩套管灌浆段竖管的上端通过所述桩套管内平台连接,所述桩套管上端套管的上端与所述套筒的下端可拆卸连接。通过设置桩套管内平台,便于进行干法灌浆连接工作。
进一步地,还包括用于对所述海上风机基础进行调平的调平装置,所述调平装置设置于所述桩套管内;
所述调平装置包括千斤顶和调平支撑板,所述调平支撑板设置于所述钢桩的顶端,所述千斤顶设置于所述调平支撑板与所述桩套管内平台之间。
通过设置调平装置,使施工人员能够很方便地进行干法调平作业,保证海上风机基础的调平无需人员水下作业,安全可靠。
进一步地,所述桩套管的上部与所述海上风机基础通过连接底板连接,所述桩套管的下部与所述海上风机基础通过连接横板连接,所述桩套管的外侧壁与所述海上风机基础通过连接竖板连接。
采用连接底板、连接横板以及连接竖板,使桩套管能够非常稳固地与所述海上风机基础固定连接。
进一步地,所述桩套管的下端与所述连接底板平齐或凸出于所述连接底板。桩套管的下端与连接底板平齐或凸出于连接底板,超出部分可置于海床或者插入海床砂土层,从而提升桩套管与套筒的密封性能。
进一步地,所述套筒的上端安装有临时平台,所述临时平台与所述海上风机基础连接。
临时平台既是海上风机基础的平台和套筒之间的人行通道,也是稳定套筒的支撑结构,且可以用作嵌岩或其他施工设备的安置平台。
本发明还提供了一种后打桩海上风机基础的施工方法,以改善上述问题。
该方法应用上述任一后打桩海上风机基础的施工装置,该方法包括:
吊装所述海上风机基础前,将所述套筒连接于所述桩套管上端;
将所述海上风机基础放置到海床面,使所述桩套管的底端钢管置于海底或者插入海床泥土;
将所述钢桩置于所述桩套管内部,套上打桩锤打桩,直至打入所述桩套管内到指定设计高程;
打桩工序完成后,抽出所述套筒和所述桩套管内的海水和泥沙;
对所述海上风机基础调平;
对所述桩套管与所述钢桩进行现场焊接连接、灌浆连接或者两者同时实施;
拆除套筒。
进一步地,还包括对所述海上风机基础进行调平的调平方法,该调平方法应用了调平装置,该调平装置包括千斤顶和调平支撑板,所述调平支撑板设置于所述钢桩的顶端,所述桩套管内设置有所述桩套管内平台,所述千斤顶设置于所述调平支撑板与所述桩套管内平台之间;
该调平方法包括:
施工人员从所述套筒下到所述桩套管内平台,施工人员将所述千斤顶放置在所述调平支撑板与所述桩套管内平台之间,通过所述千斤顶顶住所述调平支撑板,从而顶升所述钢桩,向下压所述海上风机基础,使得所述海上风机基础调平。
施工人员能够很方便地进行干法调平作业,保证海上风机基础的调平无需人员水下作业,安全可靠。
本发明的有益效果是:本发明通过上述设计得到的后打桩海上风机基础的施工装置,使用时,先将套筒吊装至海上风机基础的桩套管处,并将套筒和桩套管连接,将带有套筒的海上风机基础放置到海床面,使桩套管下端钢管置于海床上或者插入海床泥土,将钢桩置于桩套管内,套上打桩锤进行打桩,直至打入桩套管内到指定设计高程,抽出海水和泥沙,海上风机基础调平后,对桩套管与钢桩进行焊接连接、灌浆连接或者两者同时实施,再移除套筒,即完成施工。
本发明提供的后打桩海上风机基础的施工装置及施工方法,通过增加临时施工用的套筒,保证海上风机基础的调平及钢桩和海上风机基础连接工作无需人员水下作业,完全采用干法作业,安全可靠。将传统的湿法作业改造成干法作业,施工人员在桩套管平台实时监控,施工精度易控制。并且,可方便嵌岩施工干法作业。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。
图1是本发明第一实施例提供的后打桩海上风机基础的施工装置的结构示意图;
图2是本发明第一实施例提供的后打桩海上风机基础的施工装置拆除套筒后的结构示意图;
图3是本发明第一实施例提供的后打桩海上风机基础的施工装置在图2中A处的局部放大图;
图4是本发明第一实施例提供的后打桩海上风机基础的施工装置套筒与桩套管的连接结构示意图;
图5是本发明第一实施例提供的后打桩海上风机基础的施工装置在图4中B处的局部放大图。
图中标记分别为:
海上风机基础1;
桩套管2;连接底板21;连接竖板22;连接横板23;桩套管灌浆段竖管24;桩套管内平台25;桩套管上端套管26;
套筒3;临时平台31;
钢桩4;调平支撑板41;
千斤顶5;
送桩管6。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
第一实施例
请参阅图1和图2,本实施例提供的后打桩海上风机基础的施工装置,包括海上风机基础1、桩套管2以及套筒3,桩套管2用于安装钢桩4,桩套管2设置于海上风机基础1的底部,套筒3的下端与桩套管2的上端通过螺栓可拆卸连接。
本实施例中,海上风机基础1可以是海上风机导管架基础、海上风机水下三桩基础或多桩基础等。
另外,桩套管2为现有结构,是一种与海上风机基础1相连的用于插桩的结构。并且,桩套管2安装于海上风机基础1的位置为现有技术,通常是安装于海上风机基础1的底部。桩套管2的数量没有具体限定,可以为多个,本实施例中桩套管2为四个。
本实施例提供的后打桩海上风机基础的施工装置,使用时,先将套筒3吊装至海上风机基础1的桩套管2处,并将套筒3和桩套管2连接,将带有套筒3的海上风机基础1放置到海床面,使桩套管2下端钢管置于海床上或者插入海床泥土,将钢桩4置于桩套管2内,套上打桩锤进行打桩,直至打入桩套管2内到指定设计高程,抽出海水和泥沙,海上风机基础1调平后,对桩套管2与钢桩4进行焊接连接、灌浆连接或者两者同时实施,再移除套筒3,即可完成施工。
本实施例提供的后打桩海上风机基础的施工装置,通过增加临时施工用的套筒3,保证海上风机基础1的调平及钢桩4和海上风机基础1连接工作无需人员水下作业,完全采用干法作业,安全可靠。将传统的湿法作业改造成干法作业,施工人员在桩套管2的平台实时监控,施工精度易控制。并且,可方便嵌岩施工干法作业。该套筒3为临时工装,基础施工完成后可拆除并可反复使用。
在上述实施例提供的后打桩海上风机基础的施工装置的技术方案的基础上,进一步地:
请参阅图2和图3,桩套管2包括桩套管灌浆段竖管24、桩套管内平台25和桩套管上端套管26,桩套管上端套管26的下端与桩套管灌浆段竖管24的上端通过桩套管内平台25连接,桩套管上端套管26的上端与套筒3的下端可拆卸连接。通过设置桩套管内平台25,便于进行干法灌浆连接工作。
另外,桩套管2底端止水,主要有两种措施:a)桩套管2的内壁底端位置预安装橡胶止水圈,钢桩4打入后挤压橡胶止水圈形成止水密封;b)桩套管2底端钢管部分插入海底泥土止水。
本实施例中,桩套管2的内壁下端安装有橡胶止水圈。桩套管2的内壁下端位置预安装橡胶止水圈,钢桩4打入后挤压橡胶止水圈形成止水密封。
请参阅图3,桩套管2的上部与海上风机基础1通过连接底板21连接,桩套管2的下部与海上风机基础1通过连接横板23连接,桩套管2的外侧壁与海上风机基础1通过连接竖板22连接,桩套管2的下端与连接底板21平齐或凸出于连接底板21。
采用连接底板21、连接横板23以及连接竖板22,使桩套管2能够非常稳固地与海上风机基础1固定连接。桩套管2的下端与连接底板21平齐或凸出于连接底板21,超出部分可置于海床或者插入海床砂土层,从而提升桩套管2与套筒3的密封性能。
另外,请参阅图4和图5,该后打桩海上风机基础的施工装置还包括用于对海上风机基础1进行调平的调平装置,调平装置设置于桩套管2内。调平装置包括千斤顶5和调平支撑板41,调平支撑板41设置于钢桩4的顶端,千斤顶5设置于调平支撑板41与桩套管内平台25之间。
调平的基本思路是:千斤顶5置于桩套管内平台25上,通过顶升钢桩4向下压海上风机基础1调平。钢桩4顶端焊接调平支撑板41,千斤顶5底端放置在桩套管灌浆段竖管24与桩套管内平台25上,千斤顶5顶端支撑钢桩4调平支撑板41。调平后,可以将桩套管2和钢桩4先焊接连接,再灌浆。
通过设置调平装置,使施工人员能够很方便地进行干法调平作业,保证海上风机基础1的调平无需人员水下作业,安全可靠。
请参阅图1,本实施例中,套筒3的上端安装有临时平台31,临时平台31与海上风机基础1连接。临时平台31既是海上风机基础1的平台和套筒3之间的人行通道,也是稳定套筒3的支撑结构,且可以用作嵌岩或其他施工设备的安置平台。
另外,本实施例中,套筒3内根据实际使用需要,可安装爬梯,便于施工人员进出套筒3,以便进行施工。套筒3和海上风机基础1之间的连接根据实际需要,也可以增加水平连接和斜撑。
海上风机基础1安置于海底后,钢桩4插入桩套管2,并通过送桩管6将钢桩4打入到设计高程,并接近于桩套管2上端。
请参阅图1~图5,本实施例提供的后打桩海上风机基础的施工装置的优点为:
1)通过增加临时施工的套筒3,采用套筒3排水后干法作业,保证海上风机基础1的调平及灌浆连接工作无需人员水下作业,完全采用干法作业,安全可靠。
2)于传统的桩套管2的基础上,优化改造,设计了插入泥土止水的下端钢管和与套筒3连接的上端结构。
3)套筒3上端和海上风机基础1的平台的连接,增加了连接结构临时平台31,既是支撑结构,又是通道且可作为其他施工设备的安置平台。
4)将传统的湿法灌浆改造成干法灌浆,施工人员在桩套管内平台25实时监控,施工精度易控制。
5)钢桩4和桩套管2的连接,可以采用灌浆并可以增加焊接,充分保证了连接的强度和安全。
6)套筒3和桩套管2连接的止水结构,大大提高了密封止水性能。
7)该装置能够实现嵌岩施工干法作业。
第二实施例
请参阅图1~图5,本实施例提供了一种后打桩海上风机基础的施工方法,该方法应用第一实施例提供的后打桩海上风机基础的施工装置,该方法包括:
在吊装海上风机基础1前,将套筒3连接于桩套管2上端;
将海上风机基础1放置到海床面,使桩套管2的底端钢管置于海底或者插入海床泥土;
将钢桩4置于桩套管2内部,套上打桩锤打桩,直至打入桩套管2内到指定设计高程;
打桩工序完成后,抽出套筒3和桩套管2内的海水和泥沙;
对海上风机基础1调平;
对桩套管2与钢桩4进行现场焊接连接、灌浆连接或者两者同时实施;
拆除套筒3。
第三实施例
请参阅图1~图5,本实施例提供了一种后打桩海上风机基础的施工方法,该施工方法与第二实施例的区别在于:
本实施例提供的施工方法还包括对海上风机基础1进行调平的调平方法,该调平方法应用了调平装置,该调平装置包括千斤顶5和调平支撑板41,调平支撑板41设置于钢桩4的顶端,桩套管2内设置有桩套管内平台25,千斤顶5设置于调平支撑板41与桩套管内平台25之间。
该调平方法包括:
施工人员从套筒3下到桩套管内平台25,施工人员将千斤顶5放置在调平支撑板41与桩套管内平台25之间,通过千斤顶5顶住调平支撑板41,从而顶升钢桩4,向下压海上风机基础1,使得海上风机基础1调平。
施工人员能够很方便地进行干法调平作业,保证海上风机基础1的调平无需人员水下作业,安全可靠。
第四实施例
请参阅图1~图5,本实施例提供了一种后打桩海上风机基础的施工方法,该施工方法应用第一实施例所提供的后打桩海上风机基础的施工装置,该施工方法的具体步骤如下:
1)海上风机基础1加工完成后,将桩套管2底端的橡胶止水圈固定在桩套管2上;
2)海上吊装前将套筒3吊装至海上风机基础1的桩套管2处,并用螺栓联接;
3)套筒3上的临时平台31分别与海上风机基础1的平台固定连接;
4)将带有套筒3的海上风机基础1放置到海床面,使桩套管2底端钢管置于海底或者插入海床泥土;
5)将钢桩4置于桩套管2内部;
6)套上打桩锤开始打桩,钢桩4顶端接近海上风机基础1最上端时,可接上一段送桩管6,继续打入,直至打入桩套管2内到指定设计高程。打桩结束,如果由于设计偏差,钢桩4打到持力层,多余部分钢桩4无法达到设计高程,可进行截桩;
7)打桩工序完成后,抽出套筒3内和桩套管2的海水和泥沙;
8)施工人员从套筒3下到桩套管内平台25;
9)施工人员将千斤顶5放置在钢桩4顶端焊接的调平支撑板41与桩套管内平台25之间,对海上风机基础1进行调平工作;
10)调平完成后,根据需要,可以先将钢桩4桩端和桩套管2焊接固定,然后对桩套管2与钢桩4进行灌浆连接;
11)海上风机基础1安装完成后,施工人员拆除套筒3与桩套管2之间的螺栓,施工人员爬上套筒3;
12)移除套筒3。
13)根据实际情况和设计要求,如果需要嵌岩,进行嵌岩操作。
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。
在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。
在本发明中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (8)

1.一种后打桩海上风机基础的施工装置,其特征在于,包括海上风机基础、桩套管以及套筒,所述桩套管用于安装钢桩,所述桩套管设置于所述海上风机基础的底部,所述套筒的下端与所述桩套管的上端可拆卸连接。
2.根据权利要求1所述的后打桩海上风机基础的施工装置,其特征在于,所述桩套管包括桩套管灌浆段竖管、桩套管内平台和桩套管上端套管,所述桩套管上端套管的下端与所述桩套管灌浆段竖管的上端通过所述桩套管内平台连接,所述桩套管上端套管的上端与所述套筒的下端可拆卸连接。
3.根据权利要求2所述的后打桩海上风机基础的施工装置,其特征在于,还包括用于对所述海上风机基础进行调平的调平装置,所述调平装置设置于所述桩套管内;
所述调平装置包括千斤顶和调平支撑板,所述调平支撑板设置于所述钢桩的顶端,所述千斤顶设置于所述调平支撑板与所述桩套管内平台之间。
4.根据权利要求1所述的后打桩海上风机基础的施工装置,其特征在于,所述桩套管的上部与所述海上风机基础通过连接底板连接,所述桩套管的下部与所述海上风机基础通过连接横板连接,所述桩套管的外侧壁与所述海上风机基础通过连接竖板连接。
5.根据权利要求4所述的后打桩海上风机基础的施工装置,其特征在于,所述桩套管的下端与所述连接底板平齐或凸出于所述连接底板。
6.根据权利要求1所述的后打桩海上风机基础的施工装置,其特征在于,所述套筒的上端安装有临时平台,所述临时平台与所述海上风机基础连接。
7.一种后打桩海上风机基础的施工方法,其特征在于,该方法应用如权利要求1-6任一项所述的后打桩海上风机基础的施工装置,该方法包括:
吊装所述海上风机基础前,将所述套筒连接于所述桩套管上端;
将所述海上风机基础放置到海床面,使所述桩套管的底端钢管置于海底或者插入海床泥土;
将所述钢桩置于所述桩套管内部,套上打桩锤打桩,直至打入所述桩套管内到指定设计高程;
打桩工序完成后,抽出所述套筒和所述桩套管内的海水和泥沙;
对所述海上风机基础调平;
对所述桩套管与所述钢桩进行现场焊接连接、灌浆连接或者两者同时实施;
拆除套筒。
8.根据权利要求7所述的后打桩海上风机基础的施工方法,其特征在于,还包括对所述海上风机基础进行调平的调平方法,该调平方法应用了调平装置,该调平装置包括千斤顶和调平支撑板,所述调平支撑板设置于所述钢桩的顶端,所述桩套管内设置有所述桩套管内平台,所述千斤顶设置于所述调平支撑板与所述桩套管内平台之间;
该调平方法包括:
施工人员从所述套筒下到所述桩套管内平台,施工人员将所述千斤顶放置在所述调平支撑板与所述桩套管内平台之间,通过所述千斤顶顶住所述调平支撑板,从而顶升所述钢桩,向下压所述海上风机基础,使得所述海上风机基础调平。
CN201510481801.9A 2015-08-03 2015-08-03 一种后打桩海上风机基础的施工装置及施工方法 Active CN105155569B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201510481801.9A CN105155569B (zh) 2015-08-03 2015-08-03 一种后打桩海上风机基础的施工装置及施工方法
US15/750,277 US10253475B2 (en) 2015-08-03 2016-07-18 Construction device and method for offshore wind turbine foundation with piling performed later
PCT/CN2016/090331 WO2017020697A1 (zh) 2015-08-03 2016-07-18 一种后打桩海上风机基础的施工装置及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510481801.9A CN105155569B (zh) 2015-08-03 2015-08-03 一种后打桩海上风机基础的施工装置及施工方法

Publications (2)

Publication Number Publication Date
CN105155569A true CN105155569A (zh) 2015-12-16
CN105155569B CN105155569B (zh) 2017-05-31

Family

ID=54796587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510481801.9A Active CN105155569B (zh) 2015-08-03 2015-08-03 一种后打桩海上风机基础的施工装置及施工方法

Country Status (3)

Country Link
US (1) US10253475B2 (zh)
CN (1) CN105155569B (zh)
WO (1) WO2017020697A1 (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971000A (zh) * 2016-06-16 2016-09-28 江苏海上龙源风力发电有限公司 一种海上风机嵌岩单桩基础临时施工平台
WO2017020697A1 (zh) * 2015-08-03 2017-02-09 广东明阳风电产业集团有限公司 一种后打桩海上风机基础的施工装置及施工方法
CN106759312A (zh) * 2017-03-08 2017-05-31 中交第三航务工程局有限公司宁波分公司 钢套筒的安装方法
CN107859051A (zh) * 2017-10-26 2018-03-30 中交第三航务工程局有限公司宁波分公司 调平装置及导管架的调平方法
CN107938699A (zh) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 一种升压站基础的施工方法
CN110004961A (zh) * 2019-05-17 2019-07-12 中交一航局第二工程有限公司 套箱施工系统及其施工方法
CN110241823A (zh) * 2019-05-10 2019-09-17 江苏华西村海洋工程服务有限公司 一种海上桩基施工的调平工艺
CN111373101A (zh) * 2017-12-07 2020-07-03 Ihc荷兰Ie有限公司 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件
CN111472382A (zh) * 2020-04-28 2020-07-31 中山大学 一种带抗拔钢管桩的吸力桶基础及其安装方法
CN111648396A (zh) * 2019-06-28 2020-09-11 熊翱 一种带施工吸力筒的导管架及其施工方法
CN112081133A (zh) * 2020-08-06 2020-12-15 中国科学院力学研究所 一种海上风机的基座固定结构及基础安装方法

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11286684B2 (en) * 2018-06-26 2022-03-29 Sa-Ra Enerjiinsaat Ticaret Ve Sanayi Anonim Sirketi Connection apparatus for mounting a guyed mast
DK3887602T3 (en) * 2018-11-28 2023-01-30 Imenco Corrosion Tech As A device for securing a connection to be formed between a leg of a marine structure and a pile of a fundament fastened in a seabed
CN109518711B (zh) * 2018-12-24 2025-03-11 熊翱 一种导管腿柱分叉的导管架基础及其施工方法
CN110206056A (zh) * 2019-05-14 2019-09-06 中交第一航务工程局有限公司 一种用于海上风电的中心桩加负压筒复合基础及操作方法
CN109989403B (zh) * 2019-05-20 2024-09-20 华电重工股份有限公司 一种沉桩定位工装
EP3754116B1 (en) 2019-06-21 2024-04-10 Saipem S.p.A. System and method for levelling and gripping a jacket leg into a hollow foundation pile
CN110468818A (zh) * 2019-07-19 2019-11-19 中国能源建设集团广东火电工程有限公司 一种海上风电机组定位支撑导向架
CN111119223B (zh) * 2020-01-13 2024-09-24 天津大学 椭圆形多筒导管架基础结构
NL2025306B1 (en) * 2020-04-08 2021-10-25 Heerema Marine Contractors Nl Devices and methods for installing piles into the ground or seabed
CN111365196A (zh) * 2020-04-16 2020-07-03 常熟风范电力设备股份有限公司 一种可调式风电基座
CN111995339A (zh) * 2020-07-16 2020-11-27 天津大学前沿技术研究院有限公司 一种海洋平台抗冲刷的固化土及其制备方法
JP2024517828A (ja) 2021-05-06 2024-04-23 フリーデ・アンド・ゴールドマン・リミテッド・ライアビリティ・カンパニー・ディ/ビー/エイ・フリーデ・アンド・ゴールドマン・リミテッド 洋上自昇式船舶とともに使用することに適合した輸送船舶用のラック構造体のためのシステムおよび方法
CN113373967A (zh) * 2021-06-10 2021-09-10 天津港航工程有限公司 一种基于门架式多桩风机基础的风机安装施工方法
CN114016539A (zh) * 2021-12-01 2022-02-08 珠海巨涛海洋石油服务有限公司 一种深水风电用上部导管架及建造工艺
CN115012396A (zh) * 2022-06-20 2022-09-06 中交第三航务工程局有限公司宁波分公司 一种密排桩沉桩施工工艺
CN115125989B (zh) * 2022-08-15 2023-08-08 湖南恒岳重钢钢结构工程有限公司 一种海上风力发电机组的导管架调平装置
CN115874577A (zh) * 2022-12-02 2023-03-31 中国电建集团福建省电力勘测设计院有限公司 一种海上风电phc高桩承台风机基础靠泊构件及其施工方法
CN118793053A (zh) * 2023-04-14 2024-10-18 上海佳豪船海工程研究设计有限公司 一种打桩导向架及其施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4422806A (en) * 1981-02-17 1983-12-27 Chevron Research Company Sliding tension leg tower
AU680244B2 (en) * 1993-06-11 1997-07-24 Kvaerner H&G Offshore Ltd Foundation and method of installation
CN201649118U (zh) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 导管架式海上风电机组基础结构
CN102587405A (zh) * 2012-02-27 2012-07-18 广东明阳风电产业集团有限公司 海上风机导管架基础安装方法及分离式导管架装置
CN202730790U (zh) * 2012-08-13 2013-02-13 天津市海王星海上工程技术有限公司 外挂裙桩式筒柱结构
CN202767094U (zh) * 2012-10-09 2013-03-06 国电联合动力技术有限公司 一种海上风机裙桩基础
CN204825955U (zh) * 2015-08-03 2015-12-02 浙江华蕴海洋工程技术服务有限公司 一种后打桩海上风机基础的施工装置

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1718006A (en) * 1928-08-15 1929-06-18 Jesse W Reno Landing platform for airplanes
US2997852A (en) * 1954-12-30 1961-08-29 De Long Corp Apparatus and method for reecting a supporting structure over a body of water
US3029608A (en) * 1956-12-28 1962-04-17 Beulah Perkins Platform for off shore drilling and supporting columns therefor
US3326006A (en) * 1964-05-01 1967-06-20 Tecon Corp Pile shells and couplings
US3457728A (en) * 1968-03-26 1969-07-29 Texaco Inc Replaceable pile sleeve insert
US3646947A (en) * 1969-04-04 1972-03-07 Brown & Root Jacket pile cleanout apparatus
US3922869A (en) * 1972-06-30 1975-12-02 Orb Inc Pumped evacuated tube water hammer pile driver method
US3851483A (en) * 1972-12-12 1974-12-03 M Holley Sleeved-pile structure
US3991581A (en) * 1975-06-02 1976-11-16 Brown & Root, Inc. Method and apparatus for handling piling and anchoring an offshore tower
US4212562A (en) * 1978-07-31 1980-07-15 Lynes, Inc. Method and apparatus for leveling templates for offshore subterranean wells
US4405115A (en) * 1981-02-20 1983-09-20 Varco International, Inc. Gripping jack system
US4589802A (en) * 1981-08-11 1986-05-20 Sedco, Inc. Slip assembly for subsea template
FR2536826B1 (fr) * 1982-11-26 1986-06-20 Spie Offshore Procede d'ancrage de conduite immergee, dispositif pour sa mise en oeuvre et ancrage ainsi realise
IT1172825B (it) * 1983-04-18 1987-06-18 Tecnomare Spa Dima sottomarina per la perforazione di pozzi per lo sfruttamento di giacimenti di idrocarburi in mare
US4740110A (en) * 1987-04-06 1988-04-26 Shell Offshore Inc. Platform grouting system and method
GB2238816B (en) * 1989-12-06 1993-05-12 Marathon Oil Co Offshore jacket having increased buoyancy
US6494644B1 (en) * 1991-01-02 2002-12-17 Foundation Systems Of Louisiana, Inc. Pile connector and method of installation
CA2084792C (en) * 1991-05-10 1996-11-19 Osamu Kiyomiya Water area structure using placing member for underwater ground
US5755533A (en) * 1994-12-16 1998-05-26 Shell Oil Company Tendon foundation guide cone assembly and method
US6299385B1 (en) * 1999-08-04 2001-10-09 Paragon Engineering Services Incorporated Mini-jacket and method for installation using caisson
US7044686B2 (en) * 2002-07-22 2006-05-16 Donald May Apparatus and method for supporting a structure with a pier
US7416367B2 (en) * 2005-05-13 2008-08-26 St Onge Gene Lateral force resistance device
GB0520891D0 (en) * 2005-10-14 2005-11-23 Tidal Generation Ltd Foundation structure for water current energy system
EP2402511B1 (en) * 2010-07-02 2016-03-02 IHC Holland IE B.V. Template for and method of installing a plurality of foundation elements in an underwater ground formation
US20120107055A1 (en) * 2010-08-20 2012-05-03 Hilgefort Gmbh Anlagenkomponenten Und Apparatebau Base structure for off-shore wind turbines and method for building thereof
BE1019832A4 (nl) * 2011-02-22 2013-01-08 Geosea N V Inrichting voor het vervaardigen van een fundering voor een zich op hoogte bevindende massa, bijbehorende werkwijze en samenstel van de inrichting en een opvijzelbaar platform.
BE1019834A4 (nl) * 2011-02-22 2013-01-08 Geosea N V Inrichting voor het vervaardigen van een fundering voor een zich op hoogte bevindende massa, bijbehorende werkwijze en samenstel van de inrichting en een opvijzelbaar platform.
US9181674B2 (en) * 2011-06-27 2015-11-10 Hubbell Incorporated Seismic restraint helical pile systems and method and apparatus for forming same
EP2623675A1 (de) * 2012-02-03 2013-08-07 Nordic Yards Holding GmbH Plattform-Oberteil (Topside) für eine Offshore-Plattform und Verfahren zum Installieren eines derartigen Plattform-Oberteils
NL2008279C2 (en) * 2012-02-13 2013-08-14 Ihc Holland Ie Bv A template for and method of installing a plurality of foundation elements in an underwater ground formation.
EP2834423B1 (en) * 2012-03-29 2019-10-23 W3g Piling Noise Mitigation Ltd. Offshore structures and associated apparatus and methods
FR2989097B1 (fr) * 2012-04-05 2016-10-14 Dcns Fondation d'eolienne off-shore, eolienne off-shore correspondante, et leur procede de mise en place
US9725868B2 (en) * 2014-05-23 2017-08-08 Keystone Engineering Inc. Offshore support structure
CN105155569B (zh) * 2015-08-03 2017-05-31 浙江华蕴海洋工程技术服务有限公司 一种后打桩海上风机基础的施工装置及施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4422806A (en) * 1981-02-17 1983-12-27 Chevron Research Company Sliding tension leg tower
AU680244B2 (en) * 1993-06-11 1997-07-24 Kvaerner H&G Offshore Ltd Foundation and method of installation
CN201649118U (zh) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 导管架式海上风电机组基础结构
CN102587405A (zh) * 2012-02-27 2012-07-18 广东明阳风电产业集团有限公司 海上风机导管架基础安装方法及分离式导管架装置
CN202730790U (zh) * 2012-08-13 2013-02-13 天津市海王星海上工程技术有限公司 外挂裙桩式筒柱结构
CN202767094U (zh) * 2012-10-09 2013-03-06 国电联合动力技术有限公司 一种海上风机裙桩基础
CN204825955U (zh) * 2015-08-03 2015-12-02 浙江华蕴海洋工程技术服务有限公司 一种后打桩海上风机基础的施工装置

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017020697A1 (zh) * 2015-08-03 2017-02-09 广东明阳风电产业集团有限公司 一种后打桩海上风机基础的施工装置及施工方法
US10253475B2 (en) 2015-08-03 2019-04-09 Ming Yang Smart Energy Group., Ltd. Construction device and method for offshore wind turbine foundation with piling performed later
CN105971000A (zh) * 2016-06-16 2016-09-28 江苏海上龙源风力发电有限公司 一种海上风机嵌岩单桩基础临时施工平台
CN106759312A (zh) * 2017-03-08 2017-05-31 中交第三航务工程局有限公司宁波分公司 钢套筒的安装方法
CN106759312B (zh) * 2017-03-08 2019-04-02 中交第三航务工程局有限公司宁波分公司 钢套筒的安装方法
CN107859051A (zh) * 2017-10-26 2018-03-30 中交第三航务工程局有限公司宁波分公司 调平装置及导管架的调平方法
CN107938699A (zh) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 一种升压站基础的施工方法
CN111373101A (zh) * 2017-12-07 2020-07-03 Ihc荷兰Ie有限公司 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件
CN111373101B (zh) * 2017-12-07 2023-08-29 机械设备控股有限公司 联接系统、联接系统和船的组件、以及联接系统、护套桩和基础桩的组件
CN110241823A (zh) * 2019-05-10 2019-09-17 江苏华西村海洋工程服务有限公司 一种海上桩基施工的调平工艺
CN110004961A (zh) * 2019-05-17 2019-07-12 中交一航局第二工程有限公司 套箱施工系统及其施工方法
CN110004961B (zh) * 2019-05-17 2024-05-10 中交一航局第二工程有限公司 套箱施工系统及其施工方法
CN111648396A (zh) * 2019-06-28 2020-09-11 熊翱 一种带施工吸力筒的导管架及其施工方法
CN111472382A (zh) * 2020-04-28 2020-07-31 中山大学 一种带抗拔钢管桩的吸力桶基础及其安装方法
CN112081133A (zh) * 2020-08-06 2020-12-15 中国科学院力学研究所 一种海上风机的基座固定结构及基础安装方法
CN112081133B (zh) * 2020-08-06 2021-06-25 中国科学院力学研究所 一种海上风机的基座固定结构及基础安装方法

Also Published As

Publication number Publication date
WO2017020697A1 (zh) 2017-02-09
CN105155569B (zh) 2017-05-31
US10253475B2 (en) 2019-04-09
US20180223497A1 (en) 2018-08-09

Similar Documents

Publication Publication Date Title
CN105155569A (zh) 一种后打桩海上风机基础的施工装置及施工方法
CN101215834A (zh) 支腿式地下连续墙施工工法
CN106013052A (zh) 钢板桩与沉井组合式地下停车库及其施工方法
CN101864765A (zh) 基于双向搅拌的smw施工工法及三轴搅拌设备
CN105780779A (zh) 外设压密注浆的拉森钢板桩复合支护结构及其使用方法
CN102134853A (zh) Ct式锁口钢管桩基坑止水支护装置及工法
CN103015429A (zh) 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法
CN110359476A (zh) 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法
CN106609509A (zh) 自平衡基坑围护结构及其施工方法
CN204825955U (zh) 一种后打桩海上风机基础的施工装置
CN112878375A (zh) 一种适用于硬质地层的水下隧道内垂直顶升实施工法及结构
CN208545763U (zh) 一种用于桥梁深水基础的钢管桩围堰
CN102839691A (zh) 无砂水泥管深井降水井口快速封堵方法及其装置
CN107964971B (zh) 一种采用pba工法施工的地铁车站的降水方法
CN205000332U (zh) 一种后打桩海上风机基础施工装置与桩套管连接结构
CN102888847A (zh) 电梯井局部深基坑免降水施工方法
CN108797653A (zh) 一种利用深基坑围护桩进行结构抗浮的施工方法
CN113638448B (zh) 工井及其施工方法以及地下管道工井装置及其施工方法
CN106120811A (zh) 一种基坑周边预防变形和纠偏施工方法
CN104074234B (zh) 电厂循环水系统的内河水取水口结构及其施工方法
CN212641468U (zh) 坑中坑快速施工结构
CN108729457A (zh) 一种用于桥梁深水基础的钢管桩围堰及其施工方法
CN214363441U (zh) 岩溶地区人工挖孔桩
CN206591535U (zh) 组合式围堰
CN116517600A (zh) 一种隧道分期施工的临时封堵结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: Room 604, building 5, No. 998, Wenyi West Road, Wuchang Street, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: ZHEJIANG HUAYUN OCEAN ENGINEERING TECHNOLOGY SERVICE Co.,Ltd.

Patentee after: Zhu Ronghua

Patentee after: Zhoushan Huayun Marine Technology Co.,Ltd.

Address before: 311100 room 4, building 20, No. 213 Longtan Road, Hangzhou District, Yuhang, Zhejiang

Patentee before: ZHEJIANG HUAYUN OCEAN ENGINEERING TECHNOLOGY SERVICE Co.,Ltd.

Patentee before: Zhu Ronghua