CN110206056A - 一种用于海上风电的中心桩加负压筒复合基础及操作方法 - Google Patents
一种用于海上风电的中心桩加负压筒复合基础及操作方法 Download PDFInfo
- Publication number
- CN110206056A CN110206056A CN201910401802.6A CN201910401802A CN110206056A CN 110206056 A CN110206056 A CN 110206056A CN 201910401802 A CN201910401802 A CN 201910401802A CN 110206056 A CN110206056 A CN 110206056A
- Authority
- CN
- China
- Prior art keywords
- central
- negative pressure
- cylinder
- pile
- pressure cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Wind Motors (AREA)
Abstract
本发明公开了一种用于海上风电的中心桩加负压筒复合基础及操作方法,如图1所示,具有如下改进及优点;包括中心桩、负压筒、中心筒、连接机构、灌浆料;其中,负压筒为多个,每个负压筒通过连接机构和中心筒形成一个组合体;中心桩通过中心筒打入土中;中心桩与中心筒通过灌浆料连接形成整体。对于本发明所述的中心桩加负压筒复合基础来讲;可以在海上风电较大水深应用;具有如下改进及优点:(1)多个负压筒通过连接机构和中心筒形成一个组合体;(2)中心桩通过中心筒打入土中;(3)中心桩与中心筒通过灌浆料连接形成整体;那么通过实施可知,不仅能适应更大水深,而且还具有投资成本低、施工速度快等优点。
Description
技术领域
本发明涉及风电施工领域,具体来讲是一种用于海上风电的中心桩加负压筒复合基础及操作方法。
背景技术
近年来,随着海上风电不断发展,新技术、新工艺、新材料的开发应用,具有资源丰富、发电利用小时数高、不占用土地、不消耗水资源和适宜大规模开发等特点的海上风电正处在快速发展阶段。由于海上风电要面临投资建设成本高、施工困难、周期长等问题。
单桩基础因为制造质工序少,海上施工快捷等优点得到大量推广应用。但是经过分析发现,随着水深的增加,单桩基础出现水平位移大、足够能力的打桩锤欠缺、基础成本高等问题;故本发明就是在此情况下作出改进,在此提供一种用于海上风电的中心桩加负压筒复合基础,使得具有适应更大水深,承载力强,投资成本低、施工速度快等优点。
发明内容
因此,为了解决上述不足,本发明在此提供一种用于海上风电的中心桩加负压筒复合基础及操作方法;可以在海上风电较大水深应用;同时将多个负压筒通过连接机构和中心筒形成一个组合体,中心桩通过中心筒打入土中,中心桩与中心筒通过灌浆料连接形成整体;那么通过实施可知,不仅能适应更大水深,而且还具有投资成本低、施工速度快等优点。
本发明是这样实现的,构造一种用于海上风电的中心桩加负压筒复合基础,其特征在于:包括中心桩、负压筒、中心筒、连接机构、灌浆料;其中,负压筒为多个,每个负压筒通过连接机构和中心筒形成一个组合体;中心桩通过中心筒打入土中;中心桩与中心筒通过灌浆料连接形成整体。
优化的,中心筒的顶部具有扩开口,便于对中心桩和中心筒中间的环形空间进行灌浆。
优化的,连接机构形成三角状,其的外端与负压筒的顶部连接,连接机构的内侧上、下端分别与中心筒的外侧连接。
本发明具有如下优点:本发明通过改进在此提供一种用于海上风电的中心桩加负压筒复合基础,如图1所示,具有如下改进及优点;包括中心桩、负压筒、中心筒、连接机构、灌浆料;其中,负压筒为多个,每个负压筒通过连接机构和中心筒形成一个组合体;中心桩通过中心筒打入土中;中心桩与中心筒通过灌浆料连接形成整体。对于本发明所述的中心桩加负压筒复合基础来讲;可以在海上风电较大水深应用;具有如下改进及优点:(1)多个负压筒通过连接机构和中心筒形成一个组合体;(2)中心桩通过中心筒打入土中;(3)中心桩与中心筒通过灌浆料连接形成整体;那么通过实施可知,不仅能适应更大水深,而且还具有投资成本低、施工速度快等优点。
另外,在本专利中,中心筒的顶部具有扩开口,便于对中心桩和中心筒中间的环形空间进行灌浆。
另外,在本专利中,连接机构4形成三角状,三角状的连接机构4整体较为牢固。
附图说明
图1是本发明所述的中心桩加负压筒复合基础的整体示意图。
其中:中心桩1,中心筒3,负压筒2,连接机构4,灌浆料5,扩开口6。
具体实施方式
下面将结合附图1对本发明进行详细说明,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明通过改进在此提供一种用于海上风电的中心桩加负压筒复合基础,如图1所示,可以按照如下方式予以实施;包括中心桩1、负压筒2、中心筒3、连接机构4、灌浆料5;其中,负压筒2为多个,每个负压筒2通过连接机构4和中心筒3形成一个组合体;中心桩1通过中心筒3打入土中;中心桩1与中心筒3通过灌浆料5连接形成整体。
对于本发明所述的中心桩加负压筒复合基础来讲;可以在海上风电较大水深应用;具有如下改进及优点:(1)多个负压筒通过连接机构和中心筒形成一个组合体;(2)中心桩通过中心筒打入土中;(3)中心桩与中心筒通过灌浆料连接形成整体;那么通过实施可知,不仅能适应更大水深,而且还具有投资成本低、施工速度快等优点。
在本专利所述一种用于海上风电的中心桩加负压筒复合基础中,中心筒3的顶部具有扩开口6,便于对中心桩和中心筒中间的环形空间进行灌浆。
在本专利所述一种用于海上风电的中心桩加负压筒复合基础中,连接机构4形成三角状,三角状的连接机构4整体较为牢固,其的外端与负压筒2的顶部连接,连接机构4的内侧上、下端分别与中心筒3的外侧连接。
本发明属于一种用于海上风电的中心桩加负压筒复合基础;可以在较大水深中应用;具有适应水深大,施工速度快,建设成本低等优点。
用于海上风电的中心桩加负压筒复合基础装置的操作步骤如下:
步骤A、将负压筒、中心筒、连接机构在陆地制造成一个组合体;
步骤B、用吊机将组合体吊入海底进行安装和调平;
步骤C、下放中心桩,穿过中心筒内,然后使用打桩锤将中心桩打入到设计标高;
步骤D、对中心桩和中心筒中间的环形空间进行灌浆固结。
综上可知,本发明在此提供一种用于海上风电的中心桩加负压筒复合基础;包括中心桩、负压筒、中心筒、连接机构、灌浆料;其中,多个负压筒通过连接机构和中心筒形成一个组合体;中心桩通过中心筒打入土中;中心桩与中心筒通过灌浆料连接形成整体。具有适应水深大,施工速度快,建设成本低等优点。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (4)
1.一种用于海上风电的中心桩加负压筒复合基础,其特征在于:包括中心桩(1)、负压筒(2)、中心筒(3)、连接机构(4)、灌浆料(5);其中,负压筒(2)为多个,每个负压筒(2)通过连接机构(4)和中心筒(3)形成一个组合体;中心桩(1)通过中心筒(3)打入土中;中心桩(1)与中心筒(3)通过灌浆料(5)连接形成整体。
2.根据权利要求1所述一种用于海上风电的中心桩加负压筒复合基础,其特征在于:中心筒(3)的顶部具有扩开口(6)。
3.根据权利要求1或2所述一种用于海上风电的中心桩加负压筒复合基础,其特征在于:连接机构(4)形成三角状,其的外端与负压筒(2)的顶部连接,连接机构(4)的内侧上、下端分别与中心筒(3)的外侧连接。
4.一种用于海上风电的中心桩加负压筒复合基础的操作方法,其特征在于:如下:
步骤A、将负压筒、中心筒、连接机构在陆地制造成一个组合体;
步骤B、用吊机将组合体吊入海底进行安装和调平;
步骤C、下放中心桩,穿过中心筒内,然后使用打桩锤将中心桩打入到设计标高;
步骤D、对中心桩和中心筒中间的环形空间进行灌浆固结。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910401802.6A CN110206056A (zh) | 2019-05-14 | 2019-05-14 | 一种用于海上风电的中心桩加负压筒复合基础及操作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910401802.6A CN110206056A (zh) | 2019-05-14 | 2019-05-14 | 一种用于海上风电的中心桩加负压筒复合基础及操作方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110206056A true CN110206056A (zh) | 2019-09-06 |
Family
ID=67787249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910401802.6A Pending CN110206056A (zh) | 2019-05-14 | 2019-05-14 | 一种用于海上风电的中心桩加负压筒复合基础及操作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110206056A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288184A (zh) * | 2022-09-01 | 2022-11-04 | 中国长江三峡集团有限公司 | 浅覆盖层的海上风电单桩复合基础施工方法及其复合基础 |
CN115652984A (zh) * | 2022-11-15 | 2023-01-31 | 三峡新能源阳江发电有限公司 | 一种海上风电筒形基础及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202390846U (zh) * | 2011-11-28 | 2012-08-22 | 江苏海上龙源风力发电有限公司 | 一种风力发电机组的单桩基础 |
CN202689022U (zh) * | 2012-06-25 | 2013-01-23 | 中国水电顾问集团华东勘测设计研究院 | 一种具有负压筒的海上风电桁架单桩基础结构 |
CN207331725U (zh) * | 2017-04-19 | 2018-05-08 | 合肥学院 | 一种海上风电工程钢桩基础 |
US20180223497A1 (en) * | 2015-08-03 | 2018-08-09 | Ming Yang Smart Energy Group, Ltd. | Construction device and method for offshore wind turbine foundation with piling performed later |
US20180340312A1 (en) * | 2017-05-25 | 2018-11-29 | Powerchina Huadong Engineering Corporation Limited | Offshore non-driven-in large-diameter monopile foundation structure and constryction method |
CN210140845U (zh) * | 2019-05-14 | 2020-03-13 | 中交第一航务工程局有限公司 | 一种用于海上风电的中心桩加负压筒复合基础 |
-
2019
- 2019-05-14 CN CN201910401802.6A patent/CN110206056A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202390846U (zh) * | 2011-11-28 | 2012-08-22 | 江苏海上龙源风力发电有限公司 | 一种风力发电机组的单桩基础 |
CN202689022U (zh) * | 2012-06-25 | 2013-01-23 | 中国水电顾问集团华东勘测设计研究院 | 一种具有负压筒的海上风电桁架单桩基础结构 |
US20180223497A1 (en) * | 2015-08-03 | 2018-08-09 | Ming Yang Smart Energy Group, Ltd. | Construction device and method for offshore wind turbine foundation with piling performed later |
CN207331725U (zh) * | 2017-04-19 | 2018-05-08 | 合肥学院 | 一种海上风电工程钢桩基础 |
US20180340312A1 (en) * | 2017-05-25 | 2018-11-29 | Powerchina Huadong Engineering Corporation Limited | Offshore non-driven-in large-diameter monopile foundation structure and constryction method |
CN210140845U (zh) * | 2019-05-14 | 2020-03-13 | 中交第一航务工程局有限公司 | 一种用于海上风电的中心桩加负压筒复合基础 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288184A (zh) * | 2022-09-01 | 2022-11-04 | 中国长江三峡集团有限公司 | 浅覆盖层的海上风电单桩复合基础施工方法及其复合基础 |
CN115652984A (zh) * | 2022-11-15 | 2023-01-31 | 三峡新能源阳江发电有限公司 | 一种海上风电筒形基础及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110984214B (zh) | 海上风电单桩-翼板-堆石体复合基础及其施工方法 | |
CN103225315B (zh) | 一种由单桩、筒形基础和锚索组成的海上风电基础 | |
CN101545462B (zh) | 一种钢-混凝土组合重力式海上风电机组基础结构 | |
CN211646450U (zh) | 海上风电单桩-翼板-堆石体复合基础 | |
CN202689022U (zh) | 一种具有负压筒的海上风电桁架单桩基础结构 | |
CN202039382U (zh) | 加肋式海底吸力锚 | |
CN105862907B (zh) | 环形组合式超大直径海上风电单桩基础及其施工工艺 | |
CN110439018B (zh) | 一种插入式钢圆筒风电基础 | |
CA3177328C (en) | Novel offshore wind power foundation suitable for shallow overburden layer and construction method thereof | |
CN105862905A (zh) | 一种海上风电嵌岩单桩基础及其施工方法 | |
CN102704505A (zh) | 一种陆上风电机组地基基础 | |
CN106930313A (zh) | 一种近海风电工程桩桶组合基础及其施工方法 | |
CN110206056A (zh) | 一种用于海上风电的中心桩加负压筒复合基础及操作方法 | |
CN212336069U (zh) | 深海风力发电导管架式单桩复合结构 | |
CN211873069U (zh) | 组合结构海上风机翼板单桩基础 | |
CN201581410U (zh) | 海底裙式吸力锚 | |
CN110847219A (zh) | 由单桩和吸力筒组成的海上升压站组合基础 | |
CN210140845U (zh) | 一种用于海上风电的中心桩加负压筒复合基础 | |
CN105239593A (zh) | 组装式预应力锚索风机基础系统及其施工方法 | |
CN211523266U (zh) | 由单桩和吸力筒组成的海上升压站组合基础 | |
CN202247927U (zh) | 咬合桩圆桶型基础 | |
CN208235569U (zh) | 一种用于海上风电大功率机组的基础结构 | |
CN205776312U (zh) | 环形组合式超大直径海上风电单桩基础 | |
CN109024658A (zh) | 一种装配重力式海上风电基础 | |
CN108560577A (zh) | 海洋风电桩桶复合基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |