CN115094691A - Positioning frame for pre-buried sleeve of track bolt - Google Patents
Positioning frame for pre-buried sleeve of track bolt Download PDFInfo
- Publication number
- CN115094691A CN115094691A CN202210708120.1A CN202210708120A CN115094691A CN 115094691 A CN115094691 A CN 115094691A CN 202210708120 A CN202210708120 A CN 202210708120A CN 115094691 A CN115094691 A CN 115094691A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- square pipe
- full
- mounting
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims description 117
- 230000006835 compression Effects 0.000 claims description 7
- 238000007906 compression Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000005096 rolling process Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 19
- 238000000151 deposition Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 16
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000010586 diagram Methods 0.000 description 9
- 230000002787 reinforcement Effects 0.000 description 3
- 125000006850 spacer group Chemical group 0.000 description 3
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/24—Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means
- E01B29/28—Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means the fastening means being of screw-and-nut type; Apparatus therefor, adapted to additionally drilling holes
- E01B29/29—Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means the fastening means being of screw-and-nut type; Apparatus therefor, adapted to additionally drilling holes for horizontally-arranged fastening elements, e.g. fish-bolts
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/24—Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means
- E01B29/28—Fixing or removing detachable fastening means or accessories thereof; Pre-assembling track components by detachable fastening means the fastening means being of screw-and-nut type; Apparatus therefor, adapted to additionally drilling holes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
技术领域technical field
本发明实施例涉及定位架技术领域,尤其涉及一种轨道螺栓预埋套筒定位架。Embodiments of the present invention relate to the technical field of positioning frames, and in particular, to a track bolt pre-embedded sleeve positioning frame.
背景技术Background technique
在港口码头、铁路货站和集装箱堆场等应用大型起重设备的场景中,轨道施工是土建施工的重中之重,其中轨道施工中通常需要预埋螺栓,这些预埋螺栓定位精准与否直接影响到钢轨扣件安装的精度,为了保证预埋螺栓的定位准确,近年来在重型轨道领域逐渐兴起了采用直杆型形螺杆设计,其主要为通过精准二次预埋波纹管套筒的施工工艺来确保螺杆准确定位,而在精准二次预埋波纹管套筒的施工过程中,通常采用轨道螺栓预埋套筒定位架来辅助对螺杆进行定位。In the scenarios where large-scale lifting equipment is used in ports, railway freight stations, and container yards, rail construction is the top priority of civil construction, in which pre-embedded bolts are usually required in rail construction. Are these pre-embedded bolts accurate or not? It directly affects the installation accuracy of rail fasteners. In order to ensure the accurate positioning of the embedded bolts, in recent years, the design of straight rod-shaped screws has gradually emerged in the field of heavy-duty rails. The construction process is used to ensure the accurate positioning of the screw, and in the construction process of the precise secondary pre-embedded bellows sleeve, the track bolt pre-embedded sleeve positioning frame is usually used to assist the positioning of the screw.
目前常用的现浇轨道梁施工螺栓预埋套筒定位方法多样,按照定位架构件材料划分主要为钢板穿孔定位或角钢、槽钢型定位架等,按照固定方式分为辅助筋焊接固定、螺栓固定等,针对套筒预埋施工的特点,存在的缺点如下:一、常用的预埋件定位方法有定位板辅助定位方法,虽然定位准确,但是对于轨道梁这种相对尺寸较小的构件,会影响后续混凝土浇筑工序,不甚适用,二、辅助筋定位直接焊接在钢筋笼上的方法,是定位精度较差,工作效率较低,适用于大型预埋件,焊接容易对套筒造成损伤,三、角钢、槽钢定位架辅助定位的方法,用钢量大,不甚经济,同时经检索,2021年3月12日公开的,公开号为CN212689623U的中国发明专利公开了一种钢结构地脚螺栓预埋定位架,其大致描述为,包括水平设置的上定位件、平行设于上定位件正下方的下定位件和竖向连接上定位件及下定位件且预埋于混凝土的若干地脚螺栓,上定位件和下定位件各设有周向分布的若干第一螺栓孔和第二螺栓孔,第一螺栓孔与第二螺栓孔一一对应同轴设置,地脚螺栓与第一螺栓孔的数量相等,还包括用以将上定位件及下定位件固定在地脚螺栓上的若干对螺母,以及用以固定全部地脚螺栓的限位箍筋,其在使用时,通过将地脚螺栓安装在第一螺栓孔和第二螺栓孔,实现地脚螺栓与上定位件和下定位件的分别连接,从而实现对于多个地脚螺栓预埋过程中的辅助定位。At present, there are various positioning methods for pre-embedded sleeves of cast-in-place rail beam construction bolts. According to the material of the positioning frame, it is mainly divided into steel plate perforation positioning or angle steel, channel steel positioning frame, etc. Etc., according to the characteristics of the sleeve embedded construction, the shortcomings are as follows: 1. The commonly used positioning methods for embedded parts include the positioning plate-assisted positioning method. Although the positioning is accurate, for the relatively small components such as track beams, it will It affects the subsequent concrete pouring process and is not very suitable. Second, the method of welding the auxiliary reinforcement directly to the reinforcement cage has poor positioning accuracy and low work efficiency. It is suitable for large embedded parts, and the welding is easy to cause damage to the sleeve. 3. The assisted positioning method of angle steel and channel steel positioning frame uses a large amount of steel and is not very economical. At the same time, after searching, the Chinese invention patent published on March 12, 2021 with the publication number CN212689623U discloses a steel structure ground The anchor bolt pre-embedded positioning frame is roughly described as including a horizontally arranged upper positioning member, a lower positioning member arranged in parallel directly below the upper positioning member, and several vertically connected upper positioning members and lower positioning members and embedded in concrete. Anchor bolts, the upper positioning member and the lower positioning member are respectively provided with a number of first bolt holes and second bolt holes distributed in the circumferential direction, the first bolt holes and the second bolt holes are coaxially arranged in one-to-one correspondence, and the anchor bolts are arranged with the first bolt holes and the second bolt holes. The number of bolt holes is equal, and it also includes several pairs of nuts for fixing the upper positioning piece and the lower positioning piece on the anchor bolts, and limit stirrups for fixing all the anchor bolts. The anchor bolts are installed in the first bolt hole and the second bolt hole, so as to realize the connection of the anchor bolts with the upper positioning member and the lower positioning member respectively, so as to realize the auxiliary positioning during the pre-embedding process of the multiple anchor bolts.
现有技术方案虽然可以应用于地脚螺栓预埋过程中的辅助定位施工,但是上定位件上设置的第一螺栓孔的位置较为固定,下定位件上设置的第二螺栓孔的位置也较为固定,因此当预埋多个地脚螺栓时,相邻的两排地脚螺栓之间的相对距离较为固定,同时上定位件的结构和下定位件的结构均较为固定,使用灵活性较低。Although the prior art solution can be applied to the auxiliary positioning construction during the pre-embedding process of the anchor bolts, the position of the first bolt hole provided on the upper positioning member is relatively fixed, and the position of the second bolt hole provided on the lower positioning member is also relatively stable. Therefore, when multiple anchor bolts are embedded, the relative distance between the adjacent two rows of anchor bolts is relatively fixed, and the structure of the upper positioning member and the lower positioning member are relatively fixed, and the use flexibility is low. .
发明内容SUMMARY OF THE INVENTION
本发明实施例提供一种轨道螺栓预埋套筒定位架,通过第一安装方管、第二安装方管和多个伸缩连接杆的配合,使两者之间的相对位置能够稳定,从而实现双排多个全牙螺杆的支架定位,进而实现多个套筒的辅助定位,同时第一安装方管和第二安装方管之间的距离可以调节,从而使安装在第一安装方管上的多个全牙螺杆和安装在第二安装方管上的两排全牙螺杆之间的相对距离可以调节。The embodiment of the present invention provides a track bolt pre-embedded sleeve positioning frame, through the cooperation of the first installation square tube, the second installation square tube and a plurality of telescopic connecting rods, the relative position between the two can be stabilized, thereby realizing The bracket positioning of double rows of multiple full-thread screws, thereby realizing the auxiliary positioning of multiple sleeves, at the same time, the distance between the first installation square tube and the second installation square tube can be adjusted, so as to be installed on the first installation square tube The relative distance between the multiple full-thread screws and the two rows of full-thread screws installed on the second installation square tube can be adjusted.
本发明实施例提供一种轨道螺栓预埋套筒定位架,包括固定架、若干伸缩连接杆、若干全牙螺杆和若干套筒;The embodiment of the present invention provides a track bolt pre-embedded sleeve positioning frame, which includes a fixing frame, a plurality of telescopic connecting rods, a plurality of full-thread screws and a plurality of sleeves;
所述固定架包括第一安装方管、第二安装方管和若干横支方管;所述横支方管沿第一方向设置,每个所述横支方管上均可拆卸设有第一组装件和第二组装件,所述第一组装件连接第一安装方管,所述第二组装件连接第二安装方管,每个所述横支方管的两端还设置有辅助安装定位的木工夹;The fixing frame includes a first installation square tube, a second installation square tube, and a plurality of horizontally branched square tubes; the horizontally branched square tubes are arranged along the first direction, and each of the horizontally branched square tubes can be detachably provided with a third square tube. An assembly part and a second assembly part, the first assembly part is connected to the first installation square pipe, the second assembly part is connected to the second installation square pipe, and the two ends of each of the cross-branched square pipes are also provided with auxiliary Install the positioning woodworking clip;
所述第一安装方管和所述第二安装方管相邻近的一侧的对应位置处设有若干连接孔,若干所述伸缩连接杆的两端分别通过若干连接孔连接所述第一安装方管和所述第二安装方管;A plurality of connecting holes are provided at the corresponding positions on the adjacent sides of the first installation square tube and the second installation square tube, and the two ends of the telescopic connecting rods are respectively connected to the first installation tube through a plurality of connection holes. installing the square tube and the second installing square tube;
所述第一安装方管和所述第二安装方管相对应位置处上均设有多个用于安装全牙螺杆的安装孔,所述安装孔沿第二方向,所述第一方向和所述第二方向相互垂直;每个全牙螺杆螺纹在穿过所述安装孔后螺纹连接一对螺母,所述一对螺母分别位于所述安装孔的两端,以通过调整一对螺母使对应所述全牙螺杆可沿所述安装孔进行上下位置限定;所述套筒的顶端和底端均设有带孔堵头,每个所述套筒通过螺帽可拆卸固定在所述全牙螺杆上。The corresponding positions of the first installation square tube and the second installation square tube are provided with a plurality of installation holes for installing the full-thread screw, the installation holes are along the second direction, the first direction and the The second directions are perpendicular to each other; each full thread screw thread is threadedly connected to a pair of nuts after passing through the installation hole, and the pair of nuts are respectively located at both ends of the installation hole, so that by adjusting the pair of nuts, the Corresponding to the full-thread screw, the upper and lower positions can be defined along the mounting hole; the top and bottom ends of the sleeve are provided with plugs with holes, and each of the sleeves is detachably fixed on the full-thread through a nut. on the screw.
作为优选的,所述第一组装件包括第一连接盘,所述第一连接盘底端设有两个第一开口滑槽,两个所述第一开口滑槽内均滑动连接有第一滑动板,两个所述第一开口滑槽间开设有第一限位槽,所述第一限位槽内滑动连接有两个第一限位滑块,两个所述第一限位滑块分别连接两个第一滑动板,两个所述第一滑动板的底端均固定连接有第一钩板,所述第一钩板与所述第一安装方管相匹配;所述第一连接盘上还转动连接有第一转动盘,所述第一转动盘顶端开设有第一封闭槽,所述第一封闭槽内滑动连接有两个第一半套连接架,两个所述第一半套连接架的闭合后与所述横支方管相匹配,两个所述第一半套连接架通过若干第一螺栓连接固定在所述横支方管上;Preferably, the first assembly includes a first connecting plate, and two first opening chute are provided at the bottom end of the first connecting plate, and a first opening chute is slidably connected to the two first opening chute. A sliding plate, a first limit slot is opened between the two first opening chute, two first limit sliders are slidably connected in the first limit slot, and the two first limit sliders The blocks are respectively connected with two first sliding plates, the bottom ends of the two first sliding plates are fixedly connected with first hook plates, and the first hook plates are matched with the first installation square pipe; A first rotating plate is also rotatably connected to a connecting plate, a first closed groove is opened at the top of the first rotating plate, and two first half-sleeve connecting frames are slidably connected in the first closed groove. The first half-sleeve connecting frame is matched with the cross-branched square tube after being closed, and the two first half-sleeve connecting frames are connected and fixed on the cross-branched square tube by a plurality of first bolts;
所述第二组装件包括第二连接盘,所述第二连接盘底端设有两个第二开口滑槽,两个所述第二开口滑槽内均滑动连接有第二滑动板,两个所述第二开口滑槽间开设有第二限位槽,所述第二限位槽内滑动连接有两个第二限位滑块,两个所述第二限位滑块分别连接两个第二滑动板,两个所述第二滑动板的底端均固定连接有第二钩板,所述第二钩板与所述第二安装方管相匹配;所述第二连接盘上还转动连接有第二转动盘,所述第二转动盘顶端开设有第二封闭槽,所述第二封闭槽内滑动连接有两个第二半套连接架,两个所述第二半套连接架的闭合后与所述横支方管相匹配,两个所述第二半套连接架通过若干第二螺栓连接固定在所述横支方管上。The second assembly includes a second connecting plate, the bottom end of the second connecting plate is provided with two second opening chutes, the two second opening chutes are both slidably connected with second sliding plates, and the two A second limit slot is defined between each of the second opening chute, and two second limit sliders are slidably connected in the second limit slot, and the two second limit sliders are respectively connected to two second limit sliders. two second sliding plates, the bottom ends of the two second sliding plates are fixedly connected with second hook plates, and the second hook plates are matched with the second installation square pipe; A second rotating disk is also rotatably connected, a second closed groove is opened at the top of the second rotating disk, and two second half-sleeve connecting frames are slidably connected in the second closed groove. After the connecting frame is closed, it is matched with the cross-branched square tube, and the two second half-sleeve connecting frames are connected and fixed on the cross-branched square tube by a plurality of second bolts.
作为优选的,所述第一安装方管和所述第二安装方管相互邻近的一侧的对应位置上设有若干连接孔;所述伸缩连接杆的两端均设有连接端管,每个所述伸缩连接杆两端的连接端管分别插入所述第一安装方管和所述第二安装方管对应位置处的连接孔内;Preferably, a plurality of connection holes are provided at corresponding positions on the side adjacent to each other of the first installation square tube and the second installation square tube; both ends of the telescopic connection rod are provided with connection end tubes, each The connecting end pipes at both ends of the telescopic connecting rod are respectively inserted into the connecting holes at the corresponding positions of the first installation square pipe and the second installation square pipe;
每个所述连接端管上设置有两个连接槽,每个所述连接孔内均设有两个与所述连接槽相匹配的连接板,通过所述连接槽与所述连接板的卡接将所述伸缩连接杆的两端分别固定至所述第一安装方管和所述第二安装方管上。Each of the connecting end pipes is provided with two connecting grooves, and each of the connecting holes is provided with two connecting plates matching the connecting grooves. The two ends of the telescopic connecting rod are respectively fixed to the first installation square tube and the second installation square tube.
作为优选的,所述连接孔为圆形孔,所述连接端管为方形管,所述方形管与所述圆形孔相匹配,且两个所述连接槽位于所述方形管对角线对应的两管臂上,所述连接孔对应所述连接槽位置处设有连接孔内凸起的连接板。Preferably, the connecting hole is a circular hole, the connecting end pipe is a square pipe, the square pipe is matched with the circular hole, and the two connecting grooves are located on the diagonal lines of the square pipe On the corresponding two pipe arms, a connecting plate protruding in the connecting hole is provided at the position of the connecting hole corresponding to the connecting groove.
作为优选的,所述伸缩连接杆包括方管套和两个伸缩管,两个所述伸缩管分别滑动套接在所述方管套的两端内,所述方管套的两端均设有贯穿所述方管套的螺纹帽,所述螺纹帽内螺纹连接有压紧螺纹杆,两个所述压紧螺纹管分别穿过所述方管套的两端的所述螺纹帽并抵接所述方管套内的所述伸缩管,以对所述伸缩管进行定位固定,所述伸缩管内固定连接有配重板。Preferably, the telescopic connecting rod includes a square tube sleeve and two telescopic tubes, the two telescopic tubes are respectively slidably sleeved in two ends of the square tube sleeve, and both ends of the square tube sleeve are provided with There is a threaded cap penetrating the square tube sleeve, the threaded cap is internally threaded with a compression threaded rod, and the two compression threaded tubes respectively pass through the threaded caps at both ends of the square tube sleeve and abut The telescopic tube in the square tube sleeve is used to position and fix the telescopic tube, and a counterweight plate is fixedly connected in the telescopic tube.
作为优选的,所述第一半套连接架和所述第二半套连接架上均固定连接有连接耳板,所述耳板上开设有通过孔,所述通过孔与所述第一螺栓、所述第二螺栓相匹配。Preferably, connecting lugs are fixedly connected to the first half-sleeve connecting frame and the second half-sleeve connecting frame, and a through hole is opened on the lug plate, and the through hole is connected to the first bolt , the second bolts are matched.
作为优选的,所述全牙螺杆上内螺纹连接有螺栓帽,所述螺栓帽的顶端与所述全牙螺杆的顶端齐平,且所述全牙螺杆与所述螺栓帽间通过点焊固定连接。Preferably, a bolt cap is connected with an internal thread on the full-thread screw, the top of the bolt cap is flush with the top of the full-thread screw, and the full-thread screw and the bolt cap are fixed by spot welding connect.
作为优选的,所述全牙螺杆、所述第一安装方管、所述第二安装方管所述伸缩连接杆和所述横支方管均为厚度为4~5mm的镀锌方管。Preferably, the full-thread screw, the first installation square tube, the second installation square tube, the telescopic connecting rod and the cross-branch square tube are all galvanized square tubes with a thickness of 4-5 mm.
作为优选的,所述全牙螺杆的直径为14mm,长度为60cm,所述全牙螺杆为Q235b材质;Preferably, the diameter of the full-tooth screw is 14mm, the length is 60cm, and the full-tooth screw is made of Q235b material;
所述带孔堵头的直径为6cm,所述带孔堵头为PE塑料的材质。The diameter of the plug with holes is 6 cm, and the plug with holes is made of PE plastic.
作为优选的,所述带孔堵头远离所述套筒的一端设有阶梯台环,所述带孔堵头邻近所述套筒的一端设有与所述套筒匹配的环形槽。Preferably, the end of the plug with holes away from the sleeve is provided with a stepped ring, and the end of the plug with holes adjacent to the sleeve is provided with an annular groove matching the sleeve.
本发明实施例提供的一种轨道螺栓预埋套筒定位架,通过横支方管和伸缩连接杆连接固定第一安装方管和第二安装方管,使得第一安装方管和第二安装方管之间的在第一方向上的距离可调,将若干全牙螺杆分两排沿第二方向分别安装在第一安装方管和第二安装方管上,通过多个螺帽的配合,便于套筒相对于全牙螺杆的连接和定位;第一方向和第二方向相互垂直,从而实现单个套筒的定位从而使安装在第一安装方管上的多个全牙螺杆和安装在第二安装方管上的两排全牙螺杆之间的相对距离可以调节;主体结构采用装配而成,使用灵活性较好,并且装配操作较为简单,施工效率较高,施工后方便拆解,拆解后的运输与存放较为容易。An embodiment of the present invention provides a track bolt pre-embedded sleeve positioning frame, which connects and fixes a first installation square tube and a second installation square tube through a transverse support square tube and a telescopic connecting rod, so that the first installation square tube and the second installation square tube are connected and fixed. The distance between the square tubes in the first direction is adjustable, and several full-thread screws are installed in two rows on the first installation square tube and the second installation square tube respectively along the second direction, through the cooperation of a plurality of nuts. , which is convenient for the connection and positioning of the sleeve relative to the full-thread screw; the first direction and the second direction are perpendicular to each other, so as to realize the positioning of a single sleeve, so that the multiple full-thread screws installed on the first installation square tube and the The relative distance between the two rows of full-thread screws on the second installation square tube can be adjusted; the main structure is assembled, which has good flexibility in use, simple assembly operation, high construction efficiency, and easy disassembly after construction. Transport and storage after dismantling is easier.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作一简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained according to these drawings without creative efforts.
图1为根据本发明实施例轨道螺栓预埋套筒定位架的立体结构示意图;1 is a schematic three-dimensional structural diagram of a track bolt pre-embedded sleeve spacer according to an embodiment of the present invention;
图2为本发明实施例的图1中A处的局部放大结构示意图;FIG. 2 is a partial enlarged structural schematic diagram of the place A in FIG. 1 according to an embodiment of the present invention;
图3为本发明实施例的图1中B处的局部放大结构示意图;FIG. 3 is a schematic diagram of a partially enlarged structure at B in FIG. 1 according to an embodiment of the present invention;
图4为本发明实施例的图1中C处的局部放大结构示意图;FIG. 4 is a schematic diagram of a partially enlarged structure at C in FIG. 1 according to an embodiment of the present invention;
图5为本发明实施例中第二连接盘、第二滑动板和第二钩板等配合的分解的立体结构示意图;5 is a schematic diagram of an exploded perspective structure of the second connection plate, the second sliding plate, the second hook plate, etc. in the embodiment of the present invention;
图6为本发明实施例中套筒和带孔堵头配合的分解的立体结构示意图;Fig. 6 is the disassembled three-dimensional schematic diagram of the cooperation of the sleeve and the plug with holes in the embodiment of the present invention;
图7为本发实施例中连接端管、连接槽和连接板等配合的局部分解的立体结构示意图;7 is a schematic diagram of a partially exploded three-dimensional structure of the cooperation of the connecting end pipe, the connecting groove and the connecting plate in the embodiment of the present invention;
图8为本发明实施例的整体的仰视的立体结构示意图;FIG. 8 is an overall bottom-view three-dimensional structural schematic diagram of an embodiment of the present invention;
图9为本发明实施例的图8中D处的局部放大结构示意图。FIG. 9 is a partial enlarged structural schematic diagram of the position D in FIG. 8 according to an embodiment of the present invention.
附图标记:1、螺母;2、全牙螺杆;3、套筒;4、第一安装方管;5、第二安装方管;6、横支方管;7、带孔堵头;8、螺帽;9、连接孔;10、连接端管;11、连接槽;12、连接板;13、木工夹;14、第一连接盘;15、第一滑动板;16、第一钩板;17、第一转动盘;18、第一半套连接架;19、第一螺栓;20、第二连接盘;21、第二滑动板;22、第二钩板;23、第二转动盘;24、第二半套连接架;25、第二螺栓;26、方管套;27、伸缩管;28、螺纹帽;29、压紧螺纹杆;30、连接耳板;31、螺栓帽;32、阶梯台环;33、环形槽。Reference numerals: 1. Nut; 2. Full thread screw; 3. Sleeve; 4. First installation square tube; 5. Second installation square tube; 6. Cross-branched square tube; 7. Plug with holes; 8 , nut; 9, connecting hole; 10, connecting end pipe; 11, connecting groove; 12, connecting plate; 13, woodworking clamp; 14, first connecting plate; 15, first sliding plate; 16, first hook plate ; 17, the first rotating plate; 18, the first half of the connecting frame; 19, the first bolt; 20, the second connecting plate; 21, the second sliding plate; 22, the second hook plate; 23, the second rotating plate ;24, the second half set of connecting frame; 25, the second bolt; 26, the square tube sleeve; 27, the telescopic tube; 28, the threaded cap; 29, the compression threaded rod; 30, the connection ear plate; 32. Step ring; 33. Ring groove.
具体实施方式Detailed ways
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments These are some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
本申请实施例中术语“和/或”,仅仅是一种描述关联对象的关联关系,表示可以存在三种关系,例如,A和/或B,可以表示:单独存在A,同时存在A和B,单独存在B这三种情况。The term "and/or" in this embodiment of the present application is only an association relationship to describe associated objects, indicating that there may be three kinds of relationships, for example, A and/or B, which may indicate that A exists alone, and A and B exist at the same time. , there are three cases of B alone.
本申请实施例中的术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。本申请的描述中,术语“包括”和“具有”以及它们任何变形,意图在于覆盖不排他的包含。例如包含了一系列部件或单元的系统、产品或设备没有限定于已列出的部件或单元,而是可选地还包括没有列出的部件或单元,或可选地还包括对于这些产品或设备固有的其它部件或单元。本申请的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。The terms "first" and "second" in the embodiments of the present application are only used for the purpose of description, and cannot be understood as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In the description of this application, the terms "comprising" and "having" and any variations thereof are intended to cover non-exclusive inclusion. For example, a system, product or device comprising a series of components or units is not limited to the listed components or units, but may optionally also include components or units not listed, or Other parts or units inherent in the equipment. In the description of the present application, "a plurality of" means at least two, such as two, three, etc., unless otherwise expressly and specifically defined.
在本文中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本申请的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域技术人员显式地和隐式地理解的是,本文所描述的实施例可以与其它实施例相结合。Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present application. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor a separate or alternative embodiment that is mutually exclusive of other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
现有技术中的预埋螺栓方案虽然可以应用于地脚螺栓预埋过程中的辅助定位施工,但是上定位件上设置的第一螺栓孔的位置较为固定,下定位件上设置的第二螺栓孔的位置也较为固定,因此当预埋多个地脚螺栓时,相邻的两排地脚螺栓之间的相对距离较为固定,同时上定位件的结构和下定位件的结构均较为固定,使用灵活性较低。Although the pre-embedded bolt solution in the prior art can be applied to the auxiliary positioning construction in the pre-embedded process of the anchor bolts, the position of the first bolt hole set on the upper positioning member is relatively fixed, and the second bolt set on the lower positioning member is relatively fixed. The position of the holes is also relatively fixed, so when multiple anchor bolts are embedded, the relative distance between the two adjacent rows of anchor bolts is relatively fixed, and the structure of the upper positioning member and the lower positioning member are relatively fixed. Less flexibility of use.
因此,本发明实施例提供一种轨道螺栓预埋套筒定位架,通过横支方管和伸缩连接杆连接固定第一安装方管和第二安装方管,使得第一安装方管和第二安装方管之间的在第一方向上的距离可调,将若干全牙螺杆分两排沿第二方向分别安装在第一安装方管和第二安装方管上,通过多个螺帽的配合,便于套筒相对于全牙螺杆的连接和定位;第一方向和第二方向相互垂直,从而实现单个套筒的定位从而使安装在第一安装方管上的多个全牙螺杆和安装在第二安装方管上的两排全牙螺杆之间的相对距离可以调节;主体结构采用装配而成,使用灵活性较好,并且装配操作较为简单,施工效率较高,施工后方便拆解,拆解后的运输与存放较为容易。以下将通过多个实施例进行展开说明和介绍。Therefore, the embodiment of the present invention provides a track bolt pre-embedded sleeve spacer, which connects and fixes the first installation square tube and the second installation square tube through the cross-branched square tube and the telescopic connecting rod, so that the first installation square tube and the second installation square tube are connected and fixed. The distance between the installation square tubes in the first direction is adjustable, and several full-thread screws are installed in two rows on the first installation square tube and the second installation square tube respectively along the second direction. It is convenient for the connection and positioning of the sleeve relative to the full-thread screw; the first direction and the second direction are perpendicular to each other, so as to realize the positioning of a single sleeve, so that the multiple full-thread screws installed on the first installation square tube can be installed with The relative distance between the two rows of full-thread screws on the second installation square tube can be adjusted; the main structure is assembled, with good flexibility in use, simple assembly operation, high construction efficiency, and easy disassembly after construction , it is easier to transport and store after dismantling. The following will expand the description and introduction through multiple embodiments.
图1为本发明实施例提供一种轨道螺栓预埋套筒定位架,包括固定架、若干伸缩连接杆、若干全牙螺杆2和若干套筒3;1 provides a track bolt pre-embedded sleeve positioning frame according to an embodiment of the present invention, including a fixing frame, a plurality of telescopic connecting rods, a plurality of full-
所述固定架包括第一安装方管4、第二安装方管5和若干横支方管6;所述横支方管6沿第一方向(水平方向)设置,每个所述横支方管6上均可拆卸设有第一组装件和第二组装件,所述第一组装件连接第一安装方管4,所述第二组装件连接第二安装方管5,每个所述横支方管6的两端还设置有辅助安装定位的木工夹13,如图2中所示;The fixing frame includes a first installation
具体的,如图3、图4、图8和图9中所示,所述第一组装件包括第一连接盘14,所述第一连接盘14底端设有两个第一开口滑槽,两个所述第一开口滑槽内均滑动连接有第一滑动板15,两个所述第一开口滑槽间开设有第一限位槽,所述第一限位槽内滑动连接有两个第一限位滑块,两个所述第一限位滑块分别连接两个第一滑动板15,两个所述第一滑动板15的底端均固定连接有第一钩板16,所述第一钩板16与所述第一安装方管4相匹配,第一钩板16与第一安装方管4进行连接时,使两个位于同一开口槽内的两个第一钩板16相互远离,之后使第一安装方管4进入两个第一钩板16之间的空间内,并使第一安装方管4与第一连接盘14接触,之后推动两个第一钩板16相互靠近复位,松开第一安装方管4,使第一安装方管4进入两个第一钩板16的钩板区,完成第一钩板16与第一安装方管4之间的连接;所述第一连接盘14上还转动连接有第一转动盘17,所述第一转动盘17顶端开设有第一封闭槽,所述第一封闭槽内滑动连接有两个第一半套连接架18,两个所述第一半套连接架18的闭合后与所述横支方管6相匹配,两个所述第一半套连接架18通过若干第一螺栓19连接固定在所述横支方管6上,通过第一组装件的设计,便于实现横支方管6相对于第一安装方管4的装配连接定位。Specifically, as shown in FIG. 3 , FIG. 4 , FIG. 8 and FIG. 9 , the first assembly includes a first connecting plate 14 , and the bottom end of the first connecting plate 14 is provided with two first opening chute , a first sliding plate 15 is slidably connected in the two first opening sliding grooves, a first limiting groove is opened between the two first opening sliding grooves, and the first limiting groove is slidably connected with Two first limit sliders, the two first limit sliders are respectively connected with two first sliding plates 15 , and the bottom ends of the two first sliding plates 15 are fixedly connected with a first hook plate 16 , the first hook plate 16 is matched with the first installation square tube 4, when the first hook plate 16 is connected with the first installation square tube 4, the two first hooks located in the same opening groove The plates 16 are separated from each other, and then the first mounting square tube 4 is brought into the space between the two first hook plates 16, and the first mounting square tube 4 is brought into contact with the first connecting plate 14, and then the two first hooks are pushed The plates 16 are close to each other and reset, loosen the first installation square tube 4, make the first installation square tube 4 enter the hook plate area of the two first hook plates 16, and complete the connection between the first hook plate 16 and the first installation square tube 4 The first connecting plate 14 is also rotatably connected with a first rotating plate 17, the top of the first rotating plate 17 is provided with a first closed groove, and two first closed grooves are slidably connected in the first closed groove. Half-
如图5中所示,所述第二组装件包括第二连接盘20,所述第二连接盘20底端设有两个第二开口滑槽,两个所述第二开口滑槽内均滑动连接有第二滑动板21,两个所述第二开口滑槽间开设有第二限位槽,所述第二限位槽内滑动连接有两个第二限位滑块,两个所述第二限位滑块分别连接两个第二滑动板21,两个所述第二滑动板21的底端均固定连接有第二钩板22,所述第二钩板22与所述第二安装方管5相匹配;第二钩板22与第二安装方管5进行连接时,使两个位于同二开口槽内的两个第二钩板22相互远离,之后使第二安装方管5进入两个第二钩板22之间的空间内,并使第二安装方管5与第二连接盘20接触,之后推动两个第二钩板22相互靠近复位,松开第二安装方管5,使第二安装方管5进入两个第二钩板22的钩板区,完成第二钩板22与第二安装方管5之间的连接;所述第二连接盘20上还转动连接有第二转动盘23,所述第二转动盘23顶端开设有第二封闭槽,所述第二封闭槽内滑动连接有两个第二半套连接架24,两个所述第二半套连接架24的闭合后与所述横支方管6相匹配,两个所述第二半套连接架24通过若干第二螺栓25连接固定在所述横支方管6上,通过第二组装件的设计,便于实现横支方管6相对于第二安装方管5的装配连接定位。As shown in FIG. 5 , the second assembly includes a second connecting
第一安装方管4与横支方管6之间以及第二安装方管5与横支方管6之间均采用装配而成,该部分结构使用灵活性较好,并且装配操作较为简单,施工效率较高,施工后方便拆解,拆解后的运输与存放较为容易,第一半套连接架18上和第二半套连接架24上均固定连接有连接耳板30,多个连接耳板30上均开设有通过孔,多个通过孔分别与多个第一螺栓19匹配和多个第二螺栓25匹配,多个横支方管6的两端均设置有用于辅助安装定位的木工夹13。The first installation
其中,木工夹13均为市面上购买的本领域技术人员公知的常规设备,也可以根据实际需要进行定制,本专利中我们只是对其进行使用,并未对其结构和功能进行改进,对于本领域的技术人员来说,只要按照其使用说明书的要求进行调试操作即可,在此不再对其进行赘述。Among them, the
所述第一安装方管4和所述第二安装方管5相邻近的一侧的对应位置处设有若干连接孔9,若干所述伸缩连接杆的两端分别通过若干连接孔9连接所述第一安装方管4和所述第二安装方管5。The first installation
本实施例中,通过第一安装方管4和第二安装方管5的相互靠近的一端均设置有多个连接孔9,第一安装方管4和第二安装方管5之间设置有多个伸缩连接杆,通过第一安装方管4、第二安装方管5和多个伸缩连接杆的配合,便于实现第一安装方管4和第二安装方管5之间的连接,使两者之间的相对位置能够稳定,从而实现双排多个全牙螺杆2的支架定位,进而实现多个套筒3的辅助定位,同时第一安装方管4和第二安装方管5之间的距离可以调节,从而使安装在第一安装方管4上的多个全牙螺杆2和安装在第二安装方管5上的两排全牙螺杆2之间的相对距离可以调节。In this embodiment, a plurality of connecting holes 9 are provided at the ends of the first installation
具体的,如图7中所示,所述第一安装方管4和所述第二安装方管5相互邻近的一侧的对应位置上设有若干连接孔9;所述伸缩连接杆包括方管套26和两个伸缩管27,两个所述伸缩管27分别滑动套接在所述方管套26的两端内,所述方管套26的两端均设有贯穿所述方管套26的螺纹帽28,所述螺纹帽28内螺纹连接有压紧螺纹杆29,两个所述压紧螺纹管分别穿过所述方管套26的两端的所述螺纹帽28并抵接所述方管套26内的所述伸缩管27,以对所述伸缩管27进行定位固定,所述伸缩管27内固定连接有配重板,使伸缩管27的整体重心靠下,减少伸缩管27使用过程中的转动,第一安装方管4、第二安装方管5、多个横支方管6和多个方管套26均采用尺寸为40mm×80mm厚度为4~5mm的镀锌方管,降低材料成本,并且若精度要求高,也可采用角钢或槽钢等精度较高的型钢材料。Specifically, as shown in FIG. 7 , a plurality of connecting holes 9 are provided at corresponding positions on the side adjacent to each other of the first installation square tube 4 and the second installation square tube 5 ; the telescopic connecting rod includes a square A tube sleeve 26 and two telescopic tubes 27, the two telescopic tubes 27 are respectively slidably sleeved in the two ends of the square tube sleeve 26, and both ends of the square tube sleeve 26 are provided with through the square tube The threaded cap 28 of the sleeve 26, the threaded cap 28 is internally threaded with a compression threaded rod 29, and the two compression threaded pipes respectively pass through the threaded caps 28 at both ends of the square tube sleeve 26 and abut The telescopic tube 27 in the square tube sleeve 26 is used for positioning and fixing the telescopic tube 27, and a counterweight plate is fixedly connected to the telescopic tube 27, so that the overall center of gravity of the telescopic tube 27 is lower, reducing the expansion and contraction During the rotation of the tube 27 during use, the first installation square tube 4, the second installation square tube 5, the plurality of cross-branched square tubes 6 and the plurality of square tube sleeves 26 are all plated with a size of 40mm×80mm and a thickness of 4-5mm. Zinc square tube reduces material cost, and if high precision is required, high-precision profile steel materials such as angle steel or channel steel can also be used.
所述伸缩连接杆的两端均设有连接端管10,每个所述伸缩连接杆两端的连接端管10分别插入所述第一安装方管4和所述第二安装方管5对应位置处的连接孔9内。多个连接板12分别与多个连接槽11匹配,通过连接端管10上连接槽11的开设,以及连接孔9内连接板12的配合,实现伸缩连接杆的两端分别相对于第一安装方管4和第二安装方管5的装配连接,使第一安装方管4与伸缩连接杆之间以及第二安装方管5与伸缩连接杆之间均采用装配而成,该部分结构使用灵活性较好,并且装配操作较为简单,施工效率较高,施工后方便拆解,拆解后的运输与存放较为容易。Both ends of the telescopic connecting rod are provided with connecting
在上述实施例的基础上,作为一种优选的实施方式,所述连接孔9为圆形孔,所述连接端管10为方形管,所述方形管与所述圆形孔相匹配,且两个所述连接槽11位于所述方形管对角线对应的两管臂上,所述连接孔9对应所述连接槽11位置处设有连接孔9内凸起的连接板12。On the basis of the above embodiment, as a preferred embodiment, the connecting hole 9 is a circular hole, the connecting
所述第一安装方管4和所述第二安装方管5相对应位置处上均设有多个用于安装全牙螺杆2的安装孔,所述安装孔沿第二方向(竖直方向),所述第一方向和所述第二方向相互垂直;每个全牙螺杆2螺纹在穿过所述安装孔后螺纹连接一对螺母,所述一对螺母分别位于所述安装孔的两端,以通过调整一对螺母使对应所述全牙螺杆2可沿所述安装孔进行上下位置限定;所述套筒3的顶端和底端均设有带孔堵头7,每个所述套筒3通过螺帽8可拆卸固定在所述全牙螺杆2上。The corresponding positions of the first installation
本实施例中,多个全牙螺杆2分别穿过多个安装孔,若干对螺母1分别螺纹连接在多个全牙螺杆2上,且通过调整每对螺母1可以实现全牙螺杆2在安装孔内的上下位置的限定,通过螺母1与全牙螺杆2的配合,使全牙螺杆2可以较好的相对于第一安装方管4和第二安装方管5进行位置调整和调整后的定位,多个套筒3的顶端和底端均设置有带孔堵头7,且多个套筒3均通过多个螺帽8分别可拆卸固定在多个全牙螺杆2上,通过多个螺帽8的配合,便于套筒3相对于全牙螺杆2的连接和定位,从而实现单个套筒3的定位In this embodiment, a plurality of full-
在上述实施例的基础上,作为一种优选的实施方式,所述全牙螺杆2上内螺纹连接有螺栓帽31,所述螺栓帽31的顶端与所述全牙螺杆2的顶端齐平,且所述全牙螺杆2与所述螺栓帽31间通过点焊固定连接。全牙螺杆2上内螺纹连接有螺栓帽31,螺栓帽31的顶端与全牙螺杆2的顶端平齐,且全牙螺杆2与螺栓帽31之间采用点焊固定连接,便于全牙螺杆2的转动时的辅助驱动。On the basis of the above embodiment, as a preferred embodiment, a
在上述实施例的基础上,作为一种优选的实施方式,所述全牙螺杆2、所述第一安装方管4、所述第二安装方管5所述伸缩连接杆和所述横支方管6均为厚度为4~5mm的镀锌方管。On the basis of the above embodiment, as a preferred implementation, the full-
在上述实施例的基础上,作为一种优选的实施方式,所述全牙螺杆2的直径为14mm,长度为60cm,所述全牙螺杆2为Q235b材质;全牙螺杆2的直径为14mm,全牙螺杆2为Q235b材质,全牙螺杆2单根长60cm,一方面实现全牙螺杆2的适用性,另一方面避免全牙螺杆2过长而造成操作困难。On the basis of the above embodiment, as a preferred embodiment, the diameter of the full-
所述带孔堵头7的直径为6cm,所述带孔堵头7为PE塑料的材质,方便配合套筒3使用的同时降低成本。The diameter of the plug 7 with holes is 6 cm, and the plug 7 with holes is made of PE plastic, which is convenient to use with the
在上述实施例的基础上,作为一种优选的实施方式,如图6中所示,所述带孔堵头7远离所述套筒3的一端设有阶梯台环32,以提高带孔堵头7的结构强度,所述带孔堵头邻近所述套筒3的一端设有与所述套筒3匹配的环形槽33,能够配合套筒3,实现带孔堵头7与套筒3接触部分的密封效果,减少混凝土浇筑时混凝土进入套筒3内的概率。On the basis of the above embodiment, as a preferred embodiment, as shown in FIG. 6 , the end of the plug 7 with holes away from the
本实施例中所述的轨道螺栓预埋套筒定位架的工作原理和工作过程为,在使用时具体步骤如下:The working principle and working process of the track bolt pre-embedded sleeve spacer described in this embodiment are as follows. The specific steps in use are as follows:
1、安装套筒31. Install the
首先将连接端管10插入连接孔9,之后通过转动连接端管10,使连接孔9内的连接板12进入连接槽11,实现连接端管10与连接板12之间的相对位置的稳定,然后全牙螺杆2插入安装孔,并通过螺母1实现全牙螺杆2在安装孔内的位置固定,将套筒3的顶端和底端均使用带孔堵头7封堵好,确保封堵密实,然后通过螺帽8固定在定位架上的全牙螺杆2上。First, insert the connecting
2、初调2. Initial tuning
将定位架安装至扎好的钢筋笼内,定位架安装过程中实现将安装有第一组装件的第一安装方管4与横支方管6进行连接装配,之后将安装有第二组装件的第二安装方管5与横支方管6进行连接装配,此过程中,将两个第一半套连接架18相互推离,然后使横支方管6进入两个第一半套连接架18之间的空间内,将两个第一半套连接架18相互推近,通过第一螺栓19实现两个第一半套连接架18之间的相互压紧,从而实现两个第一半套连接架18与横支方管6的连接,同理完成第二半套连接架24相对于横支方管6的连接,安装能完成后,使用全站仪测量复核,调节好定位架的水平和平面位置,并使用木工夹13等工具予以紧固,轨道梁较长时,可以设置多个第一安装管和多个第二安装管,并将多个第一安装管首尾相接,同理多个第二安装管首尾相接,串联使用,为方便拆卸,防止混凝土污染,可以在全牙螺杆2上刷润滑油。Install the positioning frame into the bound steel cage. During the installation process of the positioning frame, the first installation
3、终调3. Final tone
使用拉水平线的方法,校核套筒3顶标高,对标高有偏差的,调整至符合设计要求。Use the method of pulling the horizontal line to check the elevation of the top of the
4、完成4. Complete
终调完成后,对定位架的加固和平面位置进行复查,确认无误后即完成定位安装。After the final adjustment is completed, check the reinforcement and plane position of the positioning frame, and complete the positioning installation after confirming that it is correct.
5、拆卸5. Disassembly
混凝土完成浇筑并达到一定强度后,可以予以拆除,拆除过程中,首先松开套筒3顶部螺帽8,再通过拧动(可采用电动工具)全牙螺杆2顶部与全牙螺杆2点焊固定的螺栓帽31,即可将全牙螺杆2拧出,全部拆除后可以将定位架拆除。After the concrete is poured and reaches a certain strength, it can be dismantled. During the dismantling process, first loosen the
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that it can still be The technical solutions described in the foregoing embodiments are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210708120.1A CN115094691A (en) | 2022-06-21 | 2022-06-21 | Positioning frame for pre-buried sleeve of track bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210708120.1A CN115094691A (en) | 2022-06-21 | 2022-06-21 | Positioning frame for pre-buried sleeve of track bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115094691A true CN115094691A (en) | 2022-09-23 |
Family
ID=83293146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210708120.1A Pending CN115094691A (en) | 2022-06-21 | 2022-06-21 | Positioning frame for pre-buried sleeve of track bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115094691A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116851999A (en) * | 2023-06-07 | 2023-10-10 | 河北畅盛科技工程有限公司 | Auxiliary fixing device for welding embedded part |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205776795U (en) * | 2016-05-16 | 2016-12-07 | 中国一冶集团有限公司 | Rectangular column foundation bolt batch positioner |
CN208930485U (en) * | 2018-06-26 | 2019-06-04 | 中民筑友科技投资有限公司 | A kind of embedded parts positioning device |
CN211421795U (en) * | 2019-09-25 | 2020-09-04 | 宁波建工工程集团有限公司 | Three-section type pull rod overhanging external scaffold |
CN212926597U (en) * | 2020-06-23 | 2021-04-09 | 河南津大幕墙有限公司 | Glass curtain wall internal corner stand matching part |
CN213359297U (en) * | 2020-08-19 | 2021-06-04 | 四川中际建设工程有限公司 | Scaffold for civil house construction |
CN113090017A (en) * | 2021-05-26 | 2021-07-09 | 江西国金建设集团有限公司 | Foldable rectangular column template reinforcing buckle structure |
CN214834685U (en) * | 2021-05-19 | 2021-11-23 | 深圳市博广达工程科技有限公司 | High-interchangeability coil buckle type scaffold system |
CN216156380U (en) * | 2021-09-15 | 2022-04-01 | 中国铁建大桥工程局集团有限公司 | Prefabricated bridge deck system pre-buried sleeve positioning device |
-
2022
- 2022-06-21 CN CN202210708120.1A patent/CN115094691A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205776795U (en) * | 2016-05-16 | 2016-12-07 | 中国一冶集团有限公司 | Rectangular column foundation bolt batch positioner |
CN208930485U (en) * | 2018-06-26 | 2019-06-04 | 中民筑友科技投资有限公司 | A kind of embedded parts positioning device |
CN211421795U (en) * | 2019-09-25 | 2020-09-04 | 宁波建工工程集团有限公司 | Three-section type pull rod overhanging external scaffold |
CN212926597U (en) * | 2020-06-23 | 2021-04-09 | 河南津大幕墙有限公司 | Glass curtain wall internal corner stand matching part |
CN213359297U (en) * | 2020-08-19 | 2021-06-04 | 四川中际建设工程有限公司 | Scaffold for civil house construction |
CN214834685U (en) * | 2021-05-19 | 2021-11-23 | 深圳市博广达工程科技有限公司 | High-interchangeability coil buckle type scaffold system |
CN113090017A (en) * | 2021-05-26 | 2021-07-09 | 江西国金建设集团有限公司 | Foldable rectangular column template reinforcing buckle structure |
CN216156380U (en) * | 2021-09-15 | 2022-04-01 | 中国铁建大桥工程局集团有限公司 | Prefabricated bridge deck system pre-buried sleeve positioning device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116851999A (en) * | 2023-06-07 | 2023-10-10 | 河北畅盛科技工程有限公司 | Auxiliary fixing device for welding embedded part |
CN116851999B (en) * | 2023-06-07 | 2024-02-06 | 河北畅盛科技工程有限公司 | Auxiliary fixing device for welding embedded part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110425342B (en) | Super high-rise concrete pumping pipe installation structure and installation method thereof | |
CN115094691A (en) | Positioning frame for pre-buried sleeve of track bolt | |
CN109695473A (en) | A kind of railway tunnel built-in groove channel fixing device and fixing means | |
CN112081391A (en) | A steel structure truss single tube splicing device | |
CN204386608U (en) | A kind of tunnel invert construction tool | |
CN112726824B (en) | Assembled steel structure building steel column joint structure and installation method | |
JP2014181439A (en) | Form device for prismatic concrete structure and construction method using the same | |
CN210482377U (en) | Assembled gallows of utility tunnel pipeline | |
CN114922553B (en) | Electrician climbing ladder | |
CN108896371B (en) | Manufacturing tool and manufacturing method for new and old concrete junction surface oblique shear test piece | |
CN107740585B (en) | Hanging installation method for ultra-long inclined steel structure circular pipe | |
CN215443113U (en) | Column formwork support structure | |
CN108612259B (en) | An assembled lattice column that is easy to disassemble and its use method | |
CN104533077A (en) | Telescopic platform for hydraulic climbing form frame and manufacturing method of telescopic platform | |
WO2021103895A1 (en) | Pre-embedded assembly type expansion joint ultra-long installation suspension leveling positioning system and construction method | |
CN109778597B (en) | Variable cross section shear hinge and floating plate using same | |
CN221810531U (en) | A cross-bracing concrete surface defect repairing device | |
CN214613355U (en) | Railway track slab repair formwork clamp construction device | |
CN221186948U (en) | Movable clamp for PC component die | |
CN213277043U (en) | PE pipeline connection scene simulator | |
CN219471588U (en) | Verticality adjuster for vertical component of assembly structure | |
CN205741943U (en) | A kind of continuous rigid frame bridge closure segment pushing tow top board top support structure | |
CN217782879U (en) | Adjustable clip supports formula beam type template strutting arrangement | |
CN221823115U (en) | Constructional column steel bar embedded part | |
CN221973056U (en) | Rag bolt location mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |