WO2015098584A1 - ユーザ端末、無線基地局、無線通信方法及び無線通信システム - Google Patents
ユーザ端末、無線基地局、無線通信方法及び無線通信システム Download PDFInfo
- Publication number
- WO2015098584A1 WO2015098584A1 PCT/JP2014/083071 JP2014083071W WO2015098584A1 WO 2015098584 A1 WO2015098584 A1 WO 2015098584A1 JP 2014083071 W JP2014083071 W JP 2014083071W WO 2015098584 A1 WO2015098584 A1 WO 2015098584A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cell
- control signal
- pucch
- uplink control
- cells
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
- H04W72/232—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal the control data signalling from the physical layer, e.g. DCI signalling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0032—Distributed allocation, i.e. involving a plurality of allocating devices, each making partial allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signalling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/14—Spectrum sharing arrangements between different networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/20—Selecting an access point
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0014—Three-dimensional division
- H04L5/0023—Time-frequency-space
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W48/00—Access restriction; Network selection; Access point selection
- H04W48/18—Selecting a network or a communication service
Definitions
- the present invention relates to a user terminal, a radio base station, a radio communication method, and a radio communication system applicable to a next generation communication system.
- LTE Long Term Evolution
- SC-FDMA Single Carrier Frequency Division Multiple Access
- LTE-A LTE Advanced or LTE enhancement
- the system band of the LTE-A system includes at least one component carrier (CC: Component Carrier) having the system band of the LTE system as a unit.
- CC Component Carrier
- CA carrier aggregation
- the CC is simply referred to as a cell.
- a control channel (PDCCH :) in which downlink control information (DCI) related to a cell that transmits and receives signals on a shared data channel (PDSCH (Physical Downlink Shared Channel) / PUSCH (Physical Uplink Shared Channel)) is assigned to another cell by CCS. Notification can be made via Physical Downlink Control Channel.
- DCI downlink control information
- PDSCH Physical Downlink Shared Channel
- PUSCH Physical Uplink Shared Channel
- E-UTRA Evolved Universal Terrestrial Radio Access
- E-UTRAN Evolved Universal Terrestrial Radio Access Network
- the present invention has been made in view of such points, and in a system in which a plurality of radio base stations and user terminals communicate using CA or DC, even when CCS and PUCCH on SCell are applied simultaneously,
- One of the objects is to provide a user terminal, a radio base station, a radio communication method, and a radio communication system that can suppress performance degradation of the entire system.
- a user terminal is a user terminal that communicates with a plurality of cell groups each composed of one or more cells using different frequency bands, and is transmitted from each cell.
- a receiving unit that receives a link signal; and a control unit that selects at least one cell from cells to which an uplink control signal set for each cell group can be assigned and controls the cell as a cell that transmits the uplink control signal.
- the control unit includes a cell that has received the downlink control signal and a cell that transmits the uplink control signal. It is determined whether or not they are the same, and a resource to be allocated to the uplink control signal is determined based on the determination result.
- CA carrier aggregation
- DC dual connectivity
- positioning scenario 4 of a carrier aggregation It is a figure which shows an example of allocation of PUCCH with respect to SCell. It is a figure which shows an example of cross carrier scheduling (CCS). It is a figure which shows an example of CCS assumed in the conventional CA. It is a figure which shows an example of the parameter of PDCCH / EPDCCH used for allocation of the PUCCH resource at the time of CCS setting. It is a figure which shows an example of allocation of the PUCCH resource by aspect 1 at the time of detecting CCS which does not straddle CG.
- CCS cross carrier scheduling
- PUCCH Physical Downlink Control Channel
- EPDCCH extended physical downlink control channel
- PUCCH Physical Downlink Control Channel
- the description “transmit / receive a channel (PUCCH, PDCCH, etc.)” means that a signal is transmitted / received via the channel.
- uplink and downlink are simply described, they mean “uplink” and “downlink”, respectively.
- HetNet Heterogeneous Network
- CA Carrier aggregation
- DC dual connectivity
- the HetNet configuration in order to support further increase in traffic, a scenario in which small cells are deployed at high density is being studied.
- a scenario in which small cells are deployed at high density is being studied.
- the macro cell layer wide coverage and mobility are ensured by establishing a connection of a control plane (C (Control) -plane) and supporting a high transmission power density in a low frequency band.
- C Control
- U User
- the small cell may be called a phantom cell, a pico cell, a nano cell, a femto cell, a micro cell, or the like.
- FIG. 1 is a schematic diagram of carrier aggregation (CA) and dual connectivity (DC).
- the user terminal UE communicates with the radio base stations eNB1 and eNB2.
- FIG. 1 shows control signals transmitted and received via a physical downlink control channel (PDCCH: Physical Downlink Control Channel) and a physical uplink control channel (PUCCH: Physical Uplink Control Channel).
- PDCCH Physical Downlink Control Channel
- PUCCH Physical Uplink Control Channel
- DCI Downlink Control Information
- UCI Uplink Control Information
- FIG. 1A shows communication of eNB1, eNB2 and UE related to CA.
- eNB1 is a radio base station (hereinafter referred to as a macro base station) that forms a macro cell
- eNB2 is a radio base station (hereinafter referred to as a small base station) that forms a small cell.
- the small base station may have a configuration such as RRH (Remote Radio Head) connected to the macro base station.
- RRH Remote Radio Head
- one scheduler for example, a scheduler included in the macro base station eNB1 controls scheduling of a plurality of cells.
- CA (Rel. 10/11 CA) may be referred to as intra-base station CA (intra-eNB CA), but is simply referred to as CA in this specification.
- HARQ Hybrid Automatic Repeat reQuest
- SCell Small cell
- FIG. 1B shows communication of eNB1, eNB2 and UE related to DC.
- eNB1 and eNB2 are macro base stations, but are not limited to this configuration.
- a plurality of schedulers are provided independently, and the plurality of schedulers (for example, the scheduler that the macro base station eNB1 has and the scheduler that the macro base station eNB2 has) each have one or more cells Control the scheduling of For this reason, DC may be referred to as inter-base station CA (inter-eNB CA).
- inter-eNB CA inter-base station CA
- the base stations are connected by a non-ideal backhaul whose delay cannot be ignored. For example, they are connected by an X2 interface. For this reason, the UE needs to feed back UCI related to a cell formed by the base station for each base station. That is, the UE needs to perform UCI feedback by assigning PUCCH to radio resources of at least one SCell in addition to PCell (PUCCH on SCell). As described above, in DC, the UE needs to transmit PUCCH in at least two cells, but there is a feature that a throughput improvement effect similar to CA can be obtained without connecting between cells by an ideal backhaul.
- FIG. 2 is a schematic diagram of CA placement scenario 4.
- the macro cell is PCell and the small cell is SCell.
- CA deployment scenario 4 (deployment scenario # 4) secures macro cell coverage at frequency F1 and offloads macro cell traffic to small cells formed by RRH (Remote Radio Head) at frequency F2 (F1 ⁇ F2). It is a configuration. According to the said structure, it is possible to enjoy the effect of both the mobility ensuring by a macro cell and the capacity increase by a small cell.
- the user terminal can offload UCI feedback to the small cell.
- the user terminal needs to be able to use uplink CA (UL-CA).
- FIG. 3 is a diagram illustrating an example of PUCCH allocation to SCells in DC or CA.
- the horizontal axis represents frequency, and shows connections between five cells using radio resources in a predetermined frequency band and the user terminal UE.
- a cell configured to be able to allocate a PUCCH is referred to as a “PUCCH configured cell”.
- the SCell that is set to be able to assign the PUCCH is referred to as a “PUCCH setting SCell”.
- an SCell that is not set as being capable of being assigned a PUCCH is referred to as a “PUCCH non-configured SCell”.
- the PUCCH setting cell includes a PCell and a PUCCH setting SCell.
- FIG. 3A is a diagram illustrating an example of PUCCH allocation to SCells in DC.
- each radio base station sets a cell group (CG: Cell Group) composed of one or a plurality of cells.
- CG Cell Group
- Each CG is likely to be composed of one or more cells formed by the same radio base station or one or more cells formed by the same transmission point (transmission antenna device, transmission station, etc.). Is not limited to this.
- the CG including the PCell is called a master cell group (MCG: Master CG), and the CG other than the MCG is called a secondary cell group (SCG: Secondary CG).
- MCG Master CG
- SCG Secondary CG
- Each CG can perform CA for two or more cells, but is set so that the sum of the cells constituting the MCG and SCG is a predetermined value (for example, five cells) or less.
- the predetermined value may be determined in advance or may be dynamically set between the eNB and the UE. Further, the total number of MCGs and SCGs that can be configured, combinations of cells, and the like may be notified to the eNB as capability signaling according to the UE implementation.
- a radio base station in which MCG is set is called a master base station (MeNB: Master eNB), and a radio base station in which SCG is set is called a secondary base station (SeNB: Secondary eNB).
- the UE is connected to five cells (C1-C5).
- C1 is PCell and C2-C5 is SCell.
- C1 and C2 constitute an MCG, and C3-C5 constitute an SCG.
- the frequencies used by each cell are C1, C2, C3, C4, and C5 in ascending order.
- Each CG is set so that at least one cell can feed back the PUCCH.
- C1 which is PCell is set as a PUCCH setting cell of MCG
- C3 is set as a PUCCH setting cell of SCG. That is, UCI feedback by MCG PUCCH is performed by PCell (C1), and UCI feedback by SCG PUCCH is performed by PUCCH setting SCell (C3).
- the UE can also multiplex and transmit UCI on PUSCH. That is, UCI feedback by PUSCH is not limited to a PUCCH setting cell.
- FIG. 3B is a diagram illustrating an example of PUCCH allocation to SCell in CA.
- each radio base station also sets CG configured by one or a plurality of cells in CA.
- Each CG is likely to be composed of one or more cells formed by the same radio base station or one or more cells formed by the same transmission point (transmission antenna device, transmission station, etc.). Is not limited to this.
- CG including PCell in CA is referred to as XCG
- CG other than XCG is referred to as YCG.
- the names are not particularly limited.
- each CG CA of two or more cells can be performed, but the total of the cells constituting the XCG and YCG is set to be a predetermined value (for example, 5 cells) or less.
- the predetermined value may be determined in advance or may be dynamically set between the eNB and the UE.
- the cell configuration is the same as in FIG. 3A except that XCG and YCG correspond to the MCG and SCG in FIG. 3A.
- Each CG is set so that at least one cell can feed back the PUCCH.
- C1 which is a PCell
- C3 is set as a cell to which a YCG PUCCH can be assigned. That is, C1 and C3 are PUCCH setting cells, UCG feedback of XCG is performed by PCell (C1), and UCI feedback of YCG is performed by PUCCH setting SCell (C3).
- the UE can also multiplex and transmit UCI on PUSCH. That is, UCI feedback by PUSCH is not limited to a PUCCH setting cell.
- the information regarding a PUCCH setting cell is notified to a user terminal from a radio base station by higher layer signaling (for example, RRC signaling, a broadcast signal).
- the information regarding CG may also be notified by higher layer signaling.
- the user terminal may be notified of information on a cell or CG that feeds back UCI on the PCell PUCCH or information on a cell or CG that feeds back UCI on the SCell PUCCH.
- FIG. 3B shows that CA is configured to transmit PUCCH in one SCell in addition to PCell, and in each case, two cells (ie, XCG) of UCI for PCell of PCell and three cells (ie, YCG of PUCCH of SCell). This is an example in a case where the UCI is set to be fed back.
- PDSCH-1 is assigned to cell C1
- PDSCH-2 is assigned to a different cell C2.
- PDCCH-1 which is control information for decoding PDSCH-1 is transmitted by the same C1 as PDSCH-1 (FIG. 4A).
- PDCCH-2 which is control information for decoding PDSCH-2, is sent on C1 different from PDSCH-2 (FIG. 4B).
- Each of PDCCH-1 and PDCCH-2 includes a CIF (Carrier Indicator Field).
- the CIF is a bit field for setting a carrier identifier (CI) that identifies a cell (CC) scheduled in CCS to DCI.
- CCS straddling CG means CCS in the case of indicating scheduling for a cell belonging to a CG different from the CG to which the cell receiving the PDCCH belongs. In other words, it means CCS when a cell that transmits and receives PDCCH and a cell in which PDSCH decoding is performed using the PDCCH (a cell specified by CIF included in PDCCH) belong to different CGs.
- a system in which CCS and PUCCH on SCell are simultaneously applied can be considered.
- PUCCH on SCell is essential, and in addition, there is a possibility that CCS is applied to perform load balancing of PDCCH.
- PUCCH on SCell is not essential in CA, but PUCCH on SCell may be set for the purpose of PUCCH load balancing, and CCS may be applied to perform PDCCH load balancing. .
- FIG. 5 is a diagram illustrating an example of CCS assumed in the conventional CA.
- FIG. 6 is a diagram illustrating an example of PDCCH / EPDCCH parameters used for PUCCH resource allocation when CCS is set.
- PCell (C1) is a PUCCH transmission cell.
- CCS from PCell to SCell such as CCS from C1 to C2
- the PUCCH resource of the transmission cell is determined.
- FIG. 6A shows an example of the minimum CCE number
- FIG. 6B shows an example of the minimum ECCE number.
- the PUCCH resource of PUCCH format 1a / 1b is determined by the following equation (1) in the case of PDCCH, and by the following equation (2) in the case of EPDCCH (distributed transmission).
- a transmission power control (TPC) command bit included in PDCCH / EPDCCH is used for a retransmission response signal.
- TPC transmission power control
- ARI ACK / NACK Resource Indicator
- allocation is dynamically performed by ARI from PUCCH resource candidates set in advance by an upper layer. Also, since CCS from SCell to PCell is not supported, it is not shown in FIG.
- the present inventors focused on the fact that the following CCSs (1) to (6) are considered when considering the PUCCH transmission in the SCell; (1) PUCCH configuration from the PCell CCS to SCell, (2) CCS from PCell to PUCCH non-configured SCell, (3) CCS from PUCCH configured SCell to PUCCH configured SCell, (4) CCS from PUCCH configured SCell to PUCCH non-configured SCell, (5) CCS from PUCCH non-configuration SCell to PUCCH configuration SCell, (6) CCS from PUCCH non-configuration SCell to PUCCH non-configuration SCell. Note that CCS to PCell is not supported.
- the present inventors have noted that the PUCCH setting cell feeds back not only its own cell but also the UCI of another SCell.
- the UCIs of C1 and C2 are transmitted by the PCell (C1)
- the UCIs of C3, C4, and C5 are transmitted by the PUCCH setting SCell (C3).
- the present inventors appropriately define the operation when CCS and PUCCH on SCell are set in a system in which a plurality of radio base stations and user terminals communicate using CA or DC. I was inspired by that.
- the present inventors determine whether or not the PDCCH receiving cell (the cell in which the user terminal receives the PDCCH that notifies CCS) and the cell that transmits the PUCCH selected from the PUCCH setting cell are the same.
- the idea is to change the method for determining the resource to be allocated to the PUCCH based on the determination result.
- a cell corresponding to a PCell in PUCCH resource allocation at the time of conventional CCS setting can be expanded to a PUCCH setting cell including a PUCCH setting SCell. For this reason, it becomes possible to appropriately determine the resource for transmitting the PUCCH, and the occurrence of a decrease in the performance of the entire system can be reduced.
- a user terminal shall have the structure which selects the cell which transmits PUCCH from PUCCH setting cells, when PDCCH which notifies CCS is detected.
- a cell that transmits PUCCH when PDCCH indicating CCS is detected is referred to as a “PUCCH transmission cell”. If a CCS that straddles a CG is detected, the PUCCH setting cell of each CG can be a PUCCH transmission cell. However, if a CCS that does not cross the CG is detected, the PUCCH setting cell of the CG that detects the CCS is a PUCCH transmission. Can be a cell.
- the radio communication method receives a CCS indicating scheduling for one cell (referred to as aspect 1) and receives a CCS indicating scheduling for a plurality of cells (referred to as aspect 2). ).
- a CCS indicating scheduling for one cell referred to as aspect 1
- a CCS indicating scheduling for a plurality of cells referred to as aspect 2.
- each aspect is demonstrated concretely, respectively.
- the scheduling indicated by the CIF is CCS, and even if the scheduling is for the same cell (carrier), it is called CCS.
- Aspect 1 of the radio communication method according to the present embodiment regulates PUCCH resource allocation when receiving CCS indicating scheduling to one cell.
- a PUCCH signal including one UCI is transmitted from one PUCCH transmission cell.
- the UCI to be fed back is an acknowledgment signal such as an acknowledgment (ACK: Acknowledgement) or a negative acknowledgment (NACK: Negative ACK), but other than this (for example, channel quality information (CQI: Channel Quality Information), etc.) is fed back. You may do it.
- the upper layer parameter and the CCE number of the PUCCH to which DCI is assigned PUCCH resources are allocated based on (ECCE number in the case of EPDCCH).
- the PUCCH resource can be calculated according to the above-described equation (1).
- the CCE number is written, the ECCE number of EPDCCH is also included.
- the user terminal uses the PUCCH resource based on the higher layer parameter and the ARI included in the DCI. Assign.
- the PUCCH resource can be calculated according to the above-described equation (2).
- the user terminal When the downlink control signal includes information indicating a plurality of cross carrier scheduling, the user terminal is selected for each cell specified by the cell receiving the downlink control signal and the information indicating the cross carrier scheduling. It is determined whether or not the cell transmitting the uplink control signal is the same, and a resource to be allocated to the uplink control signal is determined based on the determination result. The same applies to the second aspect described later.
- FIG. 7 is a diagram illustrating an example of PUCCH resource allocation according to aspect 1 when a CCS that does not cross CG is detected.
- the configuration of the cell and CG is shown in the upper part of FIG.
- the time series of the process which concerns on the user terminal in the case where a PDCCH receiving cell and a PUCCH transmission cell are the same and different in the middle part and the lower part of FIG. 7 is shown.
- the configuration of the cell and CG shown in the upper part is the same as the configuration shown in FIG. 3A.
- the configuration to which the radio communication method according to the present embodiment is applied is not limited to this, and may be applied to other DC configurations or CA configurations. That is, the MCG and SCG shown in FIG. 7-13 may be XCG and YCG as shown in FIG. 3B, or may be composed of a combination of CG other than these.
- 7-13 is the same in that the PDCCH reception cell and the PUCCH transmission cell are time series of processing related to the user terminal when the same and different PDCCH transmission cells.
- 7-13 shows an example in which the cell group including the PDCCH reception cell is SCG. However, even when the SCG and the MCG are replaced in each figure, the same as the original figure except that the CG is different. Result.
- the user terminal receives PDCCH indicating CCS to C4 at C3, decodes PDSCH scheduled by CCS at C4, and transmits PUCCH for the PDSCH at C3.
- the PDCCH reception cell and the PUCCH transmission cell are the same, allocation based on the CCE number is performed.
- the user terminal receives the PDCCH indicating the CCS to C5 at C4, decodes the PDSCH scheduled by the CCS at C5, and transmits the PUCCH for the PDSCH at C3.
- the PDCCH reception cell and the PUCCH transmission cell are different, allocation based on the ARI is performed.
- FIG. 8 is a diagram illustrating an example of PUCCH resource allocation according to aspect 1 when a CCS straddling CG is detected.
- the middle part of FIG. 8 shows an example in which the user terminal receives PDCCH indicating CCS to C2 at C3, decodes PDSCH scheduled by CCS at C2, and transmits PUCCH for the PDSCH at C3.
- the PDCCH reception cell and the PUCCH transmission cell are the same, allocation based on the CCE number is performed.
- the lower part of FIG. 8 shows an example in which the PDCCH indicating the CCS to C2 is received by C3, the PDSCH scheduled by the CCS is decoded by C2, and the PUCCH for the PDSCH is transmitted by C1.
- the PDCCH reception cell and the PUCCH transmission cell are different, allocation based on the ARI is performed.
- the wireless communication method according to the present embodiment is close to the existing CCS mechanism adopted by CA, the mounting burden is small and can be introduced at an early stage. Further, in a system to which CCS and PUCCH on SCell are applied at the same time, PUCCH can be appropriately operated, so that PUCCH load balance and PDCCH interference control can be appropriately performed.
- the PDSCH reception cell and the PUCCH transmission cell are the same, in addition to the determination method for determining the resource to be allocated to the PUCCH depending on whether the PDCCH reception cell and the PUCCH transmission cell are the same, the PDSCH reception cell and the PUCCH transmission cell May be determined based on whether or not are the same. Specifically, when the PDSCH reception cell and the PUCCH transmission cell are the same, the radio resource number for receiving the PDSCH instead of the ARI and / or the antenna port number of the reference signal required for PDSCH demodulation (demodulation reference signal) You may use the method of determining the resource allocated to PUCCH.
- radio resources to be allocated to the uplink control signal based on the information on the downlink shared data channel received in the cell specified by the information indicating the cross carrier scheduling instead of the ARI. You may decide.
- the downlink shared data channel for example, the radio resource number of the downlink shared data channel and / or the antenna port number of the demodulation reference signal of the downlink shared data channel can be used.
- PUCCH resource allocation based on the PDSCH radio resource number can prevent PUCCH resource collision between user terminals.
- data destined for different user terminals is spatially multiplexed, there is a possibility that a collision may occur if PUCCH resources are allocated only with PDSCH radio resources.
- the antenna port number of the demodulation reference signal differs between user terminals, it is possible to prevent collision of PUCCH resources between user terminals by using the antenna port number together with PUCCH resource allocation. .
- the PDCCH reception cell and the PUCCH transmission cell are not the same, and the PDSCH reception cell and the PUCCH transmission cell are the same, whether to use the ARI or the PDSCH radio resource or the reference signal antenna port number Is set in advance. You may switch according to the transmission mode (Transmission mode) and the presence or absence of the setting of EPDCCH. Further, when the PDCCH reception cell, the PDSCH reception cell, and the PUCCH transmission cell are all the same, it is sufficient to perform PUCCH resource allocation based on the PDCCH CCE number.
- Aspect 2 of the radio communication method according to the present embodiment regulates PUCCH resource allocation when CCS indicating scheduling to a plurality of cells is received.
- CCS a plurality of PDSCHs may be allocated at the same time. In such a case, allocation of PUCCH resources is determined according to aspect 2.
- aspect 2 When CCS indicates scheduling to a plurality of cells, in aspect 2, the determination of aspect 1 is performed for each cell indicated by the CCS, and the PUCCH resource for each cell is determined.
- aspect 2 is roughly divided into three cases: When a user terminal transmits a PUCCH signal including UCI of two cells from one PUCCH transmission cell (aspect 2.1), one PUCCH transmission When transmitting a PUCCH signal including UCI of three or more cells from a cell (aspect 2.2), and simultaneously transmitting PUCCH signals from two or more PUCCH transmission cells (aspect 2.3) is there.
- aspects 2.1, aspect 2.2, and aspect 2.3 are included.
- Aspect 2.1 is applied when a user terminal transmits a PUCCH signal including UCIs of two cells from one PUCCH transmission cell. In this case, channel selection (channel selection) is performed on the two PUCCH resources determined in accordance with aspect 1.
- channel selection sets a plurality of radio resources for the PUCCH format 1a / 1b, and retransmits a plurality of cells by bit information by phase modulation (for example, QPSK data modulation) and radio resource selection information.
- phase modulation for example, QPSK data modulation
- radio resource selection information for example, a combination of response signals can be notified.
- mapping table which can be determined by the number of cells assigned by RRC signaling from the higher layer and the transmission mode (that is, the number of transport blocks, the number of codewords, etc.).
- PUCCH radio resources for example, Ch1 to Ch4 set in the mapping table, indexes of OCC (Orthogonal Cover Code), CS (Cyclic Shift) and PRB (Physical Resource Block) can be used.
- FIG. 9 is a diagram illustrating an example of PUCCH resource allocation according to aspect 2.1 when CCS is detected to two cells that do not cross CG.
- the user terminal receives the PDCCH indicating the CCS to C3 and C5 at C3, decodes the PDSCH scheduled by the CCS at C3 and C5, and transmits the PUCCH for the two PDSCHs at C3.
- An example is shown.
- the allocation based on the CCE number is performed, so that the allocation based on the two CCE numbers is performed, and the channel selection is applied to the allocated resources.
- the user terminal receives PDCCH indicating CCS to C4 and C5 at C4, decodes PDSCH scheduled by CCS at C4 and C5, respectively, and PUCCH for the two PDSCHs at C3.
- An example of transmission is shown.
- the allocation based on the ARI is performed, so that the allocation based on the two ARIs is performed, and the channel selection is applied to the allocated resources so that the PUCCH transmission resource To decide.
- FIG. 10 is a diagram illustrating an example of allocation of PUCCH resources according to aspect 2.1 when CCS is detected to two cells including CCSs straddling CG.
- the user terminal receives the PDCCH indicating the CCS to C2 and C4 at C3, decodes the PDSCH scheduled by the CCS at C2 and C4, respectively, and transmits the PUCCH for the two PDSCHs at C3.
- An example is shown.
- the allocation based on the CCE number is performed in order to perform the allocation based on the CCE number to which the two PDCCHs are mapped.
- a PUCCH transmission resource is determined by applying channel selection.
- the user terminal receives PDCCH indicating CCS to C2 and C5 at C4, decodes PDSCH scheduled by CCS at C2 and C5, respectively, and PUCCH for the two PDSCHs at C3.
- An example of transmission is shown.
- the allocation based on the ARI is performed, so that the allocation based on the two ARIs is performed, and the channel selection is applied to the allocated resources so that the PUCCH transmission resource To decide.
- Aspect 2.2 is applied when a user terminal transmits a PUCCH signal including UCIs of three or more cells from one PUCCH transmission cell.
- the TPC command bit is regarded as an ARI
- a PUCCH resource is determined
- a PUCCH signal configured in PUCCH format 3 is assigned to the resource.
- PUCCH format 3 it is possible to transmit an acknowledgment signal having a maximum of 10 bits in frequency division duplex (FDD) and a maximum of 20 bits in time division duplex (TDD).
- FDD frequency division duplex
- TDD time division duplex
- the correspondence between the ARI and the PUCCH resource is notified by higher layer signaling (for example, RRC signaling).
- the PUCCH format 3 when the PDCCH / PDSCH actually received by the user terminal is only the PDSCH allocation of 1 or 2 cells (for example, When the user terminal fails to receive the PDCCH), feedback is performed using the PUCCH format 1a / 1b with the PUCCH resource determined based on the CCE number or the ARI according to the rule of aspect 1 or aspect 2.1.
- FIG. 11 is a diagram illustrating an example of PUCCH resource allocation according to aspect 2.2 when CCS is detected to three cells that do not cross CG.
- the user terminal receives the PDCCH indicating CCS to C3, C4, and C5 at C3, decodes the PDSCH scheduled by CCS at C3, C4, and C5, respectively, and performs the corresponding PDSCH for the three PDSCHs at C3.
- the example which transmits PUCCH is shown.
- the user terminal since the TPC command bit is regarded as an ARI and the PUCCH resource is determined, the user terminal, as in aspect 1, even if the PDCCH reception cell and the PUCCH transmission cell are the same, the CCE number
- the PUCCH resource is determined based on the ARI, and the PUCCH signal configured in the PUCCH format 3 is allocated to the resource.
- the PUCCH transmission resource is determined based on the CCE number to which the PDCCH is mapped, and the PUCCH configured in the PUCCH format 1a / 1b is assigned to the resource. Assign signals.
- the user terminal receives the PDCCH indicating CCS to C3, C4, and C5 at C4, decodes the PDSCH scheduled by CCS at C3, C4, and C5, respectively.
- the example which transmits PUCCH with respect to PDSCH is shown.
- the user terminal determines the PUCCH resource based on the ARI as described above. For example, when the user terminal actually receives only the PDCCH to which C4 is allocated, the PUCCH transmission resource is determined based on the ARI included in the PDCCH, and the PUCCH signal configured in the PUCCH format 1a / 1b is assigned to the resource. assign.
- FIG. 12 is a diagram illustrating an example of PUCCH resource allocation according to aspect 2.2 when CCS is detected in three cells including CCSs straddling CG.
- the user terminal receives the PDCCH indicating the CCS to C2, C4, and C5 at C3, decodes the PDSCH scheduled by the CCS at C2, C4, and C5, respectively, and performs the corresponding PDSCH for the three PDSCHs at C3.
- the example which transmits PUCCH is shown.
- the user terminal determines the PUCCH resource based on the ARI as described above.
- the PUCCH transmission resource is determined based on the CCE number to which the PDCCH is mapped, and the PUCCH configured in the PUCCH format 1a / 1b is assigned to the resource. Assign signals.
- the user terminal receives PDCCH indicating CCS to C2, C4, and C5 at C4, decodes PDSCH scheduled by CCS at C2, C4, and C5.
- the example which transmits PUCCH with respect to PDSCH is shown.
- the user terminal determines the PUCCH resource based on the ARI as described above. For example, when the user terminal actually receives only the PDCCH to which C4 is allocated, the PUCCH transmission resource is determined based on the ARI included in the PDCCH, and the PUCCH signal configured in the PUCCH format 1a / 1b is assigned to the resource. assign.
- Aspect 2.3 is applied when a user terminal transmits PUCCH signals simultaneously from two or more PUCCH transmission cells.
- a PUCCH resource is determined using an appropriate one of aspect 1, aspect 2.1, and aspect 2.2.
- PUCCH signals are simultaneously transmitted from the determined plurality of radio resources.
- FIG. 13 is a diagram illustrating an example of PUCCH resource allocation according to aspect 2.3 when CCS is detected in two cells.
- the user terminal receives PDCCH indicating CCS to C2 and C4 at C3, decodes PDSCH scheduled by CCS at C2 and C4, respectively, and transmits PUCCH to each PDSCH at C1 and C3.
- An example is shown.
- the PDCCH reception cell and the PUCCH transmission cell are the same, the allocation based on the CCE number is performed, and when the PDCCH reception cell is different, the allocation based on the ARI is performed.
- the PUCCH transmission resource is determined, and in C3, the PUCCH transmission resource is determined based on one CCE number. And each PUCCH signal is transmitted from the resource determined by C1 and C3.
- the user terminal receives PDCCH indicating CCS to C2 and C5 at C4, decodes PDSCH scheduled by CCS at C2 and C5, respectively, and PUCCH for each PDSCH at C1 and C3.
- PDCCH indicating CCS to C2 and C5 at C4 decodes PDSCH scheduled by CCS at C2 and C5, respectively, and PUCCH for each PDSCH at C1 and C3.
- each PUCCH transmission resource was determined based on aspect 1, it is not restricted to this.
- the resource of one PUCCH transmission cell may be determined in aspect 1
- the resource of another PUCCH transmission cell may be determined in aspect 2.1.
- FIG. 13 shows a case where a plurality of PUCCH signals are simultaneously transmitted from two PUCCH transmission cells, but the same applies even when three or more PUCCH transmission cells are selected.
- a PUCCH resource is determined using an appropriate one of the modes 1, 2.1, and 2.2, and PUCCH signals are simultaneously transmitted from the determined plurality of radio resources. To do.
- CCS when CCS and PUCCH on SCell are set in a wireless communication system to which DC or CA is applied, CCS indicating scheduling to a plurality of cells.
- the number of UCIs of cells included in the PUCCH signal transmitted by the PUCCH transmission cell, and the PUCCH transmission cell PUCCH resources for each cell are determined based on the number of PUCCH setting cells selected as.
- the number of CGs is 2 and the total number of cells constituting each CG has been described as 5.
- the application of the radio communication method according to the present embodiment is not limited to this configuration. .
- three or more CGs may exist, and each CG may be composed of one cell.
- control information of the upper layer and the physical layer may be combined and dynamically selected.
- a PUCCH transmission cell candidate may be set by higher layer signaling, and a PUCCH may be transmitted by a cell selected from the candidate based on physical layer information.
- indicates a PUCCH transmission cell in addition to a PDSCH reception cell by CIF.
- a PUCCH transmission cell may be indicated in addition to the PUCCH resource by ARI.
- PUCCH transmission cells can be flexibly set, and channel selection and simultaneous transmission can be configured (configurable), so PUCCH offloading and quality assurance can be performed according to network and traffic conditions. Can be controlled. Also, by reusing existing physical layer control information, the configuration can be realized without incurring PDCCH / EPDCCH quality degradation and overhead increase.
- PUCCH transmission for CQI / SR may be set.
- PUCCH transmission for CQI / SR can be set semi-static by higher layers such as RRC signaling.
- PUCCH transmission for CQI / SR is based on Rel. 11 to PCell only, Rel. After 12 can be set to PCell and / or PUCCH setting SCell.
- PUSCH transmission may be granted at the timing of PUCCH transmission of an acknowledgment signal for PDSCH. This PUSCH transmission may occur in all uplink cells for which UL-CA is set.
- the PUCCH resource may be determined as follows without following the PUCCH resource allocation method of the above-described aspect. For example, at a timing when a PUCCH resource for CQI / SR is set, a configuration in which an acknowledgment signal is multiplexed on the PUCCH resource can be adopted. In addition, at the timing when the PUSCH resource is set, an acknowledgment signal can be multiplexed on the PUSCH resource.
- FIG. 14 is a diagram illustrating an example of a schematic configuration of the wireless communication system according to the present embodiment.
- the wireless communication system shown in FIG. 14 is a system that includes, for example, an LTE system or SUPER 3G.
- carrier aggregation (CA) and / or dual connectivity (DC) in which a plurality of basic frequency blocks (component carriers) having the system bandwidth of the LTE system as one unit can be applied.
- this wireless communication system may be called IMT-Advanced, 4G, FRA (Future Radio Access), or the like.
- the radio communication system 1 shown in FIG. 14 includes a radio base station 11 that forms a macro cell C1, and radio base stations 12a and 12b that are arranged in the macro cell C1 and form a small cell C2 that is narrower than the macro cell C1. .
- the user terminal 20 is arrange
- DC is applied.
- CA may be referred to as intra-base station CA (Intra-eNB CA)
- DC may be referred to as inter-base station CA (Inter-eNB CA).
- Communication between the user terminal 20 and the radio base station 11 is performed using a carrier having a relatively low frequency band (for example, 2 GHz) and a narrow bandwidth (referred to as an existing carrier or a legacy carrier).
- a carrier having a relatively high frequency band (for example, 3.5 GHz) and a wide bandwidth may be used between the user terminal 20 and the radio base station 12, or between the user base 20 and the radio base station 11.
- the same carrier may be used.
- a new carrier type (NCT) may be used as a carrier type between the user terminal 20 and the radio base station 12.
- the wireless base station 11 and the wireless base station 12 (or between the wireless base stations 12) are wired (optical fiber, X2 interface, etc.) or wirelessly connected.
- the radio base station 11 and each radio base station 12 are connected to the higher station apparatus 30 and connected to the core network 40 via the higher station apparatus 30.
- the upper station device 30 includes, for example, an access gateway device, a radio network controller (RNC), a mobility management entity (MME), and the like, but is not limited thereto. Further, each radio base station 12 may be connected to a higher station apparatus via the radio base station 11.
- RNC radio network controller
- MME mobility management entity
- the radio base station 11 is a radio base station having a relatively wide coverage, and may be referred to as an eNodeB, a macro base station, a transmission / reception point, or the like.
- the radio base station 12 is a radio base station having local coverage, and may be called a small base station, a pico base station, a femto base station, a Home eNodeB, a micro base station, a transmission / reception point, or the like.
- the radio base stations 11 and 12 are not distinguished, they are collectively referred to as a radio base station 10.
- Each user terminal 20 is a terminal that supports various communication schemes such as LTE and LTE-A, and may include not only a mobile communication terminal but also a fixed communication terminal.
- OFDMA Orthogonal Frequency Division Multiple Access
- SC-FDMA Single Carrier Frequency Division Multiple Access
- OFDMA is a multi-carrier transmission scheme that performs communication by dividing a frequency band into a plurality of narrow frequency bands (subcarriers) and mapping data to each subcarrier.
- SC-FDMA is a single-carrier transmission scheme that reduces interference between terminals by dividing the system bandwidth into bands consisting of one or continuous resource blocks for each terminal and using a plurality of terminals with mutually different bands. is there.
- the downlink communication channel includes a PDSCH (Physical Downlink Shared Channel) shared by each user terminal 20 and a downlink L1 / L2 control channel (PDCCH, PCFICH, PHICH, extended PDCCH).
- PDSCH Physical Downlink Shared Channel
- PDCCH Physical Downlink Control Channel
- DCI Downlink Control Information
- the number of OFDM symbols used for PDCCH is transmitted by PCFICH (Physical Control Format Indicator Channel).
- the HARQ ACK / NACK for PUSCH is transmitted by PHICH (Physical Hybrid-ARQ Indicator Channel). Moreover, scheduling information of PDSCH and PUSCH may be transmitted by an extended PDCCH (EPDCCH). This EPDCCH is frequency division multiplexed with PDSCH (downlink shared data channel).
- PHICH Physical Hybrid-ARQ Indicator Channel
- EPDCCH extended PDCCH
- the uplink communication channel includes a PUSCH (Physical Uplink Shared Channel) that is an uplink data channel shared by each user terminal 20 and a PUCCH (Physical Uplink Control Channel) that is an uplink control channel. User data and higher control information are transmitted by this PUSCH. Also, downlink radio quality information (CQI: Channel Quality Indicator) and uplink control information (UCI: Uplink Control Information) such as ACK / NACK are transmitted by PUCCH.
- CQI Channel Quality Indicator
- UCI Uplink Control Information
- FIG. 15 is a diagram illustrating an example of an overall configuration of the radio base station 10 (including the radio base stations 11 and 12) according to the present embodiment.
- the radio base station 10 includes a plurality of transmission / reception antennas 101 for MIMO (Multi Input Multi Output) transmission, an amplifier unit 102, a transmission / reception unit 103, a baseband signal processing unit 104, a call processing unit 105, a transmission path And an interface 106.
- MIMO Multi Input Multi Output
- User data transmitted from the radio base station 10 to the user terminal 20 via the downlink is input from the higher station apparatus 30 to the baseband signal processing unit 104 via the transmission path interface 106.
- the baseband signal processing unit 104 performs PDCP layer processing, user data division / combination, RLC layer transmission processing including RLC (Radio Link Control) retransmission control transmission processing, MAC (Medium Access Control) retransmission control (for example, HARQ (Hybrid ARQ) transmission processing), scheduling, transmission format selection, channel coding, inverse fast Fourier transform (IFFT) processing, and precoding processing are performed and transferred to each transmission / reception section 103.
- the downlink control channel signal is also subjected to transmission processing such as channel coding and inverse fast Fourier transform, and transferred to each transceiver 103.
- the baseband signal processing unit 104 notifies the user terminal 20 of control information for communication in the cell by higher layer signaling (RRC signaling, broadcast signal, etc.).
- the information for communication in the cell includes, for example, uplink or downlink system bandwidth and feedback resource information.
- Each transmission / reception unit 103 converts the baseband signal output by precoding for each antenna from the baseband signal processing unit 104 to a radio frequency band.
- the amplifier unit 102 amplifies the frequency-converted radio frequency signal and transmits the amplified signal using the transmission / reception antenna 101.
- radio frequency signals received by the respective transmission / reception antennas 101 are amplified by the amplifier units 102 and frequency-converted by the respective transmission / reception units 103. It is converted into a baseband signal and input to the baseband signal processing unit 104.
- the baseband signal processing unit 104 performs fast Fourier transform (FFT) processing, inverse discrete Fourier transform (IDFT: Inverse Discrete Fourier Transform) processing, error on user data included in the input baseband signal. Correction decoding, MAC retransmission control reception processing, RLC layer, and PDCP layer reception processing are performed and transferred to the upper station apparatus 30 via the transmission path interface 106.
- the call processing unit 105 performs call processing such as communication channel setting and release, state management of the radio base station 10, and radio resource management.
- FIG. 16 is a diagram illustrating an example of a main functional configuration of the baseband signal processing unit 104 included in the radio base station 10 according to the present embodiment.
- the baseband signal processing unit 104 included in the radio base station 10 includes a control unit 301, a downlink control signal generation unit 302, a downlink data signal generation unit 303, a mapping unit 304, A mapping unit 305, a channel estimation unit 306, an uplink control signal decoding unit 307, and an uplink data signal decoding unit 308 are included at least.
- a control unit 301 includes a control unit 301, a downlink control signal generation unit 302, a downlink data signal generation unit 303, a mapping unit 304, A mapping unit 305, a channel estimation unit 306, an uplink control signal decoding unit 307, and an uplink data signal decoding unit 308 are included at least.
- a control unit 301 includes a control unit 301, a downlink control signal generation unit 302, a downlink data signal generation unit 303,
- the control unit 301 controls scheduling of downlink user data transmitted on the PDSCH, downlink control information (DCI) transmitted on the PDCCH and / or enhanced PDCCH (EPDCCH), downlink reference signals, and the like.
- the control unit 301 also performs control (allocation control) of uplink data transmitted on the PUSCH, uplink control information (UCI) transmitted on the PUCCH or PUSCH, and uplink reference signal scheduling.
- Information related to allocation control of uplink signals is notified to user terminals using downlink control information.
- the control unit 301 controls allocation of radio resources to the downlink signal and the uplink signal based on the instruction information from the higher station apparatus 30 and the feedback information from each user terminal 20. That is, the control unit 301 has a function as a scheduler.
- the control part 301 when applying DC to the user terminal 20, the control part 301 is good also as a structure which controls the scheduling of one or more cells for every radio base station 10 independently.
- CA When CA is applied to the user terminal 20, the control unit 301 is configured to collectively control scheduling of a plurality of cells including cells of other radio base stations 10, and the control unit of the other radio base station 10 It is good also as a structure which 301 does not have a function as a scheduler.
- control unit 301 controls the PDCCH / EPDCCH signal configuration and notifies the downlink control signal generation unit 302 of the PDCCH / EPDCCH signal configuration.
- the downlink control signal generation unit 302 generates a downlink control signal (PDCCH signal and / or EPDCCH signal) whose assignment has been determined by the control unit 301. Specifically, the downlink control signal generation unit 302, based on an instruction from the control unit 301, DL allocation (DL assignment) for notifying downlink signal allocation information or UL for notifying uplink signal allocation information. Generate a grant (UL grant).
- DL allocation DL assignment
- UL grant Generate a grant
- the downlink control signal generation unit 302 is preferably configured to generate the CIF of the downlink control signal in association with a PUCCH transmission cell related to a cell for which CCS is specified based on the CIF.
- the downlink data signal generation unit 303 generates a downlink data signal (PDSCH signal) from user data input from the transmission path interface 106.
- the data signal generated by the downlink data signal generation unit 303 includes an encoding process and a modulation process according to a coding rate and a modulation scheme determined based on information such as channel state information (CSI) from each user terminal 20 Is done.
- CSI channel state information
- the mapping unit 304 is configured to generate a radio resource for the downlink control signal generated by the downlink control signal generation unit 302 and the downlink data signal generated by the downlink data signal generation unit 303. Control assignments to
- the demapping unit 305 demaps the uplink signal transmitted from the user terminal and separates the uplink signal.
- Channel estimation section 306 estimates the channel state from the reference signal included in the received signal separated by demapping section 305, and outputs the estimated channel state to uplink control signal decoding section 307 and uplink data signal decoding section 308. To do.
- the uplink control signal decoding unit 307 decodes a feedback signal (for example, confirmation response signal) transmitted from the user terminal through the uplink control channel (PUCCH) and outputs the decoded signal to the control unit 301.
- the uplink data signal decoding unit 308 decodes the uplink data signal transmitted from the user terminal through the uplink shared channel (PUSCH) and outputs the decoded signal to the transmission path interface 106.
- FIG. 17 is a diagram illustrating an example of the overall configuration of the user terminal 20 according to the present embodiment.
- the user terminal 20 includes a plurality of transmission / reception antennas 201 for MIMO transmission, an amplifier unit 202, a transmission / reception unit (reception unit) 203, a baseband signal processing unit 204, and an application unit 205.
- radio frequency signals received by a plurality of transmission / reception antennas 201 are each amplified by an amplifier unit 202, converted in frequency by a transmission / reception unit 203, and converted into a baseband signal.
- the baseband signal is subjected to FFT processing, error correction decoding, retransmission control reception processing, and the like by the baseband signal processing unit 204.
- downlink user data is transferred to the application unit 205.
- the application unit 205 performs processing related to a layer higher than the physical layer and the MAC layer. Also, broadcast information in the downlink data is also transferred to the application unit 205.
- uplink user data is input from the application unit 205 to the baseband signal processing unit 204.
- the baseband signal processing unit 204 performs MAC retransmission control (for example, HARQ transmission processing), channel coding, precoding, discrete Fourier transform (DFT) processing, IFFT processing, etc. 203.
- the transmission / reception unit 203 converts the baseband signal output from the baseband signal processing unit 204 into a radio frequency band. Thereafter, the amplifier unit 202 amplifies the frequency-converted radio frequency signal and transmits the amplified signal using the transmitting / receiving antenna 201.
- FIG. 18 is a diagram illustrating an example of a main functional configuration of the baseband signal processing unit 204 included in the user terminal 20.
- the baseband signal processing unit 204 included in the user terminal 20 includes a control unit 401, an uplink control signal generation unit 402, an uplink data signal generation unit 403, a mapping unit 404, and demapping.
- the necessary configuration is provided without a shortage.
- the control unit 401 controls generation of an uplink control signal (feedback signal) and an uplink data signal based on the downlink control signal (PDCCH signal) transmitted from the radio base station and the received PDSCH signal.
- the downlink control signal is output from the downlink control signal decoding unit 407.
- the control unit 401 may manage information required for communication with the radio base station 10 such as whether the user terminal 20 is applied with DC or whether CA is applied.
- control part 401 can utilize the information regarding each cell and CG with which the user terminal 20 is communicating.
- control unit 401 can use information about a cell that has received each downlink signal.
- the control unit 401 also functions as a feedback control unit that controls feedback of an acknowledgment signal (ACK / NACK) with respect to the PDSCH signal. Specifically, the control unit 401 controls selection of a cell (CC) to which an acknowledgment signal is fed back and a PUCCH resource to which the acknowledgment signal is allocated. Based on the downlink control signal transmitted from the radio base station, the control unit 401 determines the feedback destination cell of the acknowledgment signal and the PUCCH resource to be used, and the uplink control signal generation unit 402 and the mapping unit 404 To give instructions.
- ACK / NACK acknowledgment signal
- the control unit 401 selects a PUCCH transmission cell from PUCCH setting cells set by the radio base station in order to determine a PUCCH resource. For example, the control unit 401 may select a PUCCH transmission cell based on information notified in an upper layer and / or a physical layer. For example, the PUCCH transmission cell may be selected from information notified by higher layer signaling (RRC signaling, broadcast signal, etc.). Alternatively, the control information of the upper layer and the physical layer may be combined and dynamically selected. Moreover, the control part 401 may select a PUCCH transmission cell based on the result of having determined whether a PDCCH receiving cell and the cell designated by CCS belong to the same CG.
- control unit 401 refers to the CIF output from the downlink control signal decoding unit 407 and transmits the PUCCH transmission cell. It is good also as a structure which selects. In addition, the selection method of the PUCCH transmission cell in the control part 401 is not restricted to these.
- the control unit 401 determines whether or not the PDCCH reception cell and the selected PUCCH transmission cell are the same in order to determine the PUCCH resource.
- the control unit 401 determines that the PDCCH reception cell and the PUCCH transmission cell are the same (when the determination result is true)
- the control unit 401 and the CCE number of the PUCCH to which DCI is assigned Is determined based on the ECCE number
- the uplink control signal generation unit 402 and the mapping unit 404 are instructed to perform feedback using the resource.
- control unit 401 determines that the PDCCH reception cell is different from the PUCCH transmission cell (when the determination result is false)
- the control unit 401 uses the UCI based on the upper layer parameter and the ARI included in the DCI. Is assigned to the uplink control signal generation unit 402 and the mapping unit 404 so as to be fed back by the resource (Aspect 1).
- control unit 401 may further include a determination unit that determines whether or not a cell specified by information indicating cross carrier scheduling is the same as a cell that transmits an uplink control signal.
- a determination unit that determines whether or not a cell specified by information indicating cross carrier scheduling is the same as a cell that transmits an uplink control signal.
- a radio resource number related to the PDSCH for example, a radio resource number related to the PDSCH, an antenna port number of a reference signal for demodulation of the PDSCH, and the like can be used. Note that the determination as to whether or not the PDCCH reception cell and the PUCCH transmission cell are the same and the determination by the determination unit do not interfere with each other, and both can be performed.
- the control unit 401 when transmitting a PUCCH signal including the UCIs of two cells in one PUCCH transmission cell, applies the channel selection to the PUCCH resource determined based on the above determination result, and uses the UCI.
- the PUCCH resource to be allocated is determined, and an instruction is given to the uplink control signal generation section 402 and the mapping section 404 so as to be fed back by the resource (Aspect 2.1).
- control unit 401 when transmitting a PUCCH signal including UCIs of three or more cells in one PUCCH transmission cell, applies UCI in PUCCH format 3 to the PUCCH resource determined based on the above determination result.
- An instruction is given to uplink control signal generation section 402 and mapping section 404 so as to be assigned and fed back (aspect 2.2).
- control unit 401 when there are two or more selected PUCCH transmission cells, the control unit 401 generates an uplink control signal so as to simultaneously transmit the PUCCH signal from the PUCCH resource determined based on the determination result.
- the unit 402 and the mapping unit 404 are instructed (Aspect 2.3). In this case, channel selection may be applied to each PUCCH signal, and UCI of PUCCH format 3 may be assigned.
- control unit 401 may determine whether DC is applied or CA is applied based on information notified from the network (for example, the wireless base station 10, the higher station apparatus 30, etc.).
- the information may be direct information that DC or CA is applied, or indirect information (for example, information indicating that MCG and SCG are set, information on an architecture used for communication, Information on backhaul, etc.).
- the information may be set by higher layer signaling (RRC signaling, broadcast signal, etc.) or may be included in the downlink signal.
- the uplink control signal generation unit 402 generates an uplink control signal (acknowledgment response signal, feedback signal such as CSI) based on an instruction from the control unit 401. Further, the uplink data signal generation unit 403 generates an uplink data signal based on an instruction from the control unit 401. Note that the control unit 401 instructs the uplink data signal generation unit 403 to generate an uplink data signal when the UL grant is included in the downlink control signal notified from the radio base station.
- the mapping unit 404 controls allocation of uplink control signals (UCI) and uplink data signals to radio resources based on an instruction from the control unit 401. For example, the mapping unit 404 allocates a feedback signal to the PUCCH of the cell according to the cell (CC) that performs feedback via the PUCCH.
- UCI uplink control signals
- CC cell
- the demapping unit 405 demaps the downlink signal transmitted from the radio base station 10 and separates the downlink signal.
- the channel estimation unit 406 estimates the channel state from the reference signal included in the received signal separated by the demapping unit 405, and sends the estimated channel state to the downlink control signal decoding unit 407 and the downlink data signal decoding unit 408. Output.
- the downlink control signal decoding unit 407 decodes the downlink control signal (PDCCH signal) transmitted on the downlink control channel (PDCCH), and outputs scheduling information (allocation information to uplink resources) to the control unit 401.
- the downlink data signal decoding unit 408 decodes the downlink data signal transmitted through the downlink shared channel (PDSCH) and outputs the decoded downlink data signal to the application unit 205.
- PDSCH downlink shared channel
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Computer Security & Cryptography (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
本実施の形態に係る無線通信方法の態様1は、1つのセルへのスケジューリングを示すCCSを受信した場合におけるPUCCHリソースの割り当てを規定するものである。態様1では、1つのPUCCH送信セルから1つのUCIを含んだPUCCH信号を送信することになる。フィードバックするUCIは、例えば肯定応答(ACK:Acknowledgement)、否定応答(NACK:Negative ACK)などの確認応答信号であるが、これ以外(例えば、チャネル品質情報(CQI:Channel Quality Information)など)をフィードバックしても良い。
本実施の形態に係る無線通信方法の態様2は、複数のセルへのスケジューリングを示すCCSを受信した場合におけるPUCCHリソースの割り当てを規定するものである。CCSでは、複数のPDSCHを同時に割り当てることがあるが、そのような場合には態様2によりPUCCHリソースの割り当てを決定する。
態様2.1は、ユーザ端末が、1つのPUCCH送信セルから2つのセルのUCIを含んだPUCCH信号を送信する場合に適用される。この場合、態様1により決定された2つのPUCCHリソースに対してチャネルセレクション(channel selection)を行う。
態様2.2は、ユーザ端末が、1つのPUCCH送信セルから3つ以上のセルのUCIを含んだPUCCH信号を送信する場合に適用される。この場合、TPCコマンドビットをARIとみなして、PUCCHリソースを決定し、当該リソースにPUCCHフォーマット3で構成されたPUCCH信号を割り当てる。PUCCHフォーマット3によれば、周波数分割複信(FDD:Frequency Division Duplex)では最大10ビット、時間分割複信(TDD:Time Division Duplex)では最大20ビットの確認応答信号を送信することができる。ARIとPUCCHリソースとの対応関係は、上位レイヤシグナリング(例えば、RRCシグナリング)によって通知される。
態様2.3は、ユーザ端末が、2つ以上のPUCCH送信セルからPUCCH信号を同時送信する場合に適用される。まず、各PUCCH送信セルについて、態様1、態様2.1及び態様2.2のうち適切なものを用いてPUCCHリソースを決定する。そして、決定した複数の無線リソースから、それぞれPUCCH信号を同時送信する。
なお、CGをまたぐCCSにおいて、いずれのPUCCH設定セルからPUCCHを送信するかは、上位レイヤから設定しても良いし、物理レイヤで動的に選択しても良い。例えば、上位レイヤシグナリング(RRCシグナリング、報知信号など)でPUCCH送信セルを直接設定しても良い。
なお、PDSCHに対する確認応答信号以外にも、CQI/SR(Scheduling Request)向けのPUCCH送信が設定される可能性がある。具体的には、CQI/SR向けのPUCCH送信は、RRCシグナリングなどの上位レイヤにより準静的(semi-static)に設定され得る。また、CQI/SR向けのPUCCH送信は、Rel.11まではPCellのみに、Rel.12以降はPCell及び/又はPUCCH設定SCellに設定され得る。
以下、本実施の形態に係る無線通信システムの一例について、詳細に説明する。なお、同一の構成要素には同一の符号を付し、重複する説明は省略する。
Claims (10)
- 異なる周波数帯を利用する1つ以上のセルからそれぞれ構成される複数のセルグループと通信を行うユーザ端末であって、
各セルから送信される下りリンク信号を受信する受信部と、
各セルグループにそれぞれ設定される上り制御信号を割り当て可能なセルから少なくとも1つのセルを選択し、上り制御信号を送信するセルとして制御する制御部と、を有し、
前記制御部は、前記受信部が受信した下り制御信号にクロスキャリアスケジューリングを示す情報が含まれる場合に、当該下り制御信号を受信したセルと、前記上り制御信号を送信するセルと、が同一か否かを判定し、当該判定結果に基づいて前記上り制御信号に割り当てるリソースを決定することを特徴とするユーザ端末。 - 前記制御部は、前記判定結果が真であり、かつ前記上り制御信号が2つ以下のセルの上り制御情報を含む場合に、前記下り制御信号が割り当てられた下り制御チャネルのCCE(Control Channel Element)番号又はECCE(Enhanced CCE)番号に基づいて、前記上り制御信号に割り当てる無線リソースを決定することを特徴とする請求項1に記載のユーザ端末。
- 前記制御部は、前記判定結果が真であるとともに前記上り制御信号が3つ以上のセルの上り制御情報を含む場合、又は前記判定結果が偽である場合に、前記下り制御信号に含まれるARI(ACK/NACK Resource Indicator)に基づいて、前記上り制御信号に割り当てる無線リソースを決定することを特徴とする請求項1又は2に記載のユーザ端末。
- 前記制御部は、前記判定結果が偽である場合、前記クロスキャリアスケジューリングを示す情報により指定されるセルと、前記上り制御信号を送信するセルと、が同一か否かを判定する判定部を有し、
当該判定部の判定結果が真である場合、前記ARIの代わりに、前記クロスキャリアスケジューリングを示す情報により指定されるセルで受信する下り共有データチャネルに関する情報に基づいて、前記上り制御信号に割り当てる無線リソースを決定することを特徴とする請求項3に記載のユーザ端末。 - 前記制御部は、前記上り制御信号が2つのセルの上り制御情報を含む場合に、前記判定結果に基づいて決定した無線リソースにチャネルセレクションを適用して、前記上り制御信号に割り当てる無線リソースを決定することを特徴とする請求項1に記載のユーザ端末。
- 前記制御部は、前記上り制御信号が3つ以上のセルの上り制御情報を含む場合に、前記判定結果に基づいて決定した無線リソースにPUCCHフォーマット3により生成した上り制御信号を割り当てることを特徴とする請求項1に記載のユーザ端末。
- 前記制御部は、前記上り制御信号を送信するセルとして複数のセルが制御される場合に、前記判定結果に基づいて決定した複数の無線リソースから前記上り制御信号を同時送信するように制御することを特徴とする請求項1に記載のユーザ端末。
- 異なる周波数帯を利用する1つ以上のセルから構成されるセルグループを形成し、前記セルグループと異なるセルグループを形成する他の無線基地局とデュアルコネクティビティ(Dual Connectivity)又はキャリアアグリゲーション(Carrier Aggregation)を適用してユーザ端末と通信する無線基地局であって、
各セルから下りリンク信号を送信する送信部と、
各セルグループにそれぞれ設定される上り制御信号を割り当て可能なセルから、上り制御信号を受信する受信部と、を有し、
前記上り制御信号に割り当てられたリソースは、前記送信部によってクロスキャリアスケジューリングを示す情報を含む下り制御信号が送信されたセルと、前記上り制御信号が送信されるセルと、が同一か否かを判定した結果に基づいて決定されたことを特徴とする無線基地局。 - 異なる周波数帯を利用する1つ以上のセルからそれぞれ構成される複数のセルグループと通信を行うユーザ端末の無線通信方法であって、
各セルから送信される下りリンク信号を受信する工程と、
各セルグループにそれぞれ設定される上り制御信号を割り当て可能なセルから少なくとも1つのセルを選択し、上り制御信号を送信するセルとして制御する工程と、を有し、
受信した下り制御信号にクロスキャリアスケジューリングを示す情報が含まれる場合に、当該下り制御信号を受信したセルと、前記上り制御信号を送信するセルと、が同一か否かを判定し、
前記上り制御信号に割り当てるリソースは、当該判定結果に基づいて決定されることを特徴とする無線通信方法。 - 異なる周波数帯を利用する1つ以上のセルから構成されるセルグループを形成し、前記セルグループと異なるセルグループを形成する他の無線基地局とデュアルコネクティビティ(Dual Connectivity)又はキャリアアグリゲーション(Carrier Aggregation)を適用して無線基地局がユーザ端末と通信する無線通信システムであって、
前記ユーザ端末は、各セルから送信される下りリンク信号を受信する受信部と、
各セルグループにそれぞれ設定される上り制御信号を割り当て可能なセルから少なくとも1つのセルを選択し、上り制御信号を送信するセルとして制御する制御部と、を有し、
前記制御部は、前記受信部が受信した下り制御信号にクロスキャリアスケジューリングを示す情報が含まれる場合に、当該下り制御信号を受信したセルと、前記上り制御信号を送信するセルと、が同一か否かを判定し、当該判定結果に基づいて前記上り制御信号に割り当てるリソースを決定し、
前記無線基地局は、各セルから下りリンク信号を送信する送信部と、
各セルグループにそれぞれ設定される上り制御信号を割り当て可能なセルから、上り制御情報を受信する受信部と、を有することを特徴とする無線通信システム。
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/107,473 US9985758B2 (en) | 2013-12-26 | 2014-12-15 | User terminal, radio base station, radio communication method and radio communication system |
EP19168921.5A EP3528564B1 (en) | 2013-12-26 | 2014-12-15 | User terminal and radio communication method |
KR1020167015949A KR102015373B1 (ko) | 2013-12-26 | 2014-12-15 | 유저단말, 무선기지국, 무선통신방법 및 무선통신시스템 |
EP14875045.8A EP3089529B1 (en) | 2013-12-26 | 2014-12-15 | User terminal and wireless communication method |
CN201910930438.2A CN110602783B (zh) | 2013-12-26 | 2014-12-15 | 用户终端、无线通信方法 |
CN201480070746.8A CN105900506B (zh) | 2013-12-26 | 2014-12-15 | 用户终端、无线基站、无线通信方法以及无线通信系统 |
US15/962,237 US10389497B2 (en) | 2013-12-26 | 2018-04-25 | User terminal and radio base station |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013268333A JP6012588B2 (ja) | 2013-12-26 | 2013-12-26 | ユーザ端末、無線基地局及び無線通信方法 |
JP2013-268333 | 2013-12-26 |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/107,473 A-371-Of-International US9985758B2 (en) | 2013-12-26 | 2014-12-15 | User terminal, radio base station, radio communication method and radio communication system |
US15/962,237 Continuation US10389497B2 (en) | 2013-12-26 | 2018-04-25 | User terminal and radio base station |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015098584A1 true WO2015098584A1 (ja) | 2015-07-02 |
Family
ID=53478448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/083071 WO2015098584A1 (ja) | 2013-12-26 | 2014-12-15 | ユーザ端末、無線基地局、無線通信方法及び無線通信システム |
Country Status (6)
Country | Link |
---|---|
US (2) | US9985758B2 (ja) |
EP (2) | EP3528564B1 (ja) |
JP (1) | JP6012588B2 (ja) |
KR (1) | KR102015373B1 (ja) |
CN (2) | CN105900506B (ja) |
WO (1) | WO2015098584A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017181787A1 (zh) * | 2016-04-18 | 2017-10-26 | 中兴通讯股份有限公司 | 上行控制信息传输方法、装置、系统及存储介质 |
Families Citing this family (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6012588B2 (ja) * | 2013-12-26 | 2016-10-25 | 株式会社Nttドコモ | ユーザ端末、無線基地局及び無線通信方法 |
CN107926019A (zh) * | 2015-08-31 | 2018-04-17 | 株式会社Ntt都科摩 | 用户终端、无线基站以及无线通信方法 |
US10827471B2 (en) * | 2016-02-16 | 2020-11-03 | Qualcomm Incorporated | Uplink procedures on a wireless communication medium |
US20190158206A1 (en) * | 2016-05-13 | 2019-05-23 | Intel IP Corporation | Multi-user multiple input multiple ouput systems |
ES2919748T3 (es) * | 2016-11-25 | 2022-07-28 | Ntt Docomo Inc | Terminal de usuario y método de comunicación inalámbrica |
CN108282881B (zh) * | 2017-01-06 | 2020-12-15 | 华为技术有限公司 | 一种资源配置方法及装置 |
AU2017404993A1 (en) * | 2017-03-22 | 2019-10-10 | Ntt Docomo, Inc. | User terminal and radio communication method |
US11070334B2 (en) * | 2017-04-20 | 2021-07-20 | Ntt Docomo, Inc. | User terminal and radio communication method |
CN110832898B (zh) * | 2017-05-02 | 2023-09-05 | 株式会社Ntt都科摩 | 用户终端以及无线通信方法 |
US11191043B2 (en) * | 2017-05-02 | 2021-11-30 | Ntt Docomo, Inc. | User terminal and radio communication method |
US10419196B2 (en) | 2017-05-05 | 2019-09-17 | At&T Intellectual Property I, L.P. | Virtual carrier aggregation for wideband operation of wireless communication systems |
MX2019013299A (es) * | 2017-05-10 | 2020-02-05 | Ntt Docomo Inc | Terminal de usuario y metodo de radiocomunicacion. |
CN110832816A (zh) * | 2017-05-12 | 2020-02-21 | 株式会社Ntt都科摩 | 用户终端以及无线通信方法 |
ES2929390T3 (es) * | 2017-05-31 | 2022-11-28 | Ntt Docomo Inc | Terminal, método de comunicación por radio y sistema |
MX2019014706A (es) * | 2017-06-08 | 2020-02-07 | Ntt Docomo Inc | Terminal de usuario y metodo de comunicacion por radio. |
US11196531B2 (en) * | 2017-06-13 | 2021-12-07 | Ntt Docomo, Inc. | User terminal and radio communication method |
EP3641467A4 (en) * | 2017-06-13 | 2021-01-20 | Ntt Docomo, Inc. | USER TERMINAL DEVICE, WIRELESS BASE STATION AND WIRELESS COMMUNICATION PROCEDURE |
EP3644531A4 (en) * | 2017-06-23 | 2021-03-24 | NTT DoCoMo, Inc. | USER TERMINAL DEVICE AND WIRELESS COMMUNICATION PROCEDURE |
US20200288438A1 (en) * | 2017-09-07 | 2020-09-10 | Ntt Docomo, Inc. | User terminal and radio communication method |
CN111316608B (zh) * | 2017-09-08 | 2023-07-25 | 株式会社Ntt都科摩 | 用户终端以及无线通信方法 |
JP7068331B2 (ja) * | 2017-10-31 | 2022-05-16 | 株式会社Nttドコモ | 端末および端末の送信方法 |
RU2749094C1 (ru) * | 2017-11-09 | 2021-06-04 | Гуандун Оппо Мобайл Телекоммьюникейшнз Корп., Лтд. | Способ определения ресурсов канала управления восходящей линии связи, оконечное устройство и устройство со стороны сети |
EP3742837A4 (en) * | 2018-01-19 | 2021-09-15 | Ntt Docomo, Inc. | USER TERMINAL AND RADIOELECTRIC COMMUNICATION PROCESS |
PT3758427T (pt) * | 2018-02-23 | 2023-12-19 | Ntt Docomo Inc | Terminal de utilizador, estação base sem fios e método de comunicações sem fios |
AU2019437515A1 (en) * | 2019-03-27 | 2021-09-30 | Ntt Docomo, Inc. | User equipment |
US11356996B2 (en) * | 2019-07-06 | 2022-06-07 | Qualcomm Incorporated | Cross carrier activation of a periodic grant |
EP4008073B1 (en) * | 2019-08-01 | 2024-11-27 | QUALCOMM Incorporated | Cross carrier feedback |
US11310815B2 (en) | 2020-07-14 | 2022-04-19 | Sprint Communications Company L.P. | Wireless data communication service over multiple uplinks |
CN116137966A (zh) * | 2020-08-06 | 2023-05-19 | 株式会社Ntt都科摩 | 终端、基站装置及接收方法 |
US20240032035A1 (en) * | 2020-08-07 | 2024-01-25 | Ntt Docomo, Inc. | Terminal and communication method |
JP7534535B2 (ja) | 2020-08-17 | 2024-08-14 | 華為技術有限公司 | アップリンク制御情報を伝送するための方法、通信装置、および関連デバイス |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012176602A1 (ja) * | 2011-06-21 | 2012-12-27 | シャープ株式会社 | 移動通信システム、基地局装置、移動局装置、通信方法および集積回路 |
JP2013179597A (ja) * | 2010-01-11 | 2013-09-09 | Electronics & Telecommunications Research Inst | 無線通信システムでキャリア集成 |
US20130322397A1 (en) * | 2011-03-18 | 2013-12-05 | Lg Electronics Inc. | Method of transmitting control information in a wireless communication system and apparatus thereof |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9485060B2 (en) * | 2009-10-01 | 2016-11-01 | Interdigital Patent Holdings, Inc. | Uplink control data transmission |
EP2502456B1 (en) * | 2009-11-19 | 2020-08-12 | InterDigital Patent Holdings, Inc. | Component carrier activation/deactivation in multi-carrier systems |
WO2011132721A1 (en) * | 2010-04-22 | 2011-10-27 | Sharp Kabushiki Kaisha | Communication method and system for physical uplink control channel resource assignment, and base station, user equipment and integrated circuit therein |
WO2011137408A2 (en) * | 2010-04-30 | 2011-11-03 | Interdigital Patent Holdings, Inc. | Determination of carriers and multiplexing for uplink control information transmission |
CN102013954B (zh) * | 2010-07-08 | 2011-12-07 | 华为技术有限公司 | 信道状态信息上报方法和用户设备 |
US9060360B2 (en) * | 2010-07-26 | 2015-06-16 | Lg Electronics Inc. | Method and device for transmitting control information |
JP4923161B1 (ja) * | 2010-09-29 | 2012-04-25 | シャープ株式会社 | 移動通信システム、移動局装置、基地局装置、通信方法および集積回路 |
CN102098151B (zh) * | 2010-12-28 | 2015-08-12 | 中兴通讯股份有限公司 | 一种正确/错误应答消息的发送方法及用户终端 |
US8879497B2 (en) * | 2011-01-05 | 2014-11-04 | Panasonic Intellectual Property Corporation Of America | Terminal device, base station device, transmitting method and receiving method |
WO2012169744A2 (ko) * | 2011-06-08 | 2012-12-13 | 엘지전자 주식회사 | 무선통신 시스템에서의 정보 전송 방법 및 장치 |
CN103636150B (zh) * | 2011-06-28 | 2016-11-09 | Lg电子株式会社 | 发送和接收上行信号的方法、用户设备和基站 |
CN102932918B (zh) * | 2011-08-09 | 2016-03-30 | 华为技术有限公司 | 物理上行控制信道分配方法、用户设备、和基站 |
WO2013027963A2 (ko) * | 2011-08-19 | 2013-02-28 | 엘지전자 주식회사 | 상향링크 제어정보 전송방법 및 사용자기기와, 상향링크 제어정보 수신방법 및 기지국 |
KR102217646B1 (ko) * | 2012-05-24 | 2021-02-19 | 삼성전자 주식회사 | 이동 통신 시스템 및 그 이동 통신 시스템에서 채널 송수신 방법 |
US9526091B2 (en) * | 2012-03-16 | 2016-12-20 | Intel Corporation | Method and apparatus for coordination of self-optimization functions in a wireless network |
US8923255B2 (en) * | 2012-03-16 | 2014-12-30 | Blackberry Limited | Uplink control channel resource collision avoidance in carrier aggregation systems |
US9369998B2 (en) * | 2012-04-15 | 2016-06-14 | Lg Electronics Inc. | Method for determining uplink resource, method for transmitting uplink control signal using same, and apparatus therefor |
KR20150018531A (ko) * | 2012-05-09 | 2015-02-23 | 삼성전자주식회사 | 이동통신 시스템에서 불연속 수신을 제어하는 방법 및 장치 |
JP6012588B2 (ja) * | 2013-12-26 | 2016-10-25 | 株式会社Nttドコモ | ユーザ端末、無線基地局及び無線通信方法 |
JP2015126308A (ja) * | 2013-12-26 | 2015-07-06 | 株式会社Nttドコモ | ユーザ端末、無線基地局、無線通信方法及び無線通信システム |
-
2013
- 2013-12-26 JP JP2013268333A patent/JP6012588B2/ja active Active
-
2014
- 2014-12-15 US US15/107,473 patent/US9985758B2/en active Active
- 2014-12-15 CN CN201480070746.8A patent/CN105900506B/zh active Active
- 2014-12-15 KR KR1020167015949A patent/KR102015373B1/ko active Active
- 2014-12-15 WO PCT/JP2014/083071 patent/WO2015098584A1/ja active Application Filing
- 2014-12-15 EP EP19168921.5A patent/EP3528564B1/en active Active
- 2014-12-15 EP EP14875045.8A patent/EP3089529B1/en active Active
- 2014-12-15 CN CN201910930438.2A patent/CN110602783B/zh active Active
-
2018
- 2018-04-25 US US15/962,237 patent/US10389497B2/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013179597A (ja) * | 2010-01-11 | 2013-09-09 | Electronics & Telecommunications Research Inst | 無線通信システムでキャリア集成 |
US20130322397A1 (en) * | 2011-03-18 | 2013-12-05 | Lg Electronics Inc. | Method of transmitting control information in a wireless communication system and apparatus thereof |
WO2012176602A1 (ja) * | 2011-06-21 | 2012-12-27 | シャープ株式会社 | 移動通信システム、基地局装置、移動局装置、通信方法および集積回路 |
Non-Patent Citations (2)
Title |
---|
3RD GENERATION PARTNERSHIP PROJECT: "Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN) stage 2", 3GPP TS 36.300 |
See also references of EP3089529A4 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017181787A1 (zh) * | 2016-04-18 | 2017-10-26 | 中兴通讯股份有限公司 | 上行控制信息传输方法、装置、系统及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
US10389497B2 (en) | 2019-08-20 |
EP3528564A1 (en) | 2019-08-21 |
US20160323076A1 (en) | 2016-11-03 |
EP3089529B1 (en) | 2019-08-07 |
US9985758B2 (en) | 2018-05-29 |
US20180248664A1 (en) | 2018-08-30 |
CN110602783A (zh) | 2019-12-20 |
JP6012588B2 (ja) | 2016-10-25 |
CN105900506B (zh) | 2019-10-25 |
EP3528564B1 (en) | 2021-09-08 |
EP3089529A1 (en) | 2016-11-02 |
EP3089529A4 (en) | 2017-06-14 |
KR20160102991A (ko) | 2016-08-31 |
CN110602783B (zh) | 2023-06-02 |
JP2015126309A (ja) | 2015-07-06 |
KR102015373B1 (ko) | 2019-08-28 |
CN105900506A (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6012588B2 (ja) | ユーザ端末、無線基地局及び無線通信方法 | |
JP5931828B2 (ja) | ユーザ端末、基地局及び無線通信方法 | |
US10462781B2 (en) | User terminal, base station and radio communication method | |
JP6216592B2 (ja) | ユーザ端末、基地局及び送信制御方法 | |
CN105850215B (zh) | 用户终端、无线基站、无线通信方法以及无线通信系统 | |
WO2015046060A1 (ja) | ユーザ端末、基地局及び無線通信方法 | |
JP6224417B2 (ja) | ユーザ端末、基地局及び無線通信方法 | |
JP2018019416A (ja) | ユーザ端末、基地局及び送信制御方法 | |
JP6410779B2 (ja) | ユーザ端末及び無線通信方法 | |
JP6243191B2 (ja) | ユーザ端末、基地局及び無線通信方法 | |
JP2017184282A (ja) | ユーザ端末、無線基地局及び無線通信方法 | |
JP2018023159A (ja) | ユーザ端末 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14875045 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 20167015949 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 15107473 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REEP | Request for entry into the european phase |
Ref document number: 2014875045 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014875045 Country of ref document: EP |