[go: up one dir, main page]

CN2921513Y - New Cable Holder - Google Patents

New Cable Holder Download PDF

Info

Publication number
CN2921513Y
CN2921513Y CN 200620061565 CN200620061565U CN2921513Y CN 2921513 Y CN2921513 Y CN 2921513Y CN 200620061565 CN200620061565 CN 200620061565 CN 200620061565 U CN200620061565 U CN 200620061565U CN 2921513 Y CN2921513 Y CN 2921513Y
Authority
CN
China
Prior art keywords
support
bracket
hole
cable
notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620061565
Other languages
Chinese (zh)
Inventor
叶炽凡
刘南辉
谭记兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Lishan Composite Material Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620061565 priority Critical patent/CN2921513Y/en
Application granted granted Critical
Publication of CN2921513Y publication Critical patent/CN2921513Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses cable support mainly relates to city cable pit or railway, tunnel, bridge on use, lay the support of cable. The support comprises a support seat and a support rod, wherein a vertical through hole socket is arranged on the support seat, and a notch is arranged on the transverse end surface of the support seat and leads to the through hole socket to form a T-shaped open slot; one end of the support rod is provided with a head end and a neck which are matched with the hole. By adopting the structure, when the cable trench is constructed, the bracket base is embedded into the brick wall, and the bracket rod is embedded into the bracket base when the cable trench is installed, so that the construction is simple, safe and convenient, the construction period is short, the installation efficiency is high, and the cost is low.

Description

新型电缆支架New Cable Holder

技术领域technical field

本实用新型新型电缆支架主要涉及城市电缆沟或铁路、隧道、桥梁上使用的、铺设电缆的支架。The utility model relates to a cable support mainly related to a support used on urban cable trenches or railways, tunnels and bridges for laying cables.

背景技术Background technique

现有的用于城市电缆沟或铁路、隧道、桥梁上铺设电缆的支架主要是用膨胀螺丝固定金属支架,这种支架安装起来工期长、效率低,只能一次性安装使用,维修、拆除、更换不方便,在安装过程中经常会造成电缆沟结构的损坏,或使外观造成破坏,并且遇到潮湿、复杂环境容易造成触电事故。Existing brackets for laying cables on urban cable trenches or railways, tunnels, and bridges mainly use expansion screws to fix metal brackets. It is inconvenient to replace, and the structure of the cable trench is often damaged during the installation process, or the appearance is damaged, and it is easy to cause electric shock accidents in humid and complicated environments.

随着城市、乡镇电力建设发展的需要,迫切需要一种施工简单、安全、方便、工期短、安装效率高、成本低的电缆支架,本实用新型预埋式高分子复合材料电缆支架应运而生。With the needs of the development of electric power construction in cities and towns, there is an urgent need for a cable bracket with simple construction, safety, convenience, short construction period, high installation efficiency and low cost. This utility model pre-embedded polymer composite cable bracket came into being .

发明内容Contents of the invention

本实用新型的目的是提供一种新型电缆支架,它采用高分子复合材料制作,克服了以上所述膨胀螺丝铁质电缆支架的缺陷,既能够保证施工简单、安全、方便、工期短、安装效率高、成本低,又能提高支架的适应性和承载能力,是一种符合现有要求的高效支架。The purpose of this utility model is to provide a new type of cable support, which is made of polymer composite materials, overcomes the above-mentioned defects of the expansion screw iron cable support, and can ensure simple construction, safety, convenience, short construction period and installation efficiency High, low cost, and can improve the adaptability and bearing capacity of the support, it is a high-efficiency support that meets the existing requirements.

本实用新型一种新型电缆支架,包括一支架座和一支架杆,其特征在于在支架座上有一垂直的通孔插口,在支架座横向端面上有槽口通向通孔插口,形成一“T”形开口槽;在支架杆的一端有一与所述孔契合的头端和脖颈。The utility model is a novel cable support, which includes a support seat and a support rod, and is characterized in that there is a vertical through-hole socket on the support seat, and there is a notch leading to the through-hole socket on the transverse end surface of the support seat, forming a " T " shape opening groove; There is a head end and a neck fitting with said hole at one end of the support rod.

上述的新型电缆支架,所述支架座上的通孔是有一定锥度的,所述与孔契合的头端也是具有同样锥度的。In the above-mentioned novel cable bracket, the through hole on the bracket seat has a certain taper, and the head end fitting with the hole also has the same taper.

上述的新型电缆支架,所述支架座的上端面上、距离通孔和槽口一定距离的位置有横向细小的标志线。In the above-mentioned new type cable support, there are small horizontal marking lines on the upper end surface of the support seat at a certain distance from the through hole and the notch.

上述的新型电缆支架,所述支架座上、槽口的另一端、标志线一侧有固定槽口或固定孔。In the above-mentioned novel cable bracket, there are fixing notches or fixing holes on the bracket seat, the other end of the notch, and one side of the marking line.

采用上述结构,在电缆沟施工时将支架座预埋砖墙内,安装时只要将支架杆嵌入支架座即可,施工简单、安全、方便、工期短、安装效率高、成本低。With the above structure, the support seat is pre-embedded in the brick wall during the construction of the cable trench, and only the support rod is inserted into the support seat during installation. The construction is simple, safe, convenient, short construction period, high installation efficiency and low cost.

附图说明Description of drawings

图1是本实用新型电缆支架的支架座主视图。Fig. 1 is the front view of the bracket base of the utility model cable bracket.

图2是图1所示A-A剖视图。Fig. 2 is a sectional view of A-A shown in Fig. 1 .

图3是图1所示B-B剖视图。Fig. 3 is a B-B sectional view shown in Fig. 1 .

图4是本实用新型电缆支架的支架杆主视图。Fig. 4 is a front view of the support rod of the cable support of the present invention.

图5是图4所示仰视图。Fig. 5 is a bottom view shown in Fig. 4 .

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步详述:Below in conjunction with accompanying drawing, the utility model is described in further detail:

本实用新型是一种预埋式高分子复合材料新型电缆支架,包括一支架座1和一支架杆2,在支架座1上有一通孔插口11,在支架座1横向端面13上有槽口12通向通孔插口11,形成一“T”形开口槽;见图1、图2、图3所示。在支架杆2的一端有一与所述通孔插口11和槽口12契合的头端21和脖颈22,见图4、图5所示。在使用时,首先在电缆沟施工沏砖时,按设计要求将支架座1预埋进砖墙内,于墙体形成一体。在安装电缆时,将支架杆2嵌入支架座1后,即可放置电缆并固定。在维修更换时,只要将支架杆2的头端21和脖颈22从支架座1中拔出即可。The utility model is a new cable bracket of pre-embedded polymer composite material, comprising a bracket base 1 and a bracket rod 2, a through-hole socket 11 on the bracket base 1, and a notch on the lateral end surface 13 of the bracket base 1 12 leads to through-hole socket 11, forms a " T " shape opening groove; See Fig. 1, Fig. 2, shown in Fig. 3. At one end of the support rod 2 there is a head end 21 and a neck 22 matching the through-hole socket 11 and the notch 12, as shown in Fig. 4 and Fig. 5 . When in use, firstly when making bricks in the construction of the cable trench, the support seat 1 is pre-embedded in the brick wall according to the design requirements to form an integral body with the wall. When installing the cables, after the support rod 2 is embedded in the support seat 1, the cables can be placed and fixed. When maintaining and replacing, as long as the head end 21 and the neck 22 of the support rod 2 are pulled out from the support seat 1, it is enough to get final product.

为使支架杆2在支架座1上嵌入紧固,所述的通孔插口11和槽口12以及支架杆1上的头端21和脖颈22均具有一定锥度,见图2、图3、图5所示,这样的结构支架杆与支架座连接牢固。In order to make the bracket rod 2 embedded and fastened on the bracket seat 1, the through-hole socket 11 and the notch 12, as well as the head end 21 and the neck 22 on the bracket rod 1 all have a certain taper, see Fig. 2, Fig. 3, Fig. Shown in 5, such structural support bar is firmly connected with support seat.

进一步的形式,所述支架座1的上端面上、距离通孔11和槽口12一定距离的位置,有小小标志线14,这样可以根据要求在预埋时以标志线14为标准进行沏埋,保证预埋准确,墙面整齐,同时可以保证每个支架座的承重强度。In a further form, there is a small marking line 14 on the upper end surface of the support seat 1 at a certain distance from the through hole 11 and the notch 12, so that the marking line 14 can be used as the standard when pre-embedding according to requirements. Buried to ensure accurate pre-embedding, neat walls, and the load-bearing strength of each bracket.

为了保证预埋支架座的承重强度,在所述支架座1上、槽口12的另一端、标志线14一侧内,可以有多个固定通孔15或固定槽口16,见图1所示,如此,可以将支架座1与墙体紧密地结合在一起,更有效地保证支架座的承重强度。In order to ensure the load-bearing strength of the pre-embedded support seat, on the support seat 1, the other end of the notch 12, and one side of the marking line 14, there may be a plurality of fixed through holes 15 or fixed notches 16, as shown in Figure 1. In this way, the bracket base 1 and the wall can be closely combined to ensure the load-bearing strength of the bracket base more effectively.

采用上述结构,在电缆沟施工时将支架座预埋砖墙内,安装时只要将支架杆嵌入支架座即可,施工简单、安全、方便、工期短、安装效率高、成本低。并且更换方便,也可以按照要求更换不同的支架杆。With the above structure, the support seat is pre-embedded in the brick wall during the construction of the cable trench, and only the support rod is inserted into the support seat during installation. The construction is simple, safe, convenient, short construction period, high installation efficiency and low cost. And the replacement is convenient, and different support rods can also be replaced according to requirements.

Claims (4)

1, a kind of novel cable support comprises a bracket and a cradling piece, it is characterized in that having on bracket a vertical through hole, has notch to lead to through hole on the vertical section of bracket; At an end of cradling piece one head end and the neck that agrees with described hole arranged.
2, novel cable support according to claim 1 is characterized in that the through hole on the described bracket has certain taper, and the described head end that agrees with the hole also has same tapering.
3, novel cable support according to claim 1 and 2 is characterized in that on the upper-end surface of described bracket, apart from the position of through hole and notch certain distance laterally tiny markings is arranged.
4, novel cable support according to claim 3 is characterized in that on the described bracket, the other end of notch, markings one side have fixedly notch or fixed hole.
CN 200620061565 2006-07-13 2006-07-13 New Cable Holder Expired - Fee Related CN2921513Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620061565 CN2921513Y (en) 2006-07-13 2006-07-13 New Cable Holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620061565 CN2921513Y (en) 2006-07-13 2006-07-13 New Cable Holder

Publications (1)

Publication Number Publication Date
CN2921513Y true CN2921513Y (en) 2007-07-11

Family

ID=38253992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620061565 Expired - Fee Related CN2921513Y (en) 2006-07-13 2006-07-13 New Cable Holder

Country Status (1)

Country Link
CN (1) CN2921513Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292044A (en) * 2012-02-27 2013-09-11 杭州萧山四桥通讯器材厂 Section steel cable bearer and producing method thereof
CN104421497A (en) * 2013-08-28 2015-03-18 大连长之琳科技发展有限公司 T-shaped nylon bracket
CN110445072A (en) * 2019-08-15 2019-11-12 福建省宏闽电力工程监理有限公司 Construction method of cable support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292044A (en) * 2012-02-27 2013-09-11 杭州萧山四桥通讯器材厂 Section steel cable bearer and producing method thereof
CN104421497A (en) * 2013-08-28 2015-03-18 大连长之琳科技发展有限公司 T-shaped nylon bracket
CN110445072A (en) * 2019-08-15 2019-11-12 福建省宏闽电力工程监理有限公司 Construction method of cable support

Similar Documents

Publication Publication Date Title
CN103061515B (en) Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method
CN2921513Y (en) New Cable Holder
CN110629976A (en) A prefabricated subway station rail top air duct
CN205544044U (en) Combination cable bracket
CN107217687B (en) A kind of pipe gallery and the road structure with the pipe gallery
CN105442395B (en) A pre-buried channel of contact rail for magnetic levitation engineering
CN201265703Y (en) Pre-buried cable support
CN103510716A (en) Installation and construction method of concrete prefabricated wall panel and lifting shifting device
CN201109998Y (en) Plugging template for reserved hole of floor pipeline
CN202347796U (en) Installation structure of decorative wall plate
CN213685587U (en) Gas pipeline wears floor bearing strutting arrangement
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN204460108U (en) Floor secretly buries the fixture of large-scale light fixture in electric lamp cap box or ceiling fan
CN204224931U (en) Capacitance sleeper
CN203660445U (en) Cable bridge
CN215329229U (en) Tool for controlling height of hanging wire
CN104613432B (en) Floor secretly buries the fixture of large-scale light fixture in electric lamp cap box or ceiling fan
CN207034386U (en) A kind of piping lane support quick installation mechanism
CN202990529U (en) Concrete transverse web member strut with preformed holes and grounding steel bars
CN219138402U (en) Concrete vibrating device for large-diameter embedded sleeve
CN203531115U (en) Novel inspection well base
CN216275827U (en) Protective plate for building well chamber
CN214305613U (en) Pre-buried formula feed pipe gallows
CN202117322U (en) Floor slab hole reservation device being convenient to use repeatedly
CN204179585U (en) A kind of novel cable lifting crane span structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DONGGUAN DONGLI COMPOSITE MATERIAL CO., LTD.

Free format text: FORMER OWNER: YE CHIFAN

Effective date: 20110425

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 523000 ZHOUWAN VILLAGE, WANGNIUDUN TOWN, DONGGUAN CITY, GUANGDONG PROVINCE TO: 523205 ZHOUWAN INDUSTRIAL ZONE, ZHOUWAN VILLAGE, WANGNIUDUN TOWN, DONGGUAN CITY, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110425

Address after: 523205 Guangdong province Dongguan wangniudunzhen zhouwan zhouwan Village Industrial Zone

Patentee after: Dongguan Lishan composite material Co., Ltd.

Address before: Wangniudun zhouwan village 523000 Guangdong city of Dongguan Province

Patentee before: Ye Chifan

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070711

Termination date: 20110713