CN110445072A - Construction method of cable support - Google Patents
Construction method of cable support Download PDFInfo
- Publication number
- CN110445072A CN110445072A CN201910752833.6A CN201910752833A CN110445072A CN 110445072 A CN110445072 A CN 110445072A CN 201910752833 A CN201910752833 A CN 201910752833A CN 110445072 A CN110445072 A CN 110445072A
- Authority
- CN
- China
- Prior art keywords
- cable bearer
- plug
- embedment
- slot
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
- H02G3/32—Installations of cables or lines on walls, floors or ceilings using mounting clamps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
The invention discloses a construction method of a cable support, which relates to the field of cable processing and comprises the following steps: s1, preparing a construction tool and a cable bracket by being familiar with the construction site environment; s2, burying the buried end into the side wall according to the design height, the design interval and the design size, and finishing building the wall; s3, mounting the external hanging end on the embedded end to form a complete cable support; s4, measuring a first distance from the cable support to the preset height; and S5, responding to the first distance meeting the preset deviation value, and adjusting the cable support is not needed. The method is simple, the installation and the height adjustment are carried out at one time, the installation efficiency is improved, and the time consumption is reduced; meanwhile, the height of the external hanging end can be adjusted during installation, so that the deviation during embedding is avoided, and the external hanging end is convenient to replace after aging; the connecting strength of the embedded end and the externally hung end is enhanced and the bearing of the externally hung end is improved through the slidable first slot of the clamping block in the first clamping groove.
Description
Technical field
The present invention relates to claim cable construction field, in particular to a kind of construction method of cable bearer.
Background technique
The construction of high-tension cable concrete support is needed when pouring side wall through template or other articles according to high-voltage electricity
Cable concrete support size reserving hole, after side wall demoulding be put into concrete support then pour into mortar carry out it is secondary pour it is solid
Fixed, time-consuming for construction, process is more and complicated, heavy workload.Padding is not of uniform size when reserved bracket holes, it has not been convenient to side wall molding
And sidewall surfaces out-of-flatness is caused, it not can guarantee concrete support extension elongation and elevation angle size.And it is secondary to pour work
Amount, which increases, working efficiency is low and easily loosens concrete support easily there is potential problem.Therefore there is also one kind currently on the market
Plow-in cable bracket can not be replaced after this kind of plow-in cable bracket aging, simultaneously because causing in embedment side wall in advance
In the presence of can not adjust height, it is inconvenient to use the problems such as.
Summary of the invention
In view of the above drawbacks of the prior art, technical problem to be solved by the invention is to provide a kind of cable beareves
Construction method, it is intended to facilitate installing and dismounting and replacement, while adjustable cable bearer height.
To achieve the above object, the present invention provides a kind of construction method of cable bearer, include the following steps:
Step S1, it is familiar with the environment of construction site, gets out construction tool and cable bearer;The cable bearer includes
It is embedded to end and plug-in end;It is fixedly connected with link block on the embedment end, offers the first groove on the link block, described
Sliding slot is offered in one groove two sidewalls, and at least two bolts hole are offered on the sliding slot;The two opposite sides in plug-in end
Sliding block is fixedly installed on wall, the sliding block and the sliding slot match, and fixation hole is offered on the sliding block, the fixation
Hole and the bolt hole correspond;First bottom portion of groove is also provided at least two first slots, and the plug-in end is leaned on
The side at the nearly embedment end offers the first card slot, and first card slot and the sliding block are mutually perpendicular to;The plug-in end is leaned on
The two sides of the nearly sliding block are also provided with slide opening, and the slide opening and first card slot connect;Installation in first card slot
There is fixture block, the fixture block two sides are fixedly installed with wing plate, and the wing plate extends out out of described slide opening;
Step S2, the embedment end is embedded in side wall by design height, design spacing and design size, and completes to build
Wall;
Step S3, the plug-in end is installed on the embedment end, the sliding block at the plug-in end is penetrated using bolt
The fixation hole and lock onto advance the embedment end the link block the bolt hole, form the complete cable branch
Frame;
Step S4, level meter is adjusted to the preset height, rotates the level meter to the cable bearer, measures institute
State cable bearer to the preset height first distance;
Step S5, predetermined deviation value is satisfied in response to the first distance, then without adjusting the cable bearer;Response
It is not content with predetermined deviation value in the first distance, then adjusts the height at the plug-in end.
In the technical scheme, by being embedded to end installation together by embedment end embedment side wall, then by plug-in end tin in advance, most
Afterwards by testing the distance of complete cable bearer and preset height bracket, determines whether to meet predetermined deviation value, be unsatisfactory for then
It is adjusted cable bearer height;This method is simple, and installation and adjusting height disposably carries out, and installation effectiveness is improved, when reduction
Consumption;Plug-in end adjustable height during installation simultaneously, there are deviations when avoiding pre-buried, and are convenient for changing after plug-in end aging;
By the activity installation fixture block in first card slot at plug-in end, and integral type is installed at plug-in end and embedment end, and fixture block is in the first card
Sliding extends to first slot at embedment end in slot, the bearing strength for improving plug-in end and being embedded to after the integral type of end.
In a specific embodiment, first slot and the fixture block match, and the fixture block can be back and forth described
Sliding in first slot.
In the technical scheme, by the way that in fixture block in the first card slot slidably the first slot, enhancing is embedded to end and plug-in end
Bonding strength improves plug-in end load-bearing.
In a specific embodiment, embedment end described in the step S2 passes through hermetic bag close to described link block one end
It is sealed;Dust grains of sand cement in work progress is avoided to be attached to surface.
In a specific embodiment, before the step S4 further include:
Step S41, the hermetic bag on the embedment end surfaces on side wall is cleaned out.
In a specific embodiment, the described embedment one end of end far from the link block is also fixedly installed with for reinforcing
The reinforcing prop of intensity of the embedment end in side wall, the reinforcing prop is perpendicular to the embedment end.
In a specific embodiment, after the step S5 further include:
Step S51, the bolt on the cable bearer for meeting predetermined deviation is locked, and by controlling the wing
Plate pushes the fixture block to enter in first card slot.
The beneficial effects of the present invention are: in the technical scheme, by the way that embedment end is embedded to side wall in advance, then by plug-in end
Cylinder embedment end installation together, finally by the distance for testing complete cable bearer and preset height bracket, determines whether to meet
Predetermined deviation value, is unsatisfactory for, and is adjusted cable bearer height;This method is simple, and installation and adjusting height disposably carries out,
Installation effectiveness is improved, when reduction is consumed;Plug-in end adjustable height during installation simultaneously, there are deviations when avoiding pre-buried, and outside
It is convenient for changing after hanging end aging;By the activity installation fixture block in first card slot at plug-in end, and plug-in end and embedment end are installed
Integral type, fixture block slide the first slot for extending to embedment end in the first card slot, improve plug-in end and embedment end integral type
Bearing strength afterwards.
Detailed description of the invention
Fig. 1 is the flow diagram of the construction method of one of embodiment cable bearer;
Fig. 2 is the structural schematic diagram of the cable bearer in an embodiment;
Fig. 3 is the structural schematic diagram at the embedment end in an embodiment;
Fig. 4 is the structural schematic diagram at the plug-in end in an embodiment;
Fig. 5 is the structural schematic diagram of the fixture block in an embodiment.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figs. 1-5, in the first embodiment of the invention, a kind of construction method of cable bearer is provided, including as follows
Step:
Step S1, it is familiar with the environment of construction site, gets out construction tool and cable bearer;The cable bearer includes
It is embedded to end 100 and plug-in end 200;It is fixedly connected with link block 101 on the embedment end 100, is offered on the link block 101
First groove 102 offers sliding slot 104 on first groove, 102 two sidewalls, offers at least two on the sliding slot 104
Bolt hole 105;Sliding block 201, the sliding block 201 and the sliding slot are fixedly installed on the two opposite side walls in the plug-in end 200
104 match, and fixation hole 202 is offered on the sliding block 201, and the fixation hole 202 and the bolt hole 105 1 are a pair of
It answers;First groove, 102 bottom is also provided at least two first slots 103, and the plug-in end 200 is close to the embedment end
100 side offers the first card slot 203, and first card slot 203 and the sliding block 201 are mutually perpendicular to;The plug-in end 200
Two sides close to the sliding block 201 are also provided with slide opening 204, and the slide opening 204 and first card slot 203 connect;It is described
Fixture block 300 is installed, 300 two sides of fixture block are fixedly installed with wing plate 301, and the wing plate 301 is from described in first card slot 203
It extends out in slide opening 204;
Step S2, the embedment end 100 is embedded in side wall by design height, design spacing and design size, and complete
At building a wall;
Step S3, the plug-in end 200 is installed on the embedment end 100, the plug-in end 200 is penetrated using bolt
The fixation hole 202 of the sliding block 201 and the bolt hole for locking onto the link block 101 for being embedded to end 100 in advance
105, form the complete cable bearer;
Step S4, level meter is adjusted to the preset height, rotates the level meter to the cable bearer, measures institute
State cable bearer to the preset height first distance;
Step S5, predetermined deviation value is satisfied in response to the first distance, then without adjusting the cable bearer;Response
It is not content with predetermined deviation value in the first distance, then adjusts the height at the plug-in end 200.
In the present embodiment, first slot 103 and the fixture block 300 match, and the fixture block 300 can be back and forth in institute
State sliding in the first slot 103.
In the present embodiment, embedment end 100 described in the step S2 passes through hermetic bag close to described 101 one end of link block
It is sealed;Dust grains of sand cement in work progress is avoided to be attached to surface.
In the present embodiment, before the step S4 further include:
Step S41, the hermetic bag on 100 surface of embedment end on side wall is cleaned out.
In the present embodiment, the embedment end 100 is also fixedly installed with far from one end of the link block 101 for reinforcing
The reinforcing prop 106 of intensity of the embedment end 100 in side wall, the reinforcing prop 106 is perpendicular to the embedment end 100.
In the present embodiment, after the step S5 further include:
Step S51, the bolt on the cable bearer for meeting predetermined deviation is locked, and by controlling the wing
Plate 301 pushes the fixture block 300 to enter in first card slot 203.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without
It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical solution, all should be within the scope of protection determined by the claims.
Claims (6)
1. a kind of construction method of cable bearer, which comprises the steps of:
Step S1, it is familiar with the environment of construction site, gets out construction tool and cable bearer;The cable bearer includes embedment
End and plug-in end;It is fixedly connected with link block on the embedment end, the first groove is offered on the link block, described first is recessed
Sliding slot is offered on slot two sidewalls, and at least two bolts hole are offered on the sliding slot;On the two opposite side walls in plug-in end
Be fixedly installed with sliding block, the sliding block and the sliding slot match, and fixation hole is offered on the sliding block, the fixation hole with
The bolt hole corresponds;First bottom portion of groove is also provided at least two first slots, and the plug-in end is close to institute
The side for stating embedment end offers the first card slot, and first card slot and the sliding block are mutually perpendicular to;The plug-in end is close to institute
The two sides for stating sliding block are also provided with slide opening, and the slide opening and first card slot connect;Card is installed in first card slot
Block, the fixture block two sides are fixedly installed with wing plate, and the wing plate extends out out of described slide opening;
Step S2, the embedment end is embedded in side wall by design height, design spacing and design size, and completes to build a wall;
Step S3, the plug-in end is installed on the embedment end, the institute of the sliding block at the plug-in end is penetrated using bolt
It states fixation hole and lock onto the bolt hole of the link block at the embedment end in advance, form the complete cable bearer;
Step S4, level meter is adjusted to the preset height, rotates the level meter to the cable bearer, measures the electricity
First distance of the cable bracket to the preset height;
Step S5, predetermined deviation value is satisfied in response to the first distance, then without adjusting the cable bearer;In response to institute
It states first distance and is not content with predetermined deviation value, then adjust the height at the plug-in end.
2. a kind of construction method of cable bearer as described in claim 1, which is characterized in that first slot and the card
Block matches, and the fixture block can slide in first slot back and forth.
3. a kind of construction method of cable bearer as described in claim 1, which is characterized in that be embedded to described in the step S2
It holds and is sealed close to described link block one end by hermetic bag;Dust grains of sand cement in work progress is avoided to be attached to surface.
4. a kind of construction method of cable bearer as described in claim 1, which is characterized in that also wrapped before the step S4
It includes:
Step S41, the hermetic bag on the embedment end surfaces on side wall is cleaned out.
5. a kind of construction method of cable bearer as described in claim 1, which is characterized in that the embedment end is far from the company
The one end for connecing block is also fixedly installed with reinforcing prop for reinforcing the intensity of the embedment end in side wall, and the reinforcing prop is vertical
In the embedment end.
6. a kind of construction method of cable bearer as described in claim 1, which is characterized in that also wrapped after the step S5
It includes:
Step S51, the bolt on the cable bearer for meeting predetermined deviation is locked, and pushed away by controlling the wing plate
The fixture block is moved to enter in first card slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910752833.6A CN110445072B (en) | 2019-08-15 | 2019-08-15 | Construction method of cable support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910752833.6A CN110445072B (en) | 2019-08-15 | 2019-08-15 | Construction method of cable support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110445072A true CN110445072A (en) | 2019-11-12 |
CN110445072B CN110445072B (en) | 2020-10-30 |
Family
ID=68435684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910752833.6A Active CN110445072B (en) | 2019-08-15 | 2019-08-15 | Construction method of cable support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110445072B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06233437A (en) * | 1993-02-01 | 1994-08-19 | Asahi Tec Corp | Brace |
CN2921513Y (en) * | 2006-07-13 | 2007-07-11 | 叶炽凡 | New Cable Holder |
CN106870827A (en) * | 2017-04-18 | 2017-06-20 | 中国十九冶集团有限公司 | Pipeline support structure in concrete structure and installation method |
CN108110703A (en) * | 2017-11-28 | 2018-06-01 | 中国二十冶集团有限公司 | Direct-burried assembled cable bearer and its construction method of installation |
CN108104276A (en) * | 2017-12-20 | 2018-06-01 | 隋浩智 | A kind of steel construction board house skeleton |
CN207801388U (en) * | 2018-01-26 | 2018-08-31 | 广东粤明动力有限公司 | A kind of cable laying holder |
CN208508429U (en) * | 2018-09-04 | 2019-02-15 | 广东电网有限责任公司 | Installation type cable support |
-
2019
- 2019-08-15 CN CN201910752833.6A patent/CN110445072B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06233437A (en) * | 1993-02-01 | 1994-08-19 | Asahi Tec Corp | Brace |
CN2921513Y (en) * | 2006-07-13 | 2007-07-11 | 叶炽凡 | New Cable Holder |
CN106870827A (en) * | 2017-04-18 | 2017-06-20 | 中国十九冶集团有限公司 | Pipeline support structure in concrete structure and installation method |
CN108110703A (en) * | 2017-11-28 | 2018-06-01 | 中国二十冶集团有限公司 | Direct-burried assembled cable bearer and its construction method of installation |
CN108104276A (en) * | 2017-12-20 | 2018-06-01 | 隋浩智 | A kind of steel construction board house skeleton |
CN207801388U (en) * | 2018-01-26 | 2018-08-31 | 广东粤明动力有限公司 | A kind of cable laying holder |
CN208508429U (en) * | 2018-09-04 | 2019-02-15 | 广东电网有限责任公司 | Installation type cable support |
Also Published As
Publication number | Publication date |
---|---|
CN110445072B (en) | 2020-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101956438B (en) | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof | |
CN214834860U (en) | Self-climbing hydraulic distributing machine convenient to install and fix | |
CN205577327U (en) | Metal clad sheet system is hung futilely to wall body | |
CN212740488U (en) | Opening side pipe slide rail gallows for hoist | |
CN105887590A (en) | Height direction adjusting system and method after railway foundation subsidence | |
CN106460403A (en) | Handrail assembly, system and method of installation | |
CN110445072A (en) | Construction method of cable support | |
CN209799136U (en) | Mounting structure of stainless steel furred ceiling | |
CN212154211U (en) | Adjustable slurry spreading device | |
CN210395980U (en) | Wall brick dry hanging connection structure | |
CN108193889A (en) | A kind of masonry wall quickly spread slurry, jointing device | |
CN108943373A (en) | A kind of movable tooling for concrete prefabricated element production | |
CN205116759U (en) | But reuse's variable scale is built by laying bricks or stones and is counted pole with skin | |
CN114803903A (en) | Plate lifting device for indoor building construction | |
CN115749290A (en) | Construction method and device for controlling flatness of concrete surface at root of column wall | |
CN104328981B (en) | A kind of door and window auxiliary frame locating mounting method | |
CN210508408U (en) | Concrete pouring workbench for house construction | |
CN212295648U (en) | Adjustable riser special water stop joint | |
CN218449371U (en) | Rail mounted horizontal hanger | |
CN218176549U (en) | Cement evenly daubing equipment for building tile | |
CN212534193U (en) | Equipment foundation convenient to quick adjustment | |
CN220704737U (en) | Windowsill coping prefabricated component | |
CN110644429A (en) | Slope protection concrete pouring mold for high and steep slope and slope protection construction method | |
CN213774603U (en) | Building engineering is with consolidating strutting arrangement convenient to installation | |
CN211869402U (en) | Hoisting device is built by laying bricks or stones in construction of side flat stone |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220427 Address after: 510000 room 602, No. 1421, North Guangzhou Avenue, Baiyun District, Guangzhou, Guangdong Patentee after: SINODAAN Co.,Ltd. Address before: 350000 tower 10, 150 Huqian Road, Gulou District, Fuzhou City, Fujian Province Patentee before: FUJIAN HONGMIN POWER ENGINEERING SUPERVISION CO.,LTD. |