CN201265703Y - Pre-buried cable support - Google Patents

Pre-buried cable support Download PDF

Info

Publication number
CN201265703Y
CN201265703Y CNU200820201695XU CN200820201695U CN201265703Y CN 201265703 Y CN201265703 Y CN 201265703Y CN U200820201695X U CNU200820201695X U CN U200820201695XU CN 200820201695 U CN200820201695 U CN 200820201695U CN 201265703 Y CN201265703 Y CN 201265703Y
Authority
CN
China
Prior art keywords
cable
embedded
support
built
polymer composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820201695XU
Other languages
Chinese (zh)
Inventor
叶炽凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Lishan Composite Material Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU200820201695XU priority Critical patent/CN201265703Y/en
Application granted granted Critical
Publication of CN201265703Y publication Critical patent/CN201265703Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses pre-buried formula cable support mainly relates to the support that uses, lay the cable on city cable pit or railway, tunnel, the bridge. Comprises an embedded seat (11) and a bracket seat (12); a cable placing groove (14) is arranged on the bracket base (12); the embedded cable support (1) comprises a steel bar (2), a polymer composite material (2) is coated outside the steel bar (3), and a layer of glass fiber reinforced plastic material (3) is coated on the outer surface of the polymer composite material (2). By adopting the structure, the cable support can be embedded into the brick wall when the cable trench is constructed, and the construction is simple, safe and convenient, the construction period is short, the installation efficiency is high, and the cost is low.

Description

预埋式电缆支架 Embedded cable bracket

技术领域 technical field

本实用新型预埋式电缆支架,主要涉及城市电缆沟或铁路、隧道、桥梁上使用的、铺设电缆的支架。The utility model relates to a pre-embedded cable support, which mainly relates to a cable laying support used in urban cable trenches or railways, tunnels and bridges.

背景技术 Background technique

现有的用于城市电缆沟或铁路、隧道、桥梁上铺设电缆的支架主要是用膨胀螺丝固定金属支架,这种支架安装起来工期长、效率低,只能一次性安装使用,维修、拆除、更换不方便,在安装过程中经常会造成电缆沟结构的损坏,或使外观造成破坏,并且遇到潮湿、复杂环境容易容易生锈、损害,甚至造成触电事故。Existing brackets for laying cables on urban cable trenches or railways, tunnels, and bridges mainly use expansion screws to fix metal brackets. It is inconvenient to replace, and the structure of the cable trench is often damaged during the installation process, or the appearance is damaged, and it is easy to rust, damage, or even cause electric shock accidents in humid and complicated environments.

随着城市、乡镇电力建设发展的需要,迫切需要一种施工简单、安全、方便、工期短、安装效率高、成本低的电缆支架,本实用新型预埋式高分子复合材料电缆支架应运而生。With the needs of the development of electric power construction in cities and towns, there is an urgent need for a cable bracket with simple construction, safety, convenience, short construction period, high installation efficiency and low cost. This utility model pre-embedded polymer composite cable bracket came into being .

发明内容 Contents of the invention

本实用新型的目的是提供一种新型预埋式电缆支架,它采用高分子复合材料制作,克服了以上所述膨胀螺丝铁质电缆支架的缺陷,既能够保证施工简单、安全、方便、工期短、安装效率高、成本低,又能提高支架的适应性和承载能力,是一种符合现有要求的高效支架。The purpose of this utility model is to provide a new type of pre-embedded cable support, which is made of polymer composite materials, overcomes the above-mentioned defects of the expansion screw iron cable support, and can ensure simple, safe, convenient and short construction period , high installation efficiency, low cost, and can improve the adaptability and bearing capacity of the support, it is a high-efficiency support that meets the existing requirements.

本实用新型预埋式电缆支架,包括预埋座11和支架座12;其特征在于在支架座12上有线缆放置槽14;所述预埋式电缆支架1包括一钢筋2,在钢筋3外包覆有高分子复合材料2,在高分子复合材料2的外表覆盖一层玻璃钢材料3。The utility model pre-embedded cable support includes a pre-embedded seat 11 and a support seat 12; it is characterized in that there is a cable placement groove 14 on the support seat 12; The outer covering is covered with a polymer composite material 2 , and a layer of glass fiber reinforced plastic material 3 is covered on the outer surface of the polymer composite material 2 .

上述的预埋式电缆支架,在预埋式电缆支架1的外表面上、预埋座11和支架座12间有标痕13。The above-mentioned pre-embedded cable support has marks 13 on the outer surface of the pre-embedded cable support 1 and between the pre-embedded seat 11 and the support seat 12 .

上述的预埋式电缆支架,所述标痕13是凸起。In the above-mentioned pre-embedded cable bracket, the mark 13 is a protrusion.

上述的预埋式电缆支架,所述线缆放置槽14是一弧形槽。In the above-mentioned pre-embedded cable bracket, the cable placement groove 14 is an arc-shaped groove.

上述的预埋式电缆支架,所述线缆放置槽14的背面有一小槽口15。In the above-mentioned pre-embedded cable bracket, there is a small notch 15 on the back of the cable placement groove 14 .

采用上述结构,在电缆沟施工时将电缆支架预埋砖墙内即可,施工简单、安全、方便、工期短、安装效率高、成本低。With the above-mentioned structure, the cable support can be pre-embedded in the brick wall during the construction of the cable trench, and the construction is simple, safe, convenient, short in construction period, high in installation efficiency and low in cost.

附图说明 Description of drawings

图1是本实用新型预埋式电缆支架主视图。Fig. 1 is the front view of the pre-embedded cable bracket of the present invention.

图2是图1所示A—A剖视图。Fig. 2 is A-A sectional view shown in Fig. 1 .

具体实施方式 Detailed ways

下面结合附图对本实用新型作进一步详述:Below in conjunction with accompanying drawing, the utility model is described in further detail:

本实用新型是一种预埋式高分子复合材料新型电缆支架,包括预埋座11和支架座12;在支架座12上有线缆放置槽14,该线缆放置槽可以是各种样式的凹槽,见图2所示,是一弧形槽;进一步的方式,在线缆放置槽14的背面有一小槽口15,如此,可以用绑线对放置在支架座12上的线缆进行绑扎,以利固定。在预埋式电缆支架1的外表面上、预埋座11和支架座12间有标痕13,用于标示预埋的位置,使所有的预埋电缆支架做到规整;图1、图2所示,所述标痕13是凸起。The utility model is a new cable support of pre-embedded polymer composite material, which includes a pre-embedded seat 11 and a support seat 12; there is a cable placement groove 14 on the support seat 12, and the cable placement groove can be of various styles. The groove, as shown in Figure 2, is an arc-shaped groove; in a further way, there is a small notch 15 on the back side of the cable placement groove 14, so that the cables placed on the bracket seat 12 can be fixed with binding wires. Bind to facilitate fixation. On the outer surface of the pre-embedded cable support 1, there are marks 13 between the pre-embedded seat 11 and the support seat 12, which are used to mark the pre-embedded position and make all the pre-embedded cable supports regular; Fig. 1, Fig. 2 As shown, the mark 13 is a protrusion.

本实用新型预埋式电缆支架1包括一钢筋2,在钢筋3外包覆有高分子复合材料2,该复合材料是专利号为03114337.7、发明名称为“一种井盖用高分子复合材料”所述的材料,在高分子复合材料2的外表覆盖一层普通玻璃钢材料3。采用这种结构,承载力强,成本低,耐腐蚀。The utility model pre-embedded cable support 1 includes a steel bar 2, and the steel bar 3 is covered with a polymer composite material 2. The composite material is a patent No. 03114337.7, and the invention name is "a polymer composite material for manhole covers". The material mentioned above is covered with a layer of ordinary glass fiber reinforced plastic material 3 on the outer surface of the polymer composite material 2. With this structure, it has strong bearing capacity, low cost and corrosion resistance.

Claims (5)

1, built-in type cable bearer comprises pre-buried seat (11) and bracket (12); It is characterized in that cable standing groove (14) is arranged on bracket (12); Described built-in type cable bearer (1) comprises a reinforcing bar (2), is coated with polymer composite (2) at reinforcing bar (3), at appearance covering one deck glass fibre reinforced plastic material (3) of polymer composite (2).
2, built-in type cable bearer according to claim 1 is characterized in that on the outer surface of built-in type cable bearer (1), between pre-buried seat (11) and bracket (12) mark trace (13) is arranged.
3, built-in type cable bearer according to claim 2 is characterized in that described mark trace (13) is a projection.
4, built-in type cable bearer according to claim 1 is characterized in that described cable standing groove (14) is a curve bath.
5, built-in type cable bearer according to claim 4 is characterized in that there is a little notch (15) at the back side of described cable standing groove (14).
CNU200820201695XU 2008-10-10 2008-10-10 Pre-buried cable support Expired - Fee Related CN201265703Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820201695XU CN201265703Y (en) 2008-10-10 2008-10-10 Pre-buried cable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820201695XU CN201265703Y (en) 2008-10-10 2008-10-10 Pre-buried cable support

Publications (1)

Publication Number Publication Date
CN201265703Y true CN201265703Y (en) 2009-07-01

Family

ID=40832071

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820201695XU Expired - Fee Related CN201265703Y (en) 2008-10-10 2008-10-10 Pre-buried cable support

Country Status (1)

Country Link
CN (1) CN201265703Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114024273A (en) * 2022-01-06 2022-02-08 山东计保电气有限公司 Cable bracket with high tolerance performance and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114024273A (en) * 2022-01-06 2022-02-08 山东计保电气有限公司 Cable bracket with high tolerance performance and preparation method thereof
CN114024273B (en) * 2022-01-06 2022-05-13 山东计保电气有限公司 Cable bracket with high tolerance performance and preparation method thereof

Similar Documents

Publication Publication Date Title
CN205479706U (en) Push pipe work jing ding advances structure
RU2007145415A (en) SOLID ROAD CANVAS FOR RAIL VEHICLES
CN103437556B (en) Building water supply and drainage and heating engineering waterproofing and insulation construction method
FR2927913B1 (en) PREFABRICATED CONCRETE ELEMENT FOR REALIZING A RESERVOIR FOR RECOVERING AND / OR RETAINING RAINWATER WATER
CL2011000833A1 (en) Masonry comprising courses of bricks and mortar joints whereby at least one mortar joint is reinforced by a reinforcing band, which comprises a wire connection structure, said structure is provided with protrusions that protrude with respect to the plane; and method of applying reinforcing bands.
CN205530344U (en) Utility tunnel is pour to split type no mould
CN102226345B (en) Method for carrying out advanced water shut-off on post-cast strips in underground engineering and advanced water shut-off steel plate structure
CN201265703Y (en) Pre-buried cable support
CN2921513Y (en) New Cable Holder
CN102545129A (en) Large-section cable clamp
FR2909400B1 (en) DEVICE FOR ARASING A CONCRETE SURFACE AFTER THE CASTING
RU64316U1 (en) LONG-MOVABLE BRACKET
ATE494428T1 (en) BRIDGE ELEMENT
CN202370544U (en) Installation equipment for back-stick type waterstop for tunnel construction joint
CN201214740Y (en) Composite tunnel pavement
CN204753849U (en) Continuous subsiding crack structure of heavy construction leak protection
CN201089374Y (en) Conduit for fixing contacting net
CN202258138U (en) Corner type path identifying device of power cable
CN204728365U (en) A kind of aqueduct valve well mounting structure
CN201686930U (en) Elastomeric expansion device for railway concrete bridge
CN202530518U (en) Embedded device at sewer line in toilet
KR100663061B1 (en) Underground buried position status indication block of sewer pipe
CN200979974Y (en) A case-type wire and cable docking case
CN2856117Y (en) Insulating crossing plastic fasteners
CN205745678U (en) The construction positioner of embedding pipe fittings

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DONGGUAN DONGLI COMPOSITE MATERIAL CO., LTD.

Free format text: FORMER OWNER: YE CHIFAN

Effective date: 20110425

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 523000 ZHOUWAN VILLAGE, WANGNIUDUN TOWN, DONGGUAN CITY, GUANGDONG PROVINCE TO: 523205 ZHOUWAN INDUSTRIAL ZONE, ZHOUWAN VILLAGE, WANGNIUDUN TOWN, DONGGUAN CITY, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110425

Address after: 523205 Guangdong province Dongguan wangniudunzhen zhouwan zhouwan Village Industrial Zone

Patentee after: Dongguan Lishan composite material Co., Ltd.

Address before: Wangniudun zhouwan village 523000 Guangdong city of Dongguan Province

Patentee before: Ye Chifan

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090701

Termination date: 20111010