CN207815645U - Air port mounting structure - Google Patents
Air port mounting structure Download PDFInfo
- Publication number
- CN207815645U CN207815645U CN201721812002.6U CN201721812002U CN207815645U CN 207815645 U CN207815645 U CN 207815645U CN 201721812002 U CN201721812002 U CN 201721812002U CN 207815645 U CN207815645 U CN 207815645U
- Authority
- CN
- China
- Prior art keywords
- trepanning
- tuyere structure
- air port
- fixing piece
- installing matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011159 matrix material Substances 0.000 claims description 89
- 239000007787 solid Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 62
- 238000000034 method Methods 0.000 abstract description 17
- 238000004378 air conditioning Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 12
- 238000011900 installation process Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 125000003003 spiro group Chemical group 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/32—Supports for air-conditioning, air-humidification or ventilation units
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/06—Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/0007—Indoor units, e.g. fan coil units
- F24F1/0043—Indoor units, e.g. fan coil units characterised by mounting arrangements
- F24F1/0047—Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in the ceiling or at the ceiling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/14—Details or features not otherwise provided for mounted on the ceiling
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
- Duct Arrangements (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Connection Of Plates (AREA)
Abstract
The embodiment of the utility model discloses wind gap mounting structure relates to the air conditioning equipment field for simplify the installation procedure of wind gap structure, reduce the complexity of installation. The tuyere structure installation method comprises the following steps: mounting a fixing piece on the side surface of the tuyere structure; and connecting the fixing piece with a mounting base body, wherein the connecting position of the fixing piece and the mounting base body is adjustable. The mounting structure has strong mounting universality and is simple, convenient and efficient to mount.
Description
Technical field
The utility model is related to apparatus of air conditioning fields, and in particular to a kind of air port mounting structure.
Background technology
The air outlet structure of air conditioner of existing ceiling type air conditioner is embedded into inside furred ceiling, and the installation of air outlet structure of air conditioner needs
It will following ten steps:Step 1: furred ceiling is open;Step 2: in furred ceiling edge heavy platform;Step 3: nested for air port
Inward flange pastes U.S. line paper;Step 4: the heavy platform joint place brush bonding glue at air port nesting Yu furred ceiling edge;Step 5: adopting
Air port nesting is fixed at furred ceiling with nailing gun;Step 6: mending high-strength putty for air port nesting and the periphery of furred ceiling heavy platform;
Step 7: pasting paper of squeegeeing in air port nesting and furred ceiling edge;Step 8: brush putty is polished, mopping filling-in;Step 9: removing
The U.S. line paper and equating edge of air port nesting inward flange;Step 10: air port component is fixed in the nesting of air port with screw.
Inventor has found, at least there are following problems in the prior art:Outlet air mouthpiece uses above-mentioned peace in the prior art
Dress mode, installation process are complicated, are related to that process is more, and installation period is long, and emergency works project cannot be satisfied;The constructor of each step
Member may be different, and the cooperation personnel being related to are more, it is difficult to ensure the reliability of installation.
Utility model content
One of the utility model purpose is to propose a kind of air port mounting structure, to simplify the installation of tuyere structure
Process reduces the complexity of installation.
To achieve the above object, the utility model provides following technical scheme:
One embodiment of the utility model provides a kind of air port mounting structure, including tuyere structure, the side of the tuyere structure
Face is equipped with the fixing piece for being connect with the installing matrix, and the link position of the fixing piece and the installing matrix is can
It adjusts.
In one or more embodiments, the fixing piece is connected by the fastener across slotted hole with the installing matrix
It connects.
In one or more embodiments, the fixing piece have the first trepanning and the second trepanning, first trepanning and
Second trepanning is slotted hole;The fixing piece is fixed by first trepanning and the side of the tuyere structure;Institute
State the longitudinal direction of the parallel tuyere structure of length direction of the first trepanning, the parallel air port of length direction of second trepanning
The transverse direction of structure.
In one or more embodiments, the opposite both sides of the tuyere structure are installed on the peace by the fixing piece
Fill matrix.
In one or more embodiments, air port mounting structure further includes locating part, and the locating part is set to the air port
Structure, the locating part have the plane that can block the installing matrix bottom end.
In one or more embodiments, air port mounting structure further includes panel, and the panel is set to the tuyere structure
Away from the side of the interior machine.
In one or more embodiments, the fixing piece includes the first plate and the second plate, and first trepanning is set to institute
State the first plate, second trepanning is set to second plate, and first plate is fixed with the tuyere structure, second plate and
The installing matrix is fixed.
In one or more embodiments, the angle of first plate and second plate is 95 degree to 140 degree.
In one or more embodiments, the length of second trepanning is 8mm to 20mm.
In one or more embodiments, the total height of the fixing piece is 7mm to 12mm.
In one or more embodiments, the installing matrix includes furred ceiling.
Based on the above-mentioned technical proposal, the utility model embodiment can at least have the following technical effects:
Tuyere structure mounting structure provided by the utility model, according to actual needs, installing matrix opening have certain deviation
When still can meet installation, do over again without installing matrix, be open again again;Hanging is reliable, can be filled after tuyere structure installation
Divide fitting installing matrix;Simple installation can be installed immediately after the completion of installing matrix is open, and installation is efficient.
Description of the drawings
Attached drawing described herein is used to provide a further understanding of the present invention, and is constituted part of this application,
The exemplary embodiment of the utility model and the description thereof are used to explain the utility model, does not constitute to the improper of the utility model
It limits.In the accompanying drawings:
Fig. 1 is the tuyere structure installation method flow diagram that one embodiment of the utility model provides;
Fig. 2 is the tuyere structure and the fixed schematic diagram of installing matrix that one embodiment of the utility model provides;
Fig. 3 is the tuyere structure installation method flow diagram that another embodiment of the utility model provides;
Fig. 4 is the tuyere structure and the fixed schematic diagram of interior machine that another embodiment of the utility model provides;
Fig. 5 is the structural schematic diagram of tuyere structure in Fig. 4;
Fig. 6 is the diagrammatic side-view cross-sectional schematic diagram at locating part in Fig. 5;
Fig. 7 is the diagrammatic side-view cross-sectional schematic diagram at fixing piece in Fig. 5;
Fig. 8 is the scheme of installation of tuyere structure and guide frame in Fig. 4;
Fig. 9 is the schematic cross-sectional view of guide frame in Fig. 8;
Figure 10 is the scheme of installation of guide frame and fixinig plate in Fig. 9;
Figure 11 is adjustable direction schematic diagram of fixinig plate in Figure 10;
Figure 12 is the structural schematic diagram of fixinig plate in Figure 10;
Figure 13 is the structural schematic diagram one of fixing piece in Fig. 5;
Figure 14 is the structural schematic diagram two of fixing piece in Fig. 5;
Figure 15 is the structural schematic diagram three of fixing piece in Fig. 5.
Reference numeral:
1, interior machine;2, tuyere structure;3, fixing piece;4, suspending assembly;5, connector;6, guide frame;7, locating part;
8, panel;9, fixinig plate;10, installing matrix;31, the first trepanning;32, the second trepanning;33, the first plate;34, the second plate;35, tight
Firmware;41, connecting plate;42, nut;61, guiding surface;91, notch.
Specific implementation mode
Technical solution provided by the utility model is illustrated in more detail with reference to Fig. 1~Figure 15.
Referring to Fig. 1 and Fig. 2, the utility model embodiment provides a kind of tuyere structure installation method, realizes air port installation
The side of structure is connected with installing matrix, and installing matrix specifically may include furred ceiling.This method specifically includes following steps:
Step S1, in the side mounting fixing parts 3 of tuyere structure 2.
In order to enable the tuyere structure 2 after installation is firm, reliable, it can be more in the opposite both sides interval installation of tuyere structure 2
A fixing piece 3.
Step S2, fixing piece 3 is connect with installing matrix 10.Wherein, the link position of fixing piece 3 and installing matrix be can
It adjusts.The company of fixing piece and the installing matrix can be selected according to the size of tuyere structure and the bulk of installation site
Connect position.
Above-mentioned technical proposal by tuyere structure 2 and is pacified using with the adjustable fixing piece 3 of the link position of installing matrix 10
It fills matrix 10 to connect, install convenient is efficient.
Fixing piece 3 can be located at each side of tuyere structure, may also be at one of which or multigroup opposite side.
In the present embodiment, fixing piece 3 has the first trepanning 31 and the second trepanning 32, wherein above-mentioned step one specifically can be with
Including:Fixing piece 3 is fixed by the first trepanning 31 and the side of tuyere structure.The secure components such as stay bolt can be used and pass through first
Fixing piece 3 and the side of tuyere structure are fixed in trepanning 31.
Above-mentioned step two specifically may include:Pass through second trepanning 32 by tuyere structure and the peace using fastener
Matrix 10 is filled to fix.
First trepanning 31 and the second trepanning 32 are slotted hole.The parallel tuyere structure of the length direction of first trepanning 31 2
Laterally (width direction of tuyere structure 2 shown in Fig. 4), the longitudinal direction (figure of the parallel tuyere structure of the length direction of the second trepanning 32 2
The length direction of tuyere structure 2 shown in 4).
Referring to Fig. 2, another embodiment of the utility model provides a kind of air port mounting structure, including interior machine 1 and tuyere structure
2, the side of tuyere structure 2 is equipped with the fixing piece 3 for being connect with installing matrix 10, the company of fixing piece 3 and installing matrix 10
It is adjustable to connect position.
Installing matrix 10 specifically includes furred ceiling.
Referring to Fig. 7, fixing piece 3 is connect by the fastener 35 across slotted hole with installing matrix 10.
Referring to Figure 13, fixing piece 3 has the first trepanning 31 and the second trepanning 32, and the first trepanning 31 and the second trepanning 32 are
For slotted hole.Fixing piece 3 is fixed by the first trepanning 31 and the side of tuyere structure 2;The length direction of first trepanning 31 is parallel
The longitudinal direction of the tuyere structure 2, the transverse direction of the parallel tuyere structure of the length direction of the second trepanning 32 2.
First trepanning 31 and second trepanning 32 different by the way that length direction is arranged, can be in the lateral, vertical of tuyere structure 2
The adjustment of installation site is carried out to both direction, installation is more convenient.
Referring to Fig. 2, the opposite both sides of tuyere structure 2 are installed on installing matrix 10 by fixing piece 3.So connection, air port
The installation of structure 2 is more convenient, and the tuyere structure 2 after installation is solid and reliable.
Referring to Fig. 2 and Fig. 6, air port mounting structure further includes locating part 7, and locating part 7 is set to tuyere structure 2, and locating part 7 has
The plane of 10 bottom end of installing matrix can be blocked by having, in order to be positioned in installation process.
Referring to Fig. 2, Fig. 6, air port mounting structure further includes panel 8, and panel 8 is set to one that tuyere structure 2 deviates from interior machine 1
Side.
Referring to Figure 13, fixing piece 3 includes the first plate 33 and the second plate 34 being fixed to each other, and the first trepanning 31 is set to the first plate
33, the second trepanning 32 is set to the second plate 34.First plate 33 is fixed with tuyere structure 2, and the second plate 34 is fixed with installing matrix 10.This
In embodiment, fixing piece 3 can make using the fastener 35 normally through the second opening 32 just by using above structure
It can be so that installing matrix 10 provides the second plate 34 active force obliquely, the vertical component energy and locating part which has
7 cooperations, so that the ground of tuyere structure 2 is concordant with the bottom surface of installing matrix 10.The fastener 35 of so-called normal mounting refers to,
By fastener 35 using for screw, the length direction of fastener 35 is approximately perpendicular to the surface of the second plate 34.
Referring to Figure 14, the angle of the first plate 33 and the second plate 34 is 95 degree to 140 degree, for example, for 95 degree, 100 degree, 105
It spends, 110 degree, 120 degree, 130 degree, 140 degree etc..When the angle to install fastener 35, the fixed force F of fastener 35 is oblique
On, there are one upward component F1, while in the case where locating part 7 limits, can make bottom surface and the installation of tuyere structure 2
The bottom surface of matrix 10 is concordant.
Referring to Figure 15, the length C of the second trepanning 32 is 8mm to 20mm.After the certifiable air port dismounting of above-mentioned length originally
Bearing is destroyed when can not install, and can aside reinstall fastener 35.
Referring to Figure 14, the total height B of fixing piece 3 is 7mm to 12mm.Above-mentioned height can meet the general thickness of installing matrix
Degree ensures that it will not be excessively high or escapes to the lower section of installing matrix 10.
Referring to Figure 15, the diameter R of the second trepanning 32 is 2.5mm to 4mm.Diameter R can meet can in existing project installation
The screw sizes that can be used, while ensureing that the installation of screw will not relax.
It is 2mm to 5mm referring to Figure 15, distance D of second trepanning 32 apart from bottom, which is that the installation of fastener 35 carries
Supply space without interfering with tuyere structure 2.
Referring to Fig. 3 to Figure 15, another embodiment of the utility model provides a kind of tuyere structure installation method, including following step
Suddenly:
Step S10, judge whether the support strength of installing matrix 10 meets the lifting requirements of tuyere structure 2.
Can installing matrix 10 meet lifting requirements, depend on material, thickness, the shape, structure etc. of installing matrix 10.It is real
Border in use, with tuyere structure 2 be installed in installing matrix 10 after total be it is safe, can normal use be mark
It is accurate.
If step S20, meeting the requirements, the side of tuyere structure 2 is mounted in installing matrix 10, by installing matrix 10
Main carrying tuyere structure 2.Tuyere structure 2 is mounted on the interior machine 1 of unit, carrying tuyere structure 2 is assisted by interior machine 1.Its
In, by the side of tuyere structure 2 be mounted on installing matrix 10 on operation and by tuyere structure 2 be mounted on unit interior machine 1 on
Operation can successively carry out, can also be carried out at the same time.It is carried out at the same time and needs more operating personnel.Operation needed for successively carrying out
Personnel amount is then less.
In above-mentioned step S20, the support strength of installing matrix 10 is met the requirements, and there are two types of installation sides for tuyere structure 2
Formula:The interior machine 1 that direct side is loaded on installing matrix 10, is directly mounted at unit.Both modes can be used alone, also in combination with it
His mounting means to carry the weight of tuyere structure 2 jointly.
The side mounting means of tuyere structure 2 refers to that the side of tuyere structure 2 is directly installed in installing matrix 10, no
Need nesting.Specifically, screw and plate may be used directly to fix the side of tuyere structure 2 and installing matrix 10.Herein
Mounting means described in the air port mounting structure embodiment provided hereinafter is provided.
If step S30, being unsatisfactory for requiring, tuyere structure 2 is mounted on the interior machine 1 of unit, is mainly held by interior machine 1
Carry tuyere structure 2;The side of tuyere structure 2 is mounted in installing matrix 10, carrying tuyere structure is assisted by installing matrix 10
2。
The tuyere structure installation method that above-mentioned technical proposal provides, can be based on the bearing capacity of itself of installing matrix 10
Whether meet the requirements to determine the mounting means of tuyere structure 2;If 10 bearing capacity of installing matrix is met the requirements, tuyere structure
2 mainly using side dress (i.e. side is installed) carrying, and the position of installation point is more, can disperse the weight of tuyere structure 2, even and if
The problems such as deformation, will not occur in 2 long enough of tuyere structure.If the bearing capacity of installing matrix 10 is unsatisfactory for tuyere structure 2
Lifting requirements are then mainly carried tuyere structure 2 by interior machine 1.Above two mounting means can save nesting, and then save embedding
Required complicated procedures of forming in installation process is covered, the installation procedure of tuyere structure 2 is simplified, improves installation effectiveness.
Tuyere structure 2 is carried by installing matrix 10 and interior machine 1 simultaneously, installation point when above-mentioned mounting means can reduce side dress
Quantity.
Step S20 is described below and specifically includes following steps:
Step 1: in the side mounting fixing parts 3 of tuyere structure 2.Referring to Fig. 5 and Figure 13, wherein fixing piece 3 has the
One trepanning 31 and the second trepanning 32, the first trepanning 31 and the second trepanning 32 at least one be slotted hole.Fixing piece 3 passes through
One trepanning 31 and the side of tuyere structure 2 are fixed.If the first trepanning 31 and the second trepanning 32 are slotted hole, the first trepanning 31
Length direction along tuyere structure 2 first direction, the length direction of the second trepanning 32 along tuyere structure 2 second direction.
One of first direction and second direction are the longitudinal direction of tuyere structure 2, another transverse direction for tuyere structure 2.First trepanning 31
Can be slotted hole with the second trepanning 32, can adjust fixing piece 3 by two slotted holes ties with installing matrix 10, air port
The installation site of structure 2.
Step 2: the side of tuyere structure 2 and installing matrix 10 are fixed across the second trepanning 32 using fastener 35.Ginseng
See that Fig. 7, fastener are such as bolt etc..
Above-mentioned step S30 specifically may include following steps:
Step 1: suspending assembly 4 to be installed on to the interior machine 1 of unit.The structure of suspending assembly 4 can there are many, Ke Yiwei
Plate or frame class formation, will provide specific structure type hereinafter.
Step 2: tuyere structure 2 and suspending assembly 4 are fixed.Referring to Fig. 4, such as:Using connector 5 from tuyere structure 2
Bottom wear to top and fix tuyere structure 2 and suspending assembly 4.Referring to Fig. 4, connector 5 is specifically as follows long spiro nail.
The specific implementation mode of above-mentioned tuyere structure installation method is described below.
Side dress mode is introduced first.It introduces tuyere structure 2 and installing matrix 10 is fixed on by side cartridge screw.Tuyere structure from
Under up install installing matrix 10, locating part (design is relatively thin, there is sufficient intensity) 7 resist 10 lower face of installing matrix (see
Fig. 6), make tuyere structure and 10 bottom surface of installing matrix straight.At this time fastener (being specially side cartridge screw) 35 passes through fixing piece 3
On the second trepanning 32 (Figure 13) be fixed in installing matrix 10.Further, fixinig plate 3 can also be equipped with the first of long waist shaped and open
Hole 31, it is therefore an objective to which can be open actual size according to installing matrix 10,3 position of adjustment fixinig plate so that when side cartridge screw fastens
It will not lead to 2 deformation of tuyere structure, ensure that appearance is unaffected.
Next introduces lifting mode.Suspending assembly (suspending assembly 4 is equipped with screw hole) 4 is installed on interior machine 1 in advance, is hung
Hanging nut 42 in pre-welding on hanging component 4.Guide frame 6, the fixation side of guide frame 6 can be arranged in tuyere structure 2
There are many formula, for example buckle, and screw is fixed, glue bond.Certainly, also directly can be inherently designed in tuyere structure 2 can play class
Like the feature of guiding role.Finite place piece 7 is fixed on tuyere structure, tuyere structure 2 is fixed with the fixinig plate of adjustable installation site
9, fixinig plate 9 is equipped with notch 91, by notch 91 fixinig plate 9 is snapped on connector 5, referring to Fig. 5, Figure 11 and Figure 12.
Specific installation steps are as follows:
1) before installing, the fixing screws (see Figure 10) on the fixinig plate 9 of position adjustable are first unloaded, by the fixation of position adjustable
It is spare that piece 9 is placed on the installation of erector's pocket.
2) along 1 length direction of interior machine, two suspending assemblies 4 are fixed by screw in 1 both sides of interior machine, referring to Fig. 4.
3) connector 5 (being specially long spiro nail) pre- stubborn several threads are fixed on suspending assembly 4, hang screw at this time
Head exposes in 10 bottom surface of installing matrix, and tuyere structure 2 enables hanging head of screw smoothly to lead to by the guiding surface 61 of guide frame 6
6 medial surface of guide frame is crossed, sees Fig. 8 to Figure 10.
4) after the head of connector 5 is by guide frame 6, tuyere structure 2 is up resisted with hand enables locating part 7 and peace
Fill the fitting of 10 lower face of matrix.
5) erector can take out the fixinig plate 9 for the position adjustable that step 1 is removed inside pocket at this time, see Figure 10, figure
11 and Figure 12, the fixinig plate 9 are designed with the notch 91 of card screw, and by 91 snap-fit connection members 5 of notch, fixinig plate 9 is caught in direction
Shown in arrow in Figure 10.Adjustable position long waist shaped through-hole is designed on the fixinig plate 9, ensures that 5 head of connector will not lead to
The through-hole is crossed, and the body of rod of connector 5 can be in long waist shaped through-hole slide inside, to ensure that tuyere structure 2 can be in length
Side is offset up.In addition adjustment long waist shaped hole can also be arranged in the width direction of the fixinig plate 9, ensure tuyere structure 2 in width
It can also slightly be adjusted on degree.The arrow of length direction, width direction meaning shown in Figure 12.
6) connector 5 is finally tightened, tuyere structure 2 is made to be bonded with installing matrix 10.
It is surely filled since in project installation actual application, the opening of installing matrix 10 often differs with 1 air outlet of interior machine
Divide alignment, the above clever structure design, ensure that lifting is fixed can be adapted to major part requirement of engineering.
Described in detail above is to hang mounting means, and in actual application, this hanging method is suitble to tuyere structure 2 itself
Compare thick situation.If tuyere structure 2 is relatively thin, can also be installed using following mode:
1) suspending assembly 4 is fixed on interior machine 1.
2) installation of tuyere structure 2 is resisted in 10 bottom surface of installing matrix, i.e., locating part 7 is touched 10 bottom surface of installing matrix.
3) nut of the directly alignment suspending assembly 4 of connector (specifically including long screw) 5, then tightens, makes tuyere structure 2
Effectively fitting installing matrix 10, and be fixed on interior machine 1.
It should be noted that connector 5 is only arranged in above-mentioned lifting fixed form in the longitudinal direction, if tuyere structure 2
Longer, tuyere structure 2 may deform, and cause intermediate place deformation to expose gap, then can also be in 2 centre position of tuyere structure
It is fixed and is assisted by side cartridge screw mode.
The tuyere structure installation method that the utility model above-described embodiment provides can only use it according to actual needs
A kind of middle mounting means or two kinds of mounting means use simultaneously.Above-mentioned installation method, installation are versatile;Installing matrix 10 is opened
Mouth has and still can meet installation when certain deviation, does over again without installing matrix 10, is open again again.Hanging is reliable, air port
Structure 2 can fully be bonded installing matrix 10 after installing;Simple installation can be installed immediately after the completion of installing matrix 10 is open,
Convenience and high-efficiency.
Referring to Fig. 4 to Figure 13, another embodiment of the utility model provides a kind of air port mounting structure, can be used for implementing above-mentioned
The tuyere structure installation method that embodiment provides.The air port mounting structure includes interior machine 1 and tuyere structure 2, and tuyere structure 2 is by interior
Machine 1 and installing matrix carry jointly.
Interior machine 1 is lifted on roof (or being ceiling).According to the difference of actual conditions, tuyere structure 2 may be used
Following bearing modes of one of them:By installing matrix 10 mainly carrying and interior machine 1 auxiliary carrying, by interior machine 1 mainly carrying and
The auxiliary carrying of installing matrix 10.
Tuyere structure 2 is carried by interior machine 1, can be fixed on peace to avoid that in the prior art must be mounted on tuyere structure 2
Fill the complex procedures brought in the nesting of matrix 10, the problems such as required personnel are more.
Further, the side of tuyere structure 2 is equipped with the fixing piece 3 for being connect with installing matrix 10, fixing piece 3 with
The link position of installing matrix 10 is adjustable.
Fixing piece 3 can be selected one according to actual needs and installed with installing matrix 10 by the way that multiple mounting structures are arranged.Or
The adjustable holes of installation sites such as slotted hole are arranged in person, fixing piece 3, to realize may be selected for installation site.
Referring to Figure 13, in the present embodiment, fixing piece 3 has the first trepanning 31 and the second trepanning 32.First trepanning 31 and
At least one is slotted hole for two trepannings 32, this is sentenced be slotted hole for.Fixing piece 3 passes through the first trepanning 31 and air port
The side of structure 2 is fixed;The length direction of first trepanning 31 is along the first direction of tuyere structure 2, the length of the second trepanning 32
Direction is along the second direction of tuyere structure 2, and one of first direction and second direction are the longitudinal direction of tuyere structure 2, separately
One is the transverse direction of tuyere structure 2.
First trepanning 31 and second trepanning 32 different by the way that length direction is arranged, can be in the lateral, vertical of tuyere structure 2
The adjustment of installation site is carried out to both direction, installation is more convenient.
Further, interior machine 1 is fixed with suspending assembly 4, and tuyere structure 2 is fixed by connector 5 and suspending assembly 4.Even
Fitting 5 can be stay bolt.
Referring to Fig. 4, optionally, the transverse end surface of interior machine 1 is fixedly connected with tuyere structure 2 by suspending assembly 4.Setting is hung
Hanging component 4, convenient for machine 1 and tuyere structure 2 in connection.Suspending assembly 4 is arranged in the transverse end surface of interior machine 1, has fully considered interior machine
1 design feature and the convenience of installation.
Referring to Fig. 4, in the present embodiment, the opposite both sides of tuyere structure 2 are installed on installing matrix 10, and tuyere structure 2 is opposite
Other both sides be fixedly connected with interior machine 1 by suspending assembly 4.In the present embodiment, two longitudinal edge sides of tuyere structure 2 are loaded on installation
Matrix 10, widthwise edge are lifted on interior machine 1.
Referring to Fig. 4, in the present embodiment, suspending assembly 4 includes connecting plate 41 and nut 42, and connecting plate 41 and interior machine 1 are removable
Connection is unloaded, tuyere structure 2 is connect by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of above structure, structure is tight
It gathers, it is easy for installation.
Referring to Fig. 4, for the ease of installation connecting element 5, tuyere structure 2 is equipped with for guiding leading for 5 installation direction of connector
To structure 6.Guide frame 6 can be inclined-plane or other structures, to help connector 5 to find threaded hole accurately.
Referring to Fig. 9, in the present embodiment, guiding surface 61 can be arranged in guide frame 6, and connecting plate 41 is found accurately for connector 5
Guiding is provided with nut 42.This is simple and compact for structure, manufacture easy to process.
Referring to Fig. 6, further, air port mounting structure further includes locating part 7, and locating part 7 is set to tuyere structure 2, limit
Part 7 has the plane that can block 10 bottom end of installing matrix.Locating part 7 can be plate, the side of locating part 7 and tuyere structure
Tuyere structure 2 is exposed in 2 installations, the other side, and the side is when tuyere structure 2 is installed for supporting in installing matrix 101, to air port
Position-limiting action is played in the installation of 2 upper and lower directions of structure so that tuyere structure 2 is not retracted in excessively inside installing matrix 10.
Referring to Fig. 6 or Fig. 7, optionally, air port mounting structure further includes panel 8, and panel 8 is set to tuyere structure 2 away from interior
The side of machine 1.
The size of panel 8 can be greater than or equal to the size that installing matrix 10 is open, and such panel 8 can block air port
The installation site of structure 2 so that the precision of installation site is required lower.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown only is the utility model and simplified description for ease of description, rather than indicates or imply meaning
Device or element must have a particular orientation, be specific azimuth configuration and operation, thus should not be understood as new to this practicality
Type protects the limitation of content.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
It is same to replace, but these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The spirit and scope of scheme.
Claims (11)
1. a kind of air port mounting structure, which is characterized in that including tuyere structure (2), the side of the tuyere structure (2) is equipped with
Fixing piece (3) for being connect with installing matrix (10), the fixing piece (3) and the link position of the installing matrix (10) are
It is adjustable.
2. air port mounting structure according to claim 1, which is characterized in that the fixing piece (3) is by passing through slotted hole
Fastener (35) connect with the installing matrix (10).
3. air port mounting structure according to claim 2, which is characterized in that the fixing piece (3) has the first trepanning
(31) and the second trepanning (32), first trepanning (31) and second trepanning (32) are slotted hole;The fixing piece (3)
It is fixed by first trepanning (31) and the side of the tuyere structure (2);The length direction of first trepanning (31) is flat
The longitudinal direction of the row tuyere structure (2), the transverse direction of the parallel tuyere structure (2) of length direction of second trepanning (32).
4. air port mounting structure according to claim 1, which is characterized in that the opposite both sides of the tuyere structure (2) are logical
It crosses the fixing piece (3) and is installed on the installing matrix (10).
5. air port mounting structure according to claim 1, which is characterized in that further include locating part (7), the locating part
(7) it is set to the tuyere structure (2), the locating part (7) has the plane that can block the installing matrix (10) bottom end.
6. air port mounting structure according to claim 1, which is characterized in that further include panel (8), the panel (8) sets
Deviate from the side of interior machine (1) in the tuyere structure (2).
7. air port mounting structure according to claim 3, which is characterized in that the fixing piece (3) includes the first plate (33)
With the second plate (34), first trepanning (31) is set to first plate (33), and second trepanning (32) is set to described second
Plate (34), first plate (33) is fixed with the tuyere structure (2), and second plate (34) is solid with the installing matrix (10)
It is fixed.
8. air port mounting structure according to claim 7, which is characterized in that first plate (33) and second plate
(34) angle is 95 degree to 140 degree.
9. air port mounting structure according to claim 7, which is characterized in that the length of second trepanning (32) is 8mm
To 20mm.
10. air port mounting structure according to claim 1, which is characterized in that the total height of the fixing piece (3) is 7mm
To 12mm.
11. air port mounting structure according to claim 1, which is characterized in that the installing matrix (10) includes furred ceiling.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710742959 | 2017-08-25 | ||
CN2017107429596 | 2017-08-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207815645U true CN207815645U (en) | 2018-09-04 |
Family
ID=61942238
Family Applications (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721812269.5U Active CN207815646U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401437.6A Pending CN107940712A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201711401534.5A Active CN109425089B (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure, indoor unit and air conditioning unit |
CN201711401546.8A Pending CN108050680A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201711401439.5A Pending CN108151266A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201721812367.9U Active CN208042459U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201721812002.6U Active CN207815645U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
Family Applications Before (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721812269.5U Active CN207815646U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401437.6A Pending CN107940712A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201711401534.5A Active CN109425089B (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure, indoor unit and air conditioning unit |
CN201711401546.8A Pending CN108050680A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201711401439.5A Pending CN108151266A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201721812367.9U Active CN208042459U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
Country Status (5)
Country | Link |
---|---|
US (1) | US20210071906A1 (en) |
EP (1) | EP3640559B1 (en) |
CN (7) | CN207815646U (en) |
ES (1) | ES2967707T3 (en) |
WO (1) | WO2019119873A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108050680A (en) * | 2017-08-25 | 2018-05-18 | 珠海格力电器股份有限公司 | Tuyere structure mounting method and tuyere structure |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109297165A (en) * | 2018-11-20 | 2019-02-01 | 宁波奥克斯电气股份有限公司 | A boom assembly and an air conditioner |
CN112880171A (en) * | 2021-03-24 | 2021-06-01 | 珠海格力电器股份有限公司 | Air outlet frame of air outlet component, air outlet component and central air conditioner |
CN113048645B (en) * | 2021-04-21 | 2024-11-29 | 珠海格力电器股份有限公司 | Supporting structure |
CN114484839B (en) * | 2021-12-10 | 2023-05-23 | 惠瑞净化科技(江苏)有限公司 | Install high-efficient supply-air outlet of sealed on lithium cell toilet roof |
Family Cites Families (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1604111A1 (en) * | 1965-11-20 | 1970-04-30 | Air Devices Inc | Ceiling diffuser |
JP2575949Y2 (en) * | 1992-07-28 | 1998-07-02 | ダイキン工業株式会社 | Installation device for ceiling-mounted air conditioners |
JP3445428B2 (en) * | 1996-01-12 | 2003-09-08 | 東芝キヤリア株式会社 | Duct ventilation fan |
JPH10213345A (en) * | 1997-01-28 | 1998-08-11 | Nissei Kinzoku Kk | Room air conditioner mounting implement |
EP1029204B1 (en) * | 1997-11-06 | 2002-03-06 | Nerling Gmbh Systemräume | Measuring room with air-conditioning device |
JP4359955B2 (en) * | 1999-03-26 | 2009-11-11 | ダイキン工業株式会社 | Embedded ceiling air conditioner |
US6587642B1 (en) * | 2000-11-14 | 2003-07-01 | Daniel King | Ceiling fan cooling system |
CA2364672C (en) * | 2001-09-20 | 2010-06-29 | Canplas Industries Ltd. | Passive venting device |
JP2005049074A (en) * | 2003-07-31 | 2005-02-24 | Fuji Industrial Co Ltd | Ceiling suspension type range hood fan |
KR20050113319A (en) * | 2004-05-27 | 2005-12-02 | 삼성전자주식회사 | Ceiling flush type air conditioner |
JP4946185B2 (en) * | 2006-06-08 | 2012-06-06 | ダイキン工業株式会社 | Indoor unit of air conditioner |
KR101321544B1 (en) * | 2008-01-28 | 2013-10-25 | 엘지전자 주식회사 | Ceiling type air conditioner |
CN202401705U (en) * | 2011-10-17 | 2012-08-29 | 北京优尼法制药技术有限公司 | Integrated structure of suspended ceiling and air inlet |
CN203231490U (en) * | 2013-02-28 | 2013-10-09 | 大金工业株式会社 | Panel Mount Auxiliary Devices and Air Conditioner Indoor Units |
JP6270645B2 (en) * | 2013-12-26 | 2018-01-31 | 三菱電機株式会社 | Equipment mounting device and indoor unit |
DE102014001543B4 (en) * | 2014-02-07 | 2017-08-31 | Octanorm-Vertriebs-GmbH für Bauelemente | System for creating suspended ceiling constructions |
CN104019536A (en) * | 2014-06-17 | 2014-09-03 | 珠海格力电器股份有限公司 | Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner |
CN204165215U (en) * | 2014-06-17 | 2015-02-18 | 珠海格力电器股份有限公司 | Ceiling type air conditioner |
CN204100439U (en) * | 2014-07-08 | 2015-01-14 | 广东松下环境系统有限公司 | Ion generating device |
CN204084765U (en) * | 2014-07-18 | 2015-01-07 | 中国建筑第七工程局有限公司 | A kind of device for fixing air port system |
CN204134190U (en) * | 2014-10-14 | 2015-02-04 | 王彬 | A kind of elevating mechanism of Novel mahjong machine |
CN104330086A (en) * | 2014-10-16 | 2015-02-04 | 重庆金宏汽车电子有限公司 | Vehicle navigator rapid assembling structure |
CN204648631U (en) * | 2015-05-28 | 2015-09-16 | 广东美的制冷设备有限公司 | Lifting fixtures and ceiling-mounted air conditioner |
CN205174759U (en) * | 2015-11-19 | 2016-04-20 | 宁波威霖住宅设施有限公司 | Vent panel switch structure |
CN205448203U (en) * | 2015-12-23 | 2016-08-10 | 宁波威霖住宅设施有限公司 | Central air conditioning wind gap shell fragment mounting structure |
CN106123263B (en) * | 2016-06-20 | 2019-06-11 | 珠海格力电器股份有限公司 | Ceiling type air conditioner and air outlet device thereof |
CN205726795U (en) * | 2016-06-30 | 2016-11-23 | 浙江光大通信设备有限公司 | The mounting structure of light current module |
CN205939596U (en) * | 2016-07-04 | 2017-02-08 | 珠海格力电器股份有限公司 | Air port fixing device, air port structure and ceiling type air conditioner |
CN106152449A (en) * | 2016-09-19 | 2016-11-23 | 珠海格力电器股份有限公司 | Air outlet structure and central air-conditioning system with same |
CN106642329B (en) * | 2016-11-29 | 2020-09-25 | 青岛海尔空调器有限总公司 | Air conditioner indoor unit |
CN207815646U (en) * | 2017-08-25 | 2018-09-04 | 珠海格力电器股份有限公司 | Air port mounting structure |
CN207831611U (en) * | 2017-12-22 | 2018-09-07 | 珠海格力电器股份有限公司 | Air port structure assembly and ceiling type air conditioner |
-
2017
- 2017-12-22 CN CN201721812269.5U patent/CN207815646U/en active Active
- 2017-12-22 CN CN201711401437.6A patent/CN107940712A/en active Pending
- 2017-12-22 CN CN201711401534.5A patent/CN109425089B/en active Active
- 2017-12-22 CN CN201711401546.8A patent/CN108050680A/en active Pending
- 2017-12-22 CN CN201711401439.5A patent/CN108151266A/en active Pending
- 2017-12-22 CN CN201721812367.9U patent/CN208042459U/en active Active
- 2017-12-22 CN CN201721812002.6U patent/CN207815645U/en active Active
-
2018
- 2018-09-03 EP EP18892809.7A patent/EP3640559B1/en active Active
- 2018-09-03 US US16/763,488 patent/US20210071906A1/en not_active Abandoned
- 2018-09-03 ES ES18892809T patent/ES2967707T3/en active Active
- 2018-09-03 WO PCT/CN2018/103735 patent/WO2019119873A1/en unknown
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108050680A (en) * | 2017-08-25 | 2018-05-18 | 珠海格力电器股份有限公司 | Tuyere structure mounting method and tuyere structure |
Also Published As
Publication number | Publication date |
---|---|
CN108151266A (en) | 2018-06-12 |
EP3640559A1 (en) | 2020-04-22 |
CN207815646U (en) | 2018-09-04 |
US20210071906A1 (en) | 2021-03-11 |
ES2967707T3 (en) | 2024-05-03 |
CN208042459U (en) | 2018-11-02 |
EP3640559A4 (en) | 2020-11-04 |
CN107940712A (en) | 2018-04-20 |
CN109425089B (en) | 2024-08-30 |
CN109425089A (en) | 2019-03-05 |
CN108050680A (en) | 2018-05-18 |
EP3640559B1 (en) | 2023-10-04 |
WO2019119873A1 (en) | 2019-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207815645U (en) | Air port mounting structure | |
CN208895460U (en) | A kind of girder steel butt junction location device | |
CN103526907A (en) | Inclined stone material dry-hanging structure and construction method thereof | |
CN201565742U (en) | Positioning block for arc-shaped welding pieces | |
CN209509277U (en) | A kind of adjustable curtain-wall adapter | |
CN211473034U (en) | Integrated kitchen ceiling structure | |
CN105080976B (en) | Vertical mill backing plate installation method and its device | |
CN105180985B (en) | A kind of ultrasonic sensor erecting device | |
CN207553391U (en) | A kind of big face aluminium keel pendant stone material system | |
CN203499191U (en) | Tilted stone cladding structure | |
CN207406022U (en) | A kind of wallboard adjustable limiting part | |
CN209699038U (en) | A kind of flange assembly tool in flanged pipe road | |
CN217631163U (en) | High-rise building elevator shaft safety construction platform | |
US20130320162A1 (en) | Support structure for solar panels | |
CN205037908U (en) | Ultrasonic sensor installation device | |
CN209620264U (en) | A kind of novel anti-pulling connector | |
CN206466657U (en) | It can compensate for the adjustable chute of manufacturing and fixing error | |
CN222350116U (en) | Honeycomb type composite board supports photovoltaic soft material and spreads subsides and hang outer wall mechanism futilely | |
CN218782770U (en) | Display board | |
CN214923691U (en) | Fire extinguisher head carrier structure | |
CN214364807U (en) | Scaffold for road and bridge engineering | |
CN215595028U (en) | Wallboard auxiliary installation device for assembly type building | |
CN209290536U (en) | Vehicle and its carriage chassis | |
CN211175677U (en) | Lateral anti-seismic support for air duct | |
CN109610765A (en) | Wallboard assembly and installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |