[go: up one dir, main page]

CN107940712A - Tuyere structure mounting method and tuyere structure - Google Patents

Tuyere structure mounting method and tuyere structure Download PDF

Info

Publication number
CN107940712A
CN107940712A CN201711401437.6A CN201711401437A CN107940712A CN 107940712 A CN107940712 A CN 107940712A CN 201711401437 A CN201711401437 A CN 201711401437A CN 107940712 A CN107940712 A CN 107940712A
Authority
CN
China
Prior art keywords
tuyere structure
tuyere
perforate
installing matrix
air port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711401437.6A
Other languages
Chinese (zh)
Inventor
池晓龙
杜辉
苏玉海
施正兴
陈博强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Publication of CN107940712A publication Critical patent/CN107940712A/en
Priority to PCT/CN2018/103735 priority Critical patent/WO2019119873A1/en
Priority to ES18892809T priority patent/ES2967707T3/en
Priority to US16/763,488 priority patent/US20210071906A1/en
Priority to EP18892809.7A priority patent/EP3640559B1/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/32Supports for air-conditioning, air-humidification or ventilation units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/06Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/0007Indoor units, e.g. fan coil units
    • F24F1/0043Indoor units, e.g. fan coil units characterised by mounting arrangements
    • F24F1/0047Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in the ceiling or at the ceiling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/14Details or features not otherwise provided for mounted on the ceiling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
  • Duct Arrangements (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Connection Of Plates (AREA)

Abstract

The embodiment of the invention discloses a tuyere structure mounting method and a tuyere structure, relates to the field of air conditioning equipment, and aims to simplify the mounting process of a tuyere structure and reduce the mounting complexity. The tuyere structure installation method comprises the following steps: judging whether the supporting strength of the installation base body meets the hoisting requirement of the tuyere structure or not; if the requirement is met, mounting the side face of the tuyere structure on a mounting base body, mounting the tuyere structure on an inner machine of the unit, wherein the mounting base body mainly bears the load, and the inner machine bears the load in an auxiliary manner; if the requirement is not met, the tuyere structure is arranged on the inner machine, the side face of the tuyere structure is arranged on the installation base body, the installation base body is used for assisting in bearing, and the inner machine is mainly used for bearing. The installation method has strong installation universality; the opening of the installation base body can still meet the requirement of installation when having certain deviation, the hanging is reliable, and the installation is simple and convenient.

Description

Tuyere structure installation method and air port mounting structure
Technical field
The present invention relates to apparatus of air conditioning field, and in particular to a kind of tuyere structure installation method and air port installation knot Structure.
Background technology
The air outlet structure of air conditioner of existing ceiling type air conditioner is embedded into inside furred ceiling, and the installation of its air outlet structure of air conditioner needs Will following ten steps:Step 1: by furred ceiling opening;Step 2: in furred ceiling edge heavy platform;It is Step 3: nested for air port Inward flange pastes U.S. line paper;Step 4: bond glue in nested brushed with the heavy platform joint place at furred ceiling edge in air port;Step 5: adopt Air port nesting is fixed at furred ceiling with nailing gun;Step 6: high-strength putty is mended with the periphery of furred ceiling heavy platform for air port is nested; Step 7: paper of squeegeeing is pasted with furred ceiling edge in air port nesting;Step 8: brush putty is polished, mopping filling-in;Step 9: remove The U.S. line paper and equating edge of air port nesting inward flange;Step 10: air port component is fixed in the nesting of air port with screw.
Inventor has found that at least there are following problems in the prior art:Outlet air mouthpiece uses above-mentioned peace in the prior art Dress mode, installation process are complicated, are related to that process is more, and installation period length, emergency works project can not meet;The constructor of each step Member may be different, and the cooperation personnel being related to are more, it is difficult to ensure the reliability of installation.
The content of the invention
One of purpose of the present invention is to propose a kind of tuyere structure installation method and air port mounting structure, to simplification The installation procedure of tuyere structure, reduces the complexity of installation.
To achieve the above object, the present invention provides following technical scheme:
The present invention provides a kind of tuyere structure installation method, comprise the following steps:
Judge whether the support strength of furred ceiling meets the lifting requirements of the tuyere structure;
If meeting the requirements, the side of the tuyere structure is installed on installing matrix, the tuyere structure is installed on The interior machine of unit, and the installing matrix mainly carries, the interior machine auxiliary carrying;If it is unsatisfactory for requiring, by tuyere structure The interior machine is installed on, the side of the tuyere structure is installed on installing matrix, and installing matrix auxiliary carrying, it is described Interior owner will carry.
In one or more embodiments, described, the side of tuyere structure is installed on installing matrix includes following step Suddenly:
In the side mounting fixing parts of the tuyere structure;Wherein, the fixing piece has the first perforate and the second perforate, First perforate and second perforate at least one be slotted hole;The fixing piece passes through first perforate and institute The side for stating tuyere structure is fixed;
The tuyere structure and the installing matrix are fixed through second perforate using fastener.
In one or more embodiments, first perforate and second perforate are slotted hole;Described first opens First direction of the length direction in hole along the tuyere structure, the length direction of second perforate is along the tuyere structure Second direction, one of the first direction and the second direction be the tuyere structure longitudinal direction, it is another for institute State the transverse direction of tuyere structure.
In one or more embodiments, the interior machine that tuyere structure is installed on to unit comprises the following steps:
Suspending assembly is installed on to the interior machine of the unit;
The tuyere structure and the suspending assembly are fixed.
Another embodiment of the present invention provides a kind of air port mounting structure, including interior machine and tuyere structure, the tuyere structure Carried jointly by the interior machine and installing matrix.
In one or more embodiments, the side of the tuyere structure is provided with for being connected with the installing matrix The link position of fixing piece, the fixing piece and the installing matrix is adjustable.
In one or more embodiments, the fixing piece realizes the link position with the installing matrix using slotted hole It is adjustable.
In one or more embodiments, the fixing piece has the first perforate and the second perforate, first perforate and Second perforate at least one be slotted hole;The fixing piece passes through first perforate and the side of the tuyere structure Face is fixed;First direction of the length direction of first perforate along the tuyere structure, the length side of second perforate To the second direction along the tuyere structure, one of the first direction and the second direction are tied for the air port The longitudinal direction of structure, another transverse direction for the tuyere structure.
In one or more embodiments, the interior machine is fixed with suspending assembly, the tuyere structure by connector with The suspending assembly is fixed.
In one or more embodiments, the opposite both sides of the tuyere structure are installed on the installing matrix, the wind The opposite other both sides of mouth structure are fixedly connected by the suspending assembly with the interior machine.
In one or more embodiments, the suspending assembly includes connecting plate and nut, the connecting plate with it is described interior Machine is detachably connected, and the tuyere structure is connected by the connector and the nut with the connecting plate.
In one or more embodiments, the tuyere structure is equipped with the guiding for being used for guiding the connector installation direction Structure.
In one or more embodiments, air port mounting structure further includes locating part, and the locating part is arranged on the air port Structure, the locating part have the plane that can block the installing matrix bottom.
In one or more embodiments, air port mounting structure further includes panel, and the panel is arranged on the tuyere structure Away from the side of the interior machine
In one or more embodiments, the fixing piece includes the first plate and the second plate that interfix, and described first Plate is fixed with the tuyere structure, and second plate is fixed with the installing matrix.
In one or more embodiments, the angle of first plate and second plate is 95 degree to 140 degree.
In one or more embodiments, the total height of the fixing piece is 7mm to 12mm.
In one or more embodiments, the length of second perforate is 8mm to 20mm.
In one or more embodiments, the installing matrix includes furred ceiling.
Based on above-mentioned technical proposal, the embodiment of the present invention can at least produce following technique effect:
Tuyere structure installation method provided by the invention, installation are versatile;When installing matrix opening has certain deviation still It can so meet to install, do over again without installing matrix, be open again again;Hanging is reliable, can fully be pasted after tuyere structure installation Close installing matrix;Simple installation, after the completion of installing matrix opening, can install immediately, and installation is efficient.
Brief description of the drawings
Attached drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is tuyere structure installation method flow diagram provided in an embodiment of the present invention;
Fig. 2 is the schematic diagram that tuyere structure provided in an embodiment of the present invention is fixed with interior machine;
Fig. 3 is the structure diagram of tuyere structure in Fig. 2;
Fig. 4 is the diagrammatic side-view cross-sectional schematic diagram at locating part in Fig. 3;
Fig. 5 is the diagrammatic side-view cross-sectional schematic diagram at fixing piece in Fig. 3;
Fig. 6 is the scheme of installation of tuyere structure and guide frame in Fig. 2;
Fig. 7 is the schematic cross-sectional view of guide frame in Fig. 6;
Fig. 8 is the scheme of installation of guide frame and fixinig plate in Fig. 7;
Fig. 9 is adjustable direction schematic diagram of fixinig plate in Fig. 8;
Figure 10 is the structure diagram of fixinig plate in Fig. 8;
Figure 11 is the structure diagram one of fixing piece in Fig. 3;
Figure 12 is the structure diagram two of fixing piece in Fig. 3;
Figure 13 is the structure diagram three of fixing piece in Fig. 3.
Reference numeral:
1st, interior machine;2nd, tuyere structure;3rd, fixing piece;4th, suspending assembly;5th, connector;6th, guide frame;7th, locating part;8、 Panel;9th, fixinig plate;10th, installing matrix;31st, the first perforate;32nd, the second perforate;33rd, the first plate;34th, the second plate;35th, fasten Part;41st, connecting plate;42nd, nut;61st, guiding surface;91st, notch.
Embodiment
Technical solution provided by the invention is illustrated in more detail with reference to Fig. 1~Figure 13.
Referring to Fig. 1 to Figure 13, the embodiment of the present invention provides a kind of tuyere structure installation method, comprises the following steps:
Step S10, judge whether the support strength of installing matrix 10 meets the lifting requirements of tuyere structure 2.
Installing matrix 10 is specifically as follows furred ceiling.Can installing matrix 10 meet lifting requirements, depending on installing matrix 10 Material, thickness, shape, structure etc..In actual use, total after being installed to tuyere structure 2 in installing matrix 10 Be it is safe, can normal use be standard.
If step S20, meeting the requirements, the side of tuyere structure 2 is installed in installing matrix 10, is led by installing matrix 10 Carry tuyere structure 2.Tuyere structure 2 is installed on the interior machine 1 of unit, carrying tuyere structure 2 is aided in by interior machine 1.Wherein, The operation that the side of tuyere structure 2 is installed in installing matrix 10 and the behaviour being installed on tuyere structure 2 on the interior machine 1 of unit Work can be carried out successively, can be also carried out at the same time.Being carried out at the same time needs more operating personnel.Operating personnel needed for successively carrying out Quantity is then less.
In above-mentioned step S20, the support strength of installing matrix 10 is met the requirements, and tuyere structure 2 has two kinds of installation sides Formula:Direct side is loaded on installing matrix 10, is directly mounted at the interior machine 1 of unit.Both modes can be used alone, and can also combine it His mounting means to carry the weight of tuyere structure 2 jointly.
The side mounting means of tuyere structure 2, refers to that the side of tuyere structure 2 is directly installed in installing matrix 10, no Need nesting.Specifically, screw and plate can be used directly to fix the side of tuyere structure 2 and installing matrix 10.Herein Mounting means described in the air port mounting structure embodiment provided hereinafter can be also provided.
If step S30, being unsatisfactory for requiring, tuyere structure 2 is installed on the interior machine 1 of unit, is mainly carried by interior machine 1 Tuyere structure 2;The side of tuyere structure 2 is installed in installing matrix 10, carrying tuyere structure 2 is aided in by installing matrix 10.
The tuyere structure installation method that above-mentioned technical proposal provides, the bearing capacity of itself can be based on installing matrix 10 It is no to meet the requirements to determine the mounting means of tuyere structure 2;If 10 bearing capacity of installing matrix is met the requirements, tuyere structure 2 Mainly using side dress (i.e. side is installed) carrying, the position of mount point is more, can disperse the weight of tuyere structure 2, even and if wind The problems such as deformation, will not occur in 2 long enough of mouth structure.If the bearing capacity of installing matrix 10 is unsatisfactory for hanging for tuyere structure 2 Reload request, then mainly carried tuyere structure 2 by interior machine 1.Above two mounting means can save nesting, and then save nesting Required complicated procedures of forming in installation process, simplifies the installation procedure of tuyere structure 2, improves installation effectiveness.
Tuyere structure 2 is carried by installing matrix 10 and interior machine 1 at the same time, mount point when above-mentioned mounting means can reduce side dress Quantity.
Step S20 is described below and specifically includes following steps:
Step 1: in the side mounting fixing parts 3 of tuyere structure 2.Referring to Fig. 3 and Figure 11, wherein, fixing piece 3 has the One perforate 31 and the second perforate 32, the first perforate 31 and the second perforate 32 at least one be slotted hole.Fixing piece 3 passes through One perforate 31 and the side of tuyere structure 2 are fixed.If the first perforate 31 and the second perforate 32 are slotted hole, the first perforate 31 First direction of the length direction along tuyere structure 2, the second direction of the length direction of the second perforate 32 along tuyere structure 2. One of first direction and second direction be tuyere structure 2 longitudinal direction, another transverse direction for tuyere structure 2.First perforate 31 It can be slotted hole with the second perforate 32, fixing piece 3 and installing matrix 10, tuyere structure can be adjusted by two slotted holes 2 installation site.
Step 2: the side of tuyere structure 2 and installing matrix 10 are fixed through the second perforate 32 using fastener 35.Ginseng See Fig. 5, fastener is such as bolt etc..
Above-mentioned step S30 specifically may include following steps:
Step 1: suspending assembly 4 is installed on to the interior machine 1 of unit.The structure of suspending assembly 4 can have a variety of, Ke Yiwei Tabular or frame class formation, will provide specific structure type hereinafter.
Step 2: tuyere structure 2 and suspending assembly 4 are fixed.Referring to Fig. 2, such as:Using connector 5 from tuyere structure 2 Bottom wear to top and fix tuyere structure 2 and suspending assembly 4.Referring to Fig. 2, connector 5 is specifically as follows long spiro nail.
The embodiment of above-mentioned tuyere structure installation method is described below.
Side dress mode is introduced first.Introduce tuyere structure 2 and installing matrix 10 is fixed on by side cartridge screw.Tuyere structure from Under be up installed on installing matrix 10, locating part (design is relatively thin, there is sufficient intensity) 7 prop up 10 lower face of installing matrix (see Fig. 4), make tuyere structure and 10 bottom surface of installing matrix straight.At this time fastener (being specially side cartridge screw) 35 passes through fixing piece 3 On the second perforate 32 (Figure 11) be fixed in installing matrix 10.Further, fixinig plate 3 can also be equipped with the first of long waist shaped and open Hole 31, it is therefore an objective to which can be open actual size according to installing matrix 10,3 position of adjustment fixinig plate so that when side cartridge screw fastens It will not cause 2 deformation of tuyere structure, ensure that appearance is unaffected.
Next introduces lifting mode.Suspending assembly (suspending assembly 4 is equipped with screw hole) 4 is installed on interior machine 1 in advance, is hung Nut 42 is used in hanging in pre-welding on component 4.Tuyere structure 2 can set guide frame 6, the fixed form of guide frame 6 Very much, for example it is buckled, screw is fixed, glue bond.Certainly, also can directly tuyere structure 2 be inherently designed with can play it is similar The feature of guiding role.Finite place piece 7 is fixed on tuyere structure, tuyere structure 2 is fixed with the fixinig plate 9 of adjustable installation site, Fixinig plate 9 is equipped with notch 91, can be snapped on connector 5 by 91 fixinig plate 9 of notch, referring to Fig. 3, Fig. 9 and Figure 10.
Specific installation steps are as follows:
1) before installing, the fixing screws (see Fig. 8) on the fixinig plate 9 of position adjustable are first unloaded, by the fixation of position adjustable It is spare that piece 9 is placed on the installation of erector's pocket.
2) along interior 1 length direction of machine, two suspending assemblies 4 are fixed by screw in interior 1 both sides of machine, referring to Fig. 2.
3) connector 5 (being specially long spiro nail) pre- stubborn several threads are fixed on suspending assembly 4, hang head of screw at this time Expose enables hanging head of screw to pass through in 10 bottom surface of installing matrix, tuyere structure 2 by the guiding surface 61 of guide frame 6 6 medial surface of guide frame, is shown in Fig. 6 to Fig. 8.
4) after the head of connector 5 is by guide frame 6, tuyere structure 2 is up propped up with hand enables locating part 7 and installation 10 lower face of matrix is bonded.
5) erector can take out the fixinig plate 9 for the position adjustable that step 1 is removed inside pocket at this time, see Fig. 8, Fig. 9 And Figure 10, the fixinig plate 9 are designed with the notch 91 of card screw, by 91 snap-fit connection members 5 of notch, fixinig plate 9 is caught in direction ginseng As shown in arrow in Fig. 8.Adjustable position long waist shaped through hole is designed on the fixinig plate 9, ensures that 5 head of connector will not be by this Through hole, and the body of rod of connector 5 can be in long waist shaped through hole slide inside, to ensure that tuyere structure 2 can be in length direction Upper offset.In addition the width of the fixinig plate 9 can also set adjustment long waist shaped hole, ensure tuyere structure 2 on the width Can also slightly it adjust.The arrow of length direction, width meaning shown in Figure 10.
6) connector 5 is finally tightened, tuyere structure 2 is bonded with installing matrix 10.
Surely filled since in project installation actual application, the opening of installing matrix 10 often differs with interior 1 air outlet of machine Divide alignment, the design of above clever structure, ensure that lifting is fixed can be adapted to major part requirement of engineering.
Described in detail above is to hang mounting means, and in actual application, this hanging method is adapted to tuyere structure 2 itself Compare thick situation.If tuyere structure 2 is relatively thin, can also be installed using following mode:
1) suspending assembly 4 is fixed on interior machine 1.
2) installation of tuyere structure 2 is propped up in 10 bottom surface of installing matrix, i.e., locating part 7 is touched 10 bottom surface of installing matrix.
3) nut of the directly alignment suspending assembly 4 of connector (specifically including long screw) 5, then tightens, makes tuyere structure 2 Effectively fitting installing matrix 10, and be fixed on interior machine 1.
It should be noted that above-mentioned lifting fixed form only sets connector 5 in the longitudinal direction, if tuyere structure 2 Longer, tuyere structure 2 may deform, and cause middle place deformation to expose gap, then can also be in 2 centre position of tuyere structure Fixed and aided in by side cartridge screw mode.
The tuyere structure installation method that the above embodiment of the present invention provides, according to actual needs, can only use wherein one Kind mounting means or two kinds of mounting means use at the same time.Above-mentioned installation method, installation are versatile;The opening of installing matrix 10 has It still can meet to install during certain deviation, do over again without installing matrix 10, be open again again.Hanging is reliable, tuyere structure 2 Installing matrix 10 can be fully bonded after installation;Simple installation, after the completion of installing matrix 10 is open, can install immediately, it is convenient high Effect.
Referring to Fig. 2 to Figure 11, another embodiment of the present invention provides a kind of air port mounting structure, available for implementing above-mentioned implementation The tuyere structure installation method that example provides.The air port mounting structure includes interior machine 1 and tuyere structure 2, and tuyere structure 2 is by interior machine 1 Carried jointly with installing matrix 10.
Installing matrix 10 specifically may include furred ceiling.Interior machine 1 is lifted on roof (or being ceiling).According to actual conditions Difference, tuyere structure 2 can use one of them following bearing modes:Mainly carried by installing matrix 10 and interior machine 1 is auxiliary Carrying is helped, is mainly carried by interior machine 1 and installing matrix 10 aids in carrying.
Tuyere structure 2 is carried by interior machine 1, can be fixed on peace to avoid that in the prior art must be installed on tuyere structure 2 Fill the complex procedures brought in the nesting of matrix 10, the problems such as required personnel are more.
Further, the side of tuyere structure 2 is provided with the fixing piece 3 for being connected with installing matrix 10, fixing piece 3 with The link position of installing matrix 10 is adjustable.
Fixing piece 3 can be selected one according to actual needs and installed with installing matrix 10 by setting multiple mounting structures.Or Person, fixing piece 3 set the adjustable holes of installation site such as slotted hole, to realize may be selected for installation site.
Referring to Figure 11, in the present embodiment, fixing piece 3 has the first perforate 31 and the second perforate 32.First perforate 31 and At least one is slotted hole for two perforates 32, this is sentenced be slotted hole exemplified by.Fixing piece 3 passes through the first perforate 31 and air port The side of structure 2 is fixed;First direction of the length direction of first perforate 31 along tuyere structure 2, the length of the second perforate 32 Second direction of the direction along tuyere structure 2, one of first direction and second direction are the longitudinal direction of tuyere structure 2, separately One is the transverse direction of tuyere structure 2.
, can be in the horizontal, vertical of tuyere structure 2 by setting length direction different the first perforate 31 and the second perforate 32 The adjustment of installation site is carried out to both direction, installation is more convenient.
Referring to Figure 11, fixing piece 3 includes the first plate 33 and the second plate 34 to interfix, the first plate 33 and tuyere structure 2 Fixed, the second plate 34 is fixed with installing matrix 10.In the present embodiment, fixing piece 3 can to use by using said structure Just installing matrix 10 can be caused to provide the second plate 34 active force obliquely normally through the fastener 35 of the second opening 32, should The vertical component that active force has can coordinate with locating part 7, so that the ground of tuyere structure 2 and the bottom surface of installing matrix 10 are put down Together.The fastener 35 of so-called normal mounting refers to, by fastener 35 using exemplified by screw, the length direction of fastener 35 perpendicular to Second plate 34.
Referring to Figure 12, the angle of the first plate 33 and the second plate 34 is 95 degree to 140 degree, for example, for 95 degree, 100 degree, 105 Spend, 110 degree, 120 degree, 130 degree, 140 degree etc..When the angle to install fastener 35, the fixed force F of fastener 35 is oblique On, it has a upward component F1, while in the case where locating part 7 is spacing, can make bottom surface and the installation of tuyere structure 2 The bottom surface of matrix 10 is concordant.
Referring to Figure 12, the total height B of fixing piece 3 is 7mm to 12mm.Above-mentioned height can meet the general thickness of installing matrix Degree, ensures that it will not be excessive or escapes to the lower section of installing matrix 10.
Referring to Figure 13, the length C of the second perforate 32 is 8mm to 20mm.Above-mentioned length can ensure original after the dismounting of air port Bearing is destroyed when can not install, and can aside reinstall fastener 35.
Referring to Figure 13, the diameter R of the second perforate 32 is 2.5mm to 4mm.Diameter R can meet can in existing project installation The screw sizes that can be used, while ensure that the installation of screw will not relax.
Referring to Figure 13, distance D of second perforate 32 apart from bottom is 2mm to 5mm, which carries for the installation of fastener 35 Space has been supplied without interfering with tuyere structure 2.
Further, interior machine 1 is fixed with suspending assembly 4, and tuyere structure 2 is fixed by connector 5 and suspending assembly 4.Even Fitting 5 can be stay bolt.
Referring to Fig. 2, alternatively, the transverse end surface of interior machine 1 is fixedly connected with tuyere structure 2 by suspending assembly 4.Setting is hung Hanging component 4, easy to connect interior machine 1 and tuyere structure 2.The transverse end surface of interior machine 1 sets suspending assembly 4, has taken into full account interior machine 1 Design feature and installation convenience.
Referring to Fig. 2, in the present embodiment, the opposite both sides of tuyere structure 2 are installed on installing matrix 10, and tuyere structure 2 is opposite Other both sides be fixedly connected by suspending assembly 4 with interior machine 1.In the present embodiment, two longitudinal edge sides of tuyere structure 2 are loaded on installation Matrix 10, widthwise edge are lifted on interior machine 1.
Referring to Fig. 2, in the present embodiment, suspending assembly 4 includes connecting plate 41 and nut 42, and connecting plate 41 and interior machine 1 are removable Connection is unloaded, tuyere structure 2 is connected by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of said structure, structure is tight Gather, it is easy for installation.
Referring to Fig. 2, for the ease of installation connecting element 5, tuyere structure 2, which is equipped with, to be used to guide leading for 5 installation direction of connector To structure 6.Guide frame 6 can be inclined-plane or other structures, to help connector 5 to find threaded hole accurately.
Referring to Fig. 7, in the present embodiment, guide frame 6 can set guiding surface 61, and connecting plate 41 is found accurately for connector 5 Guiding is provided with nut 42.This is simple and compact for structure, manufacture easy to process.
Referring to Fig. 4, further, air port mounting structure further includes locating part 7, and locating part 7 is arranged on tuyere structure 2, spacing Part 7 has the plane that can block 10 bottom of installing matrix.Locating part 7 can be tabular, the side of locating part 7 and tuyere structure 2 installations, opposite side exposes tuyere structure 2, the side when tuyere structure 2 install for supporting in installing matrix 101, to air port Position-limiting action is played in the installation of 2 above-below direction of structure so that tuyere structure 2 is not retracted in excessively inside installing matrix 10.
Referring to Fig. 4 or Fig. 5, alternatively, air port mounting structure further includes panel 8, and panel 8 is arranged on tuyere structure 2 away from interior The side of machine 1.
The size of panel 8 can be greater than or equal to the size that installing matrix 10 is open, and such panel 8 can block air port knot The installation site of structure 2 so that the precision requirement to installation site is lower.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on attached drawing institutes The orientation or position relationship shown is only for ease of the description present invention and simplifies description, rather than instruction or the device for inferring meaning Or element must have specific orientation, be specific azimuth configuration and operation, thus it is not intended that in present invention protection The limitation of appearance.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, But these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical solution spirit and Scope.

Claims (19)

1. a kind of tuyere structure installation method, it is characterised in that comprise the following steps:
Judge whether the support strength of installing matrix meets the lifting requirements of the tuyere structure;
If meeting the requirements, the side of the tuyere structure is installed on installing matrix, the tuyere structure is installed on unit Interior machine, and the installing matrix mainly carries, the interior machine auxiliary carrying;If being unsatisfactory for requiring, tuyere structure is installed In the interior machine, the side of the tuyere structure is installed on installing matrix, and installing matrix auxiliary carrying, the interior machine Main carrying.
2. tuyere structure installation method according to claim 1, it is characterised in that described then to pacify the side of tuyere structure Comprise the following steps loaded on installing matrix:
In the side mounting fixing parts of the tuyere structure;Wherein, the fixing piece has the first perforate and the second perforate, described First perforate and second perforate at least one be slotted hole;The fixing piece passes through first perforate and the wind The side of mouth structure is fixed;
The tuyere structure and the installing matrix are fixed through second perforate using fastener.
3. tuyere structure installation method according to claim 1, it is characterised in that first perforate and described second is opened Hole is slotted hole;First direction of the length direction of first perforate along the tuyere structure, second perforate Second direction of the length direction along the tuyere structure, one of the first direction and the second direction are described The longitudinal direction of tuyere structure, another transverse direction for the tuyere structure.
4. tuyere structure installation method according to claim 1, it is characterised in that described that tuyere structure is installed on unit Interior machine comprise the following steps:
Suspending assembly is installed on to the interior machine of the unit;
The tuyere structure and the suspending assembly are fixed.
A kind of 5. air port mounting structure, it is characterised in that including interior machine (1) and tuyere structure (2), the tuyere structure (2) by The interior machine (1) and installing matrix (10) carry jointly.
6. air port mounting structure according to claim 5, it is characterised in that the side of the tuyere structure (2) is provided with For the fixing piece (3) being connected with the installing matrix (10), the fixing piece (3) and the connection position of the installing matrix (10) It is adjustable to put.
7. air port mounting structure according to claim 6, it is characterised in that the fixing piece (3) is realized using slotted hole It is adjustable with the link position of the installing matrix (10).
8. air port mounting structure according to claim 7, it is characterised in that the fixing piece (3) has the first perforate (31) and the second perforate (32), first perforate (31) and second perforate (32) at least one be slotted hole;Institute Fixing piece (3) is stated to fix by first perforate (31) and the side of the tuyere structure (2);First perforate (31) First direction of the length direction along the tuyere structure (2), the length direction of second perforate (32) is along the air port The second direction of structure (2), one of the first direction and the second direction are the vertical of the tuyere structure (2) To another transverse direction for the tuyere structure (2).
9. air port mounting structure according to claim 5, it is characterised in that the interior machine (1) is fixed with suspending assembly (4), the tuyere structure (2) is fixed by connector (5) and the suspending assembly (4).
10. air port mounting structure according to claim 9, it is characterised in that the opposite both sides peace of the tuyere structure (2) Loaded on the installing matrix (10), the opposite other both sides of the tuyere structure (2) by the suspending assembly (4) with it is described interior Machine (1) is fixedly connected.
11. air port mounting structure according to claim 10, it is characterised in that the suspending assembly (4) includes connecting plate (41) it is detachably connected with nut (42), the connecting plate (41) with the interior machine (1), the tuyere structure (2) is by described Connector (5) and the nut (42) are connected with the connecting plate (41).
12. air port mounting structure according to claim 5, it is characterised in that the tuyere structure (2), which is equipped with, to be used to guide The guide frame (6) of connector (5) installation direction.
13. air port mounting structure according to claim 5, it is characterised in that further include locating part (7), the locating part (7) tuyere structure (2) is arranged on, the locating part (7) has the plane that can block the installing matrix (10) bottom.
14. air port mounting structure according to claim 5, it is characterised in that further include panel (8), the panel (8) sets Deviate from the side of the interior machine (1) in the tuyere structure (2).
15. air port mounting structure according to claim 6, it is characterised in that the fixing piece (3) includes what is interfixed First plate (33) and the second plate (34), first plate (33) is fixed with the tuyere structure (2), second plate (34) and institute It is fixed to state installing matrix (10).
16. air port mounting structure according to claim 15, it is characterised in that first plate (33) and second plate (34) angle is 95 degree to 140 degree.
17. air port mounting structure according to claim 6, it is characterised in that the total height of the fixing piece (3) is 7mm To 12mm.
18. air port mounting structure according to claim 7, it is characterised in that the length of second perforate (32) is 8mm To 20mm.
19. air port mounting structure according to claim 5, it is characterised in that the installing matrix (10) includes furred ceiling.
CN201711401437.6A 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure Pending CN107940712A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
PCT/CN2018/103735 WO2019119873A1 (en) 2017-08-25 2018-09-03 Method for mounting air conditioner air outlet structure and air conditioner air outlet installation structure
ES18892809T ES2967707T3 (en) 2017-08-25 2018-09-03 Procedure for assembling the air conditioning air outlet structure and the air conditioning air outlet installation structure
US16/763,488 US20210071906A1 (en) 2017-08-25 2018-09-03 Method for Mounting Air Outlet Structure of Air Conditioner and Air Outlet Mounting Structure of Air Conditioner
EP18892809.7A EP3640559B1 (en) 2017-08-25 2018-09-03 Method for mounting air conditioner air outlet structure and air conditioner air outlet installation structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710742959 2017-08-25
CN2017107429596 2017-08-25

Publications (1)

Publication Number Publication Date
CN107940712A true CN107940712A (en) 2018-04-20

Family

ID=61942238

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201711401534.5A Active CN109425089B (en) 2017-08-25 2017-12-22 Air port mounting structure, indoor unit and air conditioning unit
CN201721812002.6U Active CN207815645U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401439.5A Pending CN108151266A (en) 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure
CN201721812367.9U Active CN208042459U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201721812269.5U Active CN207815646U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401546.8A Pending CN108050680A (en) 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure
CN201711401437.6A Pending CN107940712A (en) 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure

Family Applications Before (6)

Application Number Title Priority Date Filing Date
CN201711401534.5A Active CN109425089B (en) 2017-08-25 2017-12-22 Air port mounting structure, indoor unit and air conditioning unit
CN201721812002.6U Active CN207815645U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401439.5A Pending CN108151266A (en) 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure
CN201721812367.9U Active CN208042459U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201721812269.5U Active CN207815646U (en) 2017-08-25 2017-12-22 Air port mounting structure
CN201711401546.8A Pending CN108050680A (en) 2017-08-25 2017-12-22 Tuyere structure mounting method and tuyere structure

Country Status (5)

Country Link
US (1) US20210071906A1 (en)
EP (1) EP3640559B1 (en)
CN (7) CN109425089B (en)
ES (1) ES2967707T3 (en)
WO (1) WO2019119873A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109297165A (en) * 2018-11-20 2019-02-01 宁波奥克斯电气股份有限公司 A boom assembly and an air conditioner
WO2019119873A1 (en) * 2017-08-25 2019-06-27 格力电器(武汉)有限公司 Method for mounting air conditioner air outlet structure and air conditioner air outlet installation structure
CN113048645A (en) * 2021-04-21 2021-06-29 珠海格力电器股份有限公司 Support structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112880171A (en) * 2021-03-24 2021-06-01 珠海格力电器股份有限公司 Air outlet frame of air outlet component, air outlet component and central air conditioner
CN114484839B (en) * 2021-12-10 2023-05-23 惠瑞净化科技(江苏)有限公司 Install high-efficient supply-air outlet of sealed on lithium cell toilet roof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0614827U (en) * 1992-07-28 1994-02-25 ダイキン工業株式会社 Ceiling embedded air conditioner installation device
JP2005049074A (en) * 2003-07-31 2005-02-24 Fuji Industrial Co Ltd Ceiling suspension type range hood fan
KR20090082731A (en) * 2008-01-28 2009-07-31 엘지전자 주식회사 Ceiling type air conditioner
CN104019536A (en) * 2014-06-17 2014-09-03 珠海格力电器股份有限公司 Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner
CN204648631U (en) * 2015-05-28 2015-09-16 广东美的制冷设备有限公司 Lifting fixtures and ceiling-mounted air conditioner
US20160252270A1 (en) * 2013-12-26 2016-09-01 Mitsubishi Electric Corporation Unit attaching device and indoor unit
CN205939596U (en) * 2016-07-04 2017-02-08 珠海格力电器股份有限公司 Air port fixing device, air port structure and ceiling type air conditioner

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1604111A1 (en) * 1965-11-20 1970-04-30 Air Devices Inc Ceiling diffuser
JP3445428B2 (en) * 1996-01-12 2003-09-08 東芝キヤリア株式会社 Duct ventilation fan
JPH10213345A (en) * 1997-01-28 1998-08-11 Nissei Kinzoku Kk Room air conditioner mounting implement
EP1029204B1 (en) * 1997-11-06 2002-03-06 Nerling Gmbh Systemräume Measuring room with air-conditioning device
JP4359955B2 (en) * 1999-03-26 2009-11-11 ダイキン工業株式会社 Embedded ceiling air conditioner
US6587642B1 (en) * 2000-11-14 2003-07-01 Daniel King Ceiling fan cooling system
CA2364672C (en) * 2001-09-20 2010-06-29 Canplas Industries Ltd. Passive venting device
KR20050113319A (en) * 2004-05-27 2005-12-02 삼성전자주식회사 Ceiling flush type air conditioner
JP4946185B2 (en) * 2006-06-08 2012-06-06 ダイキン工業株式会社 Indoor unit of air conditioner
CN202401705U (en) * 2011-10-17 2012-08-29 北京优尼法制药技术有限公司 Integrated structure of suspended ceiling and air inlet
CN203231490U (en) * 2013-02-28 2013-10-09 大金工业株式会社 Panel installation auxiliary device and indoor set of air conditioner
DE102014001543B4 (en) * 2014-02-07 2017-08-31 Octanorm-Vertriebs-GmbH für Bauelemente System for creating suspended ceiling constructions
CN204165215U (en) * 2014-06-17 2015-02-18 珠海格力电器股份有限公司 Ceiling type air conditioner
CN204100439U (en) * 2014-07-08 2015-01-14 广东松下环境系统有限公司 Ion generating device
CN204084765U (en) * 2014-07-18 2015-01-07 中国建筑第七工程局有限公司 A kind of device for fixing air port system
CN204134190U (en) * 2014-10-14 2015-02-04 王彬 A kind of elevating mechanism of Novel mahjong machine
CN104330086A (en) * 2014-10-16 2015-02-04 重庆金宏汽车电子有限公司 Vehicle navigator rapid assembling structure
CN205174759U (en) * 2015-11-19 2016-04-20 宁波威霖住宅设施有限公司 Vent panel switch structure
CN205448203U (en) * 2015-12-23 2016-08-10 宁波威霖住宅设施有限公司 Central air conditioning wind gap shell fragment mounting structure
CN106123263B (en) * 2016-06-20 2019-06-11 珠海格力电器股份有限公司 Ceiling type air conditioner and air outlet device thereof
CN205726795U (en) * 2016-06-30 2016-11-23 浙江光大通信设备有限公司 The mounting structure of light current module
CN106152449A (en) * 2016-09-19 2016-11-23 珠海格力电器股份有限公司 Air outlet structure and central air-conditioning system with same
CN106642329B (en) * 2016-11-29 2020-09-25 青岛海尔空调器有限总公司 Indoor unit of air conditioner
CN109425089B (en) * 2017-08-25 2024-08-30 珠海格力电器股份有限公司 Air port mounting structure, indoor unit and air conditioning unit
CN207831611U (en) * 2017-12-22 2018-09-07 珠海格力电器股份有限公司 Air port structure assembly and ceiling type air conditioner

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0614827U (en) * 1992-07-28 1994-02-25 ダイキン工業株式会社 Ceiling embedded air conditioner installation device
JP2005049074A (en) * 2003-07-31 2005-02-24 Fuji Industrial Co Ltd Ceiling suspension type range hood fan
KR20090082731A (en) * 2008-01-28 2009-07-31 엘지전자 주식회사 Ceiling type air conditioner
US20160252270A1 (en) * 2013-12-26 2016-09-01 Mitsubishi Electric Corporation Unit attaching device and indoor unit
CN104019536A (en) * 2014-06-17 2014-09-03 珠海格力电器股份有限公司 Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner
CN204648631U (en) * 2015-05-28 2015-09-16 广东美的制冷设备有限公司 Lifting fixtures and ceiling-mounted air conditioner
CN205939596U (en) * 2016-07-04 2017-02-08 珠海格力电器股份有限公司 Air port fixing device, air port structure and ceiling type air conditioner

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019119873A1 (en) * 2017-08-25 2019-06-27 格力电器(武汉)有限公司 Method for mounting air conditioner air outlet structure and air conditioner air outlet installation structure
CN109297165A (en) * 2018-11-20 2019-02-01 宁波奥克斯电气股份有限公司 A boom assembly and an air conditioner
CN113048645A (en) * 2021-04-21 2021-06-29 珠海格力电器股份有限公司 Support structure

Also Published As

Publication number Publication date
CN208042459U (en) 2018-11-02
WO2019119873A1 (en) 2019-06-27
US20210071906A1 (en) 2021-03-11
CN207815646U (en) 2018-09-04
CN207815645U (en) 2018-09-04
CN109425089B (en) 2024-08-30
CN109425089A (en) 2019-03-05
CN108050680A (en) 2018-05-18
EP3640559A4 (en) 2020-11-04
CN108151266A (en) 2018-06-12
ES2967707T3 (en) 2024-05-03
EP3640559A1 (en) 2020-04-22
EP3640559B1 (en) 2023-10-04

Similar Documents

Publication Publication Date Title
CN107940712A (en) Tuyere structure mounting method and tuyere structure
CN206646691U (en) Special-shaped curtain wall hitching component
CN206988579U (en) A kind of Duct fixing clamp device for portal crane ladder rail
CN209114796U (en) A kind of building wall decoration panel fastener
CN107237444A (en) Adjustable vertical top hang device
CN206667732U (en) A kind of fastener type steel pipe scaffold connects wall member
CN107313548A (en) Adjustable wall hang device
CN207150078U (en) A kind of tower crane cable support
CN221739626U (en) Short type attaching structure of construction lifter
CN208748926U (en) A kind of device for hanging installation for curtain wall and point
CN207279911U (en) Air conditioner air-out structure, air conditioner and house
CN207513170U (en) A kind of construction package supported for beam forms with reinforcing connection
CN206811812U (en) A kind of hatch door installs auxiliary mould
CN208219963U (en) Connector for house integrated ceiling
CN205938806U (en) Face frame structure of LED lamp panel
CN201701672U (en) Hanging rack
CN207063289U (en) Adjustable vertical top hang device
CN214558934U (en) Angle steel tower bolt is to hole correcting tool
CN107938834A (en) For the lightweight bulkhead installation turning formula combination handware to build a house temporarily
CN206811800U (en) A kind of hatch door trimming adjustment auxiliary mould
US20230294268A1 (en) Overlap-type Supporting and Fixing Structure for Painting
CN105222324B (en) A kind of air-conditioning anti-tipping apparatus
CN206884822U (en) A kind of handrail suspension ring locating part and handrail suspension ring
CN211751938U (en) Safety protection device for installing fire-fighting air pipe
CN209510224U (en) A kind of monitoring device apparatus for examination and repair

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420