CN202401705U - Integrated structure of suspended ceiling and air inlet - Google Patents
Integrated structure of suspended ceiling and air inlet Download PDFInfo
- Publication number
- CN202401705U CN202401705U CN2011203943165U CN201120394316U CN202401705U CN 202401705 U CN202401705 U CN 202401705U CN 2011203943165 U CN2011203943165 U CN 2011203943165U CN 201120394316 U CN201120394316 U CN 201120394316U CN 202401705 U CN202401705 U CN 202401705U
- Authority
- CN
- China
- Prior art keywords
- air port
- wall
- ceiling board
- integral structure
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
- Building Environments (AREA)
Abstract
The utility model discloses an integrated structure of a suspended ceiling and an air inlet, which comprises a suspended ceiling board (3) and the air inlet (1), wherein grooves are respectively installed on the opposite walls at a butting position of the suspended ceiling board (3) and the air inlet (1), and the openings of the grooves respectively installed on the opposite walls at the butting position of the suspended ceiling board (3) and the air inlet (1) are horizontally opposite. The integrated structure further comprises link-up members (6) which are clamped in the grooves respectively installed on the opposite walls at the butting position of the suspended ceiling board (3) and the air inlet (1). The integrated structure has the advantages of being capable of performing volume production, simplifying the installation procedure, being short in period, capable of reducing material waste, attractive in appearance, high in installation accuracy and the like.
Description
Technical field
The utility model relates to a kind of integral structure, particularly a kind of integral structure that is used on furred ceiling, installing the air port.
Background technology
In the prior art, in the time need on furred ceiling, the air port with filter plant being installed, as shown in Figure 1 like units such as pharmaceutical factories; Existing mounting means is the cubic through hole that correspondingly on ceiling board, cuts out form fit according to the size in air port, around this through hole, the seam positioning fixture is installed respectively again, can be found out by the partial enlarged drawing among Fig. 1; The cross section of seam positioning fixture 2 is " h " shape, and it can tighten on the edge of ceiling board through groove securely, and Fig. 2 is the sectional view of seam positioning fixture 2; Four seam positioning fixture 2 extensions extend in square hole; Form the load-bearing boss in air port because seam positioning fixture 2 is than the ceiling board protrusion, therefore this mounting means not only influenced attractive in appearance, but also waste the ceiling board material; And complex procedures, long construction period, installation accuracy is also relatively poor in addition.
The utility model content
To the deficiency that exists in the prior art; The purpose of the utility model is to provide the integral structure in a kind of furred ceiling that is used for and air port; Making in construction can be simple with the convenient combination of ceiling board, erection procedure, and can effectively shorten installation period, reduces the loss of material.
The technical scheme of the utility model is achieved in that
The integral structure in furred ceiling and air port; Comprise ceiling board and air port; It is characterized in that, in the relative outer wall of ceiling board and air port joint mount grooves respectively, the said groove of installing respectively at the relative outer wall of ceiling board and air port joint mouthful relative towards level; Also comprise the linking part, said linking part is stuck in the groove that the relative outer wall of ceiling board and air port joint installs respectively.
The above-mentioned furred ceiling and the integral structure in air port, said linking part has the cuboid part, and said cuboid partly is stuck in said in the groove that the relative outer wall of ceiling board and air port joint is installed respectively.
The above-mentioned furred ceiling and the integral structure in air port; The said groove of installing respectively at the ceiling board and the relative outer wall of air port joint is the device that docks that comprises first support portion, second support portion and depressed part; Said first support portion and said second support portion are positioned at the both sides of depressed part respectively, and said butt joint device is installed in respectively on the outer wall in said ceiling board and said air port.
The above-mentioned furred ceiling and the integral structure in air port; The lower edge in said air port in the upper edge of the outward extending portion of colluding back of said joint installation level, said ceiling board and lower edge in the outward extending portion of colluding back of also installation level of said joint; Second support portion that is installed in the said butt joint device of said air port outer wall is embedded into the lower edge in said air port in the outward extending portion of colluding back of level that said joint is installed, and first support portion and second support portion that are installed in the said butt joint device of said ceiling board outer wall respectively are embedded in the corresponding said portion of colluding back.
The above-mentioned furred ceiling and the integral structure in air port; The said butt joint device and the said ceiling board outer wall that are installed in said ceiling board outer wall are fitted, and are installed in the described butt joint device and the applying of said air port outer wall of said air port outer wall and adopt a kind of mode in screw, riveted joint or the welding to be fixed on the air port.
The above-mentioned furred ceiling and the integral structure in air port, the said butt joint device of installing respectively at said air port and the relative outer wall of said ceiling board joint is 1mm-3mm at interval.
The above-mentioned furred ceiling and the integral structure in air port, said linking part comprise that first connects card division, second and connect the card division, and said first connects card division and said second connects in the depressed part that the card division embeds the said butt joint device that is installed in air port and ceiling board outer wall respectively.The above-mentioned furred ceiling and the integral structure in air port, said linking part also has the vertical portion that is fixedly connected with the architectural components in house.
The above-mentioned furred ceiling and the integral structure in air port, said linking part is the seam aluminium extruded sections, and the bottom of the said vertical portion of said linking part is a square flange, and the top is fixedly connected with the architectural components in house.
The above-mentioned furred ceiling and the integral structure in air port are equipped with illuminating lamp in the illumination lamp plate in air port.
The beneficial effect of the utility model is: adopt two symmetrically arranged devices and be connected part as built-up member; Make ceiling board and air port one integrated mass; Aesthetic in appearance, the utility model can be produced in batches, and can simplify installation procedure, shortening installation period; Can reduce waste of material in addition, also have characteristics such as installation accuracy height.
Description of drawings
Fig. 1 is mounting structure sketch map and the partial enlarged drawing in mounting structure cross section of prior art when on furred ceiling, the air port being installed,
Fig. 2 is the sectional view of the seam positioning fixture of available technology adopting,
Fig. 3 is the elevation of mounting structure sketch map of the integral structure in the utility model furred ceiling and air port,
Fig. 4 is the upward view of mounting structure sketch map of the integral structure in the utility model furred ceiling and air port.
Fig. 5 is the partial enlarged drawing in mounting structure cross section, A place among Fig. 2,
Fig. 6 is the utility model furred ceiling and the structural representation that is connected part of the integral structure in air port,
Fig. 7 is the utility model furred ceiling and the structural representation that docks device of the integral structure in air port.
Among the figure: 1-air port, 2-seam positioning fixture, 3-ceiling board, 4-screw (or pressure welding), the 5-portion of colluding back; 6-is connected part, and 601-first connects the card division, and second connects the card division, the vertical portion of 603-, the 7-lamp plate that throws light on; 8-docks device, 801-first support portion, 802-second support portion, 803-depressed part.
The specific embodiment
In conjunction with accompanying drawing the utility model is done further explanation:
Like Fig. 3 and shown in Figure 4, the bottom in air port 1 is a joint for four jiaos.
The integral structure in furred ceiling and air port; Comprise ceiling board 3 with air port 1 and play lift with the load-bearing effect be connected part 6; Two butt joint devices 8 are separately fixed at ceiling board 3 and air port 1 joint; Two butt joint device 8 levels are symmetrical set relatively; Said air port 1 is equipped with the portion of colluding go back to 5 at lower edge, the said ceiling board 3 with said ceiling board 3 joints in upper edge and lower edge with said air port 1 joint, be installed in said air port 1 just the said butt joint device on the face be embedded in the portion of colluding back 5 that 1 lower edge, said air port is provided with.The bottom surface of the said portion of colluding back 5 is concordant with the bottom surface of ceiling board 3 with air port 1.Be provided with respectively the portion of colluding go back to 5 that is complementary with first support portion 801 of docking device 8 and second support portion 802 at ceiling board 3 outer walls, the bottom surface of the said portion of colluding back 5 is concordant with the bottom surface of ceiling board 3 with air port 1.
Two relative and symmetrically arranged butt joint device 8 interval 1mm-3mm of level are connected part 6 and are installed between the two.Said butt joint device 8 and the outer wall of ceiling board 3 that is installed on the ceiling board 3 fitted, 1 side in the air port, and the said butt joint device 8 that is installed on the air port 1 is fitted with air port 1 outer wall and is adopted the mode of being spirally connected to be fixed on the air port 1; Pass the middle depressed part 803 of butt joint device that is installed on the air port 1 from visible screw 4 orders of Fig. 5.
Like Fig. 5 and shown in Figure 6; Said linking part 1 comprises that first connects card division 601, second and meet card division 602 and vertical portion 603; Vertically the top of portion 603 is fixedly connected with the architectural components in house; The bottom is the flange of a square, and the bottom surface of air port 1 and ceiling board 3 is pressed close in its bottom, and the vertical part of bottom flange and said air port lower edge portion of colluding back 5 and the said ceiling board lower edge portion of colluding back 5 fits tightly.
Said air port 1 comprises plate body; Said plate body is provided with and on plate body, is provided with four oblong illumination lamp plates and ventilation opening; Said four oblongs illumination lamp plate be Fang Huan be distributed in plate body around; Ventilation opening near the center, air port is the circular hole that quadrate is uniformly distributed with, and the illumination lamp plate is that the side of one-tenth encircles the oblong hole that is uniformly distributed with ventilation opening between the circular hole that quadrate is uniformly distributed with.
Because the seam aluminium extruded sections in the furred ceiling of the utility model and the integral structure in air port belongs to standard component; After factory produces in batches; Can be assemblied on the ceiling board easily at the scene, and can guarantee installation accuracy, back and ceiling board one integrated mass are installed; Do not influence overall appearance, therefore just do not have problem yet because of cutting ceiling board waste material.
Claims (10)
1. the integral structure in furred ceiling and air port; Comprise ceiling board (3) and air port (1); It is characterized in that; In the relative outer wall of ceiling board (3) and air port (1) joint mount grooves respectively, the mouth of the said said groove of installing respectively at the ceiling board (3) and the relative outer wall of air port (1) joint relative towards level also comprises being connected part (6); Said linking part (6) is stuck in the groove that the relative outer wall of ceiling board (3) and air port (1) joint installs respectively, and said air port (1) soffit is concordant with said ceiling board (3) soffit.
2. the integral structure in furred ceiling as claimed in claim 1 and air port is characterized in that, said linking part (6) has the cuboid part, and said cuboid partly is stuck in the said groove that the relative outer wall of said ceiling board (3) and air port (1) joint installs respectively.
3. the integral structure in furred ceiling as claimed in claim 2 and air port; It is characterized in that; The said groove of installing respectively at the ceiling board (3) and the relative outer wall of air port (1) joint be comprise first support portion (801), second support portion (802) and depressed part (803) dock device (8); Said first support portion (801) and said second support portion (802) lay respectively at the both sides of depressed part (803), and said device is installed in respectively on the outer wall of said ceiling board (3) and said air port (1).
4. the integral structure in furred ceiling as claimed in claim 3 and air port; It is characterized in that; The lower edge in said air port (1) also is provided with the outward extending portion of colluding go back to of level (5) in upper edge and lower edge that said joint is provided with the outward extending portion of colluding back of level (5), said ceiling board (3) at said joint; Be installed in lower edge that said second support portion (802) of the said butt joint device (8) of said air port (1) outer wall is embedded into said air port (1) in the outward extending portion of colluding back of the level that said joint is provided with (5), first support portion (801) and second support portion (802) that are installed in the said butt joint device (8) of said ceiling board (3) outer wall respectively are embedded in the corresponding said portion of colluding back (5).
5. the integral structure in furred ceiling as claimed in claim 4 and air port; It is characterized in that; The said butt joint device (8) that is installed in said ceiling board (3) outer wall is fitted with said ceiling board (3) outer wall, and the said butt joint device (8) that is installed in said air port (1) outer wall is fitted with said air port (1) outer wall and adopted a kind of mode in screw (4), riveted joint or the welding to be fixed on the said air port (1).
6. the integral structure in furred ceiling as claimed in claim 5 and air port is characterized in that, the said butt joint device of installing respectively at said air port (1) and the relative outer wall of said ceiling board (3) joint (8) is 1mm-3mm at interval.
7. the integral structure in furred ceiling as claimed in claim 6 and air port; It is characterized in that; Said linking part (6) comprises that first connects card division (601), second and connect card division (602), and said first connects card division (601) and said second connects in the said depressed part (803) that card division (602) embeds the said said butt joint device (8) that is installed in air port (1) and ceiling board (3) outer wall respectively.
8. like the integral structure in claim 3 or described furred ceiling of claim 4 and air port, it is characterized in that said linking part (6) also has the vertical portion (603) that is fixedly connected with the architectural components in house.
9. the integral structure in furred ceiling as claimed in claim 8 and air port; It is characterized in that; Said linking part (6) is the seam aluminium extruded sections, and the bottom of the said vertical portion (603) of said linking part (6) is a square flange, and the top is fixedly connected with the architectural components in house.
10. like the integral structure in each described furred ceiling of claim 1-7 and air port, it is characterized in that the illumination lamp plate (7) that in said air port (1), is provided with is equipped with illuminating lamp in the said illumination lamp plate (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203943165U CN202401705U (en) | 2011-10-17 | 2011-10-17 | Integrated structure of suspended ceiling and air inlet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203943165U CN202401705U (en) | 2011-10-17 | 2011-10-17 | Integrated structure of suspended ceiling and air inlet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202401705U true CN202401705U (en) | 2012-08-29 |
Family
ID=46699358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203943165U Expired - Fee Related CN202401705U (en) | 2011-10-17 | 2011-10-17 | Integrated structure of suspended ceiling and air inlet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202401705U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107940713A (en) * | 2017-12-22 | 2018-04-20 | 珠海格力电器股份有限公司 | Air port structure assembly and ceiling type air conditioner |
CN108151267A (en) * | 2017-12-22 | 2018-06-12 | 珠海格力电器股份有限公司 | Air port structure assembly, mounting method thereof and ceiling type air conditioner |
CN109425089A (en) * | 2017-08-25 | 2019-03-05 | 珠海格力电器股份有限公司 | Air port installation structure, indoor unit and air conditioning unit |
-
2011
- 2011-10-17 CN CN2011203943165U patent/CN202401705U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109425089A (en) * | 2017-08-25 | 2019-03-05 | 珠海格力电器股份有限公司 | Air port installation structure, indoor unit and air conditioning unit |
CN109425089B (en) * | 2017-08-25 | 2024-08-30 | 珠海格力电器股份有限公司 | Air port mounting structure, indoor unit and air conditioning unit |
CN107940713A (en) * | 2017-12-22 | 2018-04-20 | 珠海格力电器股份有限公司 | Air port structure assembly and ceiling type air conditioner |
CN108151267A (en) * | 2017-12-22 | 2018-06-12 | 珠海格力电器股份有限公司 | Air port structure assembly, mounting method thereof and ceiling type air conditioner |
CN107940713B (en) * | 2017-12-22 | 2023-11-21 | 珠海格力电器股份有限公司 | Air port structure assembly and ceiling type air conditioner |
CN108151267B (en) * | 2017-12-22 | 2023-12-19 | 珠海格力电器股份有限公司 | Tuyere structure assembly, installation method thereof and ceiling type air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202401705U (en) | Integrated structure of suspended ceiling and air inlet | |
CN202392644U (en) | Light emitting diode (LED) working lamp for engineering vehicle | |
CN109610715B (en) | Integrated furred ceiling and wall self-contained structure | |
CN102519002A (en) | LED work lamp for engineering trucks | |
CN102535698A (en) | Heat insulation curtain wall | |
CN208442740U (en) | A kind of solar street light convenient for battery roll | |
CN204529025U (en) | A kind of lift car suspended ceiling structure | |
CN203298136U (en) | Ceiling light-emitting diode (LED) for lamp strip frame | |
CN209837431U (en) | Integrated furred ceiling and wall dress structure | |
CN207555303U (en) | A kind of Multifunction buckle Projecting Lamp | |
CN204459975U (en) | The linear Projecting Lamp of a kind of waterproof | |
CN202757060U (en) | Multifunctional lamp panel outer shell | |
CN206988935U (en) | A kind of new waterproof Projecting Lamp | |
CN206207224U (en) | A kind of square panel LED Ceiling lights | |
CN203657343U (en) | Covering plate | |
CN202691920U (en) | LED lampshade | |
CN205100373U (en) | Toilet is with T shaped plate connecting piece | |
CN208253209U (en) | A kind of lamp body structure convenient for combination installation | |
CN204254323U (en) | A kind of Novel LED down lamp | |
CN204475636U (en) | A kind of flooring keel connecting member | |
CN204358539U (en) | A new type of panel light | |
CN204456579U (en) | For the suspended ceiling module of passageway Integral ceiling | |
CN212836217U (en) | Novel suspended ceiling assembly | |
CN201771143U (en) | Suspended ceiling and mounting structure thereof | |
CN203174979U (en) | Floor board connecting buckle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120829 Termination date: 20201017 |
|
CF01 | Termination of patent right due to non-payment of annual fee |