[go: up one dir, main page]

CN1115185A - 多层钻井及完井之装置与方法 - Google Patents

多层钻井及完井之装置与方法 Download PDF

Info

Publication number
CN1115185A
CN1115185A CN94190746A CN94190746A CN1115185A CN 1115185 A CN1115185 A CN 1115185A CN 94190746 A CN94190746 A CN 94190746A CN 94190746 A CN94190746 A CN 94190746A CN 1115185 A CN1115185 A CN 1115185A
Authority
CN
China
Prior art keywords
mentioned
well
pit shaft
casing
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN94190746A
Other languages
English (en)
Other versions
CN1058547C (zh
Inventor
杰瑞·J·考林斯
欧文·鲍多恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chris Cavanna Malaysia LLC
Project Singapore Ltd.
Original Assignee
Marathon Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marathon Oil Co filed Critical Marathon Oil Co
Publication of CN1115185A publication Critical patent/CN1115185A/zh
Application granted granted Critical
Publication of CN1058547C publication Critical patent/CN1058547C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/043Directional drilling for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/004Indexing systems for guiding relative movement between telescoping parts of downhole tools
    • E21B23/006"J-slot" systems, i.e. lug and slot indexing mechanisms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/04Casing heads; Suspending casings or tubings in well heads
    • E21B33/047Casing heads; Suspending casings or tubings in well heads for plural tubing strings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/08Underwater guide bases, e.g. drilling templates; Levelling thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • E21B7/061Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • E21B7/068Deflecting the direction of boreholes drilled by a down-hole drilling motor

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Drilling And Boring (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Devices For Use In Laboratory Experiments (AREA)
  • Fertilizing (AREA)

Abstract

从共用井筒钻和完成多层地下井的方法及在完成这种多层井过程中,钻井和下套管时引导钻柱的装置,装置包括位于地表或接近地表的井口并定位于共用井筒上,至少二根井管定位于共用井筒内,并有定位于上述井口用于分离和支承井管的装置。按照该方法,至少钻一口地下井筒,通过井管之一,进入地层,并可从地层通过生产套管和/或定位于地下井筒内的生产油管,到地表开采油气。可用同样方式,通过装置的另外井管,钻其他地下井筒。

Description

多层钻井及完井之装置与方法
本申请是1993年6月18日提出的美国联合进行专利申请编号08/080,042的延续部分。
本发明涉及从单井筒或共用井筒钻多层地下井以及通过共用井筒内定位的分离套管完成这种井用的装置与方法,更具体地说,是从单井筒或共用井筒钻与完成多层地下井的装置与方法,使这种井在钻井与完井过程及以后能在地表或接近地表分层。
井筒越来越钻入地层,其方向用普通造斜器测钻或用固定在靠近钻头钻柱上的泥浆马达特意偏离垂线。在断裂的地层中,利用斜井,增加地层内井限定的泄油面积,从而提高地层的油气产量。利用普通的造斜器,钻斜井带来固有的问题是:当造斜器在井筒定位后,不能再改变,无法收回井筒的造斜器,也就不能改变深度和/或径向方向,因而使造斜器的深度和径向方向固定不变。
此外,从海上钻井平占钻井通常是偏斜的,以提高从单平台可钻并完成的井数。地层深水钻井与完井用的海上钻井平台尺寸,结构与成本随水深及平台规定的负载而异。例如,建造的平台部分可用一个桩腿或一个伸到海底的沉箱支承,或用多达8个桩腿或沉箱支承。这种海上钻井平台造价约为五百万美元到五亿美元不等。每座海上钻井平台备有一定数量的割缝,通过割缝可钻斜井,并通过用一般方法与平台固定的套管完成斜井。
因此,需要有从单井筒或共用井筒进行多层下套管钻井与完井的装置与方法,以便降低岸上与海上钻井的基建费用。
所以,本发明的目的是提供一种从单井简或共用井筒地层多层钻井与完井的装置与方法,而且,这种多层井在钻井与完井过程及以后,在地表或接近地表分层。
本发明的另一个目的是提供一种从单井筒或共用井筒地层多层钻井与完井的装置与方法,不使用可动井下组件。
本发明的再一目的是采用如下方法完成这种多层下套管井,即在一口井上进行修理作业,同时通过分离套管完成其他口井,从地层开采油气或将流体注入地层。
本发明的又一目的是提供这样一种从单井筒或共用井筒多层下套管钻井的装置与方法,这种井筒结构比较简单,可使每口多层井的生产套管单独悬挂在地面装置,并达到每口多层井的分离生产套管伸出与地表有关的地层。
为了达到上述与其他目的,并按照本发是的宗旨,正如本文实施例和概括论述的,本发明的一个特征是:
通过该装置,可以共用井筒,分层钻与完成多层地下井。装置包括位于地表或接近地表,并定位在共用井筒上的井口,定位在共用井筒内的第一和第二井管,以及定位在井口,用于分离和支承第一和第二井管的装置。确定的第一井管尺寸可使钻柱在从共用井筒钻第一地下井筒时通过,而且使生产套管在第一地下井筒完成时从此通过定位。用同样方式,确定第二井管尺寸,也使钻柱在从共用井筒钻第二地下井筒时通过,而且使生产套管在第二地下井筒完成时从此通过定位。
本发明的另一特征是:
装备的井上装置包括定位在共用地下井筒,分离和支承至少2根井管的第一装置,和
支承至少2根生产套管的第二装置,该套管从上述共用地下井筒延伸到分离地下井筒。生产套管之一伸过一根井管,而另一个生产套管则伸过另一根井管。
本发明的又一特征是:
提出了地下钻井与完井的方法,根据本方法,2根单独的井管悬挂在共用井筒井口的下面并在共用井筒内定位。钻第一地下井筒通过2根井管之一,再进入地层,而第一段生产套管固定在井口上。第一段生产套管延伸到第一井筒,并支承在井口上,以便在第一井筒穿透的地层与地表之间构成流体通道。
本发明还有一个特征是:
提供的方法从一个共用井筒至少要钻2个地下井筒。本方法包括共用井筒内至少定位2根井管,至少通过各个上述2根井管,钻分离地下井筒,并进入地层。
本发明包括的附图是说明的一部分,阐述本发明的实施例,并与说明一起来解释本发明原理。
图1为本发明装置在井筒定位的剖面图;
图2为密集双筒插件在本发明装置定位支承的剖面图;
图3为本发明装置剖面图,图示井口悬挂2根井管;
图4为本发明装置剖面图,图示装置施工时固定一起的井口剖面;
图5为本发明装置剖面图,包括通过密集双筒井口的一个井眼及相连装置井管,钻第一地下井筒用的钻杆法兰;
图6为本发明装置部分剖面图,图示利用本发明装置所钻第一地下井筒内定位的生产套管;
图7为本发明装置部分剖面图,包括通过另一密集双筒井口的井眼及相连装置井管,钻第二地下井筒用的钻杆法兰;
图8为本发明装置部分剖面图,图示利用本发明装置所钻第二地下井筒内定位的生产套管;
图9为本发明装置包括密集双筒法兰短管的部分剖面图;
图10为本发明装置部分剖面图,标有用本发明装置所钻第一和第二地下井筒内定位的分离生产油管,每一井筒在地面有分离采油树;
图11为本发明装置部分剖面图,部分在图9示出,图中采用本发明装置所钻第一和第二地下井筒在地面有分离采油树,以便使地下流体的生产通过各井筒内定位的生产套管;
图12为本发明井下回接装置固定一根井管的一个实施例剖视图;
图13为图12所示本发明井下回接装置一个实施例剖面图,图示第2井管下入通过回接装置与螺纹井眼啮合;
图14为本发明回接装置固定一根井管和第2井管一部分的另一实施例剖视图,第2井管其余部分下入共用井筒,通过回接装置与螺纹井眼啮合;
图15为有三个井眼的插件在用本发明井口装置定位支承的俯视图;
图16为本发明装置剖面图,图示井口悬挂三根井管。
如图1所示,直径比较大的井管或管子2,如直径30英寸管子,用冲击或其他合适的装置打入岸上地面或海上地面,直到管子不能再打入比较浅的深度,换句话说,直径大的井眼,例如直径36英寸的井眼,用熟练工极明显的普通方法,钻入地层,并将直径比较大的井管或管子2,如直径30英寸的管子在井眼定位并在此胶结,此后,通过管子2,钻直径稍微小的井筒,深度如1200英尺,并用熟练工极明显的普通方式,将导管4定位并胶结在该井筒里。井口6有许多桩腿或衬垫7固定在管子2和套管4上,使桩腿7底部靠压管子2的上端,如是岸上,则靠在地表,或靠在海上钻井平台的井口甲板,两者均示于图1编号5。导管4上端装在井口6内,再用合适的方法,如焊接固定之(无图示)。然后,通过套管4钻井筒到适当深度,如约3500—4000英尺。最终井筒9可以是垂直的,也可是偏斜的。
参阅图2,井口6有可通过不同直径,限定一般环形台肩14的井眼12。插件20定位在井眼12内,并支承在一般环形台肩14上。插件20至少具有2个可通过不同直径的井眼22,26,该井眼分别限定一般环形台肩23,27和锥形节24,28。如图3所示,多数井管30,34在数量上与通过插件20井眼数一致,都以下面所述方式,通过井眼22与26定位,再用如普通套管卡瓦31,35固定之,这种套管卡瓦在下入分别与锥形节24,28接触时,膨胀与插件20啮合。套管卡瓦31,35装有密封件32,36,该密封件可用任何适合的材料,如合成橡胶制作。可采用其他普通装置,如开口心轴悬挂器代替套管卡瓦31,35,将井管30,34固定到插件20上。井管30,34还装有普通封隔密封圈33,37。正如本说明全部采用的,“井管”指的是一段管线,如套管,通常定位在地下井筒内,一般由单独的管段组成,各管段如用螺纹固定在一起。
井管30,34与插件20固定后,密集双筒井口15(图4)用合适的方法,如用螺栓(无图示)固定到井口6上,并通过全部两个井眼16,18真正与井管30,34对准。井眼16,18各直径分别限制在环形台肩17,19所规定的长度范围。组装时,封隔密封圈33和37在井管30,34与密集双筒井口15之间起到流体不能透过的密封作用。所以,当井管30和34在井筒9内定位时,按普通方式,最好只通过其中一根井管运送水泥浆胶结。最好是使水泥沉积在井筒9延伸到套管4。
此后,装有如合成橡胶密封图的密封件39之插塞38,通过密集双筒井口15定位于井眼16或18(图5所示为井眼16)之一的上端,而钻杆法兰40则用合适的方法,如用螺栓(未图示)固定到密集双筒井口15上。法兰40通有井眼41,与井眼18和井管34真正对准,以便使钻柱由此通过。另外,为熟练工极明显的安全钻井,确定法兰40的尺寸,能连接普通防喷器。因此,在组装时,钻杆法兰40,井口6,密集双筒井口15及井管30,34构成一种如下述方式从地面可单独钻与完成两口井的装置,从而排除了需要装有活动零件的井下工具,并解决了与此有关的问题。本装置可从岸上钻机和/或海上钻井平台钻井时使用。
装有一端固定钻头的钻柱,通过井眼41和18及井管34,钻碎此处存在的硬化水泥。钻柱从井管34底部推进,而且用一般方式由此钻普通直井或斜井井筒46,以便穿透地层或地带。在从井管34钻井筒并在必要时划眼后,生产套管56(图6),从地面下入,直到这一部分在井筒46里定位为止。首先,生产套管56按一般方式用水泥胶结,最好延伸到井管34底部。水泥硬化之前,生产套管56固定在密集双筒井口15的井眼18内,其方法是使普通套管卡瓦57膨胀,当接触环形台肩19时,与密集双筒井口15的井眼18啮合。套管卡瓦57装有密封件58,在密集双筒井口15与生产套管56之间起到流体不能透过的密封作用。生产套管56上端还装有普通的封隔密封图59。
因而,当生产套管56固定在密集双筒井口15的井眼18并胶结在井筒46内后,从密集双筒井口15拆下钻杆法兰40,生产套管56伸出封隔密封圈59的部分要隔离或用普通工具切断,再取下井眼16上端的插塞38。用合适的方法,如用螺栓(未图示),再次将钻杆法兰40固定在密集双筒井口上,使穿过法兰40的井眼41真正与井眼16和井管30对准,以便钻柱由此通过(图7)。再次将普通防喷器固定在钻杆法兰40上,确保安全钻井。装有一端固定钻头的钻柱穿过井眼41和16及井管30,钻碎此处存在的硬化水泥。钻柱从井管30底部推进,用普通方式由此钻一直井筒或斜井筒44,以便穿透地层。在从井管30钻该井筒并在必要时划眼后,生产套管50从地面下入,直到这一部分在井筒44内定位为止,如图8所示。首先生产套管50按普通方式用水泥胶结,最好延伸到井管30底部。水泥硬化之前,生产套管50固定在密集双筒井口15的井眼16内,其方法是使普通套管卡瓦51膨胀,当接触环形台肩17时,与井眼16啮合。套管卡瓦51装有密封件52,在密集双筒井口15的井眼16与生产套管50之间起到流体不能透过的密封作用。生产套管50上端还装有普通封隔密封圈53。可采用其他普通装置,如心轴悬挂器代替套管卡瓦51,57,分别将生产套管50,56固定到密集双筒井口15上。因而,当生产套管50固定在密集双筒井口15的井眼16并胶结在井筒44内后,从密集双筒井口15拆下钻杆法兰40,生产套管50伸出封隔密封圈53的部分要隔离或用普通工具切断(图9)。
如图9所示,密集双筒法兰短管60用合适的方法,如用螺栓(无图示)固定到密集双筒井口15上,使穿过法兰短管60的井眼62和64分别与生产套管50和56真正对准。62,64各井眼均有限定锥形节63,65的直径限制。封隔密封圈的功能在生产套管50,56与法兰短管60之间分别起到流体不能透过的密封作用。以后,生产套管50和56被置于与地层相连的流体通道,用合适的方法,如射孔穿透,这样流体首先是油气进入套管50和56,到地面开采。如图10所示,直径较小的生产油管70,76分别在生产套管50,56内定位,并用普通油管悬挂器71,77支承起来,即在油管悬挂器分别接触环形台肩63与65时,将其放入法兰短管60。可采用其他普通装置,如心轴悬挂器代替油管悬挂器71,77(如图10所示),分别将生产油管70,76固定到法兰短管60上。生产油管70,76上端还装有普通密封装置72和78,在法兰短管60与生产油管70和76之间起到流体不能透过的密封作用。安装分离采油树80和86,以便分别构成与生产油管70和76相连的流体通道。
另一方面,生产套管50和56的地层渗透液可通过生产套管直接到地表开采,不必按照熟练工极明显的特殊用途使用生产油管。在该实施例中,分离采油树80和86装在法兰短管上,以便分别构成与生产套管50和56相连的流体通道,如图11所示。
所以,当按照本发明钻井与完井时,两口地下井44,46钻入同一或不同地层或层位,达到相同或不同总的深度,各为直井或斜井。分层完井44和46,通过单井筒或共用井筒到达地面,以便可同时从地层采液和/或通过两口井注入地层。当油气同时从地层开采或通过另外的井流体注入地层时,可在一口井内进行修理作业,包括但不限于修井,重新完井和另钻新井。此外,当油气通过另外的井正从同一或不同地层开采时,流体可通过一口井注入地层。
由于本发明装置井管30和34的长度,约如3500到4000英尺,最理想的是保证该井管,按在井筒9内定位,具下端附近仍然保持分离。图12一般示出的井下回接装置100,连通第一井眼102和第二井眼104。在地面或共用井筒内定位时,井管30各分离段,例如用螺纹固定在第一井眼102内。第二井眼104带有螺纹105,与弹性夹头锁37相连,固定在井管34外部。当井管34按图13所示方式,下入共用井筒时,弹性夹头锁37锁上与螺纹105啮合,将井管34固定在回接装置100上,从而使井管30与34在井下的相对关系固定。这样,提高了本发明装置井下结构的稳定性,使方向控制得到提高,从而利用本发明装置将钻井与完井井筒阻碍减少到最低程度。
图14示出另一井下回接装置120,连通第一井眼122和第二井眼124。在地面或共用井筒内定位时,井管30各分离段,例如用螺纹固定在第一井眼122内,而井管34的一段用同样方式固定在第二井眼124内,以便由此悬挂。弹性夹头锁37固定在进管34其余管段下端的外部。当井管34这些余留管段按照图14所示方式下入共用井筒时,弹性夹头锁137锁上,与第二井眼124内的螺纹125啮合,将井管34其余管段固定到回接装置120上,从而使井管30和34在井下的相对关系固定。井管34下端的密封件138在井管34与回接装置120之间起到流体不能透过的密封作用。
下面的例子表示本发明的通常作法与效用,但不能认为限于这一范围。
例一
将一根直径30英尺管子击入地内500英尺。通过直径30英尺管子钻一直径26英寸井筒,深度为2000英尺,再下钻24英寸直径并胶结。将直径26 3/4英寸,3000磅/英寸2启动井口装在直径24英寸套管上,再减小直径到24英寸。通常钻井筒通过该套管到地面套管深度,即4000英尺,再管下扩眼到直径24英寸。井下回接装置用螺纹拧到直径9 5/8英寸地面套管上,再下入26 3/4英寸的启动井口。然后下入9 5/8英寸套管,穿过插件一井眼至距井筒底部约30英尺之处。用心轴悬挂器将9 5/8英寸套管固定在插件内,再从心轴悬挂器去掉第一套管伸出插件的部分。装有弹性夹头锁直径95/8英寸套管的第二钻柱插通插件第二球筒,再下入回接装置,直到弹性夹头锁穿过回接装置与井眼螺纹固定为止。用循环水泥,通过下入井筒9 5/8英寸的套管第二钻柱,将9 5/8英寸套管的两个钻柱胶结在井筒内。然后用卡瓦装置将9 5/8英寸套管的第二钻柱固定到插件上,切断第二套管伸出插件的部分,再将密封装置装到2个套管钻柱上。
将密集双筒井口装到启动井口上,插塞插入密集双筒井口的第一井眼上,钻杆法兰装在密集双筒井口上,以便通过密集双筒井口进入第二井眼。将防喷器装到钻杆法兰后,进行压力试验。钻柱通过直径9 5/8英寸套管的第二钻柱,钻碎水泥及该套管底部的浮动设备。然后从9 5/8英寸套管的第二钻柱底部定向钻井筒到预定总深度10,000英尺。井筒划眼,再将直径7英寸生产套管下入井筒并在此胶结。然后装上卡瓦,将套管固定在密集双筒井口上。最后切断7英寸生产套管伸出密集双筒井口部分,再在生产套管与密集双筒井口之间装上封隔密封件。
从密集双筒井口上取下钻杆法兰,再从第一井眼取下插塞。然后,将钻杆法兰装到密集双筒井口上,以便进入第一井眼,再用封隔密封件隔离第一完钻井。将防喷器装到钻杆法兰后,进行压力试验。钻柱通过直径9 5/8英寸套管的第一钻柱,钻碎水泥及该套管底部的浮动设备。从9 5/8英寸套管的第一钻柱底部,远离以前钻井,定向钻井筒到总深度12,000英尺。该井筒然后划眼,再将直径7英寸的生产套管下入井筒并胶结。然后装上卡瓦,将套管固定到密集双筒井口上。切断7英寸生产套管伸出密集双筒井口部分,再在生产套管与密集双筒井口之间装上封隔密封件。最后,装上密集双筒法兰短管,两口井与分离采油树一起分层完井。
虽然本发明装置的插件已示出,并被描述为有2个井眼,两节地面套管的分离段通过该井眼定位,但对熟练工极为明显,一个插件可装有2个以上井眼,2个以上的地面套管钻柱,可按照地面井筒直径与由此插入的地面套管,通过该井眼并在地面井筒里定位。例如,插件220有三个井眼221,224和227(图15)通过,按照上面有关插件20所述方式在内部定位,并支承在井口6上。井管230,234和237分别通过井眼221,224和227(图16)定位,并按照上面有关井管30和34所述方式固定在此处。用这种方式施工时,本发明装置允许三口地下井从共用井筒或单井筒分层钻井和完井。
另外,在本发明的范围内提供共用井筒内长度不等各种不同经端位置的井管,以便将造斜器固定到该井管终端点下面的装置上,和/或设置该井管发出的钻柱致偏装置,如泥浆马达,保证防止井筒受阻。在需要造斜器地方或需要本发明装置增加井下结构稳定性的情况下,中间可装长条形框架,如I字梁。沿其长度固定在第一和第二两根井管上。如果采用这样的长条形框架,最好用合适的方法,如用螺栓将该框架至少固定在其中一根井管,第二根井管入扣底盘,两根井管通过I字梁两边的普通C型导轨定位。该普通C型导轨可沿其长度,如用焊接固定在2字梁上。
在本发明上述较佳的实施例已描述示出的同时,当然也可做出比较方案和改进型式,而且属于本发明范围之列。

Claims (37)

1.从共用井筒可分层钻和完成地下多层井的装置,该装置包括:
井口,位于地表或接近地表,且定位在共用井筒上;
第一井管,定位于上述共用井筒内,该第一井管确定的尺寸使从上述共用井筒钻第一地下井筒时能通过钻柱,并在上述第一地下井筒完成时,使定位的生产套管从此通过;
第二井管,定位于上述共用井筒内,该第二井管确定的尺寸使从上述共用井筒钻第二地下井筒时能通过钻柱,并在上述第二地下井筒完成,使定位的生产套管以此通过;以及
定位于上述井口的装置,用于分离和支承上述第一和上述第二井管。
2.如权利要求1的装置,其特征在于:另外包括:
定位于上述井筒内的第二装置,用于分离和支承上述第一和上述第二井管。
3.如权利要求1的装置,其特征在于:其定位于上述分离和支承上述第一和上述第二井管用的上述井口装置包括一个通有二个井眼的井身,该井眼单独接受上述第一和上述第二井管,上述井口支承该井身。
4.如权利要求1的装置,其特征在于:另外包括:
在上述共用井筒内定位的第三井管,该第三井管确定的尺寸使从上述共用井筒钻第三地下井筒时,能通过钻柱,并在上述第三井筒完成时,使生产套管在此定位,定位于上述井口的该装置除上述第一和上述第二井管外,还分离和支承上述第三井管。
5.如权利要求1的装置,其特征在于:其上述第一和上述第二井管均在上述共用井筒里胶结。
6.如权利要求4的装置,其特征在于:其上述第一,上述第二和上述第三井管均在上述共用井筒里胶结。
7.井口装置包括:
第一装置,用于分离和支承至少二根定位于共用地下井筒里的井管;以及
第二装置,用于支承至少二个生产套管,该套管延伸到从上述共用地下井筒完钻的分离地下井筒,上述至少二个生产套管之一,延伸通过上述至少二根井管之一,上述至少二个生产套管的另一个,延伸通过至少上述二根井管的另一根。
8.如权利要求7的井口装置,其特征在于:其第三井管定位于上述共用地下井筒里,并用上述第一装置分离与支承,而第三生产套管则延伸到从上述共用地下井筒完钻的分离地下井筒,该第三生产套管由上述装置支承,并延伸通过上述第三井管。
9.如权利要求7的井口装置另外包括:其特征在于:
第三装置,用于支承至少二根生产油管,上述至少二根生产油管之一延伸到上述至少二根生产套管之一,上述至少二根生产油管另一根延伸到上述至少二根井管另一根。
10.如权利要求9的井口装置其特征在于:其第三井管定位于上述共用地下井筒,并用上述第一装置分离和支承,而第三生产套管则延伸到从上述共用地下井筒完钻的分离地下井筒,该第三生产套管用上述装置支承,并延伸通过上述第三井管,而第三生产油管用上述第三装置支承,并延伸到上述第三生产套管。
11.如权利要求9的井口装置另外包括:其特征在于:
第一采油树,固定在上述第三装置上,以便构成与上述至少二根生产油管之一相连的流体通道;以及
第二采油树,固定在上述第三装置上,以便构与上述至少二根生产油管另一根相连的流体通道。
12.地下钻井与完井的方法包括:
从共用井筒的井口悬挂和分离至少二根井管,至少该二根井管定位在上述共用井筒内;
钻第一地下井筒,通过上述至少二根井管之一,进入地层,以及
将第一段生产套管固定在上述井口上,该第一段生产套管延伸到上述第一井筒,支承在上述井口上,从而在上述第一井筒穿透的地层与地表之间构成流体通道。
13.如权利要求12的方法,其特征在于:另外包括:
从上述第一井筒穿透的上述地层,通过上述第一段生产套管到上述地表,开采油气。
14.如权利要求12的方法,其特征在于:另外包括:
通过上述第一段生产套管定位生产油管;以及
密封上述第一段生产套管与上述生产油管之间规定的环状空间。
15.如权利要求14的方法,其特征在于:另外包括:
从上述第一井筒穿透的上述地层,通过上述生产油管到上述地表,开采油气。
16.如权利要求12的方法,其特征在于:另外包括:
钻第二地下井筒,通过上述至少二根井管另一根,进入地层;以及
将第二段生产套管固定到上述井口上,该第二段生产套管延伸到上述第二井筒,支承在上述井口上,从而在上述第二井筒穿透的地层与地表之间构成流体通道。
17.如权利要求16的方法,其特征在于:另外包括:
从上述第二井筒穿透的上述地层,通过上述第二段生产套管到上述地表,开采油气。
18.如权利要求16的方法,其特征在于:另外包括:
通过上述第二段生产套管定位生产油管;以及
密封上述第二段生产套管与上述生产油管之间限定的环状空间。
19.如权利要求18的方法,其特征在于:另外包括:
从上述第二井筒穿透的上述地层,通过上述生产油管到上述地表,开采油气。
20.如权利要求13的方法,其特征在于:另外包括:
钻第二地下井筒,通过上述至少二根井管另一根进入地层;以及
将第二段生产套管固定在上述井口上,该第二段生产套管延伸到上述第二井筒,支承在上述井口上,从而在上述第二井筒穿透的地层与地表之间构成流体通道。
21.如权利要求20的方法,其特征在于:另外包括:
定位生产油管,通过上述第二段生产套管;以及
密封上述第二段生产套管与上述生产油管之间限定的环状空间。
22.如权利要求21的方法,其特征在于:另外包括:
通过上述第二段生产套管进行修理作业;同时
从上述第一井筒穿透的上述地层通过在上述第一段生产套管内定位的上述生产油管到上述地表,开采油气。
23.如权利要求21的方法,其特征在于:另外包括:
通过上述第二段生产套管向第二井筒穿透的地层注入流体;同时
从上述第一井筒穿透的上述地层,通过在上述第一段生产套管内定位的上述生产油管到上述地表,开采油气。
24.如权利要求16的方法,其特征在于:另外包括:
从共用井筒的井口悬挂和分离第三井管,该第三井管定位在共用井筒内;
钻第三地下井筒,通过上述第三井管,进入地层;以及
将第三段生产套管固定在上述井口上,该第三段生产套管延伸到上述第三井筒,支承在上述井口上,从而在上述第三井筒穿透的地层与地表之间构成流体通道。
25.如权利要求24的方法,其特征在于:另外包括:
从上述第三井筒穿透的上述地层,通过上述第三段产生套管到上述地表,开采油气。
26.如权利要求24的方法,其特征在于:另外包括:
定位生产油管,通过上述第三段生产套管;以及
密封上述第三段生产套管与上述生产油管之间限定的环状空间。
27.如权利要求26的方法,其特征在于:另外包括:
从上述第三井筒穿透的上述地层,通过上述生产油管到上述地表,开采油气。
28.如权利要求16的方法,其特征在于:其上述第一井筒穿透的上述地层和上述第二井筒穿透的上述地层相同。
29.如权利要求16的方法,其特征在于:其上述第一井筒穿透的上述地层与上述第二井筒穿透的上述地层不同。
30.如权利要求12的方法,其特征在于:其上述共用井筒一般是垂直的。
31.如权利要求12的方法,其特征在于:其上述共用井筒是偏斜的。
32.从共用井筒至少钻2个地下井筒的方法包括:
至少二根井管定位在上述共用井筒内;
钻第一地下井筒通过上述至少二根井管之一,进入第一地层,以及
钻第二地下井筒,通过上述至少二根井管另一根,进入第二地层。
33.如权利要求32的方法,其特征在于:其上述至少二根井管悬挂在共用井口上,该方法另外包括:
在钻上述第一地下井筒之前,密封上述至少二根井管另一根,防止流体流动。
34.如权利要求33的方法,其特征在于:另外包括:
在钻上述第二地下井筒之前,密封上述至少二根井管之一,防止流体流动。
35.如权利要求32的方法,其特征在于:其上述第一地层与上述第二地层相同。
36.如权利要求32的方法,其特征在于:其上述第一地层与上述第二地层不同。
37.如本文描述的全部发明。
CN94190746A 1993-12-20 1994-09-16 多分枝井钻井和完井装置及其方法 Expired - Lifetime CN1058547C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/170,557 1993-12-20
US08/170,557 US5458199A (en) 1992-08-28 1993-12-20 Assembly and process for drilling and completing multiple wells

Publications (2)

Publication Number Publication Date
CN1115185A true CN1115185A (zh) 1996-01-17
CN1058547C CN1058547C (zh) 2000-11-15

Family

ID=22620340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN94190746A Expired - Lifetime CN1058547C (zh) 1993-12-20 1994-09-16 多分枝井钻井和完井装置及其方法

Country Status (19)

Country Link
US (1) US5458199A (zh)
EP (2) EP0735236B1 (zh)
JP (1) JP2799522B2 (zh)
CN (1) CN1058547C (zh)
AT (2) ATE145263T1 (zh)
AU (1) AU675359B2 (zh)
BR (1) BR9405602A (zh)
CA (1) CA2152383C (zh)
CO (1) CO4370790A1 (zh)
DE (2) DE69400907T2 (zh)
DK (2) DK0674744T3 (zh)
DZ (1) DZ1832A1 (zh)
EG (1) EG20652A (zh)
ES (2) ES2094662T3 (zh)
NO (1) NO309623B1 (zh)
NZ (1) NZ273847A (zh)
RU (1) RU2107142C1 (zh)
TN (1) TNSN94134A1 (zh)
WO (1) WO1995017580A1 (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103189592A (zh) * 2010-10-27 2013-07-03 国际壳牌研究有限公司 井下的多井结构
CN103189592B (zh) * 2010-10-27 2016-12-14 国际壳牌研究有限公司 离岸产油系统
CN106460491A (zh) * 2014-05-29 2017-02-22 哈利伯顿能源服务公司 形成多分支井
CN108533206A (zh) * 2018-05-14 2018-09-14 中国石油集团西部钻探工程有限公司 双级套管头

Families Citing this family (65)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5803176A (en) 1996-01-24 1998-09-08 Weatherford/Lamb, Inc. Sidetracking operations
US5560435A (en) * 1995-04-11 1996-10-01 Abb Vecto Gray Inc. Method and apparatus for drilling multiple offshore wells from within a single conductor string
US5865260A (en) * 1995-09-01 1999-02-02 Chevron U.S.A. Inc. Method and apparatus for drilling multiple wells from a platform
WO1997009508A1 (en) * 1995-09-01 1997-03-13 Chevron U.S.A. Inc. Method and apparatus for drilling multiple wells from a low load platform
US5941308A (en) * 1996-01-26 1999-08-24 Schlumberger Technology Corporation Flow segregator for multi-drain well completion
US5944107A (en) * 1996-03-11 1999-08-31 Schlumberger Technology Corporation Method and apparatus for establishing branch wells at a node of a parent well
US6056059A (en) 1996-03-11 2000-05-02 Schlumberger Technology Corporation Apparatus and method for establishing branch wells from a parent well
US6283216B1 (en) 1996-03-11 2001-09-04 Schlumberger Technology Corporation Apparatus and method for establishing branch wells from a parent well
US6732801B2 (en) 1996-03-11 2004-05-11 Schlumberger Technology Corporation Apparatus and method for completing a junction of plural wellbores
US5775420A (en) * 1996-03-18 1998-07-07 Mitchell; Morton Lindsay Dual string assembly for gas wells
US5862862A (en) 1996-07-15 1999-01-26 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
US5813465A (en) 1996-07-15 1998-09-29 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
CA2209958A1 (en) 1996-07-15 1998-01-15 James M. Barker Apparatus for completing a subterranean well and associated methods of using same
US5833003A (en) 1996-07-15 1998-11-10 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
US5730221A (en) 1996-07-15 1998-03-24 Halliburton Energy Services, Inc Methods of completing a subterranean well
CA2210563C (en) 1996-07-15 2004-03-02 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
AU719919B2 (en) 1996-07-15 2000-05-18 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
NO313763B1 (no) 1996-07-15 2002-11-25 Halliburton Energy Serv Inc Fremgangsmåte ved reetablering av adgang til en brönnboring og styredel til bruk ved tildannelse av en åpning i en brönnfôring
AU714721B2 (en) 1996-07-15 2000-01-06 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods of using same
US6142235A (en) * 1996-12-05 2000-11-07 Abb Vetco Gray Inc. Bottom-supported guidance device for alignment of multiple wellbores in a single conductor
US5810086A (en) 1996-12-05 1998-09-22 Abb Vetco Gray Inc. Single riser with two wellheads
US5918675A (en) * 1996-12-05 1999-07-06 Abb Vetco Gray Inc. Close proximity wellheads
US5813468A (en) * 1996-12-26 1998-09-29 Abb Vetco Gray Inc. Dual casing hanger
US6079493A (en) * 1997-02-13 2000-06-27 Halliburton Energy Services, Inc. Methods of completing a subterranean well and associated apparatus
US6012529A (en) * 1998-06-22 2000-01-11 Mikolajczyk; Raymond F. Downhole guide member for multiple casing strings
US6182760B1 (en) 1998-07-20 2001-02-06 Union Oil Company Of California Supplementary borehole drilling
CA2244451C (en) * 1998-07-31 2002-01-15 Dresser Industries, Inc. Multiple string completion apparatus and method
US6209648B1 (en) 1998-11-19 2001-04-03 Schlumberger Technology Corporation Method and apparatus for connecting a lateral branch liner to a main well bore
US6615920B1 (en) * 2000-03-17 2003-09-09 Marathon Oil Company Template and system of templates for drilling and completing offset well bores
US6318458B1 (en) * 2000-03-31 2001-11-20 Robert W. Rainey Water-well-head adaptor
US6543553B2 (en) 2001-01-29 2003-04-08 Chevron Nigeria Limited Apparatus for use in drilling oil and gas production wells or water injection wells
WO2003004830A1 (en) * 2001-07-03 2003-01-16 Fmc Technologies, Inc. High pressure side-by-side wellhead system
US6736212B2 (en) * 2001-08-29 2004-05-18 Fmc Technologies, Inc. Drilling alignment system
US7066267B2 (en) * 2003-08-26 2006-06-27 Dril-Quip, Inc. Downhole tubular splitter assembly and method
US8056619B2 (en) 2006-03-30 2011-11-15 Schlumberger Technology Corporation Aligning inductive couplers in a well
US7735555B2 (en) * 2006-03-30 2010-06-15 Schlumberger Technology Corporation Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
US7712524B2 (en) * 2006-03-30 2010-05-11 Schlumberger Technology Corporation Measuring a characteristic of a well proximate a region to be gravel packed
US7793718B2 (en) 2006-03-30 2010-09-14 Schlumberger Technology Corporation Communicating electrical energy with an electrical device in a well
WO2010091103A1 (en) * 2009-02-03 2010-08-12 David Randolph Smith Method and apparatus to construct and log a well
CN102472083B (zh) * 2009-07-23 2015-01-07 Bp北美公司 海上钻井系统
US8839850B2 (en) * 2009-10-07 2014-09-23 Schlumberger Technology Corporation Active integrated completion installation system and method
US20110192596A1 (en) * 2010-02-07 2011-08-11 Schlumberger Technology Corporation Through tubing intelligent completion system and method with connection
US9249559B2 (en) 2011-10-04 2016-02-02 Schlumberger Technology Corporation Providing equipment in lateral branches of a well
US9644476B2 (en) 2012-01-23 2017-05-09 Schlumberger Technology Corporation Structures having cavities containing coupler portions
US9175560B2 (en) 2012-01-26 2015-11-03 Schlumberger Technology Corporation Providing coupler portions along a structure
RU2488687C1 (ru) * 2012-02-13 2013-07-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Способ одновременно-раздельной эксплуатации нагнетательной скважины
US9938823B2 (en) 2012-02-15 2018-04-10 Schlumberger Technology Corporation Communicating power and data to a component in a well
US10036234B2 (en) 2012-06-08 2018-07-31 Schlumberger Technology Corporation Lateral wellbore completion apparatus and method
RU2530003C1 (ru) * 2013-06-24 2014-10-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Способ ликвидации скважины
RU2627058C1 (ru) * 2013-07-25 2017-08-03 Хэллибертон Энерджи Сервисиз, Инк. Регулируемый стыковочный ниппель для использования с устройством отклоняющего клина в стволе скважины
AU2013394895B2 (en) * 2013-07-25 2016-05-19 Halliburton Energy Services, Inc. Expandable bullnose assembly for use with a wellbore deflector
CN107676039B (zh) * 2013-07-25 2019-05-28 哈利伯顿能源服务公司 与钻井孔偏转器一起使用的可膨胀外圆角组件
CN105358789B (zh) * 2013-07-25 2017-06-30 哈利伯顿能源服务公司 与钻井孔偏转器组件一起使用的可膨胀和可变长度外圆角组件
EP3030740A1 (en) * 2013-08-07 2016-06-15 Services Pétroliers Schlumberger System and methodology for running casing strings through a conductor tube
RU2534309C1 (ru) * 2013-08-13 2014-11-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Способ ликвидации скважины
RU2541007C1 (ru) * 2014-01-21 2015-02-10 Открытое акционерное общество "Севернефтегазпром" Способ герметизации резьбового соединения муфта кондуктора-монтажный патрубок колонной головки на скважине без вывода в капитальный ремонт
US9670732B1 (en) * 2016-01-14 2017-06-06 Chevron U.S.A. Inc. Batch drilling using multiple mudline closure devices
US9670733B1 (en) * 2016-01-21 2017-06-06 Ge Oil & Gas Pressure Control Lp Subsea multibore drilling and completion system
RU2626491C1 (ru) * 2016-05-11 2017-07-28 Федеральное государственное бюджетное образовательное учреждение высшего образования "Российский государственный университет нефти и газа (национальный исследовательский университет) имени И.М. Губкина" Способ разработки многопластовых нефтяных залежей с гидродинамически связанными пластами
RU2678745C1 (ru) * 2017-12-28 2019-01-31 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Способ эксплуатации нагнетательной скважины малого диаметра с однолифтовой двухпакерной компоновкой
US11111749B2 (en) * 2019-05-14 2021-09-07 Saudi Arabian Oil Company Correcting offsets in wellbore tubulars
US11053781B2 (en) 2019-06-12 2021-07-06 Saudi Arabian Oil Company Laser array drilling tool and related methods
RU2720727C1 (ru) * 2019-10-22 2020-05-13 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Способ определения герметичности скважинного оборудования для одновременно-раздельной эксплуатации
US11319756B2 (en) 2020-08-19 2022-05-03 Saudi Arabian Oil Company Hybrid reamer and stabilizer
US12188323B2 (en) 2022-12-05 2025-01-07 Saudi Arabian Oil Company Controlling a subsea blowout preventer stack

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1900163A (en) * 1931-05-02 1933-03-07 Dana Drexler Method and apparatus for drilling oil wells
US1900164A (en) * 1932-07-05 1933-03-07 Dana Drexler Method and apparatus for drilling oil wells
US2492079A (en) * 1943-12-09 1949-12-20 Eastman Oil Well Survey Co Apparatus for completing wells
US2794505A (en) * 1955-11-04 1957-06-04 Cameron Iron Works Inc Pipe hanging apparatus
US3050120A (en) * 1955-11-25 1962-08-21 Pan American Petroleum Corp Method and apparatus for completing wells
US3052301A (en) * 1957-05-15 1962-09-04 Gray Tool Co Multiple tubing string well completion equipment
US3011552A (en) * 1957-09-26 1961-12-05 Mcevoy Co Apparatus for setting pipes in tension
US3118502A (en) * 1960-02-24 1964-01-21 Cicero C Brown Well completion apparatus
US3223168A (en) * 1960-03-28 1965-12-14 Gulf Oil Corp Well head apparatus
US3100529A (en) * 1960-06-06 1963-08-13 Jersey Prod Res Co Apparatus for positioning well pipe
US3269755A (en) * 1961-01-24 1966-08-30 Fmc Corp Well installation
US3330355A (en) * 1963-10-03 1967-07-11 Fmc Corp Method for installing a well
US3653435A (en) * 1970-08-14 1972-04-04 Exxon Production Research Co Multi-string tubingless completion technique
US3770053A (en) * 1971-12-14 1973-11-06 Fmc Corp Ocean bottom well tubing valve installation
US3848669A (en) * 1972-11-29 1974-11-19 C Brown Well control apparatus
US4044830A (en) * 1973-07-02 1977-08-30 Huisen Allen T Van Multiple-completion geothermal energy production systems
US3875999A (en) * 1974-07-15 1975-04-08 John E Liberg Well capping assembly
US4068729A (en) * 1976-06-14 1978-01-17 Standard Oil Company (Indiana) Apparatus for multiple wells through a single caisson
US4444276A (en) * 1980-11-24 1984-04-24 Cities Service Company Underground radial pipe network
US4396075A (en) * 1981-06-23 1983-08-02 Wood Edward T Multiple branch completion with common drilling and casing template
US4415205A (en) * 1981-07-10 1983-11-15 Rehm William A Triple branch completion with separate drilling and completion templates
FR2551491B1 (fr) * 1983-08-31 1986-02-28 Elf Aquitaine Dispositif de forage et de mise en production petroliere multidrains
US4749046A (en) * 1986-05-28 1988-06-07 Otis Engineering Corporation Well drilling and completion apparatus
US4832381A (en) * 1987-09-09 1989-05-23 Cameron Iron Works Usa, Inc. Seal
US4822212A (en) * 1987-10-28 1989-04-18 Amoco Corporation Subsea template and method for using the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103189592A (zh) * 2010-10-27 2013-07-03 国际壳牌研究有限公司 井下的多井结构
CN103189592B (zh) * 2010-10-27 2016-12-14 国际壳牌研究有限公司 离岸产油系统
CN106460491A (zh) * 2014-05-29 2017-02-22 哈利伯顿能源服务公司 形成多分支井
CN106460491B (zh) * 2014-05-29 2019-07-26 哈利伯顿能源服务公司 形成多分支井的方法
CN108533206A (zh) * 2018-05-14 2018-09-14 中国石油集团西部钻探工程有限公司 双级套管头

Also Published As

Publication number Publication date
ATE166426T1 (de) 1998-06-15
DE69410484D1 (de) 1998-06-25
DK0735236T3 (da) 1998-10-07
ATE145263T1 (de) 1996-11-15
CA2152383A1 (en) 1995-06-29
WO1995017580A1 (en) 1995-06-29
JP2799522B2 (ja) 1998-09-17
ES2116805T3 (es) 1998-07-16
EP0735236B1 (en) 1998-05-20
NZ273847A (en) 1997-01-29
DK0674744T3 (zh) 1997-02-24
AU7730794A (en) 1995-07-10
NO951991L (no) 1995-06-29
EP0674744A1 (en) 1995-10-04
DZ1832A1 (fr) 2002-02-17
RU2107142C1 (ru) 1998-03-20
AU675359B2 (en) 1997-01-30
DE69400907T2 (de) 1997-04-10
ES2094662T3 (es) 1997-01-16
EP0674744B1 (en) 1996-11-13
EG20652A (en) 1999-10-31
CO4370790A1 (es) 1996-10-07
DE69410484T2 (de) 1999-01-07
CA2152383C (en) 1999-03-16
NO309623B1 (no) 2001-02-26
JPH08501365A (ja) 1996-02-13
CN1058547C (zh) 2000-11-15
US5458199A (en) 1995-10-17
NO951991D0 (no) 1995-05-19
EP0735236A1 (en) 1996-10-02
DE69400907D1 (de) 1996-12-19
BR9405602A (pt) 1999-09-08
TNSN94134A1 (fr) 1995-09-21

Similar Documents

Publication Publication Date Title
CN1115185A (zh) 多层钻井及完井之装置与方法
US5655602A (en) Apparatus and process for drilling and completing multiple wells
EP0614505B1 (en) Template and process for drilling and completing multiple wells
US6336507B1 (en) Deformed multiple well template and process of use
AU2003249021B2 (en) Wellbore plug system and method
US6758289B2 (en) Method and apparatus for hydrocarbon subterranean recovery
US8657013B2 (en) Riser system
CA2493379A1 (en) Wellbore sealing system and method
US20130037272A1 (en) Method and system for well access to subterranean formations
US3512592A (en) Offshore drilling method and apparatus
NO166296B (no) Fremgangsmaate for boring av avviksbroenner.
US2607422A (en) Method and apparatus for suspending pipe in boreholes
US10119372B2 (en) System and method for high-pressure high-temperature tieback
CN1891974A (zh) 欠平衡完井方法及完井装置
Myers et al. Jolliet TLWP well systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: AKE KAVANAGH MALAYSIA CO., LTD.

Free format text: FORMER OWNER: MARATHON OIL CO.

Effective date: 20101125

Owner name: AKE PROGRAM SINGAPORE CO., LTD.

Free format text: FORMER OWNER: AKE KAVANAGH MALAYSIA CO., LTD.

Effective date: 20101125

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: TEXAS, USA TO: KUALA LUMPUR, MALAYSIA

Free format text: CORRECT: ADDRESS; FROM: KUALA LUMPUR, MALAYSIA TO: SINGAPORE, SINGAPORE

CP02 Change in the address of a patent holder

Address after: Texas, USA

Patentee after: Marathon Oil Co.

Address before: Ohio, USA

Patentee before: Marathon Oil Co.

TR01 Transfer of patent right

Effective date of registration: 20101125

Address after: Singapore Singapore

Patentee after: Project Singapore Ltd.

Address before: Kuala Lumpur Malaysia

Patentee before: Chris Cavanna Malaysia LLC

Effective date of registration: 20101125

Address after: Kuala Lumpur Malaysia

Patentee after: Chris Cavanna Malaysia LLC

Address before: Texas, USA

Patentee before: Marathon Oil Co.

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140916

Granted publication date: 20001115