Sokol et al., 2014 - Google Patents
Tunnelling under the Sydney Opera House: the vehicle access and pedestrian safety projectSokol et al., 2014
View PDF- Document ID
- 1777457847961182389
- Author
- Sokol N
- Adams M
- Pollak S
- McTaggart G
- Clarke B
- Publication year
- Publication venue
- Proceedings of the World Tunnel Congress, Brazil
External Links
Snippet
The current traffic arrangements for servicing the Sydney Opera House (SOH) necessitates that delivery vehicles share the open forecourt and boardwalk areas with visitors, complicating logistics and resulting in several incidents per year. The Vehicle Access and …
- 239000011435 rock 0 abstract description 44
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
- E04C3/294—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Fang et al. | Shallow tunnelling method (STM) for subway station construction in soft ground | |
CA2853564C (en) | Undercut excavation method with continuous concrete floors | |
Sandbak et al. | Ground support strategies at the turquoise ridge joint venture, Nevada | |
Frischmann et al. | Protection of the Mansion House against Damage Caused by Ground Movements due to the Docklands Light Railway Extension. | |
Amiri et al. | Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground | |
Trushko et al. | Arrangement of multistory underground parking garages in complex engineering and geological environment | |
Florkowska | Example building damage caused by mining exploitation in disturbed rock mass | |
Sokol et al. | Tunnelling under the Sydney Opera House: the vehicle access and pedestrian safety project | |
Pollak et al. | Tunneling Under the Sydney Opera House: The Vehicle Access and Pedestrian Safety Project | |
Humpheson et al. | THE BASEMENTS AND SUBSTRUCTURE FOR THE NEW HEADQUARTERS OF THE HONGKONG AND SHANGHAI BANKING CORPORATION, HONG KONG. | |
Çimentepe | Evaluation of structural analysis methods used for the design of TBM segmental linings | |
Kramer et al. | The Sequential Demolition Method–Underground Replacement of a 100 Year Old Tunnel | |
Herranz et al. | SEM crossover cavern in Downtown LA | |
Sandbak et al. | Ground support strategies for weak ground masses at the Turquoise Ridge Joint Venture, Nevada | |
Arumugam et al. | Seismic and safety performance assessment and strengthening of tunnels in Wellington | |
Zargar et al. | Top-Down construction method: A case study of commercial building in Tehran | |
Bezrodny et al. | Preservation of urban historic centers | |
Hadjigeorgiou et al. | An investigation into the behaviour of shotcrete pillars | |
Phelps et al. | Design and risk management strategy for the Sound Transit Beacon Hill Station and tunnels | |
Weeks et al. | Design and construction of CBD shafts, Metro Tunnel Project, Melbourne | |
Kramer et al. | Underground replacement of a 100 year old tunnel using the sequential demolition method | |
Schürch et al. | The Shazar caverns–Design challenges and construction experience | |
Ghazvinian et al. | A Global Review of Metro Station Construction Project | |
Fantaye et al. | Combining Secant Piles with a Grouting Program Provides a Value Engineered Alternative for a Critical Support of Excavation | |
King | Rock Tunnels |