[go: up one dir, main page]

Hadjigeorgiou et al., 2018 - Google Patents

An investigation into the behaviour of shotcrete pillars

Hadjigeorgiou et al., 2018

Document ID
4337501274780269334
Author
Hadjigeorgiou J
Habiyaremye F
Lessard J
Andrieux P
Publication year
Publication venue
Rock Support and Reinforcement Practice in Mining

External Links

Snippet

This paper reports on recent work on the behaviour of shotcrete pillars. The use of shotcrete pillars is becoming more and more popular in Canadian underground mines as an alternative means of support. This paper addresses design considerations based on a …
Continue reading at www.taylorfrancis.com (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/18Spacers of metal or substantially of metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/48Chocks or the like
    • E21D15/483Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate
    • E04H9/02Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate withstanding earthquake or sinking of ground
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Similar Documents

Publication Publication Date Title
CA2853564C (en) Undercut excavation method with continuous concrete floors
Amiri et al. Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground
Xiang et al. Assessment and control of metro-construction induced settlement of a pile-supported urban overpass
Dasar et al. Technical issues on forensic assessment of post-earthquake building damage—Case study of the Hajj Dormitory Building, Mamuju, Indonesia
Hadjigeorgiou et al. An investigation into the behaviour of shotcrete pillars
Hadjigeorgiou et al. Rock Support and Reinforcement Practice in© Mining, 1999 Balkema, Villaescusa, Rotterdam, Windsor ISBN & Thompson905809 045 (eds)
Mittal et al. River bank erosion control by soil nailing
Edelbro et al. Spiling in unstable tunnel sections–a benchmark and case study review
Alhabshi Finite element design procedures for hybrid MSE/Soil-nail retaining wall systems
Thirukumaran et al. Successful design of large span caverns in the challenging ground conditions
Cotton et al. Seismic response and extended life analysis of the deepest top-down soil nail wall in the US
Kramer et al. The Sequential Demolition Method–Underground Replacement of a 100 Year Old Tunnel
Bogusz et al. Numerical analysis of a foundation of a cooling tower in difficult geotechnical conditions
Malik et al. Diaphragm wall supported by ground anchors and inclined struts: A case study
Mohammed Prediction of the position and construction procedures response of static and dynamic conditions in the twin tunnel construction
Tomásio et al. Excavation, retaining wall and deep foundations solutions for an office building at Alcântara–Lisbon
Pashaye et al. Using Umbrella Arch Method in Design of Tunnel Lining, Case Study: Water Transfer Tunnel of Kani-sib, Urmia lake
Iberg et al. Complexities of Mixed Foundation Systems for Boston Highrise
Mohammadzadeh et al. Analysis and Modeling of Soil Retaining Structure for Urban Train Stations
Milev Soil Liquefaction Mitigation by Applying the DSM Technique Below the Foundations of a Silo Base
Zhang et al. Field and Numerical Investigations on Pumpable Standing Supports Failure Analysis in the Longwall Pre-driven Recovery Room
Osadchy et al. Landslide protection structure in the form of counterforts made of bored piles
Kramer et al. Underground replacement of a 100 year old tunnel using the sequential demolition method
Alimohammadi Shallow Foundations and Deep Foundations; Drilled Piers, Aggregate Piers and Stone Columns; Design Recommendations, Construction Considerations, and Performance
Mihaljević et al. Remediation measures for motorway bridge piers damaged by rock sliding in the Republic of Kosovo