Hadjigeorgiou et al., 2018 - Google Patents
An investigation into the behaviour of shotcrete pillarsHadjigeorgiou et al., 2018
- Document ID
- 4337501274780269334
- Author
- Hadjigeorgiou J
- Habiyaremye F
- Lessard J
- Andrieux P
- Publication year
- Publication venue
- Rock Support and Reinforcement Practice in Mining
External Links
Snippet
This paper reports on recent work on the behaviour of shotcrete pillars. The use of shotcrete pillars is becoming more and more popular in Canadian underground mines as an alternative means of support. This paper addresses design considerations based on a …
- 239000011378 shotcrete 0 title abstract description 101
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/34—Foundations for sinking or earthquake territories
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/18—Spacers of metal or substantially of metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/48—Chocks or the like
- E21D15/483—Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/14—Telescopic props
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
- E04C3/294—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate
- E04H9/02—Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate withstanding earthquake or sinking of ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2853564C (en) | Undercut excavation method with continuous concrete floors | |
Amiri et al. | Comparison of shallow tunneling method with pile and rib method for construction of subway station in soft ground | |
Xiang et al. | Assessment and control of metro-construction induced settlement of a pile-supported urban overpass | |
Dasar et al. | Technical issues on forensic assessment of post-earthquake building damage—Case study of the Hajj Dormitory Building, Mamuju, Indonesia | |
Hadjigeorgiou et al. | An investigation into the behaviour of shotcrete pillars | |
Hadjigeorgiou et al. | Rock Support and Reinforcement Practice in© Mining, 1999 Balkema, Villaescusa, Rotterdam, Windsor ISBN & Thompson905809 045 (eds) | |
Mittal et al. | River bank erosion control by soil nailing | |
Edelbro et al. | Spiling in unstable tunnel sections–a benchmark and case study review | |
Alhabshi | Finite element design procedures for hybrid MSE/Soil-nail retaining wall systems | |
Thirukumaran et al. | Successful design of large span caverns in the challenging ground conditions | |
Cotton et al. | Seismic response and extended life analysis of the deepest top-down soil nail wall in the US | |
Kramer et al. | The Sequential Demolition Method–Underground Replacement of a 100 Year Old Tunnel | |
Bogusz et al. | Numerical analysis of a foundation of a cooling tower in difficult geotechnical conditions | |
Malik et al. | Diaphragm wall supported by ground anchors and inclined struts: A case study | |
Mohammed | Prediction of the position and construction procedures response of static and dynamic conditions in the twin tunnel construction | |
Tomásio et al. | Excavation, retaining wall and deep foundations solutions for an office building at Alcântara–Lisbon | |
Pashaye et al. | Using Umbrella Arch Method in Design of Tunnel Lining, Case Study: Water Transfer Tunnel of Kani-sib, Urmia lake | |
Iberg et al. | Complexities of Mixed Foundation Systems for Boston Highrise | |
Mohammadzadeh et al. | Analysis and Modeling of Soil Retaining Structure for Urban Train Stations | |
Milev | Soil Liquefaction Mitigation by Applying the DSM Technique Below the Foundations of a Silo Base | |
Zhang et al. | Field and Numerical Investigations on Pumpable Standing Supports Failure Analysis in the Longwall Pre-driven Recovery Room | |
Osadchy et al. | Landslide protection structure in the form of counterforts made of bored piles | |
Kramer et al. | Underground replacement of a 100 year old tunnel using the sequential demolition method | |
Alimohammadi | Shallow Foundations and Deep Foundations; Drilled Piers, Aggregate Piers and Stone Columns; Design Recommendations, Construction Considerations, and Performance | |
Mihaljević et al. | Remediation measures for motorway bridge piers damaged by rock sliding in the Republic of Kosovo |