Method of controlling operation of a group of grinding plants operating in parallel

Info

Publication number
SU682269A1
SU682269A1 SU782599435A SU2599435A SU682269A1 SU 682269 A1 SU682269 A1 SU 682269A1 SU 782599435 A SU782599435 A SU 782599435A SU 2599435 A SU2599435 A SU 2599435A SU 682269 A1 SU682269 A1 SU 682269A1
Authority
SU
USSR - Soviet Union
Prior art keywords
units
unit
specific energy
relative specific
grinding
Prior art date
Application number
SU782599435A
Other languages
Russian (ru)
Inventor
Дмитрий Савельевич Аненко
Всеволод Витальевич Дудник
Василий Алексеевич Кузьменко
Иван Евгениевич Маноха
Валерий Павлович Чоботов
Original Assignee
Украинский Филиал Всесоюзного Научно-Исследовательского Института Комбикормовой Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Украинский Филиал Всесоюзного Научно-Исследовательского Института Комбикормовой Промышленности filed Critical Украинский Филиал Всесоюзного Научно-Исследовательского Института Комбикормовой Промышленности
Priority to SU782599435A priority Critical patent/SU682269A1/en
Application granted granted Critical
Publication of SU682269A1 publication Critical patent/SU682269A1/en

Links

Landscapes

  • Arc Welding In General (AREA)

Description

В ходе процесса измер ют потребл емые мощности РЬ ... Р„ и производительности размольных агрегатов Qb Qn, определ ют суммарную фактическую производительность 2 Qt и сравнивают с пп данной 2Сз- 2 Qj AQ. Периодически вычисл ют переменные величины относительных удельных энергозатрат за равные промежутки времени В случае необходимости уменьшени  суммарной производительности при 21 Qt 2Q/3 нагрузку на каждый агрегат уменьшают пропорционально величине его относительных удельных энергозатрат. в случае необходимости увеличени  суммарной производительности при 2 Qi S Q(3 нагрузку на каждый агрегат увеличивают пропорционально обратной величине его относительных удельных энергозатратIn the course of the process, the consumed power Pb ... Pn and the productivity of the grinding units Qb Qn are measured, the total actual capacity 2 Qt is determined and compared with the parameters of this 2Сз-2 Qj AQ. Periodically calculate the variables of the relative specific energy consumption for equal periods of time. If it is necessary to reduce the total performance at 21 Qt 2Q / 3, the load on each unit is reduced in proportion to the value of its relative specific energy consumption. if necessary, increase the total performance at 2 Qi S Q (3 load on each unit increases in proportion to the reciprocal of its relative specific energy consumption

Pi-tPi-t

N,KN, K

V Q,JjV Q, Jj

Источник информации, прин тый Source of Information Received

во внимание при экспертизе:into account in the examination:

Claims (2)

1. Авторское свидетельство СССР № 324071, кл. В 02 С 25/00, 1969. В случае превышени  величины относительных удельных энергозатрат одного из агрегатов предельно допустимой, данный агрегат отключают, а разницу в производительности распредел ют указанным способом . Использование предлагаемого способа управлени  груп1пой параллельно работающих размольных агрегатов позволит улучшить равномерность .износа .рабочих органов агрегатов, уменьшить затраты электроэнергии и своевременно отключить размольные агрегаты с изношенными рабочими органами . Формула изобретени  I. Способ управлени  группой параллельно работающих размольных агрегатов, заключающийс  в стабилизации суммарной производительности путем распределени  нагрузки на каждый работающий агрегат пропорционально сум.ме заданных производительностсй , отличающийс  тем, что, с целью обеспечени  равномерности износа агрегатов и уменьшени  затрат электроэнергии , измер ют производительность и потребл емую мощность каждого агрегата, периодически вычисл ют переменные величины относительных удельных энергозатрат агрегатов и при необходимости уменьшени  суммарной производительности уменьшают нагрузку на каждый агрегат пропорционально величине его относительных удельных энергозатрат, а при необходимости увеличени  суммарной производительности увеличивают нагрузку на каждый агрегат пропорционально обратной величине его относительных удельных энергозатрат. 1. USSR author's certificate number 324071, cl. B 02 C 25/00, 1969. In case of exceeding the value of the relative specific energy consumption of one of the maximum permissible units, this unit is turned off, and the performance difference is distributed in this way. The use of the proposed method of controlling a group of parallel-working grinding units will improve the uniformity of the working parts of the units, reduce the cost of electricity and promptly turn off the grinding units with worn out working parts. Claims I. A method of controlling a group of grinding machines operating in parallel, consisting in stabilizing the total capacity by distributing the load on each working unit in proportion to the sum of specified performance, characterized in that, in order to ensure evenness of the units and reduce energy costs, they measure productivity and the power consumption of each unit, periodically calculate the variable values of the relative specific energy consumption of the aggregate s and if necessary to reduce total load reduces productivity per unit in proportion to its value relative specific energy, and if necessary increase the total productivity increase load per unit in proportion to the reciprocal of its relative specific energy. 2. Способ по п. 1, отличающийс  тем, что, с целью своевременной замены изношенных рабочих органов в размольном агрегате, переменную величину относительных удельных энергозатрат агрегатов сравнивают с предельно допустимой и в случае превышени  ее агрегат отключают.2. A method according to claim 1, characterized in that, in order to promptly replace worn out working bodies in the grinding unit, the variable value of the relative specific energy consumption of the units is compared with the maximum allowable, and in case of exceeding, the unit is turned off.
SU782599435A 1978-04-04 1978-04-04 Method of controlling operation of a group of grinding plants operating in parallel SU682269A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782599435A SU682269A1 (en) 1978-04-04 1978-04-04 Method of controlling operation of a group of grinding plants operating in parallel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782599435A SU682269A1 (en) 1978-04-04 1978-04-04 Method of controlling operation of a group of grinding plants operating in parallel

Publications (1)

Publication Number Publication Date
SU682269A1 true SU682269A1 (en) 1979-08-30

Family

ID=20757394

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782599435A SU682269A1 (en) 1978-04-04 1978-04-04 Method of controlling operation of a group of grinding plants operating in parallel

Country Status (1)

Country Link
SU (1) SU682269A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267981A (en) * 1979-11-19 1981-05-19 Allis-Chalmers Corporation Grinding system and method utilizing constant feed rate source

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267981A (en) * 1979-11-19 1981-05-19 Allis-Chalmers Corporation Grinding system and method utilizing constant feed rate source
WO1981001373A1 (en) * 1979-11-19 1981-05-28 Allis Chalmers Grinding system and method utilizing constant feed rate source

Similar Documents

Publication Publication Date Title
De et al. The optimization of hybrid energy conversion systems using the dynamic programming model—Rapsody
NZ192862A (en) Load shedding utility controls peak demand consumer sets load priority
CN110021930B (en) Large-scale energy storage participation power grid partition control method and system
CN111614108A (en) A Fire-storage AGC Frequency Modulation Control Method Considering Flexible Load Characteristics
SU682269A1 (en) Method of controlling operation of a group of grinding plants operating in parallel
CN105281363B (en) The multipotency source optimization and control method of meter and customer consumption viscosity
CN103280833B (en) Based on the power distribution network control method that energy storage and the photovoltaic of active mechanisms are coordinated
CN109149589B (en) A flexible load management method and system based on multi-agent mechanism
CN110994646B (en) Method, system and storage medium for evaluating running effect of AGC (automatic gain control) adjustment of power grid
CN102761124B (en) Method for predetermining power generation load of self-contained generator set
CN109325687A (en) A system and method for apportioning peak shaving resources between provinces
CN108335045B (en) Automatic optimization method for radial flow type hydropower station based on opening degree adjustment
CN114925546B (en) Method, device and storage medium for decomposing medium of cold chain load aggregation participating in power grid regulation and control
CN115239074A (en) An adjustable load potential modeling method, scheme determination method and system
CN103956779A (en) Plant-wide load economic dispatch technology for thermal power generating units based on energy balance
CN114266481A (en) Power grid intelligent regulation system based on user demands of power utilization side
CN113612235A (en) Wind power plant equivalent frequency modulation reserve capacity dynamic allocation control method
CN110837983A (en) Multi-scenario demand response strategy considering distributed power sources, energy storage devices, and hybrid loads
CN113904328B (en) Method to obtain optimal charging and discharging power of wind farm energy storage system
FR2279167A1 (en) Energy saving accounting system for number of appliances - is carried out at user group level for savings on full power use
Cheng Capacity Evaluation of Agricultural Irrigation Load Participating in Operating Reserve of Power System
JP2566487B2 (en) Steam pressure control method for multiple boilers and generators
CN114759569B (en) Wind power consumption method for northeast region based on electric heating load fine adjustment
Canistus et al. Demand Management at Households in Sri Lanka through Dynamic Pricing and Demand Information Systems
CN111224395A (en) Power distribution network cooperative operation method oriented to multi-investment subject and multi-element interaction