RU95122732A - Сборка для бурения и оснащения скважин и способ ее осуществления - Google Patents
Сборка для бурения и оснащения скважин и способ ее осуществленияInfo
- Publication number
- RU95122732A RU95122732A RU95122732/03A RU95122732A RU95122732A RU 95122732 A RU95122732 A RU 95122732A RU 95122732/03 A RU95122732/03 A RU 95122732/03A RU 95122732 A RU95122732 A RU 95122732A RU 95122732 A RU95122732 A RU 95122732A
- Authority
- RU
- Russia
- Prior art keywords
- underground
- drilling
- drill hole
- production
- hole
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims 24
- 238000005553 drilling Methods 0.000 claims 41
- 230000015572 biosynthetic process Effects 0.000 claims 27
- 229930195733 hydrocarbon Natural products 0.000 claims 8
- 150000002430 hydrocarbons Chemical class 0.000 claims 8
- 239000012530 fluid Substances 0.000 claims 6
- 238000005204 segregation Methods 0.000 claims 3
- 239000007788 liquid Substances 0.000 claims 2
Claims (34)
1. Сборка, через которую подземные скважины раздельно пробурены и оборудованы из общего бурового отверстия, отличающаяся тем, что она содержит головную часть скважины, установленную на или около поверхности Земли и расположенную над общим буровым отверстием, первое трубчатое звено, расположенное в пределах общего бурового отверстия для перемещения через него буровых штанг в процессе бурения первого подземного бурового отверстия из общего бурового отверстия, а также для установки в нем производственной обсадной трубы, после оборудования первого подземного бурового отверстия второе трубчатое звено также расположено в пределах общего бурового отверстия для перемещения через него буровых штанг в процессе бурения второго подземного бурового отверстия из общего бурового отверстия, а также для установки в нем производственной обсадной трубы после оборудования второго подземного бурового отверстия, и средства для сегрегации и поддержки первого и второго трубчатых звеньев, установленные на головной части.
2. Сборка по п. 1, отличающаяся тем, что содержит вторые средства, расположенные в пределах упомянутого бурового отверстия для сегрегации и поддержки первого и второго трубчатых звеньев.
3. Сборка по п. 1, отличающаяся тем, что упомянутые средства, расположенные на головной части скважины для сегрегации и поддержки первого и второго трубчатых звеньев, содержат тело, имеющее два сквозных отверстия, в которых раздельно установлены первое и второе трубчатые звенья, а тело поддерживается головной частью.
4. Сборка по п. 1, отличающаяся тем, что содержит третье трубчатое звено, расположенное в пределах общего бурового отверстия для перемещения через него буровых штанг в процессе бурения третьего подземного бурового отверстия из общего бурового отверстия, а также для установки в нем производственной обсадной трубы после оборудования третьего подземного бурового отверстия, при этом упомянутые средства, расположенные на головной части скважины, отделяют и поддерживают третье трубчатое звено дополнительно к первому и второму трубчатым звеньям.
5. Сборка по п. 1, отличающаяся тем, что первое и второе трубчатые звенья зацементированы в пределах общего бурового отверстия.
6. Сборка по п. 4, отличающаяся тем, что первое, второе и третье трубчатые звенья зацементированы в пределах общего бурового отверстия.
7. Сборка головной части скважины, отличающаяся тем, что содержит первые средства для сегрегации и поддержки по меньшей мере двух трубчатых звеньев, которые расположены в пределах общего подземного бурового отверстия, и вторые средства для поддержки по меньшей мере двух производственных обсадных труб, которые проходят в раздельные подземные буровые отверстия, пробуренные из общего подземного бурового отверстия, при этом одна из производственных обсадных труб проходит через одно из двух трубчатых звеньев, а другая производственная обсадная труба - через другое трубчатое звено.
8. Сборка головной части скважины по п.7, отличающаяся тем, что третье трубчатое звено расположено в пределах общего подземного бурового отверстия и отделено и поддержано при помощи упомянутых первых средств, а третья производственная обсадная труба проходит в отдельном подземном буровом отверстии, которое пробурено из упомянутого общего подземного бурового отверстия, при этом третья производственная обсадная труба поддержана при помощи упомянутых средств и проходит через третье трубчатое звено.
9. Сборка головной части скважины по п.7, отличающаяся тем, что содержит третьи средства для поддержки по меньшей мере двух производственных трубок, одна из которых проходит в одной из по меньшей мере двух производственных обсадных труб, а другая производственная труба - в другом из по меньшей мере двух трубчатых звеньев.
10. Сборка головной части скважины по п. 9, отличающаяся тем, что третье трубчатое звено расположено в пределах общего подземного бурового отверстия и отделено и поддержано при помощи упомянутых третьих средств, третья производственная обсадная труба проходит в отдельном подземном буровом отверстии, пробуренном из общего подземного бурового отверстия, а третья производственная обсадная труба поддержана при помощи упомянутых средств и проходит через третье трубчатое звено, при этом третья производственная труба поддержана при помощи упомянутых третьих средств и проходит в третьей производственной обсадной трубе.
11. Сборка головной части скважины по п. 9, отличающаяся тем, что содержит первую производственную стойку, прикрепленную к упомянутым третьим средствам для обеспечения связи по жидкой среде с одной из по меньшей мере двух производственных труб, и вторую производственную стойку, прикрепленную к третьим средствам для обеспечения связи по жидкой среде с другой производственной трубой.
12. Способ бурения и оснащения подземных скважин, отличающийся тем, что подвешивают и разделяют по меньшей мере два трубчатых звена от головной части скважины общего бурового отверстия, причем по меньшей мере два трубчатых звена расположены в пределах общего бурового отверстия, производят бурение первого подземного бурового отверстия через одно из трубчатых звеньев и в подземную формацию, и прикрепляют первую длину производственной обсадной трубы к упомянутой головной части скважины, причем первая длина производственной обсадной трубы проходит в упомянутом первом буровом отверстии и поддержана на головной части скважины для установления связи по жидкой среде между подземной формацией, пронизанной первым буровым отверстием, и поверхностью Земли.
13. Способ бурения и оснащения подземных скважин по п. 12, отличающийся тем, что углеводороды получают из подземной формации, пронизанной упомянутым первым буровым отверстием, на поверхности Земли через первую длину производственной обсадной трубы.
14. Способ бурения и оснащения подземных скважин по п. 12, отличающийся тем, что устанавливают производственную трубу через производственную обсадную трубу первой длины и производят уплотнение кругового зазора, образованного между производственной обсадной трубой первой длины и производственной трубой.
15. Способ бурения и оснащения подземных скважин по п. 14, отличающийся тем, что углеводороды получают из подземной формации, пронизанной упомянутым первым буровым отверстием, на поверхности Земли через упомянутого производственную трубу.
16. Способ бурения и оснащения подземных скважин по п. 12, отличающийся тем, что производят бурение второго подземного бурового отверстия через другое из по меньшей мере двух трубчатых звеньев и в подземную формацию, и прикрепляют вторую длину производственной обсадной трубы к упомянутой головной части, при этом производственная обсадная труба второй длины проходит во втором буровом отверстии и поддержана на головной части для установления связи по жидкой среде между подземной формацией, пронизанной вторым буровым отверстием, и поверхностью Земли.
17. Способ бурения и оснащения подземных скважин по п. 16, отличающийся тем, что углеводороды получают от подземной формации, пронизанной упомянутым вторым буровым отверстием, на поверхности Земли через производственную обсадную трубу второй длины.
18. Способ бурения и оснащения подземных скважин по п. 16, отличающийся тем, что располагают производственную трубу в производственной обсадной трубе второй длины а производят уплотнение кругового зазора между производственной обсадной трубой второй длины и производственной трубой.
19. Способ бурения и оснащения подземных скважин по п. 18, отличающийся тем, что углеводороды получают от подземной формации, пронизанной упомянутым вторым буровым отверстием, на поверхности Земли через упомянутую производственную трубу.
20. Способ бурения и оснащения подземных скважин по п. 13, отличающийся тем, что производят бурение второго подземного бурового отверстия через другое трубчатое звено и в подземную формацию, и прикрепляют производственную обсадную трубу второй длины к упомянутой головной части скважины, при этом вторая длина производственной обсадной трубы проходит во втором буровом отверстии и поддержана на головной части для установления связи по жидкой среде между подземной формацией, пронизанной вторым буровым отверстием, и поверхностью Земли.
21. Способ бурения и оснащения подземных скважин по п. 20, отличающийся тем, что устанавливают производственную трубу через производственную обсадную трубу второй длины и производят уплотнение кругового зазора, образованного между производственной обсадной трубой второй длины и производственной трубой.
22. Способ бурения и оснащения подземных скважин по п. 21, отличающийся тем, что ремонтно-восстановительные операции проводят через производственную обсадную трубу второй длины и одновременно углеводороды получают от подземной формации, пронизанной первым буровым отверстием, на поверхности через производственную трубу, расположенную в пределах производственной обсадной трубы первой длины.
23. Способ бурения и оснащения подземных скважин по п. 21, отличающийся тем, что производят инжектирование жидкой среды в подземную формацию, пронизанную вторым буровым отверстием через производственную обсадную трубу второй длины и одновременно углеводороды получают от подземной формации, пронизанной первым буровым отверстием, на поверхности через упомянутую производственную трубу, расположенную в пределах производственной обсадной трубы первой длины.
24. Способ бурения и оснащения подземных скважин по п. 16, отличающийся тем, что подвешивают и раздельно устанавливают третье трубчатое звено от головной части общего бурового отверстия, причем третье трубчатое звено расположено в пределах общего бурового отверстия, производят бурение третьего подземного бурового отверстия через третье трубчатое звено и в подземную формацию, и прикрепляют производственную обсадную трубу третьей длины к упомянутой головной части, причем производственная обсадная труба третьей длины проходит в упомянутом третьем буровом отверстия и поддержана на головной части для установления связи по жидкой среде между подземной формацией, пронизанной третьим буровым отверстием, и поверхностью Земли.
25. Способ бурения и оснащения подземных скважин по п. 24, отличающийся тем, что углеводороды получают из подземной формации, пронизанной третьим буровым отверстием, на поверхности Земли через производственную обсадную трубу третьей длины.
26. Способ бурения и оснащения подземных скважин по п. 24, отличающийся тем, что располагают производственную трубу в производственной обсадной трубе третьей длины и производят уплотнение кругового зазора, образованного между производственной обсадной трубой третьей длины и производственной трубой.
27. Способ бурения и оснащения подземных скважин по п. 26, отличающийся тем, что углеводороды получают из подземной формации, пронизанной третьим буровым отверстием, на поверхности Земли через упомянутую производственную трубу.
28. Способ бурения и оснащения подземных скважин по п. 16, отличающийся тем, что подземная формация, пронизанная первым буровым отверстием, и подземная формация, пронизанная вторым буровым отверстием, одинаковые.
29. Способ бурения и оснащения подземных скважин по п. 16, отличающийся тем, что подземная формация, пронизанная первым буровым отверстием, отлична от подземной формации, пронизанной вторым буровым отверстием.
30. Способ бурения и оснащения подземных скважин по п. 12, отличающийся тем, что общее буровое отверстие выполнено вертикально.
31. Способ бурения и оснащения подземных скважин по п. 12, отличающийся тем, что общее буровое отверстие выполнено наклонным.
32. Способ бурения по меньшей мере двух подземных буровых отверстий из общего бурового отверстия, отличающийся тем, что располагают по меньшей мере два трубчатых звена в пределах упомянутого общего бурового отверстия, подвешенных из общей головной части, производят бурение первого подземного бурового отверстия через одно из трубчатых звеньев и в первую подземную формацию, а затем производят бурение второго подземного бурового отверстия через другое трубчатое звено и во вторую подземную формацию, при этом перед бурением первого и второго подземных буровых отверстий производят уплотнение соответствующего трубчатого звена от потока жидкой среды.
33. Способ по п. 32, отличающийся тем, что первая подземная формация и вторая подземная формация одинаковы.
34. Способ по п. 32, отличающийся тем, что первая подземная формация отлична от второй подземной формации.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US08/170,557 US5458199A (en) | 1992-08-28 | 1993-12-20 | Assembly and process for drilling and completing multiple wells |
US08/170,557 | 1993-12-20 | ||
PCT/US1994/010531 WO1995017580A1 (en) | 1993-12-20 | 1994-09-16 | Assembly and process for drilling and completing multiple wells |
Publications (2)
Publication Number | Publication Date |
---|---|
RU95122732A true RU95122732A (ru) | 1998-02-20 |
RU2107142C1 RU2107142C1 (ru) | 1998-03-20 |
Family
ID=22620340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU95122732A RU2107142C1 (ru) | 1993-12-20 | 1994-09-16 | Способ бурения и оснащения подземных скважин, сборка для раздельного бурения подземных скважин из общего бурового отверстия и сборка головной части скважин для осуществления способа |
Country Status (19)
Country | Link |
---|---|
US (1) | US5458199A (ru) |
EP (2) | EP0674744B1 (ru) |
JP (1) | JP2799522B2 (ru) |
CN (1) | CN1058547C (ru) |
AT (2) | ATE166426T1 (ru) |
AU (1) | AU675359B2 (ru) |
BR (1) | BR9405602A (ru) |
CA (1) | CA2152383C (ru) |
CO (1) | CO4370790A1 (ru) |
DE (2) | DE69410484T2 (ru) |
DK (2) | DK0735236T3 (ru) |
DZ (1) | DZ1832A1 (ru) |
EG (1) | EG20652A (ru) |
ES (2) | ES2116805T3 (ru) |
NO (1) | NO309623B1 (ru) |
NZ (1) | NZ273847A (ru) |
RU (1) | RU2107142C1 (ru) |
TN (1) | TNSN94134A1 (ru) |
WO (1) | WO1995017580A1 (ru) |
Families Citing this family (68)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5803176A (en) | 1996-01-24 | 1998-09-08 | Weatherford/Lamb, Inc. | Sidetracking operations |
US5560435A (en) * | 1995-04-11 | 1996-10-01 | Abb Vecto Gray Inc. | Method and apparatus for drilling multiple offshore wells from within a single conductor string |
US5865260A (en) * | 1995-09-01 | 1999-02-02 | Chevron U.S.A. Inc. | Method and apparatus for drilling multiple wells from a platform |
AU6905196A (en) * | 1995-09-01 | 1997-03-27 | Chevron U.S.A. Inc. | Method and apparatus for drilling multiple wells from a low load platform |
US5941308A (en) * | 1996-01-26 | 1999-08-24 | Schlumberger Technology Corporation | Flow segregator for multi-drain well completion |
US5944107A (en) | 1996-03-11 | 1999-08-31 | Schlumberger Technology Corporation | Method and apparatus for establishing branch wells at a node of a parent well |
US6056059A (en) * | 1996-03-11 | 2000-05-02 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US6732801B2 (en) | 1996-03-11 | 2004-05-11 | Schlumberger Technology Corporation | Apparatus and method for completing a junction of plural wellbores |
US6283216B1 (en) | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US5775420A (en) * | 1996-03-18 | 1998-07-07 | Mitchell; Morton Lindsay | Dual string assembly for gas wells |
US5862862A (en) | 1996-07-15 | 1999-01-26 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
CA2209958A1 (en) | 1996-07-15 | 1998-01-15 | James M. Barker | Apparatus for completing a subterranean well and associated methods of using same |
NO313763B1 (no) | 1996-07-15 | 2002-11-25 | Halliburton Energy Serv Inc | Fremgangsmåte ved reetablering av adgang til en brönnboring og styredel til bruk ved tildannelse av en åpning i en brönnfôring |
CA2210563C (en) | 1996-07-15 | 2004-03-02 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
US5833003A (en) | 1996-07-15 | 1998-11-10 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
AU719919B2 (en) | 1996-07-15 | 2000-05-18 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
US5730221A (en) | 1996-07-15 | 1998-03-24 | Halliburton Energy Services, Inc | Methods of completing a subterranean well |
AU714721B2 (en) | 1996-07-15 | 2000-01-06 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
US5813465A (en) | 1996-07-15 | 1998-09-29 | Halliburton Energy Services, Inc. | Apparatus for completing a subterranean well and associated methods of using same |
US6142235A (en) * | 1996-12-05 | 2000-11-07 | Abb Vetco Gray Inc. | Bottom-supported guidance device for alignment of multiple wellbores in a single conductor |
US5810086A (en) * | 1996-12-05 | 1998-09-22 | Abb Vetco Gray Inc. | Single riser with two wellheads |
US5918675A (en) * | 1996-12-05 | 1999-07-06 | Abb Vetco Gray Inc. | Close proximity wellheads |
US5813468A (en) * | 1996-12-26 | 1998-09-29 | Abb Vetco Gray Inc. | Dual casing hanger |
US6079493A (en) * | 1997-02-13 | 2000-06-27 | Halliburton Energy Services, Inc. | Methods of completing a subterranean well and associated apparatus |
US6012529A (en) * | 1998-06-22 | 2000-01-11 | Mikolajczyk; Raymond F. | Downhole guide member for multiple casing strings |
US6182760B1 (en) | 1998-07-20 | 2001-02-06 | Union Oil Company Of California | Supplementary borehole drilling |
CA2244451C (en) * | 1998-07-31 | 2002-01-15 | Dresser Industries, Inc. | Multiple string completion apparatus and method |
US6209648B1 (en) | 1998-11-19 | 2001-04-03 | Schlumberger Technology Corporation | Method and apparatus for connecting a lateral branch liner to a main well bore |
US6615920B1 (en) * | 2000-03-17 | 2003-09-09 | Marathon Oil Company | Template and system of templates for drilling and completing offset well bores |
US6318458B1 (en) * | 2000-03-31 | 2001-11-20 | Robert W. Rainey | Water-well-head adaptor |
US6543553B2 (en) | 2001-01-29 | 2003-04-08 | Chevron Nigeria Limited | Apparatus for use in drilling oil and gas production wells or water injection wells |
WO2003004830A1 (en) * | 2001-07-03 | 2003-01-16 | Fmc Technologies, Inc. | High pressure side-by-side wellhead system |
WO2003021076A1 (en) * | 2001-08-29 | 2003-03-13 | Fmc Technologies, Inc. | Drilling alignment system |
US7066267B2 (en) * | 2003-08-26 | 2006-06-27 | Dril-Quip, Inc. | Downhole tubular splitter assembly and method |
US8056619B2 (en) | 2006-03-30 | 2011-11-15 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US7793718B2 (en) | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US7712524B2 (en) * | 2006-03-30 | 2010-05-11 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US7735555B2 (en) * | 2006-03-30 | 2010-06-15 | Schlumberger Technology Corporation | Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly |
US20100193186A1 (en) * | 2009-02-03 | 2010-08-05 | Smith David R | Method and apparatus to construct and log a well |
MX2012000805A (es) * | 2009-07-23 | 2012-02-28 | Bp Corp North America Inc | Sistema de perforacion costa afuera. |
US8839850B2 (en) * | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
GB2498130B (en) * | 2010-10-27 | 2018-10-03 | Shell Int Research | Downhole multiple well |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
RU2488687C1 (ru) * | 2012-02-13 | 2013-07-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ одновременно-раздельной эксплуатации нагнетательной скважины |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
RU2530003C1 (ru) * | 2013-06-24 | 2014-10-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ ликвидации скважины |
EP2994596B1 (en) * | 2013-07-25 | 2018-10-10 | Halliburton Energy Services, Inc. | Expandable and variable-length bullnose assembly for use with a wellbore deflector assembly |
SG11201510102VA (en) * | 2013-07-25 | 2016-01-28 | Halliburton Energy Services Inc | Adjustable bullnose assembly for use with a wellbore deflector assembly |
MX367802B (es) * | 2013-07-25 | 2019-09-06 | Halliburton Energy Services Inc | Ensamblaje expandible de boquilla guía para uso con un deflector de pozo. |
AU2013394892B2 (en) * | 2013-07-25 | 2016-08-18 | Halliburton Energy Services, Inc. | Expandable bullnose assembly for use with a wellbore deflector |
US20160208586A1 (en) * | 2013-08-07 | 2016-07-21 | Schlumberger Technology Corporation | System and methodology for running casing strings through a conductor tube |
RU2534309C1 (ru) * | 2013-08-13 | 2014-11-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ ликвидации скважины |
RU2541007C1 (ru) * | 2014-01-21 | 2015-02-10 | Открытое акционерное общество "Севернефтегазпром" | Способ герметизации резьбового соединения муфта кондуктора-монтажный патрубок колонной головки на скважине без вывода в капитальный ремонт |
GB2541306B (en) * | 2014-05-29 | 2020-10-21 | Halliburton Energy Services Inc | Forming multilateral wells |
US9670732B1 (en) * | 2016-01-14 | 2017-06-06 | Chevron U.S.A. Inc. | Batch drilling using multiple mudline closure devices |
US9670733B1 (en) * | 2016-01-21 | 2017-06-06 | Ge Oil & Gas Pressure Control Lp | Subsea multibore drilling and completion system |
RU2626491C1 (ru) * | 2016-05-11 | 2017-07-28 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Российский государственный университет нефти и газа (национальный исследовательский университет) имени И.М. Губкина" | Способ разработки многопластовых нефтяных залежей с гидродинамически связанными пластами |
RU2678745C1 (ru) * | 2017-12-28 | 2019-01-31 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Способ эксплуатации нагнетательной скважины малого диаметра с однолифтовой двухпакерной компоновкой |
CN108533206B (zh) * | 2018-05-14 | 2023-07-07 | 中国石油天然气集团有限公司 | 双级套管头 |
US11111749B2 (en) * | 2019-05-14 | 2021-09-07 | Saudi Arabian Oil Company | Correcting offsets in wellbore tubulars |
US11053781B2 (en) | 2019-06-12 | 2021-07-06 | Saudi Arabian Oil Company | Laser array drilling tool and related methods |
RU2720727C1 (ru) * | 2019-10-22 | 2020-05-13 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Способ определения герметичности скважинного оборудования для одновременно-раздельной эксплуатации |
US11319756B2 (en) | 2020-08-19 | 2022-05-03 | Saudi Arabian Oil Company | Hybrid reamer and stabilizer |
US12188323B2 (en) | 2022-12-05 | 2025-01-07 | Saudi Arabian Oil Company | Controlling a subsea blowout preventer stack |
Family Cites Families (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1900163A (en) * | 1931-05-02 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US1900164A (en) * | 1932-07-05 | 1933-03-07 | Dana Drexler | Method and apparatus for drilling oil wells |
US2492079A (en) * | 1943-12-09 | 1949-12-20 | Eastman Oil Well Survey Co | Apparatus for completing wells |
US2794505A (en) * | 1955-11-04 | 1957-06-04 | Cameron Iron Works Inc | Pipe hanging apparatus |
US3050120A (en) * | 1955-11-25 | 1962-08-21 | Pan American Petroleum Corp | Method and apparatus for completing wells |
US3052301A (en) * | 1957-05-15 | 1962-09-04 | Gray Tool Co | Multiple tubing string well completion equipment |
US3011552A (en) * | 1957-09-26 | 1961-12-05 | Mcevoy Co | Apparatus for setting pipes in tension |
US3118502A (en) * | 1960-02-24 | 1964-01-21 | Cicero C Brown | Well completion apparatus |
US3223168A (en) * | 1960-03-28 | 1965-12-14 | Gulf Oil Corp | Well head apparatus |
US3100529A (en) * | 1960-06-06 | 1963-08-13 | Jersey Prod Res Co | Apparatus for positioning well pipe |
US3269755A (en) * | 1961-01-24 | 1966-08-30 | Fmc Corp | Well installation |
US3330355A (en) * | 1963-10-03 | 1967-07-11 | Fmc Corp | Method for installing a well |
US3653435A (en) * | 1970-08-14 | 1972-04-04 | Exxon Production Research Co | Multi-string tubingless completion technique |
US3770053A (en) * | 1971-12-14 | 1973-11-06 | Fmc Corp | Ocean bottom well tubing valve installation |
US3848669A (en) * | 1972-11-29 | 1974-11-19 | C Brown | Well control apparatus |
US4044830A (en) * | 1973-07-02 | 1977-08-30 | Huisen Allen T Van | Multiple-completion geothermal energy production systems |
US3875999A (en) * | 1974-07-15 | 1975-04-08 | John E Liberg | Well capping assembly |
US4068729A (en) * | 1976-06-14 | 1978-01-17 | Standard Oil Company (Indiana) | Apparatus for multiple wells through a single caisson |
US4444276A (en) * | 1980-11-24 | 1984-04-24 | Cities Service Company | Underground radial pipe network |
US4396075A (en) * | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch completion with common drilling and casing template |
US4415205A (en) * | 1981-07-10 | 1983-11-15 | Rehm William A | Triple branch completion with separate drilling and completion templates |
FR2551491B1 (fr) * | 1983-08-31 | 1986-02-28 | Elf Aquitaine | Dispositif de forage et de mise en production petroliere multidrains |
US4749046A (en) * | 1986-05-28 | 1988-06-07 | Otis Engineering Corporation | Well drilling and completion apparatus |
US4832381A (en) * | 1987-09-09 | 1989-05-23 | Cameron Iron Works Usa, Inc. | Seal |
US4822212A (en) * | 1987-10-28 | 1989-04-18 | Amoco Corporation | Subsea template and method for using the same |
-
1993
- 1993-12-20 US US08/170,557 patent/US5458199A/en not_active Expired - Lifetime
-
1994
- 1994-09-15 CO CO94041746A patent/CO4370790A1/es unknown
- 1994-09-16 CN CN94190746A patent/CN1058547C/zh not_active Expired - Lifetime
- 1994-09-16 AU AU77307/94A patent/AU675359B2/en not_active Expired
- 1994-09-16 DE DE69410484T patent/DE69410484T2/de not_active Expired - Fee Related
- 1994-09-16 DK DK96200898T patent/DK0735236T3/da active
- 1994-09-16 DE DE69400907T patent/DE69400907T2/de not_active Expired - Fee Related
- 1994-09-16 AT AT96200898T patent/ATE166426T1/de not_active IP Right Cessation
- 1994-09-16 JP JP7515592A patent/JP2799522B2/ja not_active Expired - Lifetime
- 1994-09-16 AT AT94928156T patent/ATE145263T1/de not_active IP Right Cessation
- 1994-09-16 EP EP94928156A patent/EP0674744B1/en not_active Expired - Lifetime
- 1994-09-16 BR BR9405602-1A patent/BR9405602A/pt not_active IP Right Cessation
- 1994-09-16 DK DK94928156.2T patent/DK0674744T3/da active
- 1994-09-16 CA CA002152383A patent/CA2152383C/en not_active Expired - Fee Related
- 1994-09-16 NZ NZ273847A patent/NZ273847A/en unknown
- 1994-09-16 RU RU95122732A patent/RU2107142C1/ru active IP Right Revival
- 1994-09-16 ES ES96200898T patent/ES2116805T3/es not_active Expired - Lifetime
- 1994-09-16 ES ES94928156T patent/ES2094662T3/es not_active Expired - Lifetime
- 1994-09-16 WO PCT/US1994/010531 patent/WO1995017580A1/en active IP Right Grant
- 1994-09-16 EP EP96200898A patent/EP0735236B1/en not_active Expired - Lifetime
- 1994-11-22 EG EG73994A patent/EG20652A/xx active
- 1994-12-07 DZ DZ940129A patent/DZ1832A1/fr active
- 1994-12-20 TN TNTNSN94134A patent/TNSN94134A1/fr unknown
-
1995
- 1995-05-19 NO NO951991A patent/NO309623B1/no unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU95122732A (ru) | Сборка для бурения и оснащения скважин и способ ее осуществления | |
RU2107142C1 (ru) | Способ бурения и оснащения подземных скважин, сборка для раздельного бурения подземных скважин из общего бурового отверстия и сборка головной части скважин для осуществления способа | |
RU2135732C1 (ru) | Подземная скважинная система (варианты) | |
DE60016829T2 (de) | Verbesserungen im Bezug auf das Unterwasserbohren von Bohrlöchern | |
US5662170A (en) | Method of drilling and completing wells | |
US4396075A (en) | Multiple branch completion with common drilling and casing template | |
US5226495A (en) | Fines control in deviated wells | |
CA2299398A1 (en) | Assembly and process for drilling and completing multiple wells | |
RU97117174A (ru) | Устройства и способы для бурения и оснащения скважин | |
RU98109950A (ru) | Сборка и способ для бурения и оснащения множества скважин | |
CA2233093A1 (en) | Assembly and process for drilling and completing multiple wells | |
ZA200403036B (en) | An entry well with slanted well bores and method. | |
CA2155918A1 (en) | Integrated well drilling and evaluation | |
EA200101263A1 (ru) | Способ создания ствола скважины | |
NO874597L (no) | Fremgangsmaate ved klargjoering av broenn med dreneringshull. | |
NO316526B1 (no) | Deformert brønnramme for flere brønner samt fremgangsmåte for dens bruk | |
RU2007148901A (ru) | Система буровых скважин с полостью | |
NO317126B1 (no) | Fremgangsmate til injeksjon av boreavfall i en bronn under boring | |
NO313465B1 (no) | Fremgangsmåte og anordning for boring av en fralands- undervannsbrönn | |
NO174521B (no) | Fremgangsmaate ved boring av et borehull | |
NO300340B1 (no) | Verktöy og fremgangsmåte for fjerning av sandbroer | |
RU2074944C1 (ru) | Способ проведения и крепления многозабойной скважины | |
CN218716697U (zh) | 一种侧钻水平井卡漏防砂再生产管柱 | |
SU1105651A1 (ru) | Способ скважинной гидродобычи мерзлых раздельно-зернистых пород и устройство дл его осуществлени | |
SU1701924A1 (ru) | Способ установки колонны труб в горную выработку |