[go: up one dir, main page]

RU2439238C1 - Method to speed up freezing of bases for ice roads - Google Patents

Method to speed up freezing of bases for ice roads Download PDF

Info

Publication number
RU2439238C1
RU2439238C1 RU2010131153/03A RU2010131153A RU2439238C1 RU 2439238 C1 RU2439238 C1 RU 2439238C1 RU 2010131153/03 A RU2010131153/03 A RU 2010131153/03A RU 2010131153 A RU2010131153 A RU 2010131153A RU 2439238 C1 RU2439238 C1 RU 2439238C1
Authority
RU
Russia
Prior art keywords
freezing
base
bases
winter
depth
Prior art date
Application number
RU2010131153/03A
Other languages
Russian (ru)
Inventor
Шахбуба Магомедкеримович Мерданов (RU)
Шахбуба Магомедкеримович Мерданов
Александр Александрович Иванов (RU)
Александр Александрович Иванов
Николай Николаевич Карнаухов (RU)
Николай Николаевич Карнаухов
Николай Иванович Смолин (RU)
Николай Иванович Смолин
Александр Ананьевич Иванов (RU)
Александр Ананьевич Иванов
Алексей Федорович Шакмаков (RU)
Алексей Федорович Шакмаков
Муминат Раджабовна Мерданова (RU)
Муминат Раджабовна Мерданова
Original Assignee
Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" filed Critical Государственное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет"
Priority to RU2010131153/03A priority Critical patent/RU2439238C1/en
Application granted granted Critical
Publication of RU2439238C1 publication Critical patent/RU2439238C1/en

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

FIELD: construction. ^ SUBSTANCE: method includes cleaning of marsh surface that has previously frozen at the depth of more than 10 cm from snow, kneading to squeeze out air bubbles and two adjacent strips for drilling of holes, water intake through drilled holes, distribution of this water along the entire surface of cleaned and kneaded base for an ice road. ^ EFFECT: increased bearing capacity of the base for an ice road. ^ 2 dwg

Description

Изобретение относится к средствам для ускорения подготовки основания при возведении зимних автодорог, а именно к средствам для ускорения процесса промораживания в глубину до необходимых пределов предварительно промороженных болотных поверхностей на недостаточную глубину.The invention relates to means for accelerating the preparation of the base during the construction of winter roads, and in particular to means for accelerating the freezing process in depth to the necessary limits of previously frozen wetland surfaces to an insufficient depth.

Известен способ для подготовки оснований под автозимники на заболоченных участках (RU №2349702 C1, E01C 19/29, опубл. 20.03.2009), согласно которому разминка осуществляется по принципу прокалывания заостренной рабочей поверхностью шпор подмороженной болотной поверхности под воздействием вибропривода, установленного внутри барабана со шпорами.There is a method for preparing bases for winters in wetlands (RU No. 2349702 C1, E01C 19/29, published March 20, 2009), according to which the warm-up is carried out on the principle of piercing the spurs of a frosty marsh surface with a pointed working surface under the influence of a vibration drive installed inside the drum with spurs.

Недостатком указанного способа является низкая эффективность процесса разминки по причине того, что острые рабочие поверхности шпор, в основном, работают по принципу прокалывания и совсем незначительно обеспечивают разламывание (разминку) подмороженной монолитной поверхности. Кроме того, этот способ имеет низкую надежность, вплоть до полного прекращения процесса разминки предварительно промороженной болотной поверхности глубиной более 8 см.The disadvantage of this method is the low efficiency of the warm-up process due to the fact that the sharp working surfaces of the spurs mainly work on the principle of piercing and very little provide breaking (warm-up) of the frosted monolithic surface. In addition, this method has low reliability, up to a complete cessation of the process of warming up a pre-frozen swamp surface with a depth of more than 8 cm.

Задачей, на решение которой направлено заявляемое техническое решение, является создание условий, обеспечивающих достижение технического результата, - увеличение несущей способности основания путем ускорения процесса промораживания вглубь до необходимых значений болотных поверхностей под основание автозимника при условии их предварительного промерзания глубиной более 10 см.The task to which the claimed technical solution is directed is to create conditions that ensure the achievement of a technical result, namely, increase the bearing capacity of the base by accelerating the freezing process inland to the required values of wetland surfaces under the base of the carriage, provided that they freeze more than 10 cm deep.

Указанный технический результат достигается тем, что в соответствии с заявляемым способом ускорения промораживания оснований автозимников предварительно промерзшая на глубину более 10 см болотная поверхность, подлежащая к подготовке для ускоренного промораживания на необходимую глубину, включает предварительную очистку, проминку основания под автозимник с выдавливанием воздушных пузырьков и двух смежных полос, в которых сверлят отверстия, забор через пробуренные отверстия воды с торфяными примесями из болотного массива, распределение этой воды по всей поверхности очищенного и промятого основания под автозимник.The specified technical result is achieved by the fact that in accordance with the claimed method of accelerating the freezing of the bases of winter winters, the wetland surface that is previously frozen to a depth of more than 10 cm, which is to be prepared for accelerated freezing to the required depth, includes preliminary cleaning, a base stain under the winter winder with squeezing air bubbles and two adjacent strips in which holes are drilled, a fence through drilled water holes with peat impurities from the swamp massif, the distribution This water is spread over the entire surface of the cleaned and washed base under the carriage.

Наличие новых операций - сверление отверстий, забор через пробуренные отверстия воды с торфяными примесями из болотного массива, распределение этой воды по всей поверхности, очищенной и промятой под основание автозимника, обеспечивает ускорение процесса теплообмена в восемь и более раз и тем самым сокращает сроки промораживания в таком же соотношении.The presence of new operations — drilling holes, taking water through pedestrian impurities from the swamp massif through drilled holes, distributing this water over the entire surface, cleaned and washed under the base of the winder — accelerates the heat exchange process by eight or more times and thereby reduces the freezing time in such same ratio.

Изобретение поясняется чертежами, где на фиг.1 изображена схема пробуренных отверстий; на фиг.2 - схема нагнетания и распределения воды по поверхности основания автозимника.The invention is illustrated by drawings, where figure 1 shows a diagram of drilled holes; figure 2 is a diagram of the injection and distribution of water on the surface of the base of the winding.

Глубина промораживания оснований автозимников 10 см является недостаточной для осуществления прохождения транспортных средств, как правило, большегрузных. Поэтому необходимо обеспечить более глубокую проморозку основания для увеличения несущей способности.A depth of freezing of the bases of car winters of 10 cm is insufficient for the passage of vehicles, as a rule, of heavy vehicles. Therefore, it is necessary to provide deeper freezing of the base to increase the bearing capacity.

Способ ускорения промораживания оснований автозимников (фиг.1 и фиг.2) в условиях предварительного промерзания болотной поверхности 1 глубиной более 10 см включает следующие основные технологические операции: очистку промерзшей поверхности 2 оснований под автозимник и двух смежных правой и левой полос для работы агрегатов с буром 3; проминку болотной поверхности 1 под автозимник пневмокатком с выдавливанием воздушных пузырьков; сверление отверстий 4 буром 3 на смежных полосах по краю, расположенному к основанию; забор через пробуренные отверстия 4 воды насосом 5 из нижней части 6 непромерзшего болотного массива 7. Насос 5 для забора воды не должен касаться минеральной поверхности дна 8 болота. Вода по поверхности 2 оснований под автозимник распределяется в форме слоев 9, например, с помощью шланга 10 и тележки 11.The method of accelerating the freezing of the bases of winter winters (Fig. 1 and Fig. 2) in the conditions of preliminary freezing of the marsh surface 1 with a depth of more than 10 cm includes the following main technological operations: cleaning the frozen surface of 2 bases under the winter winder and two adjacent right and left strips for operating units with a drill 3; the swamp of the marsh surface 1 under the winder with a pneumatic skating rink with squeezing out air bubbles; drilling holes 4 with a drill 3 on adjacent strips along an edge located to the base; the intake through the drilled holes 4 of the water by the pump 5 from the lower part 6 of the unfrozen swamp massif 7. The pump 5 for water intake must not touch the mineral surface of the bottom 8 of the swamp. Water on the surface 2 of the bases under the winder is distributed in the form of layers 9, for example, using a hose 10 and a trolley 11.

Рабочий процесс по предлагаемому способу ускорения промораживания оснований автозимников осуществляется следующим образом. Для ускорения процесса промораживания в глубину до необходимых значений предварительно промерзшей болотной поверхности 1 слоем толщиной более 10 см после определенного времени их пребывания, как правило, под снегом при отрицательных температурах окружающего воздуха, болотную поверхность под основание автозимника и две смежные полосы очищают от снега, например, посредством бульдозера с подметальной щеткой. Далее проводят проминку поверхности 2 основания под автозимник, например, пневмокатком с выдавливанием воздушных пузырьков. Затем осуществляют сверление отверстий 4 буром 3 (фиг.1 и фиг.2) смежных полос и дальнейший забор через пробуренные отверстия 4 воды насосом 5 из нижней части 6 не промерзшего болотного массива 7. Насос 5 для забора воды не должен касаться минеральной поверхности дна 8 болота. Вода по поверхности 2 (фиг.1 и фиг.2) оснований под автозимник распределяется в форме слоев 9 с помощью шланга 10 и тележки 11.The workflow on the proposed method of accelerating the freezing of the bases of winters is as follows. To accelerate the process of freezing in depth to the required values of a previously frozen marsh surface 1 layer with a thickness of more than 10 cm after a certain time of their stay, as a rule, under snow at negative ambient temperatures, the marsh surface under the base of the winder and two adjacent strips are cleared of snow, for example , using a bulldozer with a sweeping brush. Next, the surface of the base 2 under the winder is blotted, for example, with a pneumatic skating rink with squeezing air bubbles. Then, holes 4 are drilled with a drill 3 (FIG. 1 and FIG. 2) of adjacent strips and then taken through the drilled holes 4 with a pump 5 from the bottom 6 of the unfrozen swamp massif 7. The pump 5 for water intake must not touch the mineral surface of the bottom 8 swamps. Water on the surface 2 (FIG. 1 and FIG. 2) of the bases under the winder is distributed in the form of layers 9 using a hose 10 and a trolley 11.

Применение предлагаемого способа ускорения промораживания оснований автозимников позволяет:The application of the proposed method of accelerating the freezing of the bases of winter winters allows you to:

- значительно сократить продолжительность процесса промораживания на необходимую глубину;- significantly reduce the duration of the freezing process to the required depth;

- повысить эффективность и надежность процесса промораживания предварительно промерзшей болотной поверхности слоем толщиной более 10 см;- to increase the efficiency and reliability of the process of freezing previously frozen swamp surface with a layer more than 10 cm thick;

- сократить продолжительность процесса подготовки оснований автозимников для ускорения промораживания.- reduce the duration of the process of preparation of the bases of winter winters to accelerate freezing.

Claims (1)

Способ ускорения промораживания оснований автозимников, включающий расчистку основания под автозимник при условии его предварительного промерзания на глубину более 10 см и полос, примыкающих к основанию автозимника, последующую проминку расчищенной поверхности, отличающийся тем, что на расчищенных полосах, примыкающих к основанию автозимника, производят сверление отверстий, через которые осуществляют забор воды из нижних слоев непромерзшего болотного массива и ее распределение по поверхности расчищенного и промятого основания под автозимник. A method of accelerating the freezing of the bases of winter winters, including clearing the base under the winter conditions provided that it is previously frozen to a depth of more than 10 cm and the strips adjacent to the base of the winter winder, followed by a dimming of the cleared surface, characterized in that the holes are drilled on the strips adjacent to the base of the winter winder. through which water is taken from the lower layers of the unfrozen swamp massif and its distribution over the surface of the cleaned and washed base under a win-win.
RU2010131153/03A 2010-07-26 2010-07-26 Method to speed up freezing of bases for ice roads RU2439238C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010131153/03A RU2439238C1 (en) 2010-07-26 2010-07-26 Method to speed up freezing of bases for ice roads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010131153/03A RU2439238C1 (en) 2010-07-26 2010-07-26 Method to speed up freezing of bases for ice roads

Publications (1)

Publication Number Publication Date
RU2439238C1 true RU2439238C1 (en) 2012-01-10

Family

ID=45784073

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010131153/03A RU2439238C1 (en) 2010-07-26 2010-07-26 Method to speed up freezing of bases for ice roads

Country Status (1)

Country Link
RU (1) RU2439238C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2488657C1 (en) * 2012-01-31 2013-07-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Method to control heat insulation of swamp beds of ice roads before flattening

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2488657C1 (en) * 2012-01-31 2013-07-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Method to control heat insulation of swamp beds of ice roads before flattening

Similar Documents

Publication Publication Date Title
CN102828464A (en) Cement concrete pavement Y-shaped joint cutting device and cut joint filling and sealing process
RU2439238C1 (en) Method to speed up freezing of bases for ice roads
CN204690667U (en) Ultrasonic wave road surface ice removing machine
CN107701232A (en) Urban construction auxiliary construction device
CN108716208B (en) Plasma snow melting vehicle
CN203701026U (en) Trolley type automatic snow removing and ice crushing machine for road
CN201272956Y (en) Snow and ice removing apparatus of railway snow and ice cleaning vehicle
CN204401542U (en) A kind of device utilizing microwave to remove flexible pavement ice and snow
CN202430677U (en) Railway icebreaking snow plow
CN202080737U (en) Frozen coal gang drill loosening machine
CN107804433A (en) Ice working ship is dug in a kind of navigation channel
CN204023482U (en) A kind of new road deicing snow clearer
CN106087686A (en) A kind of bituminous concrete cutting equipment
CN201891102U (en) Railway sweeping vehicle
CN204224971U (en) Avenue worn pavement retreading machine
CN204151755U (en) A kind of can the view oil pressured flap gate of automatic pollutant removal
CN209652855U (en) A kind of overline bridge step sweeps away snow deicer
CN201896304U (en) Efficient railway sweeper
CN202247776U (en) Pavement deicer
CN102535381A (en) Vibration cutting deicing device
CN2483223Y (en) Amphibious excavator
JP2009035999A (en) Construction method for snow and ice melting road surface
RU2488657C1 (en) Method to control heat insulation of swamp beds of ice roads before flattening
CN100396853C (en) Ice and snow melting device
CN204455973U (en) A kind of band opens ice and the deicing vehicle of trash ice gathering-device

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20130727