KR20130042428A - 자수 디자인 생산 관리 장치 및 방법 - Google Patents
자수 디자인 생산 관리 장치 및 방법 Download PDFInfo
- Publication number
- KR20130042428A KR20130042428A KR20120039897A KR20120039897A KR20130042428A KR 20130042428 A KR20130042428 A KR 20130042428A KR 20120039897 A KR20120039897 A KR 20120039897A KR 20120039897 A KR20120039897 A KR 20120039897A KR 20130042428 A KR20130042428 A KR 20130042428A
- Authority
- KR
- South Korea
- Prior art keywords
- embroidery
- machine
- design
- information
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- D—TEXTILES; PAPER
- D05—SEWING; EMBROIDERING; TUFTING
- D05C—EMBROIDERING; TUFTING
- D05C5/00—Embroidering machines with arrangements for automatic control of a series of individual steps
-
- D—TEXTILES; PAPER
- D05—SEWING; EMBROIDERING; TUFTING
- D05B—SEWING
- D05B19/00—Programme-controlled sewing machines
- D05B19/02—Sewing machines having electronic memory or microprocessor control unit
- D05B19/12—Sewing machines having electronic memory or microprocessor control unit characterised by control of operation of machine
-
- D—TEXTILES; PAPER
- D05—SEWING; EMBROIDERING; TUFTING
- D05C—EMBROIDERING; TUFTING
- D05C5/00—Embroidering machines with arrangements for automatic control of a series of individual steps
- D05C5/02—Embroidering machines with arrangements for automatic control of a series of individual steps by electrical or magnetic control devices
-
- D—TEXTILES; PAPER
- D05—SEWING; EMBROIDERING; TUFTING
- D05C—EMBROIDERING; TUFTING
- D05C5/00—Embroidering machines with arrangements for automatic control of a series of individual steps
- D05C5/04—Embroidering machines with arrangements for automatic control of a series of individual steps by input of recorded information, e.g. on perforated tape
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Textile Engineering (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Computer Hardware Design (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Sewing Machines And Sewing (AREA)
- General Factory Administration (AREA)
Abstract
Description
도 2는 본 발명의 일 실시예에 따른 자수 디자인 생산 관리 장치를 나타낸 블록도이다.
도 3은 본 발명의 일 실시예와 관련되어 주문 정보의 출력 화면을 나타낸 도면이다.
도 4는 본 발명의 일 실시예와 관련되어 자수 디자인 분석 결과의 출력 화면을 나타낸 도면이다.
도 5는 본 발명의 일 실시예와 관련되어 공정 시뮬레이션을 준비하는 출력 화면을 나타낸 도면이다.
도 6은 본 발명의 일 실시예와 관련되어 공정 시뮬레이션 결과의 출력 화면을 나타낸 도면이다.
도 7은 본 발명의 일 실시예와 관련되어 손익예상 및 견적단가 분석의 출력 화면을 나타낸 도면이다.
도 8은 본 발명의 일 실시예와 관련되어 작업 현황 모니터링 결과의 출력 화면을 나타낸 도면이다.
도 9는 본 발명의 일 실시예와 관련되어 작업 일정 관리를 위한 출력 화면을 나타낸 도면이다.
도 10은 본 발명의 일 실시예와 관련되어 생산성 비교 분석 결과의 출력 화면을 나타낸 도면이다.
도 11은 본 발명의 일 실시예와 관련되어 자수 기계의 비정상 상태를 해소하기 위해 제공되는 문자 데이터를 나타낸 도면이다.
도 12는 본 발명의 일 실시예와 관련되어 자수 기계의 비정상 상태를 해소하기 위해 제공되는 멀티미디어 데이터를 나타낸 도면이다.
도 13은 본 발명의 일 실시예와 관련되어 자수 기계의 비정상 상태를 해소하기 위해 제공되는 애프터서비스 요청 결과의 출력 화면을 나타낸 도면이다.
도 14는 본 발명의 일 실시예에 따른 자수 디자인 생산 관리 방법을 나타낸 순서도이다.
도 15는 도 14에 도시된 장애 조치 방법을 나타낸 순서도이다.
도 16은 본 발명의 일 실시예와 관련되어 한 헤드당 작업 가능한 디자인 판 수를 나타낸 도면이다.
120: 인터페이스 모듈 130: 입출력 모듈
140: 데이터 저장 모듈 150: 디자인 분석 모듈
160: 생산성 예측 모듈 170: 공정 처리 모듈
180: 생산 관리 모듈 190: 장애 조치 모듈
1000: 자수 디자인 생산 관리 시스템
Claims (26)
- 복수의 자수 기계와 연결되는 자수 디자인 생산 관리 장치로서,
네트워크를 통해 발주자 및 적어도 하나 이상의 생산자를 연결하는 인터페이스 모듈과,
상기 발주자로부터 자수 디자인을 포함하는 주문 정보와 상기 생산자로부터 생산자 설정값을 입력받고, 상기 자수 디자인 생산을 위한 처리 정보를 출력하는 입출력 모듈과,
상기 입출력 모듈을 통해 입출력되는 정보를 저장하는 데이터 저장 모듈과,
상기 자수 디자인을 이용하여 디자인 정보 및 스티치 정보를 도출하는 디자인 분석 모듈 및
상기 디자인 정보, 상기 스티치 정보와 상기 생산자 설정값에 기초하여 상기 복수의 자수 기계 중 가용 자수 기계를 검색 및 분류하고, 분류된 가용 자수 기계에 대한 기계별 생산성 및 가용 자수 기계의 조합으로 이루어지는 복수의 공정 라인에 대한 공정별 생산성을 산출하여 상기 주문 정보에 대한 수주 가능 여부를 확인하기 위한 납기 일정을 예측하는 생산성 예측 모듈
을 포함하는 자수 디자인 생산 관리 장치. - 제1항에 있어서,
상기 가용 자수 기계에 상기 자수 디자인 생산을 개시하기 위한 작업 명령을 전송하는 공정 처리 모듈을 더 포함하는 자수 디자인 생산 관리 장치. - 제2항에 있어서,
상기 자수 디자인 생산에 대한 작업 현황을 실시간으로 모니터링하며, 상기 자수 디자인 생산에 대한 작업 일정을 관리하고, 상기 예측된 납기 일정을 실제 작업 일정과 비교 분석하는 생산 관리 모듈을 더 포함하는 자수 디자인 생산 관리 장치. - 제3항에 있어서,
상기 가용 자수 기계로부터 기계 상태 정보를 수신하는 장애 조치 모듈을 더 포함하고, 상기 기계 상태 정보는 상기 가용 자수 기계가 비정상 상태임을 나타내는 비정상 상태 메시지를 포함할 수 있는 자수 디자인 생산 관리 장치. - 제4항에 있어서,
상기 장애 조치 모듈은 상기 비정상 상태 메시지에 기초하여 상기 비정상 상태를 해소하기 위해 필요한 문자 데이터 및 멀티미디어 데이터 중 적어도 하나를 작업자에게 전송하는 자수 디자인 생산 관리 장치. - 제5항에 있어서,
상기 장애 조치 모듈은 상기 작업자의 요청에 의해 상기 생산자에게 애프터서비스 요청 메시지를 제공하는 자수 디자인 생산 관리 장치. - 제6항에 있어서,
상기 장애 조치 모듈은 상기 애프터서비스 요청 메시지에 대응하여 애프터서비스 제공 상태를 모니터링하는 자수 디자인 생산 관리 장치. - 제1항에 있어서,
상기 주문 정보에는 발주자 정보, 주문 물량 및 주문 일정이 포함되는 자수 디자인 생산 관리 장치. - 제1항에 있어서,
상기 생산자 설정값은 단사 발생 횟수, 단사 발생 시 손실 시간, 한 헤드 교체 시 손실 시간, 기타 손실 시간, 하루 작업 시간, 한 헤드 작업 범위, 디자인 간격, 디자인 마진, 필요 작업일 및 상기 가용 자수 기계의 수를 포함하는 자수 디자인 생산 관리 장치. - 제9항에 있어서,
상기 생산성 예측 모듈은 상기 기계별 생산성 및 공정별 생산성을 산출하기 위한 손실 시간, 작업 예측 시간 및 생산 판 수, 한 헤드당 작업 가능 디자인 판 수, 공정별 생산 물량, 기계별 필요 작업일, 공정별 필요 작업자 수를 산출할 수 있는 자수 디자인 생산 관리 장치. - 제1항에 있어서,
상기 디자인 정보는 상기 자수 디자인에 대한 디자인 총 침수, 윗실 총 침수 길이, 보빈 교체 횟수, 디자인 사이즈를 포함하고, 상기 스티치 정보는 상기 자수 디자인에 대한 스티치 폭을 포함하는 자수 디자인 생산 관리 장치. - 제1항에 있어서,
상기 생산성 예측 모듈은 상기 복수의 공정 라인 중 주 공정에 필요한 작업일을 산출하고, 손익예상 및 견적단가의 산출을 수행할 수 있는 자수 디자인 생산 관리 장치. - 네트워크를 통해 발주자로부터 자수 디자인을 포함하는 주문 정보 및 생산자로부터 생산자 설정값을 입력받는 단계와,
상기 자수 디자인을 분석하는 단계와,
상기 자수 디자인의 분석 결과 및 상기 생산자 설정값에 따라 상기 네트워크 상에 연결된 복수의 자수 기계 중 가용 자수 기계를 검색 및 분류하는 단계와,
상기 가용 자수 기계에 대한 기계별 생산성 및 상기 가용 자수 기계의 조합으로 이루어지는 복수의 공정 라인에 대한 공정별 생산성을 산출하는 단계와,
상기 기계별 생산성 및 공정별 생산성 산출 결과를 기초로 상기 주문 정보의 주문 물량에 대한 납기 일정을 예측하고, 예측된 납기 일정을 상기 주문 정보의 주문 일정과 비교하는 단계와,
상기 납기 일정이 상기 주문 일정을 만족할 때까지 상기 네트워크 상에 연결된 상기 복수의 자수 기계 및 상기 생산자가 추가 설정한 자수 기계를 재검색 및 재분류하고, 재분류된 가용 자수 기계에 대한 상기 기계별 및 공정별 생산성은 산출하는 단계 및 상기 예측되는 납기 일정과 상기 주문 일정을 비교하는 단계를 반복하여 수행하는 단계
를 포함하는 자수 디자인 생산 관리 방법. - 제13항에 있어서,
상기 납기 일정과 상기 주문 일정을 비교하는 단계 이후에,
상기 납기 일정이 상기 주문 일정을 만족하는 경우, 상기 가용 자수 기계에 작업 명령을 전송하여 상기 자수 디자인 생산을 개시하는 단계를 더 포함하는 자수 디자인 생산 관리 방법. - 제14항에 있어서,
상기 자수 디자인 생산을 개시하는 단계 이후에,
상기 가용 자수 기계에 대한 작업 현황을 실시간으로 모니터링하는 단계와,
상기 가용 자수 기계에 대한 작업 일정을 관리하는 단계와,
상기 예측된 납기 일정 및 실제 작업 일정을 비교 분석하는 단계를 더 포함하는 자수 디자인 생산 관리 방법. - 제15항에 있어서,
상기 가용 자수 기계에 대한 작업 현황을 실시간으로 모니터링하는 단계는 상기 가용 자수 기계로부터 기계 상태 정보를 수신하는 단계를 포함하고, 상기 기계 상태 정보는 상기 가용 자수 기계의 비정상 상태를 나타내는 비정상 상태 메시지를 포함할 수 있는 자수 디자인 생산 관리 방법. - 제16항에 있어서,
상기 비정상 상태 메시지에 기초하여 상기 비정상 상태를 해소하기 위해 필요한 문자 데이터 및 멀티미디어 데이터 중 적어도 하나를 작업자에게 전송하는 단계를 더 포함하는 자수 디자인 생산 관리 방법. - 제17항에 있어서,
상기 작업자의 요청에 의해 상기 생산자에게 애프터서비스 요청 메시지를 전송하는 단계를 더 포함하는 자수 디자인 생산 관리 방법. - 제18항에 있어서,
상기 애프터서비스 요청 메시지에 대응하여 상기 가용 자수 기계에 대한 애프터서비스 제공 상태를 모니터링하는 단계를 더 포함하는 자수 디자인 생산 관리 방법. - 제13항에 있어서,
상기 기계별 생산성 및 공정별 생산성을 산출하는 단계에서,
손실 시간, 작업 예측 시간 및 생산 판 수, 한 헤드당 작업 가능 디자인 판 수, 공정별 생산 물량, 기계별 필요 작업일, 공정별 필요 작업자 수가 산출되는 자수 디자인 생산 관리 방법. - 제20항에 있어서,
상기 손실 시간은 하기의 [수학식 1]을 통해 산출되고,
[수학식 1]
(한판 생산 시 총 손실 시간[min]) = (실 단사 시 손실 시간[min]) + (보빈 교체 시 손실 시간[min]) + (기타 손실 시간[min])
상기 [수학식 1]에서,
(실 단사 시 손실 시간[min]) = (단사 발생 횟수 × 단사 발생 시 손실 시간[sec]) / 60, (보빈 교체 시 손실 시간[min]) = (보빈 교체 횟수 × 헤드 수 × 한 헤드 교체 시 손실 시간[sec]) / 60, 일반 가마인 경우에 (보빈 교체 횟수) = (밑실 소비량[meter]) / 100, 라지 가마인 경우, (보빈 교체 횟수) = (밑실 소비량[meter]) / 150, (밑실 소비량[meter]) = (윗실 총 침수 길이) × 2/3이며,
상기 단사 발생 횟수, 상기 단사 발생 시 손실 시간, 상기 한 헤드 교체 시 손실 시간, 상기 가용 자수 기계 수에 따른 헤드 수, 판 교체시간을 포함하는 상기 기타 손실 시간은 상기 생산자 설정값으로 입력되고, 상기 윗실 총 침수 길이, 상기 보빈 교체 횟수는 상기 자수 디자인의 분석 단계에서 산출되는 자수 디자인 생산 관리 방법. - 제21항에 있어서,
상기 작업 예측 시간 및 생산 판 수는 하기의 [수학식 2] 및 [수학식 3]을 통해 산출되고,
[수학식 2]
(한 디자인 작업 시 예측 시간[min]) = Sum(RPM_TABLE[M][S] + RPM_TABLE[M][S] + RPM_TABLE[M][S] + ……)
상기 [수학식 2]에서,
[M]은 자수 기계의 타입, [S]는 스티치 길이를 나타내고, RPM_TABLE[M][S]는 선택된 자수 기계의 침 길이에 대한 정의된 시간을 나타내며,
[수학식 3]
(하루 작업 시간 기준 생산 판 수[times]) = (하루 작업 시간[hour] × 60[min]) / (한 디자인 작업 시 예측 시간[min] + 한판 생산 시 총 손실 시간[min])
상기 [수학식 3]에서,
상기 하루 작업 시간은 상기 생산자 설정값으로 입력되며, 상기 한 디자인 작업 시 예측 시간은 상기 [수학식 2]를 통해 산출되며, 상기 한판 생산 시 총 손실 시간은 상기 [수학식 1]을 통해 산출되는 자수 디자인 생산 관리 방법. - 제22항에 있어서,
상기 한 헤드당 작업 가능 디자인 판 수는 하기의 [수학식 4]을 통해 산출되고,
[수학식 4]
(한 헤드당 작업 가능 디자인 판 수) = Rxcnt × Cycnt
상기 [수학식 4]에서,
상기 Cycnt는 세로 작업 범위에서 상기 자수 디자인 간의 행 간격 및 상하 윤곽 여백을 제외한 범위에 포함되는 상기 자수 디자인의 개수를 나타내고, 상기 Rxcnt는 가로 작업 범위에서 상기 자수 디자인 간의 열 간격 및 좌우 윤곽 여백을 제외한 범위에 포함되는 상기 자수 디자인의 개수를 나타내는 자수 디자인 생산 관리 방법. - 제23항에 있어서,
상기 공정별 생산 물량 및 기계별 필요 작업일은 하기의 [수학식 5] 및 [수학식 6]을 통해 산출되고,
[수학식 5]
(공정별 생산 물량) = (하루 작업 시간 기준 생산 판수[times]) × (한 헤드당 작업 가능 디자인 판 수) × (헤드 수) × (자수 기계별 필요 작업일)
[수학식 6]
(기계별 필요 작업일) = (공정별 생산 물량 / N) / (하루 작업 시간 기준 생산 판수[times] × 한 헤드당 작업 가능 디자인 판 수 × 헤드 수)
상기 [수학식 5] 및 [수학식 6]에서,
상기 하루 작업 시간 기준 생산 판 수는 상기 [수학식 3]을 통해 산출되고, 상기 한 헤드당 작업 가능 디자인 판 수는 상기 [수학식 4]를 통해 산출되고, 상기 헤드 수는 생산자 설정값으로 입력되며, 상기 N은 선택된 자수 기계 수를 나타내는 자수 디자인 생산 관리 방법. - 제24항에 있어서,
상기 공정별 필요 작업자 수는 하기의 [수학식 7]를 통해 산출되고,
[수학식 7]
(공정별 필요 작업자 수) = ((공정 기계별 헤드 수 합 / 작업자 당 기본 헤드 수) × 하루 작업 시간[hour]) / 작업자 당 기본 작업 시간
상기 [수학식 7]에서,
상기 공정 기계별 헤드 수 합은 상기 자수 기계의 선택 시 자동 산출되며, 상기 작업자 당 기본 헤드 수, 상기 하루 작업 시간, 상기 작업자 당 기본 작업 시간은 생산자 설정값으로 입력되는 자수 디자인 생산 관리 방법. - 제13항에 있어서,
상기 복수의 공정 라인에 대한 공정별 생산성을 산출하는 단계는 상기 복수의 공정 라인 중 주 공정을 도출하는 단계를 더 포함하는 자수 디자인 생산 관리 방법.
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW101137871A TW201317421A (zh) | 2011-10-18 | 2012-10-15 | 刺繡設計生產管理裝置及方法 |
PCT/KR2012/008472 WO2013058535A2 (en) | 2011-10-18 | 2012-10-17 | Embroidery design production management apparatus and method |
US14/352,572 US20140257916A1 (en) | 2011-10-18 | 2012-10-17 | Embroidery design production management apparatus and method |
CN201280051197.0A CN103917708B (zh) | 2011-10-18 | 2012-10-17 | 刺绣设计生产管理设备和方法 |
EP12840950.5A EP2769013A4 (en) | 2011-10-18 | 2012-10-17 | DEVICE AND METHOD FOR MANAGING THE CONCEPTION AND PRODUCING AN EMBROIDERED WORK |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20110106527 | 2011-10-18 | ||
KR1020110106527 | 2011-10-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20130042428A true KR20130042428A (ko) | 2013-04-26 |
KR101419111B1 KR101419111B1 (ko) | 2014-07-11 |
Family
ID=48441133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20120039897A Active KR101419111B1 (ko) | 2011-10-18 | 2012-04-17 | 자수 디자인 생산 관리 장치 및 방법 |
Country Status (6)
Country | Link |
---|---|
US (1) | US20140257916A1 (ko) |
EP (1) | EP2769013A4 (ko) |
KR (1) | KR101419111B1 (ko) |
CN (1) | CN103917708B (ko) |
TW (1) | TW201317421A (ko) |
WO (1) | WO2013058535A2 (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111626540A (zh) * | 2020-03-25 | 2020-09-04 | 贵州师范大学 | 一种彩铝智能设备监管系统 |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106372773A (zh) * | 2015-07-23 | 2017-02-01 | 张海霞 | 一种商品产业链的管理系统 |
CN108893877B (zh) * | 2018-09-30 | 2021-08-24 | 上海鲍麦克斯电子科技有限公司 | 一种基于缝纫设备的控制系统及花样打板控制方法 |
CN109667076A (zh) * | 2019-01-16 | 2019-04-23 | 北京大豪科技股份有限公司 | 花样制版方法、装置、电子设备及存储介质 |
JP7513375B2 (ja) * | 2019-04-01 | 2024-07-09 | Juki株式会社 | 縫製管理システム及び縫製管理方法 |
WO2021181237A1 (en) * | 2020-03-07 | 2021-09-16 | Sandeep Raghuwanshi | Apparel factory sewing machines monitoring system |
CN112659651B (zh) * | 2020-12-08 | 2022-05-31 | 安徽九天印务有限公司 | 一种食品包装袋生产用自动化控制系统 |
CN112613957A (zh) * | 2021-01-05 | 2021-04-06 | 浙江东经科技股份有限公司 | 可视化纸板箱生产运营系统 |
CN113176762B (zh) * | 2021-04-13 | 2024-05-28 | 诸暨兴大豪科技开发有限公司 | 刺绣产品数的确定方法、装置、设备及存储介质 |
CN114355855B (zh) * | 2022-01-10 | 2022-09-20 | 北京宜通华瑞科技有限公司 | 一种缝制机械设备ai自动计件系统 |
CN114657717B (zh) * | 2022-03-18 | 2023-06-23 | 浙江大豪科技有限公司 | 金片的叠片绣方法、装置、设备及介质 |
Family Cites Families (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4821662A (en) * | 1985-04-19 | 1989-04-18 | Wilcom Proprietary Limited | Method of embroidery and stitch processor therefor |
EP0333155A3 (en) * | 1988-03-17 | 1990-08-08 | Tsudakoma Corporation | Optimum loom control method |
JPH0260688A (ja) * | 1988-08-26 | 1990-03-01 | Janome Sewing Mach Co Ltd | 自動刺繍システム |
IT1246039B (it) * | 1990-07-10 | 1994-11-07 | Tiziano Barea | Disopositivo per il controllo del funzionamento di macchine in particolare di macchine tessili in grado di autoapprendere il ciclo operativo di queste ultime e di correggere i propi errori in tale fase di autoapprendimento |
US5921194A (en) * | 1996-11-13 | 1999-07-13 | Brother Kogyo Kabushiki Kaisha | Sewing machine control device with display for displaying control information of sewing machines |
JP3425057B2 (ja) | 1997-03-24 | 2003-07-07 | ブラザー工業株式会社 | パターン縫い作業データ処理装置 |
JPH11253676A (ja) * | 1998-03-13 | 1999-09-21 | Brother Ind Ltd | 刺繍縫製装置用生産管理システム |
US6105520A (en) * | 1999-02-26 | 2000-08-22 | L&P Property Management Company | Quilt making automatic scheduling system and method |
US6196146B1 (en) * | 2000-03-23 | 2001-03-06 | Pulse Microsystems Ltd. | Web based embroidery system and method |
JP2001334086A (ja) * | 2000-05-29 | 2001-12-04 | Aisin Seiki Co Ltd | 複数台単頭刺繍機からなる刺繍生産システム |
WO2002027577A1 (fr) * | 2000-09-26 | 2002-04-04 | Kabushiki Kaisha Toshiba | Procede et dispositif pour l'assistance a l'achat/la mise au point de biens negociables |
JP2002143583A (ja) * | 2000-11-08 | 2002-05-21 | Toshiyuki Nakai | 刺繍ミシンのネットワークシステム |
JP2002177673A (ja) * | 2000-12-14 | 2002-06-25 | Juki Corp | 縫製支援方法、縫製支援システム及び縫製支援プログラムを格納した記録媒体 |
CN1410933A (zh) * | 2001-08-27 | 2003-04-16 | 日本世纪洋服株式会社 | 一种在制衣中从承订到剪裁所用的设备及生产方法 |
KR20030027550A (ko) | 2001-09-29 | 2003-04-07 | 썬스타 특수정밀 주식회사 | 네트워크 기반의 자수기 기술지원 시스템 및 방법, 그프로그램 소스를 기록한 기록매체 |
US7032816B2 (en) * | 2001-12-28 | 2006-04-25 | Kimberly-Clark Worldwide, Inc. | Communication between machines and feed-forward control in event-based product manufacturing |
US7308333B2 (en) * | 2002-01-31 | 2007-12-11 | Melco Industries, Inc. | Computerized stitching including embroidering |
US7130709B2 (en) * | 2002-08-07 | 2006-10-31 | Kimberly-Clark Worldwide, Inc. | Manufacturing information and alarming system and method |
US20050055255A1 (en) * | 2002-08-29 | 2005-03-10 | Soo Teo Puay | Method and system for analysing production of garments |
US20050060058A1 (en) * | 2003-05-22 | 2005-03-17 | Marion Cameron | Embroidery network control system and method |
US7885857B1 (en) * | 2004-11-15 | 2011-02-08 | Kaoru Fukuya | Appearel production method and system |
JP2006318365A (ja) * | 2005-05-16 | 2006-11-24 | Juki Corp | 縫製賃金管理システム及びミシン |
US8370224B2 (en) * | 2006-09-27 | 2013-02-05 | Rockwell Automation Technologies, Inc. | Graphical interface for display of assets in an asset management system |
US9702071B2 (en) * | 2008-10-23 | 2017-07-11 | Zazzle Inc. | Embroidery system and method |
WO2009091838A1 (en) * | 2008-01-14 | 2009-07-23 | Soft Sight, Inc. | Systems, methods and apparatus for embroidery thread color management |
CN201620257U (zh) * | 2010-01-27 | 2010-11-03 | 江苏华瑞国际实业集团有限公司 | 服装缝制车间服装缝制作业系统 |
-
2012
- 2012-04-17 KR KR20120039897A patent/KR101419111B1/ko active Active
- 2012-10-15 TW TW101137871A patent/TW201317421A/zh unknown
- 2012-10-17 EP EP12840950.5A patent/EP2769013A4/en not_active Withdrawn
- 2012-10-17 CN CN201280051197.0A patent/CN103917708B/zh active Active
- 2012-10-17 WO PCT/KR2012/008472 patent/WO2013058535A2/en active Application Filing
- 2012-10-17 US US14/352,572 patent/US20140257916A1/en not_active Abandoned
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111626540A (zh) * | 2020-03-25 | 2020-09-04 | 贵州师范大学 | 一种彩铝智能设备监管系统 |
Also Published As
Publication number | Publication date |
---|---|
CN103917708A (zh) | 2014-07-09 |
WO2013058535A2 (en) | 2013-04-25 |
US20140257916A1 (en) | 2014-09-11 |
EP2769013A4 (en) | 2015-06-17 |
CN103917708B (zh) | 2015-11-25 |
WO2013058535A9 (en) | 2013-06-13 |
EP2769013A2 (en) | 2014-08-27 |
TW201317421A (zh) | 2013-05-01 |
WO2013058535A3 (en) | 2013-08-01 |
KR101419111B1 (ko) | 2014-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101419111B1 (ko) | 자수 디자인 생산 관리 장치 및 방법 | |
KR101373369B1 (ko) | 네트워크 기반 생산 관리 시스템 및 방법 | |
US7921405B2 (en) | Facilitation of multi-project management using throughput measurement | |
JP2004164183A (ja) | レンタル見積もり方法、レンタル見積もりシステム、レンタル情報取得用端末、レンタル情報取得用プログラム、およびレンタル情報取得用サーバ | |
US20140135971A1 (en) | Sewing design manufacturing management apparatus and method | |
WO2020067137A1 (ja) | 勤務シフト作成装置、学習モデル、及びコンピュータプログラム | |
JP2008299762A (ja) | 生産管理プログラム | |
US20150348051A1 (en) | Providing Recommendations Through Predictive Analytics | |
JP2016212865A5 (ko) | ||
US20100005471A1 (en) | Prioritized resource scanning | |
JP2018097741A (ja) | 生産管理支援装置、生産管理支援方法、及び生産管理支援プログラム | |
JP2010015236A (ja) | 生産ライン評価方法、生産ライン評価システム及び生産ライン評価プログラム並びに生産ライン評価プログラムを記録した記録媒体と、生産ライン制御方法 | |
Rabelo et al. | Supply chain and hybrid simulation in the hierarchical enterprise | |
JP2021064265A (ja) | 作業実績分析サーバ、作業実績分析方法、および作業実績分析プログラム | |
JP2002197211A (ja) | 修理仲介システム、修理仲介サーバ、修理仲介方法、修理仲介プログラムおよび該プログラムを記録した記録媒体 | |
WO2017090141A1 (ja) | 工程計画装置 | |
JP2000214905A (ja) | 作業管理支援装置 | |
JP5882861B2 (ja) | 生産管理システム及び生産管理方法 | |
JP2019149108A (ja) | 工程管理システム、工程管理方法、及びプログラム | |
JP6100428B1 (ja) | 製造管理システム、クラウドサーバおよび端末コンピュータ | |
JP5873913B2 (ja) | 業務復旧支援システムおよび集約管理システム | |
JP2005115736A (ja) | 工作機械の稼働状況管理システム | |
JP2022147703A (ja) | 生産計画管理装置、生産計画管理方法及び生産計画管理システム | |
US20080222102A1 (en) | Method, apparatus and computer program product for providing a customizable safety management center | |
KR20120135962A (ko) | 워크 프로세스 기반의 신규 제품 및 기술 개발 관리 장치 및 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20120417 |
|
A201 | Request for examination | ||
PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 20120509 Comment text: Request for Examination of Application Patent event code: PA02011R01I Patent event date: 20120417 Comment text: Patent Application |
|
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20131025 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20140425 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20140707 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20140707 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
FPAY | Annual fee payment |
Payment date: 20170706 Year of fee payment: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20170706 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20180704 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20180704 Start annual number: 5 End annual number: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20200707 Start annual number: 7 End annual number: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20210707 Start annual number: 8 End annual number: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20240708 Start annual number: 11 End annual number: 11 |