KR20050085832A - 동적 최적화 트래픽 플래닝 방법 및 시스템 - Google Patents
동적 최적화 트래픽 플래닝 방법 및 시스템 Download PDFInfo
- Publication number
- KR20050085832A KR20050085832A KR1020057011555A KR20057011555A KR20050085832A KR 20050085832 A KR20050085832 A KR 20050085832A KR 1020057011555 A KR1020057011555 A KR 1020057011555A KR 20057011555 A KR20057011555 A KR 20057011555A KR 20050085832 A KR20050085832 A KR 20050085832A
- Authority
- KR
- South Korea
- Prior art keywords
- traffic
- plan
- traffic movement
- plans
- optimized
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/047—Optimisation of routes or paths, e.g. travelling salesman problem
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/01—Detecting movement of traffic to be counted or controlled
- G08G1/0104—Measuring and analyzing of parameters relative to traffic conditions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/04—Satellite based navigation systems, e.g. global positioning system [GPS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Mechanical Engineering (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Traffic Control Systems (AREA)
- Window Of Vehicle (AREA)
- Feedback Control In General (AREA)
Abstract
Description
Claims (94)
- 복수의 트래픽 및 복수의 트래픽 상태를 갖는 지역에 대해 최적화된 트래픽 무브먼트 플랜을 생성하는 방법으로서, 상기 방법은,상기 지역의 트래픽 상태에 기초하여 상기 트래픽에 대해 제1 플래닝 바운더리를 결정하는 단계;상기 제1 플래닝 바운더리를 채용하여 상기 지역의 트래픽에 대해 제1 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하는 단계;실행을 위해 제1 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 복수의 트래픽 무브먼트 플랜 중 하나를 선택하는 단계;상기 지역내 트래픽 무브먼트를 제어하기 위해 상기 제1 최적화된 트래픽 무브먼트 플랜을 출력하는 단계;상기 지역의 현재 트래픽 상태를 결정하는 단계;상기 현재 트래픽 상태에 기초하여 상기 트래픽에 제2 플래닝 바운더리를 제공하기 위해 상기 제1 플래닝 바운더리를 업데이팅하는 단계;상기 제2 플래닝 바운더리를 채용하여 상기 지역의 트래픽에 대해 제2 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하는 단계;실행을 위해 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나를 선택하는 단계; 및상기 지역내 트래픽 무브먼트를 제어하기 위해 상기 제2 최적화된 트래픽 무브먼트 플랜을 출력하는 단계;를 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 실행을 위해 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 최적화된 트래픽 무브먼트 플랜을 선택하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 실행을 위해 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 복수의 트래픽 무브먼트 플랜 중 하나를 선택하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 실행을 위해 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제2 복수의 트래픽 무브먼트 플랜 중 하나를 선택하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태를 채용하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하고, 실질적으로 상기 제1 복수의 트래픽 무브먼트 플랜에 기초하여 제2 플래닝 바운더리로 플래닝을 계속하여 상기 지역의 트래픽에 대해 상기 제2 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태를 채용하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하고, 그에 응답해서, 제2 플래닝 바운더리로 리플래닝하여 (a)상기 지역의 트래픽에 대해 실질적으로 상기 제1 복수의 트래픽 무브먼트 플랜 중 일부에 기초하여 제3 복수의 트래픽 무브먼트 플랜, 및 (b)상기 지역의 트래픽에 대해 상기 제1 복수의 트래픽 무브먼트 플랜과는 독립적으로 제4 복수의 트래픽 무브먼트 플랜을 상기 지역의 트래픽에 대해 상기 제2 복수의 트래픽 무브먼트 플랜으로서 반복적으로 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제5항에 있어서, 오브젝티브 함수 값을 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜의 각각과 연관시키는 단계; 및상기 오브젝티브 함수 값에 기초하여 상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 파기하는 단계, 그 오브젝티브 함수 값을 향상시키기 위해 상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 수정하는 단계, 상기 제2 복수의 트래픽 무브먼트 플랜 중 하나를 생성하기 위해 상기 제1 복수의 트래픽 무브먼트 플랜 중 복수의 플랜을 채용하는 단계, 상기 현재 트래픽 상태와 연관된 적어도 하나의 혼란에 응답하여 상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 수정하는 단계, 및 상기 제1 복수의 트래픽 무브먼트 플랜과는 독립적으로 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 생성하는 단계를, 상기 제2 플래닝 바운더리로 플래닝을 계속하는 것으로서, 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜에 대해 오브젝티브 함수 값을 결정하는 단계; 및상기 오브젝티브 함수 값에 기초하여 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 상기 하나를 선택하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제8항에 있어서, 상기 오브젝티브 함수 값의 각각에 대해 복수의 골을 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제8항에 있어서, 오브젝티브 함수 값에 기초하여 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜을 랭킹하는 단계; 및상기 랭킹에 기초하여 실행을 위해 상기 제2 최적화된 트래픽 무브먼트 플랜을 선택하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 실행을 위해 제1 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 복수의 트래픽 무브먼트 플랜 중 하나를 선택하는 상기 단계 이전에 상기 제1 플래닝 바운더리를 채용하는 것을 계속하여 소정 시간동안 상기 지역의 트래픽에 대해 제1 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 제1 플래닝 호라이즌을 상기 제1 플래닝 바운더리와 연관시키고 추후의 제2 플래닝 호라이즌을 상기 제2 플래닝 바운더리와 연관시키는 단계;스케줄 변동을 입력하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 상기 제2 플래닝 호라이즌 및 상기 스케줄 변동에 맞춰 조절하는 단계; 및상기 제1 복수의 트래픽 무브먼트 플랜 중 상기 조절된 적어도 하나를 채용하여 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제12항에 있어서, 상기 제1 플래닝 바운더리를 업데이팅하기 이전에 상기 조절하고 소정 시간동안 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 생성하는 것을 계속하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제12항에 있어서, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값 및 대응하는 연령을 제공하는 단계; 및상기 제1 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 연령의 함수로서 대응하는 오브젝티브 함수 값을 다운그레이딩하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 삭제하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜에 대해 오브젝티브 함수 값을 결정하는 단계; 및상기 오브젝티브 함수 값에 기초하여 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 상기 하나를 선택하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 제1 플래닝 호라이즌을 상기 제1 플래닝 바운더리와 연관시키고 추후의 제2 플래닝 호라이즌을 상기 제2 플래닝 바운더리와 연관시키는 단계;스케줄 변동을 입력하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 상기 제2 플래닝 호라이즌 및 상기 스케줄 변동에 맞춰 조절하는 단계; 및상기 제1 복수의 트래픽 무브먼트 플랜 중 상기 조절된 적어도 하나를 채용하여 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제17항에 있어서, 상기 제2 플래닝 바운더리를 업데이팅하기 이전에 상기 조절하고 소정 시간동안 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 하나를 생성하는 것을 계속하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 플래닝 바운더리와 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 복수의 현재 실행중인 레저베이션을 채용하는 단계;상기 제1 플래닝 바운더리와 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 복수의 현재 행해진 레저베이션을 채용하는 단계; 및상기 제1 플래닝 바운더리와 상기 제2 복수의 트래픽 무브먼트 플랜에 대해 후속의 플래닝 사이클동안 행해질 것으로 예상되는 복수의 레저베이션을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 트래픽 무브먼트 플랜의 풀에 상기 제1 복수의 트래픽 무브먼트 플랜 및 상기 제2 복수의 트래픽 무브먼트 플랜 중 적어도 일부를 포함시키는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제20항에 있어서, 상기 제1 복수의 트래픽 무브먼트 플랜의 제1 생성 및 상기 제2 복수의 트래픽 무브먼트 플랜의 제2 생성을 포함하여 상기 풀에서의 트래픽 무브먼트 플랜의 복수의 생성을 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제20항에 있어서, 상기 풀에서의 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 대략 50개를 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제21항에 있어서, 상기 지역의 현재 트래픽 상태를 재결정하는 단계;상기 재결정된 현재 트래픽 상태에 기초하여 상기 트래픽에 제3 플래닝 바운더리를 제공하기 위해 상기 제2 플래닝 바운더리를 업데이팅하는 단계;상기 트래픽 무브먼트 플랜의 제3 생성시 상기 제3 플래닝 바운더리를 채용하여 제3 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하는 단계;상기 제1, 제2 및 제3 생성의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값 및 대응하는 연령을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 연령의 함수로서 대응하는 오브젝티브 함수 값을 다운그레이딩하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜의 각각에 대해 다운그레이딩된 대응하는 오브젝티브 함수 값 및 상기 제3 생성의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값에 기초하여 최선 플랜을 결정하는 단계; 및상기 최선 플랜으로 상기 제2 최적화된 트래픽 무브먼트 플랜을 대체할지를 결정하기 위해 상기 제2 최적화된 무브먼트 플랜의 대응하는 오브젝티브 함수 값을 상기 최선 플랜의 오브젝티브 함수 값에 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제23항에 있어서, 상기 생성의 각각에 대해 플래닝 사이클을 채용하는 단계; 및상기 다운그레이딩을 채용하기 이전에 상기 플래닝 사이클의 소정 카운트 동안 상기 오브젝티브 함수 값을 유지하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제24항에 있어서, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜과 연관된 플래닝 윈도우를 채용하는 단계; 및상기 플래닝 윈도우가 지나간 후에 상기 무브먼트 플랜을 폐기하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제24항에 있어서, 포지티브 값을 갖는 상기 오브젝티브 함수 값 중 하나 및 네거티브 값을 갖는 상기 오브젝티브 함수 값 중 다른 하나를 채용하는 단계; 및상기 포지티브 및 네거티브 값 둘다를 다운그레이딩하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제24항에 있어서, 포지티브 값을 갖는 상기 오브젝티브 함수 값 중 하나 또는 네거티브 값을 갖는 상기 오브젝티브 함수 값 중 다른 하나를 채용하는 단계; 및상기 포지티브 및 네거티브 값 중 하나를 다운그레이딩하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제20항에 있어서, 상기 풀에서의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값을 채용하는 단계;대응하는 오브젝티브 함수 값에 기초하여 상기 풀에서의 트래픽 무브먼트 플랜을 오더링하는 단계; 및상기 오더링에 기초하여 실행을 위해 상기 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 풀에서의 상기 트래픽 무브먼트 플랜 중 하나를 선택하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제28항에 있어서, 상기 트래픽 무브먼트 플랜 중 상기 대응하는 하나를 상기 풀에 추가하기 이전에 상기 트래픽 무브먼트 플랜 중 대응하는 하나에 대해 대응하는 오브젝티브 함수 값을 결정하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제29항에 있어서, 상기 트래픽 무브먼트 플랜 중 상기 대응하는 하나를 상기 풀에 추가할 때 상기 트래픽 무브먼트 플랜 중 상기 대응하는 하나를 오더링하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제28항에 있어서, 상기 풀에서의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 연령을 채용하는 단계;대응하는 연령의 함수로서 상기 풀에서의 상기 트래픽 무브먼트 플랜 중 대응하는 하나의 대응하는 오브젝티브 함수 값을 다운그레이딩하는 단계; 및상기 다운그레이딩에 응답하여 상기 풀에서의 상기 트래픽 무브먼트 플랜 중 상기 대응하는 하나를 리오더링하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제20항에 있어서, 상기 풀에서의 트래픽 무브먼트 플랜의 소정 카운트를 유지하기 위해 상기 제1 복수의 트래픽 무브먼트 플랜 중 일부 및 상기 제2 복수의 트래픽 무브먼트 플랜 중 일부를 상기 풀로부터 삭제하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 지역의 상기 트래픽 상태의 복수의 유형을 채용하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비할 때 상기 트래픽 상태의 상기 유형 중 적어도 하나에서의 변동에 대한 체크를 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제33항에 있어서, 상기 트래픽 상태의 상기 유형 중 적어도 하나에서의 상기 변동으로서 철도 네트워크에서의 변동 및 열차 오더링 변동 중 적어도 하나를 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 상기 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하여 리플래닝 스코어를 결정하는 단계; 및상기 리플래닝 스코어가 소정의 값을 초과할 때 상기 리플래닝을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제35항에 있어서, 열차 스케줄 변동을 책임지고, 그에 응답하여, 상기 열차 스케줄 변동을 포함하는 상기 리플래닝 스코어를 결정하는 단계; 및상기 열차 스케줄 변동을 포함하는 상기 리플래닝 스코어가 소정의 값을 초과할 때 상기 리플래닝을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제36항에 있어서, 플래닝 호라이즌에서의 열차의 카운트로 나눠진 변동된 열차 스케줄의 카운트로부터 변동된 열차의 상대적인 수를 결정하는 단계;추가된 열차의 카운트와 플래닝 호라이즌에서의 열차의 상기 카운트의 합으로 나눠진 추가된 열차의 상기 카운트로부터 새로운 열차의 상대적인 수를 결정하는 단계; 및상기 리플래닝 스코어를 결정하기 위해 변동된 열차의 상기 상대적인 수 및 새로운 열차의 상기 상대적인 수를 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제37항에 있어서, 변동된 열차 스케줄의 상대적인 총 듀레이션을 결정하는 단계;변동된 열차 스케줄의 상기 상대적인 총 듀레이션으로 변동된 열차의 상기 상대적인 수를 멀티플라잉하는 단계;새로운 열차 스케줄의 상대적인 총 듀레이션을 결정하는 단계;곱을 제공하기 위해 새로운 열차 스케줄의 상기 상대적인 총 듀레이션으로 새로운 열차의 상기 상대적인 수를 멀티플라잉하는 단계; 및상기 리플래닝 스코어를 결정하기 위해 상기 곱을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 상기 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하여 리플래닝 스코어를 결정하는 단계;상기 지역의 상기 트래픽 상태의 복수의 유형을 채용하는 단계; 및상기 트래픽 상태의 상기 유형 중 적어도 하나에서의 변동에 응답하여 또는 상기 리플래닝 스코어가 소정의 값을 초과할 때 상기 리플래닝을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제39항에 있어서, 상기 리플래닝 스코어의 함수로서 카운트를 결정하는 단계; 및상기 제4 복수의 트래픽 무브먼트 플랜의 상기 카운트를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제40항에 있어서, 제1 카운트를 상기 카운트로서 채용하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜의 제2 카운트를 결정하는 단계;상기 리플래닝 스코어의 상기 함수로부터 퍼센티지를 결정하는 단계; 및상기 제2 카운트 곱하기 상기 퍼센티지로서 상기 제1 카운트를 결정하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제39항에 있어서, 상기 리플래닝 스코어의 함수로서 카운트를 결정하는 단계; 및상기 제3 복수의 트래픽 무브먼트 플랜의 상기 카운트를 재생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제42항에 있어서, 제1 카운트를 상기 카운트로서 채용하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜의 제2 카운트를 결정하는 단계;상기 리플래닝 스코어의 상기 함수로부터 퍼센티지를 결정하는 단계; 및상기 제2 카운트 곱하기 상기 퍼센티지로서 상기 제1 카운트를 결정하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제39항에 있어서, 상기 리플래닝 스코어의 함수로서 제1 카운트 및 제2 카운트를 결정하는 단계;상기 제3 복수의 트래픽 무브먼트 플랜의 상기 제1 카운트를 재생성하는 단계; 및상기 제4 복수의 트래픽 무브먼트 플랜의 상기 제2 카운트를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제39항에 있어서, 상기 제1 카운트에 대해 상기 리플래닝 스코어의 제1 함수를 채용하는 단계;상기 제2 카운트에 대해 상기 리플래닝 스코어의 제2 함수를 채용하는 단계; 및1과 동일한 상기 제1 및 제2 함수의 합을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제39항에 있어서, 상기 제1 카운트에 대해 상기 리플래닝 스코어의 제1 함수를 채용하는 단계;상기 제2 카운트에 대해 상기 리플래닝 스코어의 제2 함수를 채용하는 단계; 및스케줄 변동이 존재하지 않을 때 0.5 미만인 상기 제1 및 제2 함수의 합을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 현재 트래픽 상태에 기초하여 제1 오브젝티브 함수 값을 상기 제1 최적화된 트래픽 무브먼트 플랜에 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 현재 트래픽 상태에 기초하여 제2 오브젝티브 함수 값을 상기 최선 플랜에 제공하는 단계; 및상기 최선 플랜으로 상기 제1 최적화된 트래픽 무브먼트 플랜을 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제47항에 있어서, 상기 제2 오브젝티브 함수 값이 소정량만큼 상기 제1 오브젝티브 함수 값보다 작다고 결정하여 그에 응답해서 상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제47항에 있어서, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값 및 대응하는 연령을 제공하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 연령의 함수로서 대응하는 오브젝티브 함수 값을 다운그레이딩하는 단계;상기 제1 복수의 트래픽 무브먼트 플랜의 각각에 대해 다운그레이딩된 대응하는 오브젝티브 함수 값 및 상기 제2 복수의 트래픽 무브먼트 플랜의 각각에 대해 대응하는 오브젝티브 함수 값에 기초하여 상기 최선 플랜을 결정하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 최선 플랜의 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하여 리플래닝 스코어를 결정하는 단계;상기 리플래닝 스코어가 소정의 값을 초과하였다고 결정하여 그에 응답해서 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 현재 트래픽 상태를 채용하는 단계;상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제6항에 있어서, 상기 지역의 상기 트래픽 상태의 복수의 유형을 채용하는 단계;상기 현재 트래픽 상태에서의 상기 지역의 상기 트래픽 상태의 상기 유형 중 적어도 하나에서의 변동을 결정하고 그에 응답하여 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 현재 트래픽 상태를 채용하는 단계;상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 지역내 철도 네트워크에서의 복수의 열차에 대해 상기 제1 복수의 트래픽 무브먼트 플랜을 생성하는 단계; 및상기 철도 네트워크에서의 트래픽 상태의 변동시 상기 철도 네트워크를 가로지르는 상기 열차의 무브먼트를 동적으로 최적화하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제52항에 있어서, 상기 철도 네트워크에서의 복수의 트랙 섹션을 채용하는 단계;들어오는 날짜/시각으로부터 나가는 날짜/시각까지 상기 열차 중 하나에 의한 상기 트랙 섹션 중 하나의 플래닝된 사용을 각각 나타내는 복수의 레저베이션을 채용하는 단계; 및상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나를 생성하기 위해 상기 레저베이션을 결합하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제53항에 있어서, 상기 레저베이션의 수집으로서 상기 제1 플래닝 바운더리를 채용하는 단계;상기 철도 네트워크에서의 상기 열차의 각각에 대해 현재 위치 및 속도를 결정하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜으로부터 그리고 상기 철도 네트워크에서의 상기 열차의 현재 위치 및 속도로부터 상기 레저베이션을 결정하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제54항에 있어서, 복수의 현재 레저베이션을 상기 레저베이션 중 일부로서 채용하는 단계;첫번째 차량 및 마지막 차량을 상기 열차 중 하나에 대해 채용하는 단계;상기 트랙 섹션 중 하나상의 상기 첫번째 차량을 채용하는 단계;상기 첫번째 차량에 의해 상기 트랙 섹션 중 상기 하나에 도착하기 전에 초래된 지연 및 상기 첫번째 차량에 의해 상기 트랙 섹션 중 상기 하나에서 초래된 지연 확장을 결정하는 단계; 및상기 현재 레저베이션의 각각에 대해 초래된 상기 지연 및 상기 지연 확장을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제54항에 있어서, 첫번째 차량 및 마지막 차량을 포함하는 복수의 차량을 상기 열차의 상기 하나에 대해 채용하는 단계;상기 트랙 섹션 중 하나상으로 첫번째 차량이 들어오는 날짜/시각을 상기 들어오는 날짜/시각으로서 채용하는 단계; 및상기 트랙 섹션 중 상기 하나로부터 마지막 차량이 나가는 날짜/시각을 상기 나가는 날짜/시각으로서 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제54항에 있어서, 상기 철도 네트워크에서의 복수의 트랙 블록, 트랙 속도 제한 및 열차 위치 갭을 결정하는 단계;상기 철도 네트워크에서의 상기 트랙 블록, 상기 트랙 속도 제한 및 상기 열차 위치 갭에 기초하여 리플래닝 스코어를 계산하는 단계;상기 리플래닝 스코어가 소정의 값을 초과하였다고 결정하고 그에 응답하여 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 철도 네트워크의 상기 현재 트래픽 상태를 채용하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제54항에 있어서, 상기 열차에 대해 복수의 열차 스케줄을 채용하는 단계;상기 열차 스케줄에 대해 적어도 하나의 열차 스케줄 변동을 결정하는 단계;상기 적어도 하나의 열차 스케줄 변동에 응답하여, 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 철도 네트워크의 상기 현재 트래픽 상태를 채용하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제52항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜을 복수의 커맨드로 변환하는 단계;상기 철도 네트워크에 대해 복수의 루트 클리어 및 제어 커맨드를 상기 커맨드로서 채용하는 단계; 및상기 철도 네트워크에서의 상기 열차의 실시간 트래픽 무브먼트를 제어하기 위해 상기 루트 클리어 및 상기 제어 커맨드를 출력하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제59항에 있어서, 상기 루트 클리어 및 상기 제어 커맨드를 실행하기 위해 컴퓨터 에이디드 디스패칭 시스템을 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제60항에 있어서, 상기 철도 네트워크에서의 상기 열차에 관하여 상기 컴퓨터 에이디드 디스패칭 시스템으로부터 데이터를 수신하는 단계; 및상기 철도 네트워크에서의 상기 열차에 대해 상기 제1 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 데이터를 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제52항에 있어서, 상기 철도 네트워크의 열차에 대해 상기 제2 복수의 트래픽 무브먼트 플랜을 주기적으로 생성하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하는 단계;상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하는 단계;상기 철도 네트워크의 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하는 단계; 및상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제62항에 있어서, 상기 제1 및 제2 오브젝티브 함수 값을 결정하기 위해 정시운행 성능, 최선 시간 및 최소화하는 전반적인 지연을 포함하는 그룹으로부터 선택된 적어도 하나의 오브젝티브를 채용하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제50항에 있어서, 상기 트래픽 상태의 복수의 유형을 채용하는 단계; 및상기 리플래닝 스코어에서의 상기 유형의 각각에 대해 웨이팅 팩터를 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제64항에 있어서, 복수의 트랙 블록에 대해 제1 유형을, 복수의 트랙 속도 제한에 대해 제2 유형을, 복수의 열차 위치 갭에 대해 제3 유형을, 상기 유형으로서 채용하는 단계; 및상기 제1, 제2 및 제3 유형과 연관된 복수의 합을 채용하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제65항에 있어서, 상기 트랙 속도 제한과 연관된 제로 속도를 채용하는 단계; 및상기 제2 유형과 연관된 합과 상기 제1 유형과 연관된 합을 동등하게 하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제1항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜의 표현을 디스플레이하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제67항에 있어서, 철도 네트워크에서의 열차의 복수의 플래닝된 무브먼트를 디스플레이하기 위해 상기 제1 최적화된 트래픽 무브먼트 플랜의 시간-거리 표현을 포함하는 열차 그래프를 디스플레이하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 제50항에 있어서, 상기 지역내 철도 네트워크를 채용하는 단계;상기 철도 네트워크에서의 복수의 트랙 블록, 트랙 속도 제한 및 열차 위치 갭을 포함시키는 단계; 및상기 철도 네트워크에서의 상기 트랙 블록, 트랙 속도 제한 및 열차 위치 갭의 함수로서 상기 리플래닝 스코어를 결정하는 단계;를 더 포함하는 것을 특징으로 하는 방법.
- 제51항에 있어서, 열차 스케줄에서의 변동을 결정하고 그에 응답하여 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하는 단계를 더 포함하는 것을 특징으로 하는 방법.
- 복수의 트래픽 및 상기 트래픽의 복수의 트래픽 상태를 갖는 지역에 대한 동적 최적화 트래픽 플래닝 장치로서, 상기 장치는,상기 트래픽 상태를 나타내는 정보를 입력하는 수단; 및복수의 루틴을 실행하는 수단;을 포함하고, 상기 루틴은상기 지역의 트래픽 상태에 기초하여 상기 트래픽에 대해 제1 플래닝 바운더리를 결정하고, 상기 지역의 현재 트래픽 상태를 결정하고, 상기 현재 트래픽 상태에 기초해 상기 제1 플래닝 바운더리를 업데이팅하여 상기 트래픽에 대해 제2 플래닝 바운더리를 제공하는 플랜 모니터;상기 지역의 트래픽에 대해, 각각, 상기 제1 플래닝 바운더리 및 상기 제2 플래닝 바운더리를 연속적으로 채용하여 제1 복수의 트래픽 무브먼트 플랜 및 제2 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하고, 실행을 위해 제1 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 복수의 트래픽 무브먼트 플랜 중 하나를 선택하고, 실행을 위해 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나를 선택하고, 상기 제1 및 제2 최적화된 트래픽 무브먼트 플랜을 연속적으로 출력하는 플랜 생성기; 및상기 지역내 트래픽 무브먼트를 제어하기 위해 상기 제1 및 상기 제2 최적화된 트래픽 무브먼트 플랜을 복수의 커맨드로 연속적으로 변환하는 플랜 이그제큐티브;를 포함하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 플랜 생성기는 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태를 채용하고; 상기 플랜 모니터는 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하고; 상기 플랜 생성기는 상기 지역의 트래픽에 대해 상기 제2 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하기 위해 실질적으로 상기 제1 복수의 트래픽 무브먼트 플랜에 기초하여 소정 시간에 대해 제2 플래닝 바운더리로 계속 플래닝하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 플랜 생성기는 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태를 채용하고; 상기 플랜 모니터는 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 복수의 트래픽 상태와 상기 현재 트래픽 상태를 대비하고 그에 응답하여 상기 플랜 생성기에 신호를 송신하고; 상기 플랜 생성기는, 상기 신호에 응답하여, (a)상기 지역의 트래픽에 대해 실질적으로 상기 제1 복수의 트래픽 무브먼트 플랜 중 일부에 기초하여 제3 복수의 트래픽 무브먼트 플랜, 및 (b)상기 지역의 트래픽에 대해 상기 제1 복수의 트래픽 무브먼트 플랜과는 독립적으로 제4 복수의 트래픽 무브먼트 플랜을 상기 지역의 트래픽에 대해 상기 제2 복수의 트래픽 무브먼트 플랜으로서 반복적으로 생성하기 위해 제2 플래닝 바운더리로 리플래닝하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 플랜 이그제큐티브는 상기 지역내 트래픽 무브먼트를 수동으로 제어하기 위해 상기 제1 및 상기 제2 최적화된 트래픽 무브먼트 플랜을 대응하는 제안된 가까운 장래의 무브먼트 플랜으로 연속적으로 변환하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 플랜 이그제큐티브는 상기 지역내 트래픽 무브먼트를 자동으로 제어하기 위해 상기 제1 및 상기 제2 최적화된 트래픽 무브먼트 플랜을 복수의 자동 제어 커맨드로 연속적으로 변환하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 지역은 통근 레일 시스템을 포함하고; 상기 트래픽 상태는 통근 레일 트래픽 상태인 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 지역은 철도 네트워크를 포함하고; 상기 트래픽 상태는 철도 트래픽 상태인 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제77항에 있어서, 상기 플랜 모니터는 상기 제1 플래닝 바운더리 및 대응하는 플래닝 호라이즌을 결정하고; 상기 플랜 생성기는 상기 철도 네트워크에 대해 복수의 열차 스케줄, 열차 속성 및 트랙 디스크립션을 입력하고, 상기 제1 최적화된 트래픽 무브먼트 플랜으로서, 상기 제1 플래닝 바운더리로부터 상기 대응하는 플래닝 호라이즌까지 뻗어있는 소정 시간 인터발에 걸쳐 복수의 열차에 대해 복수의 교차/통과 플랜을 출력하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제77항에 있어서, 상기 철도 네트워크는 복수의 열차를 포함하고; 상기 트래픽 상태는 열차 지연, 상기 철도 네트워크에서의 변동 및 상기 열차에 대한 스케줄 변동을 포함하고; 상기 플랜 모니터는 상기 열차 지연, 상기 철도 네트워크에서의 상기 변동 및 상기 열차에 대한 상기 스케줄 변동 중 적어도 하나로부터 상기 플랜 생성기에 의한 리플래닝이 필요한지를 결정하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜은 복수의 제1 트래픽 상태를 포함하고; 상기 입력하는 수단은 상기 트래픽 상태를 나타내는 상기 정보를 상기 현재 트래픽 상태에 대해 업데이팅하고; 상기 플랜 모니터는 상기 제1 최적화된 트래픽 무브먼트 플랜의 복수의 제1 트래픽 상태와 상기 현재 트래픽 상태를 대비하여 리플래닝 스코어를 결정하고, 상기 리플래닝 스코어가 소정의 값을 초과하였다고 결정하고; 그에 응답하여 상기 플랜 생성기는 상기 리플래닝 스코어의 함수로서 제1 카운트 및 제2 카운트를 결정하고, 상기 제1 복수의 트래픽 무브먼트 플랜의 상기 제1 카운트를 재생성하고, 상기 제2 복수의 트래픽 무브먼트 플랜의 상기 제2 카운트를 생성하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 입력하는 수단은 상기 트래픽 상태를 나타내는 상기 정보를 상기 현재 트래픽 상태에 대해 업데이팅하고; 상기 플랜 생성기는 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하고, 상기 지역의 트래픽에 대해 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하고, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하고, 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하고, 상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 제1 최적화된 트래픽 무브먼트 플랜은 복수의 제1 트래픽 상태를 포함하고; 상기 입력하는 수단은 상기 트래픽 상태를 나타내는 상기 정보를 상기 현재 트래픽 상태에 대해 업데이팅하고; 상기 플랜 모니터는 상기 제1 최적화된 트래픽 무브먼트 플랜의 복수의 제1 트래픽 상태와 상기 현재 트래픽 상태를 대비하여 리플래닝 스코어를 결정하고, 상기 리플래닝 스코어가 소정의 값을 초과하였다고 결정하고; 그에 응답하여 상기 플랜 생성기는 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 현재 트래픽 상태를 채용하고, 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하고, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하고, 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하고, 상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 입력하는 수단은 상기 트래픽 상태를 나타내는 상기 정보를 상기 현재 트래픽 상태에 대해 업데이팅하고; 상기 플랜 모니터는 상기 지역의 상기 트래픽 상태의 복수의 유형을 채용하고, 상기 현재 트래픽 상태에서의 상기 지역의 상기 트래픽 상태의 상기 유형 중 적어도 하나에서의 변동을 결정하고; 그에 응답하여 상기 플랜 생성기는 상기 제2 복수의 트래픽 무브먼트 플랜을 생성하기 위해 상기 현재 트래픽 상태를 채용하고, 상기 현재 트래픽 상태에 기초하여 상기 제1 최적화된 트래픽 무브먼트 플랜에 대해 제1 오브젝티브 함수 값을 제공하고, 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나로부터 최선 플랜을 결정하고, 상기 현재 트래픽 상태에 기초하여 상기 최선 플랜에 대해 제2 오브젝티브 함수 값을 제공하고, 상기 제1 최적화된 트래픽 무브먼트 플랜을 상기 최선 플랜으로 대체할지를 결정하기 위해 상기 제2 오브젝티브 함수 값에 상기 제1 오브젝티브 함수 값을 비교하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 실행하는 수단은 상기 플랜 모니터, 상기 플랜 생성기 및 상기 플랜 이그제큐티브에 대해 단일의 프로세서를 포함하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 실행하는 수단은 상기 플랜 모니터 및 상기 플랜 생성기에 대한 제1 프로세서, 및 상기 플랜 이그제큐티브에 대한 제2 프로세서를 포함하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 제71항에 있어서, 상기 실행하는 수단은 상기 플랜 모니터에 대한 제1 프로세서, 상기 플랜 생성기에 대한 제2 프로세서, 및 상기 플랜 이그제큐티브에 대한 제3 프로세서를 포함하는 것을 특징으로 하는 동적 최적화 트래픽 플래닝 장치.
- 복수의 트래픽 및 상기 트래픽의 복수의 트래픽 상태를 갖는 지역에 대한 트래픽 관리 시스템으로서, 상기 시스템은,상기 트래픽 상태를 나타내는 정보를 입력하는 수단;복수의 루틴을 실행하는 수단; 및상기 지역내 트래픽 무브먼트를 제어하기 위해 커맨드를 실행하는 수단;을 포함하고, 상기 루틴은,상기 지역의 트래픽 상태에 기초하여 상기 트래픽에 대해 제1 플래닝 바운더리를 결정하고, 상기 지역의 현재 트래픽 상태를 결정하고, 상기 현재 트래픽 상태에 기초해 상기 제1 플래닝 바운더리를 업데이팅하여 상기 트래픽에 대해 제2 플래닝 바운더리를 제공하는 플랜 모니터;상기 지역의 트래픽에 대해, 각각, 상기 제1 플래닝 바운더리 및 상기 제2 플래닝 바운더리를 연속적으로 채용하여 제1 복수의 트래픽 무브먼트 플랜 및 제2 복수의 트래픽 무브먼트 플랜을 반복적으로 생성하고, 실행을 위해 제1 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 복수의 트래픽 무브먼트 플랜 중 하나를 선택하고, 실행을 위해 제2 최적화된 트래픽 무브먼트 플랜으로서 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜 중 하나를 선택하고, 상기 제1 및 제2 최적화된 트래픽 무브먼트 플랜을 연속적으로 출력하는 플랜 생성기; 및상기 지역내 트래픽 무브먼트를 제어하기 위해 상기 제1 및 상기 제2 최적화된 트래픽 무브먼트 플랜을 복수의 커맨드로 연속적으로 변환하는 플랜 이그제큐티브;를 포함하는 것을 특징으로 하는 트래픽 관리 시스템.
- 제87항에 있어서, 상기 커맨드를 실행하는 상기 수단은 상기 지역내 열차의 무브먼트를 제어하기 위한 컴퓨터 에이디드 디스패칭 시스템인 것을 특징으로 하는 트래픽 관리 시스템.
- 제88항에 있어서, 상기 컴퓨터 에이디드 디스패칭 시스템은 상기 지역에 대한 제어 및 철도 기반시설에 관한 정보를 갖는 데이터베이스를 포함하는 것을 특징으로 하는 트래픽 관리 시스템.
- 제87항에 있어서, 상기 커맨드를 실행하는 상기 수단은 상기 트래픽을 제어하기 위한 커맨드를 발행하는 트래픽 제어 시스템인 것을 특징으로 하는 트래픽 관리 시스템.
- 제90항에 있어서, 상기 트래픽 제어 시스템은 운영 제어 센터, 네트워크 관리 센터, 네트워크 제어 센터 및 트래픽 제어 센터를 포함하는 그룹으로부터 선택되는 것을 특징으로 하는 트래픽 관리 시스템.
- 제87항에 있어서, 상기 지역은 복수의 열차를 갖는 철도 네트워크를 포함하고; 상기 트래픽 상태를 나타내는 상기 정보는 상기 철도 네트워크로부터의 동적 데이터를 포함하고; 상기 플랜 생성기는 상기 철도 네트워크에 대해 복수의 열차 스케줄, 열차 속성 및 트랙 디스크립션을 입력하여 상기 제1 및 제2 복수의 트래픽 무브먼트 플랜으로서 상기 철도 네트워크에서의 상기 열차에 대해 복수의 최적화된 교차/통과 플랜을 생성하고; 상기 커맨드를 실행하는 상기 수단은 상기 철도 네트워크로부터의 상기 동적 데이터를 채용하고; 상기 교차/통과 플랜은 상기 철도 네트워크로부터의 상기 동적 데이터에 기초하여 상기 철도 네트워크에 대해 상기 열차 스케줄, 상기 열차 속성 및 상기 트랙 디스크립션에 대한 어떠한 제약도 위반하지 않는 것은 특징으로 하는 트래픽 관리 시스템.
- 제87항에 있어서, 상기 지역은 복수의 열차를 갖는 철도 네트워크를 포함하고; 상기 실행하는 수단은 상기 철도 네트워크에서의 상기 열차의 복수의 플래닝된 무브먼트를 디스플레이하기 위해 상기 제1 최적화된 트래픽 무브먼트 플랜의 시간-거리 표현을 포함하는 열차 그래프를 디스플레이하는 것을 특징으로 하는 트래픽 관리 시스템.
- 제87항에 있어서, 상기 제1 플래닝 바운더리는 상기 제1 최적화된 트래픽 무브먼트 플랜에 대한 복수의 레저베이션, 상기 제1 최적화된 트래픽 무브먼트 플랜에 대한 복수의 현재 행해진 레저베이션, 및 상기 제2 복수의 트래픽 무브먼트 플랜에 대해 다음의 플래닝 사이클동안 행해질 것으로 예상되는 복수의 레저베이션을 포함하는 것을 특징으로 하는 트래픽 관리 시스템.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US43511402P | 2002-12-20 | 2002-12-20 | |
US60/435,114 | 2002-12-20 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20050085832A true KR20050085832A (ko) | 2005-08-29 |
Family
ID=32682160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020057011555A KR20050085832A (ko) | 2002-12-20 | 2003-12-19 | 동적 최적화 트래픽 플래닝 방법 및 시스템 |
Country Status (11)
Country | Link |
---|---|
US (1) | US7386391B2 (ko) |
EP (1) | EP1573578B1 (ko) |
JP (1) | JP2006511394A (ko) |
KR (1) | KR20050085832A (ko) |
CN (1) | CN1729465A (ko) |
AT (1) | ATE461090T1 (ko) |
AU (1) | AU2003300354B2 (ko) |
CA (1) | CA2510432C (ko) |
DE (1) | DE60331772D1 (ko) |
RU (1) | RU2314561C2 (ko) |
WO (1) | WO2004059446A2 (ko) |
Families Citing this family (131)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040172175A1 (en) * | 2003-02-27 | 2004-09-02 | Julich Paul M. | System and method for dispatching by exception |
US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
US11208129B2 (en) | 2002-06-04 | 2021-12-28 | Transportation Ip Holdings, Llc | Vehicle control system and method |
US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
US9233696B2 (en) | 2006-03-20 | 2016-01-12 | General Electric Company | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear |
US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
US11358615B2 (en) | 2002-06-04 | 2022-06-14 | Ge Global Sourcing Llc | System and method for determining vehicle orientation in a vehicle consist |
US8924049B2 (en) | 2003-01-06 | 2014-12-30 | General Electric Company | System and method for controlling movement of vehicles |
US20060212188A1 (en) * | 2003-02-27 | 2006-09-21 | Joel Kickbusch | Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics |
US7937193B2 (en) * | 2003-02-27 | 2011-05-03 | General Electric Company | Method and apparatus for coordinating railway line of road and yard planners |
US20060212186A1 (en) * | 2003-02-27 | 2006-09-21 | Philp Joseph W | Method and apparatus for scheduling maintenance of way |
US7797087B2 (en) * | 2003-02-27 | 2010-09-14 | General Electric Company | Method and apparatus for selectively disabling train location reports |
US7725249B2 (en) * | 2003-02-27 | 2010-05-25 | General Electric Company | Method and apparatus for congestion management |
US20060212185A1 (en) * | 2003-02-27 | 2006-09-21 | Philp Joseph W | Method and apparatus for automatic selection of train activity locations |
US20060212187A1 (en) * | 2003-02-27 | 2006-09-21 | Wills Mitchell S | Scheduler and method for managing unpredictable local trains |
US8292172B2 (en) * | 2003-07-29 | 2012-10-23 | General Electric Company | Enhanced recordation device for rail car inspections |
US7395140B2 (en) * | 2004-02-27 | 2008-07-01 | Union Switch & Signal, Inc. | Geographic information system and method for monitoring dynamic train positions |
US7908047B2 (en) | 2004-06-29 | 2011-03-15 | General Electric Company | Method and apparatus for run-time incorporation of domain data configuration changes |
US7847807B2 (en) * | 2004-12-22 | 2010-12-07 | Hntb Holdings Ltd | Geometry creation tool |
US7849031B2 (en) | 2004-12-22 | 2010-12-07 | Hntb Holdings Ltd. | Optimizing traffic predictions and enhancing notifications |
US7511634B2 (en) * | 2004-12-22 | 2009-03-31 | Htnb Corporation | Retrieving and presenting dynamic traffic information |
US7711699B2 (en) * | 2004-12-22 | 2010-05-04 | Hntb Holdings Ltd. | Method and system for presenting traffic-related information |
WO2006099387A2 (en) | 2005-03-14 | 2006-09-21 | General Electric Company | A system and method for railyard planning |
AU2006235003B2 (en) * | 2005-04-07 | 2010-06-17 | New York Air Brake Llc | Multimedia train simulator |
DE502006003390D1 (de) * | 2005-07-18 | 2009-05-20 | Siemens Ag | Zur stauvermeidung und -auflösung |
US20070106434A1 (en) * | 2005-11-07 | 2007-05-10 | Galbraith Robert E Ii | User interface for railroad dispatch monitoring of a geographic region and display system employing a common data format for displaying information from different and diverse railroad CAD systems |
US20070115916A1 (en) * | 2005-11-07 | 2007-05-24 | Samsung Electronics Co., Ltd. | Method and system for optimizing a network based on a performance knowledge base |
US9527518B2 (en) | 2006-03-20 | 2016-12-27 | General Electric Company | System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system |
US9201409B2 (en) | 2006-03-20 | 2015-12-01 | General Electric Company | Fuel management system and method |
US9376971B2 (en) * | 2006-03-20 | 2016-06-28 | General Electric Company | Energy management system and method for vehicle systems |
US8290645B2 (en) | 2006-03-20 | 2012-10-16 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US9266542B2 (en) | 2006-03-20 | 2016-02-23 | General Electric Company | System and method for optimized fuel efficiency and emission output of a diesel powered system |
US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
US8768543B2 (en) * | 2006-03-20 | 2014-07-01 | General Electric Company | Method, system and computer software code for trip optimization with train/track database augmentation |
US8473127B2 (en) | 2006-03-20 | 2013-06-25 | General Electric Company | System, method and computer software code for optimizing train operations considering rail car parameters |
US7734383B2 (en) * | 2006-05-02 | 2010-06-08 | General Electric Company | Method and apparatus for planning the movement of trains using dynamic analysis |
US8498762B2 (en) * | 2006-05-02 | 2013-07-30 | General Electric Company | Method of planning the movement of trains using route protection |
US20070260497A1 (en) * | 2006-05-02 | 2007-11-08 | Wolfgang Daum | Method of planning train movement using a front end cost function |
US7797088B2 (en) | 2006-05-02 | 2010-09-14 | General Electric Company | Method and apparatus for planning linked train movements |
CN101356089B (zh) * | 2006-05-19 | 2015-06-24 | 通用电气公司 | 鉴于有轨车厢参数优化火车运行的系统、方法和计算机软件代码 |
US7680750B2 (en) | 2006-06-29 | 2010-03-16 | General Electric Company | Method of planning train movement using a three step optimization engine |
JP4736979B2 (ja) * | 2006-06-30 | 2011-07-27 | 日産自動車株式会社 | 車載装置、交通情報取得方法、交通情報提供システム及び交通情報提供方法 |
US8082071B2 (en) * | 2006-09-11 | 2011-12-20 | General Electric Company | System and method of multi-generation positive train control system |
US8433461B2 (en) | 2006-11-02 | 2013-04-30 | General Electric Company | Method of planning the movement of trains using pre-allocation of resources |
DE102007047474A1 (de) * | 2007-09-27 | 2009-04-02 | Siemens Ag | Verfahren zur Fahrplangenerierung für Verkehrssysteme mit Berücksichtungung zeitlicher Schranken |
US9073562B2 (en) | 2007-10-12 | 2015-07-07 | General Electric Company | System and method for a simulation based movement planner |
WO2009117364A2 (en) * | 2008-03-21 | 2009-09-24 | General Electric Company | Method for controlling a powered system based on mission plan |
US8676410B2 (en) * | 2008-06-02 | 2014-03-18 | General Electric Company | System and method for pacing a plurality of powered systems traveling along a route |
US20100235210A1 (en) * | 2009-03-11 | 2010-09-16 | United Parcel Service Of America, Inc. | Scheduled delivery service systems, apparatuses, methods, and computer programs embodied on computer-readable media |
US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
US8640629B2 (en) * | 2009-05-01 | 2014-02-04 | Norfolk Southern Corporation | Battery-powered all-electric and/or hybrid locomotive and related locomotive and train configurations |
CN101920711A (zh) * | 2009-06-17 | 2010-12-22 | 上海宝信软件股份有限公司 | 在轨道交通监控系统中通过时间表进行设备控制的方法 |
US8428798B2 (en) | 2010-01-08 | 2013-04-23 | Wabtec Holding Corp. | Short headway communications based train control system |
FR2958248B1 (fr) * | 2010-04-01 | 2012-06-15 | Alstom Transport Sa | Procede de gestion de la circulation de vehicules sur un reseau ferroviaire et systeme associe |
ES2671344T3 (es) * | 2010-12-09 | 2018-06-06 | Siemens S.A.S | Método para comunicar información entre una unidad de control a bordo y una red de transporte público |
US8774991B1 (en) * | 2010-12-10 | 2014-07-08 | Cybertran International Inc. | System and method of controlling vehicles to follow a defined trajectory in a complex track network |
US9008933B2 (en) * | 2011-05-09 | 2015-04-14 | General Electric Company | Off-board scheduling system and method for adjusting a movement plan of a transportation network |
MY175071A (en) * | 2011-06-14 | 2020-06-04 | Thales Canada Inc | Control of automatic guided vehicles without wayside interlocking |
US20130116865A1 (en) * | 2011-11-03 | 2013-05-09 | Jared COOPER | System and method for changing when a vehicle enters a vehicle yard |
US20130116916A1 (en) * | 2011-11-04 | 2013-05-09 | Joel Kickbusch | Transportation network scheduling system and method |
US8655518B2 (en) * | 2011-12-06 | 2014-02-18 | General Electric Company | Transportation network scheduling system and method |
US20130144467A1 (en) * | 2011-12-06 | 2013-06-06 | Joel Kickbusch | Transportation network scheduling system and method |
US9235991B2 (en) | 2011-12-06 | 2016-01-12 | General Electric Company | Transportation network scheduling system and method |
CN104488122A (zh) | 2012-04-02 | 2015-04-01 | 水吉能公司 | 燃料电池启动方法 |
US9027102B2 (en) | 2012-05-11 | 2015-05-05 | Sprint Communications Company L.P. | Web server bypass of backend process on near field communications and secure element chips |
US20130311153A1 (en) * | 2012-05-15 | 2013-11-21 | Caterpillar Inc. | Virtual environment and method for sorting among potential route plans for operating autonomous machine at work site |
US9282898B2 (en) | 2012-06-25 | 2016-03-15 | Sprint Communications Company L.P. | End-to-end trusted communications infrastructure |
WO2014010070A1 (ja) * | 2012-07-13 | 2014-01-16 | 株式会社日立製作所 | 列車代替運転経路選択方法およびそのシステム |
US9183412B2 (en) | 2012-08-10 | 2015-11-10 | Sprint Communications Company L.P. | Systems and methods for provisioning and using multiple trusted security zones on an electronic device |
US9015068B1 (en) * | 2012-08-25 | 2015-04-21 | Sprint Communications Company L.P. | Framework for real-time brokering of digital content delivery |
TWI548553B (zh) * | 2012-11-15 | 2016-09-11 | Nippon Sharyo Ltd | The route determination system for railway vehicles |
US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
US9003039B2 (en) | 2012-11-29 | 2015-04-07 | Thales Canada Inc. | Method and apparatus of resource allocation or resource release |
JP5811996B2 (ja) * | 2012-12-12 | 2015-11-11 | トヨタ自動車株式会社 | 交通計画作成支援装置、交通計画作成支援方法 |
AU2013270604A1 (en) * | 2012-12-14 | 2014-07-03 | Technological Resources Pty. Limited | A rail network management system |
US9578664B1 (en) | 2013-02-07 | 2017-02-21 | Sprint Communications Company L.P. | Trusted signaling in 3GPP interfaces in a network function virtualization wireless communication system |
US9171345B2 (en) * | 2013-02-15 | 2015-10-27 | Norfolk Southern Corporation | System and method for terminal capacity management |
US9613208B1 (en) | 2013-03-13 | 2017-04-04 | Sprint Communications Company L.P. | Trusted security zone enhanced with trusted hardware drivers |
US9374363B1 (en) | 2013-03-15 | 2016-06-21 | Sprint Communications Company L.P. | Restricting access of a portable communication device to confidential data or applications via a remote network based on event triggers generated by the portable communication device |
US9324016B1 (en) | 2013-04-04 | 2016-04-26 | Sprint Communications Company L.P. | Digest of biographical information for an electronic device with static and dynamic portions |
US9454723B1 (en) | 2013-04-04 | 2016-09-27 | Sprint Communications Company L.P. | Radio frequency identity (RFID) chip electrically and communicatively coupled to motherboard of mobile communication device |
US9838869B1 (en) | 2013-04-10 | 2017-12-05 | Sprint Communications Company L.P. | Delivering digital content to a mobile device via a digital rights clearing house |
US9443088B1 (en) | 2013-04-15 | 2016-09-13 | Sprint Communications Company L.P. | Protection for multimedia files pre-downloaded to a mobile device |
CA2905228C (en) * | 2013-04-22 | 2016-12-20 | Landmark Graphics Corporation | Systems and methods for adjusting existing well plans |
US9560519B1 (en) | 2013-06-06 | 2017-01-31 | Sprint Communications Company L.P. | Mobile communication device profound identity brokering framework |
RU2546577C2 (ru) * | 2013-06-19 | 2015-04-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный университет путей сообщения" (СамГУПС) | Автоматизированная система ведения и анализа графика движения |
US9293040B2 (en) * | 2013-07-01 | 2016-03-22 | Iteris, Inc. | Data quality assessment and real-time evaluation of GPS probe data |
US9129522B2 (en) * | 2013-07-01 | 2015-09-08 | Iteris, Inc. | Traffic speed estimation using temporal and spatial smoothing of GPS speed data |
US10546307B2 (en) | 2013-09-25 | 2020-01-28 | International Business Machines Corporation | Method, apparatuses, and computer program products for automatically detecting levels of user dissatisfaction with transportation routes |
RU2566171C2 (ru) * | 2014-01-16 | 2015-10-20 | Федеральное государственное унитарное предприятие "Центральный научно-исследовательский институт машиностроения" (ФГУП ЦНИИмаш) | Способ разрешения конфликтных ситуаций при управлении полетами космических аппаратов |
AU2015254431B2 (en) * | 2014-04-28 | 2018-06-14 | Hitachi, Ltd. | Driving assistance system |
EP2974939B1 (en) * | 2014-07-17 | 2023-06-07 | Hitachi, Ltd. | Train management system |
JP2016030542A (ja) * | 2014-07-30 | 2016-03-07 | 株式会社日立製作所 | 列車運行管理システム |
US10572847B2 (en) * | 2014-10-10 | 2020-02-25 | Conduent Business Services, Llc | Dynamic space-time diagram for visualization of transportation schedule adherence |
US11312018B2 (en) | 2014-11-14 | 2022-04-26 | Transportation Ip Holdings, Llc | Control system with task manager |
US9779232B1 (en) | 2015-01-14 | 2017-10-03 | Sprint Communications Company L.P. | Trusted code generation and verification to prevent fraud from maleficent external devices that capture data |
US9838868B1 (en) | 2015-01-26 | 2017-12-05 | Sprint Communications Company L.P. | Mated universal serial bus (USB) wireless dongles configured with destination addresses |
US10507853B2 (en) * | 2015-01-27 | 2019-12-17 | Mitsubishi Electric Corporation | Train-information management device and train-information management method |
US9473945B1 (en) | 2015-04-07 | 2016-10-18 | Sprint Communications Company L.P. | Infrastructure for secure short message transmission |
US9819679B1 (en) | 2015-09-14 | 2017-11-14 | Sprint Communications Company L.P. | Hardware assisted provenance proof of named data networking associated to device data, addresses, services, and servers |
US10282719B1 (en) | 2015-11-12 | 2019-05-07 | Sprint Communications Company L.P. | Secure and trusted device-based billing and charging process using privilege for network proxy authentication and audit |
US9817992B1 (en) | 2015-11-20 | 2017-11-14 | Sprint Communications Company Lp. | System and method for secure USIM wireless network access |
JP6596750B2 (ja) * | 2015-11-25 | 2019-10-30 | 三菱重工エンジニアリング株式会社 | 車両制御システム、走行管理装置、リソース管理装置、車両制御方法、プログラム |
EP3243726B1 (en) * | 2016-05-09 | 2020-07-15 | ALSTOM Transport Technologies | Traffic management method and traffic management system |
US11562300B2 (en) | 2016-06-10 | 2023-01-24 | Conduent Business Services, Llc | System and method for optimal automated booking of on-demand transportation in multi-modal journeys |
DE102016214057A1 (de) * | 2016-07-29 | 2018-02-01 | Siemens Aktiengesellschaft | Verfahren und Einrichtung zum Überarbeiten wenigstens eines geplanten Fahrplans einer verkehrstechnischen Anlage |
US10279823B2 (en) * | 2016-08-08 | 2019-05-07 | General Electric Company | System for controlling or monitoring a vehicle system along a route |
BR112019002445A2 (pt) * | 2016-08-12 | 2019-05-14 | Hatch Ltd. | sistema e método para otimizar um sistema de trilhos |
CN106781461A (zh) * | 2016-12-02 | 2017-05-31 | 交通运输部公路科学研究所 | 一种高速公路网运行态势在线推演热启动技术 |
RU2669873C2 (ru) * | 2017-03-07 | 2018-10-16 | ООО "Ассоциация инженеров и учёных по водоснабжению и водоотведению" | Способ оптимального управления системой водоотведения |
US10769946B1 (en) * | 2017-04-24 | 2020-09-08 | Ronald M Harstad | Incentive-compatible, asymmetric-information, real-time traffic-routing differential-advice |
US10499249B1 (en) | 2017-07-11 | 2019-12-03 | Sprint Communications Company L.P. | Data link layer trust signaling in communication network |
RU2667745C1 (ru) * | 2017-08-07 | 2018-09-24 | Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" | Способ оптимизации потоков сточных вод |
US10699588B2 (en) * | 2017-12-18 | 2020-06-30 | Honeywell International Inc. | Aircraft taxi routing |
US10816990B2 (en) * | 2017-12-21 | 2020-10-27 | Baidu Usa Llc | Non-blocking boundary for autonomous vehicle planning |
RU2685897C1 (ru) * | 2018-01-18 | 2019-04-23 | Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" | Способ оптимизации расходов сточных вод общесплавных систем водоотведения |
US20200342419A1 (en) * | 2019-04-29 | 2020-10-29 | Lyft, Inc. | Intelligent management of one or more machines of a vehicle service center |
CN110803203B (zh) * | 2019-11-06 | 2021-11-26 | 中国铁道科学研究院集团有限公司通信信号研究所 | 一种高速铁路行车轨迹的演进预测方法及系统 |
JP7227118B2 (ja) * | 2019-11-08 | 2023-02-21 | 株式会社日立製作所 | 資源運用計画作成支援装置、資源運用計画作成支援方法、及びプログラム |
WO2021108904A1 (en) * | 2019-12-02 | 2021-06-10 | Wsp Global Inc. | Railway management system with data repository |
CN110991740B (zh) * | 2019-12-03 | 2023-12-15 | 海南电网有限责任公司 | 基于运行模拟和智能体技术的电网规划方法和系统 |
CN112215475A (zh) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | 轨道交通的行车组织方案设计系统 |
US11714829B2 (en) * | 2020-12-14 | 2023-08-01 | Sap Se | Parallel calculation of access plans delimitation using table partitions |
CN113320575B (zh) * | 2021-05-19 | 2022-07-15 | 卡斯柯信号有限公司 | 支持后备控车模式和人工故障处理方式的tacs系统 |
CN113650655B (zh) * | 2021-08-13 | 2022-12-02 | 卡斯柯信号有限公司 | 一种基于ctc3.0的本务机摘挂计划自动生成与执行方法 |
CN113591327B (zh) * | 2021-08-17 | 2023-12-19 | 广东汇通信息科技股份有限公司 | 一种基于vissim的局部交通规划多尺度评价方法 |
US20240227884A1 (en) * | 2023-01-09 | 2024-07-11 | Progress Rail Services Corporation | Predictive control system visualization for automatic train operation |
CN116110228B (zh) * | 2023-04-06 | 2023-07-07 | 齐鲁云商数字科技股份有限公司 | 一种基于区块链的城市交通快速化引导系统 |
CN117558132B (zh) * | 2024-01-11 | 2024-03-15 | 北京华创智芯科技有限公司 | 基于大数据的交通管理平台数据处理方法及系统 |
CN118387169B (zh) * | 2024-06-24 | 2024-09-24 | 华侨大学 | 基于增量mapf的轨道交通路径规划方法及相关装置 |
CN118536688B (zh) * | 2024-07-26 | 2025-02-25 | 山东文旅云智能科技有限公司 | 一种基于人工智能的旅游路线规划方法及系统 |
Family Cites Families (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3706969A (en) * | 1971-03-17 | 1972-12-19 | Forney Eng Co | Airport ground aircraft automatic taxi route selecting and traffic control system |
US4041283A (en) * | 1975-07-25 | 1977-08-09 | Halliburton Company | Railway train control simulator and method |
US4122523A (en) * | 1976-12-17 | 1978-10-24 | General Signal Corporation | Route conflict analysis system for control of railroads |
US4361202A (en) * | 1979-06-15 | 1982-11-30 | Michael Minovitch | Automated road transportation system |
US4883245A (en) * | 1987-07-16 | 1989-11-28 | Erickson Jr Thomas F | Transporation system and method of operation |
US5574648A (en) * | 1990-10-09 | 1996-11-12 | Pilley; Harold R. | Airport control/management system using GNSS-based methods and equipment for the control of surface and airborne traffic |
US5177684A (en) * | 1990-12-18 | 1993-01-05 | The Trustees Of The University Of Pennsylvania | Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto |
US5257194A (en) * | 1991-04-30 | 1993-10-26 | Mitsubishi Corporation | Highway traffic signal local controller |
US5519618A (en) * | 1993-08-02 | 1996-05-21 | Massachusetts Institute Of Technology | Airport surface safety logic |
US5374932A (en) * | 1993-08-02 | 1994-12-20 | Massachusetts Institute Of Technology | Airport surface surveillance system |
US6321158B1 (en) * | 1994-06-24 | 2001-11-20 | Delorme Publishing Company | Integrated routing/mapping information |
US5802492A (en) * | 1994-06-24 | 1998-09-01 | Delorme Publishing Company, Inc. | Computer aided routing and positioning system |
US5559707A (en) * | 1994-06-24 | 1996-09-24 | Delorme Publishing Company | Computer aided routing system |
US7539624B2 (en) * | 1994-09-01 | 2009-05-26 | Harris Corporation | Automatic train control system and method |
US5828979A (en) * | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US6459964B1 (en) * | 1994-09-01 | 2002-10-01 | G.E. Harris Railway Electronics, L.L.C. | Train schedule repairer |
US5623413A (en) * | 1994-09-01 | 1997-04-22 | Harris Corporation | Scheduling system and method |
AU7277396A (en) * | 1995-09-07 | 1997-03-27 | Siemens Aktiengesellschaft | Control process for track-bound vehicles |
US6218961B1 (en) * | 1996-10-23 | 2001-04-17 | G.E. Harris Railway Electronics, L.L.C. | Method and system for proximity detection and location determination |
AU734038B2 (en) * | 1997-02-07 | 2001-05-31 | Ge-Harris Railways Electronics, L.L.C. | A system and method for automatic train operation |
US6331068B1 (en) * | 1999-02-18 | 2001-12-18 | Lacks Industries, Inc. | Flexible lamp mounting |
US6356383B1 (en) * | 1999-04-02 | 2002-03-12 | Corvis Corporation | Optical transmission systems including optical amplifiers apparatuses and methods |
US6587738B1 (en) | 1999-12-30 | 2003-07-01 | Ge-Harris Railway Electronics, L.L.C. | Optimal locomotive assignment for a railroad network |
US6304801B1 (en) * | 1999-12-30 | 2001-10-16 | Ge-Harris Railway Electronics, L.L.C. | Train corridor scheduling process including a balanced feasible schedule cost function |
US6546371B1 (en) | 1999-12-30 | 2003-04-08 | Ge-Harris Railway Electronics, L.L.C. | Train corridor scheduling process including various cost functions associated with railway operations |
AU2452901A (en) | 1999-12-31 | 2001-07-16 | Michael S Crone | Cost reactive resource scheduler and method |
US6356838B1 (en) | 2000-07-25 | 2002-03-12 | Sunil Paul | System and method for determining an efficient transportation route |
US6456371B1 (en) * | 2000-09-25 | 2002-09-24 | The Boeing Company | Attitude determination with earth horizon-crossing indicators and relative-attitude propagation |
-
2003
- 2003-12-19 CA CA2510432A patent/CA2510432C/en not_active Expired - Lifetime
- 2003-12-19 US US10/538,246 patent/US7386391B2/en active Active
- 2003-12-19 RU RU2005123061/09A patent/RU2314561C2/ru active
- 2003-12-19 AT AT03814373T patent/ATE461090T1/de not_active IP Right Cessation
- 2003-12-19 AU AU2003300354A patent/AU2003300354B2/en not_active Expired
- 2003-12-19 WO PCT/US2003/041207 patent/WO2004059446A2/en active Application Filing
- 2003-12-19 DE DE60331772T patent/DE60331772D1/de not_active Expired - Lifetime
- 2003-12-19 CN CNA2003801068815A patent/CN1729465A/zh active Pending
- 2003-12-19 JP JP2004564034A patent/JP2006511394A/ja not_active Withdrawn
- 2003-12-19 EP EP03814373A patent/EP1573578B1/en not_active Expired - Lifetime
- 2003-12-19 KR KR1020057011555A patent/KR20050085832A/ko not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
JP2006511394A (ja) | 2006-04-06 |
CA2510432C (en) | 2011-02-22 |
CA2510432A1 (en) | 2004-07-15 |
ATE461090T1 (de) | 2010-04-15 |
EP1573578A2 (en) | 2005-09-14 |
EP1573578A4 (en) | 2007-05-30 |
AU2003300354A1 (en) | 2004-07-22 |
EP1573578B1 (en) | 2010-03-17 |
CN1729465A (zh) | 2006-02-01 |
AU2003300354B2 (en) | 2009-03-26 |
US20060074544A1 (en) | 2006-04-06 |
RU2314561C2 (ru) | 2008-01-10 |
WO2004059446A2 (en) | 2004-07-15 |
WO2004059446A3 (en) | 2004-12-09 |
DE60331772D1 (de) | 2010-04-29 |
RU2005123061A (ru) | 2006-02-27 |
US7386391B2 (en) | 2008-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20050085832A (ko) | 동적 최적화 트래픽 플래닝 방법 및 시스템 | |
Altazin et al. | A multi-objective optimization-simulation approach for real time rescheduling in dense railway systems | |
Corman et al. | Closing the loop in real-time railway control: Framework design and impacts on operations | |
JP7066365B2 (ja) | ダイヤ作成装置および自動列車制御システム | |
D'Ariano et al. | Conflict resolution and train speed coordination for solving real-time timetable perturbations | |
Mazzarello et al. | A traffic management system for real-time traffic optimisation in railways | |
D'Ariano | Improving real-time train dispatching: models, algorithms and applications | |
Corman et al. | Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area | |
US8433461B2 (en) | Method of planning the movement of trains using pre-allocation of resources | |
US8082071B2 (en) | System and method of multi-generation positive train control system | |
Corman et al. | Dispatching trains during seriously disrupted traffic situations | |
Corman | Real-time Railway Traffic Management: Dispatching in complex, large and busy railway networks | |
Shakibayifar et al. | A multi-objective decision support system for real-time train rescheduling | |
Missikoff | An object-oriented approach to an information and decision support system for railway traffic control | |
Toletti | Automated railway traffic rescheduling and customer information | |
Van Thielen | Conflict prevention strategies for real-time railway traffic management | |
JP7403421B2 (ja) | 運行計画変更支援装置、判断モデル作成装置、判断モデル作成プログラム、及び列車運行管理システム | |
Derevitskiy et al. | Simulation of emergency care for patients with ACS in Saint Petersburg for ambulance decision making | |
Bagherian | Network-wide analysis and design of transit priority treatments | |
JP2022502777A (ja) | マルチモーダル交通ネットワークの調整方法 | |
CARNAGHI | Decision support systems in transportation: the case of surface urban public transport | |
König | Three essays on delay management for passenger rail services | |
Ghasempournejad Seifdokht | Adaptive Railway Traffic Control using Approximate Dynamic Programming | |
Middelkoop et al. | Optimizing train traffic: demonstrating benefits in a case study | |
Shakibayifar et al. | Simulation analysis of the effect of doubling and electrification on the reliability of the rail networks: A case study of Tehran-Mashhad railroad |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0105 | International application |
Patent event date: 20050620 Patent event code: PA01051R01D Comment text: International Patent Application |
|
PG1501 | Laying open of application | ||
A201 | Request for examination | ||
PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 20070830 Comment text: Request for Examination of Application |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20090529 Patent event code: PE09021S01D |
|
E601 | Decision to refuse application | ||
PE0601 | Decision on rejection of patent |
Patent event date: 20091130 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 20090529 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |