Casting process, upeer mold assembly and method of securing core to upper mold Download PDFInfo
- Publication number
- EP1927415A1 EP1927415A1 EP07120818A EP07120818A EP1927415A1 EP 1927415 A1 EP1927415 A1 EP 1927415A1 EP 07120818 A EP07120818 A EP 07120818A EP 07120818 A EP07120818 A EP 07120818A EP 1927415 A1 EP1927415 A1 EP 1927415A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- upper mold
- core
- mold assembly
- casting
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D23/00—Casting processes not provided for in groups B22D1/00 - B22D21/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D18/00—Pressure casting; Vacuum casting
- B22D18/02—Pressure casting making use of mechanical pressure devices, e.g. cast-forging
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C21/00—Flasks; Accessories therefor
- B22C21/12—Accessories
- B22C21/14—Accessories for reinforcing or securing moulding materials or cores, e.g. gaggers, chaplets, pins, bars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/10—Cores; Manufacture or installation of cores
- B22C9/108—Installation of cores
Definitions
- the present invention relates to a method of producing a casting (i.e. a casting method), an upper mold assembly used in the method, and a method of securing a core to an upper mold. More particularly the present invention relates to a sand mold press-casting process wherein an upper mold is put on a lower mold to define a cavity into which a molten metal is poured to produce a casting.
- a mold cavity for casting is defined by putting an upper mold on a lower mold, and a molten metal is poured in the cavity for production of a casting.
- the common casting process employs a gating system which necessarily needs flow channels of the pouring molten metal for controlling a flow of the pouring molten metal in order to obtain a high-quality casting free from inclusion of impurities and gasses, but the flow channels are irrelevant to shapes of a casting. In this sense, a yield of casting is degraded, and labor and time are required for separating additional metal pieces, e.g. risers and runners, from a casting after crushing sand molds, resulting in a decrease in productivity of casting and an increase in production costs.
- JP-A-2005-52871 a sand mold press-casting process is proposed in JP-A-2005-52871 .
- the proposed process uses (1) a lower mold, which is prepared by a proper molding method so as to provide a cavity just for defining a profile of a casting itself without a cavity for the aforesaid gating system and (2) an upper mold, which is prepared by a proper molding method to a form with a projection for defining a mold cavity for a casting in combination with the cavity of the lower mold.
- an amount of a molten metal necessary for producing the casting is poured in the cavity of the lower mold, and then the upper mold is put on the lower mold in the manner that the projection of the upper mold is fitted into the poured molten metal so as to define a mold cavity necessary for a profile of the casting.
- the sand mold press-casting process has the advantage that a casting with an objective profile is produced with high yield of molten metals, but can not be simply applied to a casting method using cores due to flotation of the cores.
- a recess with a shape similar to a core print of a core is generally formed as a part for receiving the core print in a lower mold, the core is placed in the receiving part and clamped between the upper and lower molds, and subsequently a molten metal is poured into the mold, as disclosed JP-A-9-57396 .
- the sand mold press-casting process involves a step of putting an upper mold on a lower mold after pouring a molten metal in the lower mold. If a core is simply placed in the lower mold before pouring, the core unfavorably floats due to buoyancy of the poured molten metal, resulting in defective a profile of a casting.
- an object of the present invention resides in providing a new casting technique in the sand mold press-casting process with use of a core, which casting technique ensures a casting operation with a high yield while preventing occurrence of defective profiles of a cast product.
- a casting process with use of a lower mold having a hollow corresponding to a partial profile of a casting, and an upper mold which supports a core and defines a mold cavity in cooperation with the lower mold, wherein the casting process comprises the steps of:
- the status information of the upper mold assembly is of a pressure applied from the upper mold assembly to the molten metal in the hollow and/or the lower mold, or of a total descending movement distance of the assembled upper mold.
- an upper mold assembly which comprises an upper mold and a core secured to the upper mold, and which defines a mold cavity in cooperation with the lower mold.
- the core is preferably secured to the upper mold by a mechanical means.
- the core is preferably secured to the upper mold by an adhesive.
- the core is preferably secured to the upper mold by a frictional fitting relationship between a projection formed on the core and a recess formed in the upper mold.
- the core is preferably secured to the upper mold by an engagement relationship between an engaging projection formed on the core and a stamped molding sand of the upper mold.
- a plurality of cores may be secured to the upper mold, and a plurality of hollows corresponding to the plurality of cores may be formed in the lower mold, whereby making possible to produce simultaneously a plurality of castings by a single pair of the upper and lower molds.
- a casting mold consisting of the upper mold and a mating lower mold is used, which upper and lower molds are prepared by foundry molding, respectively, and which are superimposed on each other so as to define a mold cavity having a product profile for obtaining a casting, wherein the core has a partial profile of the casting, and wherein the method comprises steps of:
- the core may have one or more projections
- the upper mold also may have one or more recesses for receiving the one or more projections, wherein the projections and the recesses are so formed that at least a deep region of each of the recesses has an inner diameter smaller than an outer diameter of a complementary contact part of each of the projections.
- the core supporter supporting the core model is moved relatively to the upper mold so as to bring the core model into contact with the upper mold, whereby preferably the information value of securing the core to the upper mold is a travel distance of the core supporter from an initial position when a pressure applied to the core model from the upper mold meets a predetermined information value.
- a press controlling method which method comprises: preparing the upper mold assembly by securing the core to the upper mold; pouring a necessary minimum amount of a molten metal for obtaining a casting in the hollow of the lower mold; moving downwardly the upper mold assembly to the lower mold; detecting a status information of the upper mold assembly in a state when the upper mold assembly is superimposed on the lower mold, or arrived at the lower mold; and stopping the descending movement of the upper mold assembly after detecting that the status information comes at a predetermined state, whereby the press process is completed, it is possible to shorten a time length from the pouring step to the completion of the press process to be minimum.
- a press process can be completed before a temperature of a molten metal poured in the mold cavity drops to occur a non-uniform temperature distribution in the molten metal, whereby it is possible to make a uniform metal structure of a casting.
- Fig. 1 is a schematic vertical sectional view illustrating a casting machine comprising a lower mold 10 and an upper mold assembly 20 as one embodiment of the invention.
- the lower mold 10 has a hollow 12 corresponding to a partial profile of a casting.
- the hollow 12 defines a mold cavity in combination with an upper mold 22 superimposed on the lower mold 10.
- the upper mold assembly 20 has a core 24 secured to a bottom of the upper mold 22.
- the core 24 serves as a projection 26 for shaping the profile of the casting in combination with the hollow 12.
- securing of the core 24 to the upper mold 22 is performed by mechanical connection, connection with an adhesive, connection with a frictional force or stamping molding sand.
- a bolt 28a and a nut 28b are used as a mechanical connection means.
- the bolt 28a is previously implanted in the core 24.
- the upper mold 22 is designed in the manner that the bolt 28a passes through the upper mold 22 along a vertical direction and the core 24 is held in contact with a bottom of the upper mold 22.
- a top of the bolt 28a is screwed into the nut 28b to prevent the core 24 to fall from the upper mold 22.
- the bolt 28a may be alternatively inserted through the pre-formed upper mold 22 so as to secure the core 24 at a position facing to the bottom of the upper mold 22. Wires or wedges may be used as a mechanical connection means instead of the bolt and the nut.
- Fig. 3 illustrates a core 24A attached to an upper mold 22 with an adhesive.
- a plurality of projections 24a, formed on a surface of the core 24A, are fitted into respective recesses 22a formed in a bottom of the upper mold 22, and bonded to inner surfaces of the recesses 22a with an adhesive B.
- the adhesive B may be organic or inorganic without any restriction on its kind.
- a quick drying strong adhesive based on a vinyl acetate resin was used as the adhesive B in this embodiment. If the core 24A is weighty, a bonding strength can be increased by properly enlarging a bonded plane or properly designing a shape of the bonded plane.
- Fig. 4 illustrates a core 24B attached to an upper mold 22 with a frictional force.
- Projections 24b formed on a surface of the core 24B are fitted into respective recesses 22b formed in a bottom of the upper mold 22.
- the projections 24b and the recesses 22b are designed with substantially the same shapes and dimensions.
- inner surfaces of the recesses 22b are scraped, and a frictional force is generated by the scraped molding sand grains entrained in gaps between the inner surfaces and the projections 24b whereby firmly holding the projections 24b in the recesses 22b, so that the core 24B is secured to the upper mold 22.
- Fig. 5 illustrates a core 24C attached to an upper mold 22 with use of molding sand.
- the core 24C which has projections 24c each having a diameter enlarged toward the distal end thereof, is integrally incorporated with the upper mold 22 when foundry molding, so that the core 24C is firmly secured in the upper mold 22 by the projections 24c embedded in stamped molding sand.
- the securing means for attaching the cores 24, 24A, 24B and 24C to the upper mold 22, as shown in Figs. 2 to 5 are not limited to a single use of any one of them but also may be used in combination therewith for a single mold.
- Figs. 2 to 5 show one core 24, 24A, 24B or 24C attached to the respective upper mold 22, but a plurality of cores may be attached to one upper mold 22.
- the upper mold assembly 22 shown in Fig. 1 is loaded on a lift 32 and vertically moved toward a lower mold 10 along guide rods 30.
- the lift 32 may be a proper means, e.g. an electric, hydraulics or pneumatic type
- an electric servo cylinder is preferably used for controlling a height level and a descending speed of the upper mold assembly 20 with high accuracy.
- the electric servo cylinder includes screws, a driving motor and a rotary encoder as a position transducer.
- An electric servo cylinder for controlling a descending speed of the upper mold assembly 20 and a linear scale for detecting a position of the upper mold assembly 20 and controlling a height level of the upper mold assembly 20 in response to the detected value may be used in stead of the electric servo cylinder capable of controlling a height level and a descending speed of the upper mold assembly 20.
- a molten metal in a necessity minimum amount for shaping a casting is poured in a hollow 12 of a lower mold 10, as shown in Fig. 6 .
- An amount of the molten metal to be poured in the hollow 12 is properly determined in response to a demand.
- the molten metal to be poured is preferably kept at a temperature higher by 100°C or more than its liquidus temperature.
- an upper mold assembly 20 is immediately put on the lower mold 10 before the molten metal is solidified in the lower mold 10.
- the upper mold assembly 20 is descended at a predetermined first speed quickly down to a predetermined height level just before coming into contact with a surface of the molten metal.
- the descending speed is 375 mm/second for instance, but the value is not restrictive.
- the descending speed is properly determined within a range whereat movement of the upper mold assembly 20 does not induce vibration of a casting machine as a whole.
- the proper range of the first descending speed is 300 to 1000 mm/second.
- the height level just before the upper mold assembly 20 comes into contact with the surface of the molten metal in the hollow 12 is 1 to 100 mm as a minimum distance from the surface of the molten metal to the upper mold 22 or the core 24.
- a descending speed of the upper mold assembly 20 including the upper mold 22 and the core 24 is changed to a predetermined second speed such that the upper mold assembly 20 slowly moves downwardly, as shown in Fig. 8 .
- the second speed is too high, the molten metal is made turbulent so that gases are often included in a casting. If the second speed is too low on the contrary, solidification of the molten metal is completed before the upper mold assembly 20 arrives at a final position. Therefore, the second descending speed is properly determined in a range from 1 to 100 mm/second.
- the core 24 is firmly secured to the upper mold 22 in a pouring step without any fear about floatation of the core 24 in the molten metal.
- the upper mold assembly 20 is moved to downwards at the predetermined second speed in this way and put on the lower mold 10, as shown in Fig. 9 , and a status information of affections provided to the lower mold 10 by the upper mold assembly 20 is detected.
- the status information may be a pressure applied to the lower mold 10 from the upper mold assembly 20 or a total descending distance of the upper mold assembly 20.
- the pressure can be detected by a load cell attached to a distal end of a piston rod.
- the descending movement of the upper mold assembly 20 is caused to stop.
- the descending movement of the upper mold assembly 20 is caused to stop when a detected pressure reaches 1 kPa, and kept as such for a time length during which the molten metal is completely solidified, whereby a casting process is finished.
- the upper mold assembly 20 with the core 24 secured to the upper mold 22 is moved downwardly to the lower mold 10 whereby effecting the casting operation, so that the core 24 is prevented from floating.
- a movement time length of the core 24 in the molten metal can be adjusted to be minimum, so that it is possible to prevent deformation of the core 24 due to a heat or pressure of the molten metal and occurrence of casting defects such as misrun due to a temperature change of the molten metal. Consequently, according to the invention, when effecting casting operation by a sand mold press-casting process with use of a core, it is possible to carry out a casting operation without occurrence of shape defects of products.
- the status information of the upper mold assembly may be given in a descending period other than the situation that the upper mold assembly is put on the lower mold.
- the upper mold assembly may be prepared during or after a molten metal pouring step.
- Fig. 10 illustrates a core 40, which is loaded on a core supporter 58 of a core securing device 50 and located at a position facing to an upper mold 60 above the core 40.
- the core 40 has a rod-shaped projection 42 at a center of its top surface.
- the rod-shaped projection 42 is fitted into a recess 62 formed at a center of a bottom of the upper mold 60, so as to secure the core 40 to the upper mold 60 by frictional fitting engagement of the rod-shaped projection 42 with the recess 62.
- the core securing device 50 mainly comprises a frame 90 supported with a base (not shown), sliding guide rods 52 attached to the frame 90, a pneumatically, hydraulically or electrically driving cylinder 54 having an upper part coupled to a frame 100 spanned over top ends of the guide rods 52 and a core supporter 58 secured to a top of a piston rod 56 of the driving cylinder 54.
- An axis of the driving cylinder 54 (i.e. an axis of the piston rod 56) is aligned with an axis of the rod-shaped projection 42 of the core 40. These axes are also aligned with an axis of an upper mold 60.
- the driving cylinder 54 in a state of Fig. 10 is operated for ascending the core 40, the rod-shaped projection 42 of the core 40 is fitted into the recess 62 of the upper mold 60.
- Fig. 11 shows a state that the core 40 is lifted to a position in close contact with the upper mold 60 by fitting the rod-shaped projection 42 into the recess 62.
- the rod-shaped projection 42 and the recess 62 are both formed to have a frustum conical shape, respectively.
- the rod-shaped projection may be formed to be a round rod having a constant diameter.
- the rod-shaped projection 42 has a length smaller than a depth of the recess 62, so that some allowance remains at a part between a top of the rod-shaped projection 42 and a bottom (i.e. a deepest part) of the recess 62 when the rod-shaped projection 42 is completely fitted into the recess 62.
- a relationship of B ⁇ a ⁇ b ⁇ A is preferably maintained between the rod-shaped projection 42 and the recess 62, wherein “a” is an outer diameter of a top of the rod-shaped projection 42, “b” is an outer diameter of a root of the rod-shaped projection 42, “A” is an inner diameter of an inlet of the recess 62 and “B” is an inner diameter of the recess 62 at a position near a deepest part at which the top of the rod-shaped projection 42 arrives.
- the specified dimensional relationship assures smooth fitting motion of the rod-shaped projection 42 into the recess 62.
- the top of the rod-shaped projection 42 is pressed onto an inner wall of the recess 62 so that the distal end of the rod-shaped projection 42 bites the inner wall of the recess 62.
- resultant scraped chips are entrained in an allowance between a top of the rod-shaped projection 42 and a bottom (i.e. a deepest part) of the recess 62.
- the core 40 has one rod-shaped projection 42 as above-mentioned, but a plurality of rod-shaped projections may be formed in a core 40A as another example shown in Fig.13 .
- the core 40A has two rod-shaped projections 42a and 42b, while an upper mold 60A has two recesses 62a and 62b each corresponding to the rod-shaped projections 42a and 42b.
- a dimensional relationship between the rod-shaped projections 42a and 42b and the recesses 62a and 62b is specified in the same way as the dimensional relationship between the rod-shaped projection 42 and the recess 62.
- Fig. 14 illustrates a core model 70, which has the same profile and dimensions as those of the core 40 except for omission of the rod-shaped projection, loaded on the core supporter 58 of the core securing device 50.
- the core securing device 50 in Fig. 14 is illustrated in a core loading position offset from an axis of the upper mold 60, at a fixed position, held by the upper mold holder 80.
- the core securing device 50 moves from the position of Fig. 14 to a position of Fig. 15 where an axis of the core model 70 coincides with an axis of the upper mold 60 held at the predetermined position.
- the driving cylinder 54 is started to extend the piston rod 56 and to bring the core model 70 on the core supporter 58 in close contact with the upper mold 60.
- a pressure applied to the piston rod 56 from the upper mold 60 rises. Further extension of the piston rod 56 abruptly raises the pressure.
- An upward motion of the core model 70 after coming into contact with the upper mold 60 leads to an increase in a contact pressure applied to the upper mold 60.
- Fig. 17 is a graph representing a relationship between a stroke (abscissas) of the piston rod 56 and a pressure (ordinate) applied to the piston rod 56 from the upper mold 60 when bringing the core model 70 into close contact with the upper mold 60.
- a proper contact pressure is estimated to a value near a point X (i.e. a value range of 0.008 to 0.009 MPa).
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
- Casting Devices For Molds (AREA)
Abstract
Description
- The present invention relates to a method of producing a casting (i.e. a casting method), an upper mold assembly used in the method, and a method of securing a core to an upper mold. More particularly the present invention relates to a sand mold press-casting process wherein an upper mold is put on a lower mold to define a cavity into which a molten metal is poured to produce a casting.
- According to a conventional sand mold casting process, a mold cavity for casting is defined by putting an upper mold on a lower mold, and a molten metal is poured in the cavity for production of a casting. The common casting process employs a gating system which necessarily needs flow channels of the pouring molten metal for controlling a flow of the pouring molten metal in order to obtain a high-quality casting free from inclusion of impurities and gasses, but the flow channels are irrelevant to shapes of a casting. In this sense, a yield of casting is degraded, and labor and time are required for separating additional metal pieces, e.g. risers and runners, from a casting after crushing sand molds, resulting in a decrease in productivity of casting and an increase in production costs.
- In order to raise a yield of casting, a sand mold press-casting process is proposed in
JP-A-2005-52871 - The sand mold press-casting process has the advantage that a casting with an objective profile is produced with high yield of molten metals, but can not be simply applied to a casting method using cores due to flotation of the cores. According to a conventional gating system for settling a core at a proper position in a casting mold, a recess with a shape similar to a core print of a core is generally formed as a part for receiving the core print in a lower mold, the core is placed in the receiving part and clamped between the upper and lower molds, and subsequently a molten metal is poured into the mold, as disclosed
JP-A-9-57396 - Taking the above problem into consideration, an object of the present invention resides in providing a new casting technique in the sand mold press-casting process with use of a core, which casting technique ensures a casting operation with a high yield while preventing occurrence of defective profiles of a cast product.
- In light of the above object, according to a first aspect of the invention, there is provided a casting process with use of a lower mold having a hollow corresponding to a partial profile of a casting, and an upper mold which supports a core and defines a mold cavity in cooperation with the lower mold, wherein the casting process comprises the steps of:
- preparing an upper mold assembly by securing a core to an upper mold;
- pouring a necessary minimum amount of a molten metal for obtaining a casting in the hollow of the lower mold;
- moving downwardly the upper mold assembly at a predetermined first speed to a predetermined height level just before the upper mold assembly comes into contact with a surface of the molten metal in the hollow of the lower mold;
- further moving downwardly the upper mold assembly, from the predetermined height level, at a predetermined second speed by changing the descending speed of the upper mold assembly from the first speed to the second speed;
- detecting a status information of the upper mold assembly in a state when the upper mold assembly is superimposed on the lower mold, or arrived at the lower mold; and
- stopping the descending movement of the upper mold assembly after detecting that the status information comes at a predetermined state.
- In the casting process of the invention, preferably the status information of the upper mold assembly is of a pressure applied from the upper mold assembly to the molten metal in the hollow and/or the lower mold, or of a total descending movement distance of the assembled upper mold.
- According to a second aspect of the invention, there is provided an upper mold assembly which comprises an upper mold and a core secured to the upper mold, and which defines a mold cavity in cooperation with the lower mold.
- In the upper mold assembly, the core is preferably secured to the upper mold by a mechanical means.
- In the upper mold assembly, the core is preferably secured to the upper mold by an adhesive.
- In the upper mold assembly, the core is preferably secured to the upper mold by a frictional fitting relationship between a projection formed on the core and a recess formed in the upper mold.
- In the upper mold assembly, the core is preferably secured to the upper mold by an engagement relationship between an engaging projection formed on the core and a stamped molding sand of the upper mold.
- In any of the above upper mold assemblies, a plurality of cores may be secured to the upper mold, and a plurality of hollows corresponding to the plurality of cores may be formed in the lower mold, whereby making possible to produce simultaneously a plurality of castings by a single pair of the upper and lower molds.
- According to a third aspect of the invention, there is provided a method of securing a core to an upper mold with use of a frictional force,
wherein a casting mold consisting of the upper mold and a mating lower mold is used, which upper and lower molds are prepared by foundry molding, respectively, and which are superimposed on each other so as to define a mold cavity having a product profile for obtaining a casting,
wherein the core has a partial profile of the casting, and
wherein the method comprises steps of: - preparing the upper mold having a recess for securing the core therein and the core having a projection to be fitted into the recess; and press-fitting the projection of the core into the recess of the upper mold by relatively moving a core supporter for supporting the core to the upper mold such that with use of an information value of securing the core to the upper mold, the press-fitting operation is effected until the information value meets a predetermined information value of securing the core to the upper mold.
- In the core securing method of the invention, preferably the core may have one or more projections, and the upper mold also may have one or more recesses for receiving the one or more projections, wherein the projections and the recesses are so formed that at least a deep region of each of the recesses has an inner diameter smaller than an outer diameter of a complementary contact part of each of the projections.
- In the core securing method of the invention, provided that with use of a core model without a projection, the core supporter supporting the core model is moved relatively to the upper mold so as to bring the core model into contact with the upper mold, whereby preferably the information value of securing the core to the upper mold is a travel distance of the core supporter from an initial position when a pressure applied to the core model from the upper mold meets a predetermined information value.
- According to the casting process and the upper mold assembly of the invention, since a press controlling method is employed, which method comprises: preparing the upper mold assembly by securing the core to the upper mold; pouring a necessary minimum amount of a molten metal for obtaining a casting in the hollow of the lower mold; moving downwardly the upper mold assembly to the lower mold; detecting a status information of the upper mold assembly in a state when the upper mold assembly is superimposed on the lower mold, or arrived at the lower mold; and stopping the descending movement of the upper mold assembly after detecting that the status information comes at a predetermined state, whereby the press process is completed, it is possible to shorten a time length from the pouring step to the completion of the press process to be minimum. By shortening the time length for the press process, a press process can be completed before a temperature of a molten metal poured in the mold cavity drops to occur a non-uniform temperature distribution in the molten metal, whereby it is possible to make a uniform metal structure of a casting.
- Further, in the case where a pressing force or a descending distance of the upper mold assembly is detected as the status information when pressing, it is possible to prevent the upper mold assembly from over-pressing the lower mold whereby realizing a stable production of a casting with a high accuracy.
- According to the core securing method of the invention, the following advantages are expectable.
- 1. In the method of securing the core to the upper mold with use of a frictional force, it is possible to save costs for parts by omission of securing parts or means as compared with a method of securing the core to the upper mold with a mechanically securing member or an adhesive. Further, since a work of fitting engagement of the core and the upper mold is simple, it is possible to enhance the productivity of the core securing.
- 2. In order to frictionally engage the core with the upper mold, it is needed only to press the core being supported by the core supporter against the upper mold by relative movement of the core to the upper mold. In this connection, when the core supporter is located under the upper mold and the core is loaded on the top of the core supporter whereby the core is brought into contact with the upper mold by lifting the core supporter, since it is unnecessary to hold the core with utilization of a holder or a vacuum suction means, a core securing device can be designed to have a simple structure.
- 3. It is possible to set a proper securing position for the core by measuring a contact load value between the upper mold and the core whereby realizing a stable size of a product.
-
-
Fig. 1 is a schematic vertical sectional view showing a relationship between an upper mold assembly and a lower mold as one embodiment of the invention; -
Fig. 2 is a schematic vertical sectional view of the upper mold assembly as one embodiment of the invention, which shows a mechanical connection relationship between the core and the upper mold; -
Fig. 3 is a schematic vertical sectional view of an upper mold assembly as one embodiment of the invention, which shows an adhesive connection relationship between a core and an upper mold; -
Fig. 4 is a schematic vertical sectional view of an upper mold assembly as one embodiment of the invention, which shows a frictional connection relationship between a core and an upper mold; -
Fig. 5 is a schematic vertical sectional view of an upper mold assembly as one embodiment of the invention, which shows a connection relationship with use of molding sand between a core and an upper mold; -
Fig. 6 is a schematic vertical sectional view illustrating a pouring operation with use of an upper mold assembly and a lower mold as one embodiment of the invention; -
Fig. 7 is a schematic vertical sectional view illustrating a descending movement state of the upper mold assembly at a first speed after the pouring operation shown inFig. 6 ; -
Fig. 8 is a schematic vertical sectional view illustrating a further descending movement state of the upper mold assembly at a second speed in succession to the state shown inFig. 7 ; -
Fig. 9 is a schematic vertical sectional view illustrating a state when the descending movement of the upper mold assembly is stopped after the upper mold assembly is superimposed on and pressed to the lower mold in succession to the state shown inFig. 8 ; -
Fig. 10 is a schematic vertical sectional view, as one embodiment of the invention, which illustrates a state when a core loaded on a core supporter of a core securing device is located at a position facing to an upper mold above the core; -
Fig. 11 is a schematic view illustrating a state when the core is brought into close contact with the upper mold after the core supporter has been lifted; -
Fig. 12 is a schematic sectional view illustrating a fitting engagement relationship between a core and an upper mold as one embodiment of the invention; -
Fig. 13 is a schematic view illustrating a core and an upper mold as another embodiment of the invention; -
Fig. 14 is a schematic view illustrating an operation with use of a core model for pre-confirming a travel distance of a core for securing the core to an upper mold; -
Fig. 15 is a schematic view illustrating the core model located at a lower position of the upper mold; -
Fig. 16 is a schematic view illustrating the core model brought into close contact with the upper mold; and -
Fig. 17 is a graph showing a relationship between a stroke (abscissa) of a piston rod and a pressure (ordinate) applied to the piston rod from the upper mold with respect toFigs. 14 to 16 . - Referring to the attached drawings, embodiments of the present invention will be described herein below.
-
Fig. 1 is a schematic vertical sectional view illustrating a casting machine comprising alower mold 10 and anupper mold assembly 20 as one embodiment of the invention. - The
lower mold 10 has a hollow 12 corresponding to a partial profile of a casting. The hollow 12 defines a mold cavity in combination with anupper mold 22 superimposed on thelower mold 10. Theupper mold assembly 20 has a core 24 secured to a bottom of theupper mold 22. Thecore 24 serves as aprojection 26 for shaping the profile of the casting in combination with the hollow 12. - In order to couple the
upper mold 22 and thecore 24 for fabrication of theupper mold assembly 20, securing of the core 24 to theupper mold 22 is performed by mechanical connection, connection with an adhesive, connection with a frictional force or stamping molding sand. - In
Figs. 1 and2 , abolt 28a and anut 28b are used as a mechanical connection means. Thebolt 28a is previously implanted in thecore 24. Theupper mold 22 is designed in the manner that thebolt 28a passes through theupper mold 22 along a vertical direction and thecore 24 is held in contact with a bottom of theupper mold 22. A top of thebolt 28a is screwed into thenut 28b to prevent the core 24 to fall from theupper mold 22. Thebolt 28a may be alternatively inserted through the pre-formedupper mold 22 so as to secure the core 24 at a position facing to the bottom of theupper mold 22. Wires or wedges may be used as a mechanical connection means instead of the bolt and the nut. -
Fig. 3 illustrates acore 24A attached to anupper mold 22 with an adhesive. A plurality ofprojections 24a, formed on a surface of thecore 24A, are fitted intorespective recesses 22a formed in a bottom of theupper mold 22, and bonded to inner surfaces of therecesses 22a with an adhesive B. The adhesive B may be organic or inorganic without any restriction on its kind. A quick drying strong adhesive based on a vinyl acetate resin was used as the adhesive B in this embodiment. If thecore 24A is weighty, a bonding strength can be increased by properly enlarging a bonded plane or properly designing a shape of the bonded plane. -
Fig. 4 illustrates a core 24B attached to anupper mold 22 with a frictional force.Projections 24b formed on a surface of the core 24B are fitted intorespective recesses 22b formed in a bottom of theupper mold 22. Theprojections 24b and therecesses 22b are designed with substantially the same shapes and dimensions. When theprojections 24b are fitted into therecesses 22b, inner surfaces of therecesses 22b are scraped, and a frictional force is generated by the scraped molding sand grains entrained in gaps between the inner surfaces and theprojections 24b whereby firmly holding theprojections 24b in therecesses 22b, so that the core 24B is secured to theupper mold 22. -
Fig. 5 illustrates acore 24C attached to anupper mold 22 with use of molding sand. Thecore 24C, which hasprojections 24c each having a diameter enlarged toward the distal end thereof, is integrally incorporated with theupper mold 22 when foundry molding, so that thecore 24C is firmly secured in theupper mold 22 by theprojections 24c embedded in stamped molding sand. - The securing means for attaching the
cores upper mold 22, as shown inFigs. 2 to 5 , are not limited to a single use of any one of them but also may be used in combination therewith for a single mold.Figs. 2 to 5 show onecore upper mold 22, but a plurality of cores may be attached to oneupper mold 22. - The
upper mold assembly 22 shown inFig. 1 is loaded on alift 32 and vertically moved toward alower mold 10 alongguide rods 30. Although thelift 32 may be a proper means, e.g. an electric, hydraulics or pneumatic type, an electric servo cylinder is preferably used for controlling a height level and a descending speed of theupper mold assembly 20 with high accuracy. The electric servo cylinder includes screws, a driving motor and a rotary encoder as a position transducer. An electric servo cylinder for controlling a descending speed of theupper mold assembly 20 and a linear scale for detecting a position of theupper mold assembly 20 and controlling a height level of theupper mold assembly 20 in response to the detected value may be used in stead of the electric servo cylinder capable of controlling a height level and a descending speed of theupper mold assembly 20. - Referring to
Figs. 6 to 9 , a sand mold press-casting process as one embodiment of the invention for producing a casting will be clearly understood from the following explanation. - At first, a molten metal in a necessity minimum amount for shaping a casting is poured in a hollow 12 of a
lower mold 10, as shown inFig. 6 . An amount of the molten metal to be poured in the hollow 12 is properly determined in response to a demand. The molten metal to be poured is preferably kept at a temperature higher by 100°C or more than its liquidus temperature. - According to the invention, an
upper mold assembly 20 is immediately put on thelower mold 10 before the molten metal is solidified in thelower mold 10. In order to press the molten metal in the hollow 12 for transferring a product profile to the molten metal, theupper mold assembly 20 is descended at a predetermined first speed quickly down to a predetermined height level just before coming into contact with a surface of the molten metal. The descending speed is 375 mm/second for instance, but the value is not restrictive. The descending speed is properly determined within a range whereat movement of theupper mold assembly 20 does not induce vibration of a casting machine as a whole. The proper range of the first descending speed is 300 to 1000 mm/second. The height level just before theupper mold assembly 20 comes into contact with the surface of the molten metal in the hollow 12 is 1 to 100 mm as a minimum distance from the surface of the molten metal to theupper mold 22 or thecore 24. - After the
upper mold assembly 20 moves to arrive at the predetermined height level just before coming into contact with the molten metal in the hollow 12, a descending speed of theupper mold assembly 20 including theupper mold 22 and thecore 24 is changed to a predetermined second speed such that theupper mold assembly 20 slowly moves downwardly, as shown inFig. 8 . - If the second speed is too high, the molten metal is made turbulent so that gases are often included in a casting. If the second speed is too low on the contrary, solidification of the molten metal is completed before the
upper mold assembly 20 arrives at a final position. Therefore, the second descending speed is properly determined in a range from 1 to 100 mm/second. - Anyway, the
core 24 is firmly secured to theupper mold 22 in a pouring step without any fear about floatation of the core 24 in the molten metal. - The
upper mold assembly 20 is moved to downwards at the predetermined second speed in this way and put on thelower mold 10, as shown inFig. 9 , and a status information of affections provided to thelower mold 10 by theupper mold assembly 20 is detected. The status information may be a pressure applied to thelower mold 10 from theupper mold assembly 20 or a total descending distance of theupper mold assembly 20. In this embodiment using an electric servo cylinder as alift 32, the pressure can be detected by a load cell attached to a distal end of a piston rod. - When it is detected that the status information meets a predetermined information value, the descending movement of the
upper mold assembly 20 is caused to stop. In this embodiment, the descending movement of theupper mold assembly 20 is caused to stop when a detected pressure reaches 1 kPa, and kept as such for a time length during which the molten metal is completely solidified, whereby a casting process is finished. - As is described above, in the invention, the
upper mold assembly 20 with the core 24 secured to theupper mold 22 is moved downwardly to thelower mold 10 whereby effecting the casting operation, so that thecore 24 is prevented from floating. Further, a movement time length of the core 24 in the molten metal can be adjusted to be minimum, so that it is possible to prevent deformation of thecore 24 due to a heat or pressure of the molten metal and occurrence of casting defects such as misrun due to a temperature change of the molten metal. Consequently, according to the invention, when effecting casting operation by a sand mold press-casting process with use of a core, it is possible to carry out a casting operation without occurrence of shape defects of products. - In this process, many of upper mold assemblies may be previously stocked and sequentially used for each casting step. The status information of the upper mold assembly may be given in a descending period other than the situation that the upper mold assembly is put on the lower mold. The upper mold assembly may be prepared during or after a molten metal pouring step.
- Herein below there will be described an embodiment of connection of a core and an upper mold with use of frictional force.
-
Fig. 10 illustrates a core 40, which is loaded on acore supporter 58 of acore securing device 50 and located at a position facing to anupper mold 60 above thecore 40. Thecore 40 has a rod-shapedprojection 42 at a center of its top surface. The rod-shapedprojection 42 is fitted into arecess 62 formed at a center of a bottom of theupper mold 60, so as to secure the core 40 to theupper mold 60 by frictional fitting engagement of the rod-shapedprojection 42 with therecess 62. - The
core securing device 50 mainly comprises aframe 90 supported with a base (not shown), slidingguide rods 52 attached to theframe 90, a pneumatically, hydraulically or electrically drivingcylinder 54 having an upper part coupled to aframe 100 spanned over top ends of theguide rods 52 and acore supporter 58 secured to a top of apiston rod 56 of the drivingcylinder 54. - An axis of the driving cylinder 54 (i.e. an axis of the piston rod 56) is aligned with an axis of the rod-shaped
projection 42 of thecore 40. These axes are also aligned with an axis of anupper mold 60. When the drivingcylinder 54 in a state ofFig. 10 is operated for ascending thecore 40, the rod-shapedprojection 42 of thecore 40 is fitted into therecess 62 of theupper mold 60. -
Fig. 11 shows a state that thecore 40 is lifted to a position in close contact with theupper mold 60 by fitting the rod-shapedprojection 42 into therecess 62. - A dimensional relationship between the rod-shaped
projection 42 and therecess 62 will become apparent from the following explanation referring toFig. 12 . - The rod-shaped
projection 42 and therecess 62 are both formed to have a frustum conical shape, respectively. Alternatively, the rod-shaped projection may be formed to be a round rod having a constant diameter. - The rod-shaped
projection 42 has a length smaller than a depth of therecess 62, so that some allowance remains at a part between a top of the rod-shapedprojection 42 and a bottom (i.e. a deepest part) of therecess 62 when the rod-shapedprojection 42 is completely fitted into therecess 62. A relationship of B<a<b<A is preferably maintained between the rod-shapedprojection 42 and therecess 62, wherein "a" is an outer diameter of a top of the rod-shapedprojection 42, "b" is an outer diameter of a root of the rod-shapedprojection 42, "A" is an inner diameter of an inlet of therecess 62 and "B" is an inner diameter of therecess 62 at a position near a deepest part at which the top of the rod-shapedprojection 42 arrives. - The specified dimensional relationship assures smooth fitting motion of the rod-shaped
projection 42 into therecess 62. As advance of the rod-shapedprojection 42 through therecess 62, the top of the rod-shapedprojection 42 is pressed onto an inner wall of therecess 62 so that the distal end of the rod-shapedprojection 42 bites the inner wall of therecess 62. When theupper mold 60 is scraped, resultant scraped chips are entrained in an allowance between a top of the rod-shapedprojection 42 and a bottom (i.e. a deepest part) of therecess 62. On the other hand, when the rod-shapedprojection 42 is scraped, resultant scraped chips are entrained in a gap corresponding to a difference between the outer diameter "b" of the root of the rod-shapedprojection 42 and the inner diameter "A" of the inlet of therecess 62. As a result, thecore 40 is firmly secured to theupper mold 60 with the frictional engagement that the rod-shapedprojection 42 bites the inner wall of therecess 62 and coupled with the inner wall of therecess 62. - The
core 40 has one rod-shapedprojection 42 as above-mentioned, but a plurality of rod-shaped projections may be formed in acore 40A as another example shown inFig.13 . In the example ofFig. 13 , thecore 40A has two rod-shapedprojections upper mold 60A has tworecesses projections projections recesses projection 42 and therecess 62. - When the rod-shaped
projection 42 enters into therecess 62 so as to bring the core 40 in close contact with theupper mold 60, operation of the drivingcylinder 54 shall be stopped. For the purpose, it is necessary to preset a stroke of apiston rod 56, i.e. a distance from an initial position of the core 40 on thecore supporter 58, shown inFig. 10 , to a position of the core 40 completely coupled to theupper mold 60, shown inFig. 11 , at a controller of the drivingcylinder 54. The presetting will be understood from the following explanation referring toFigs. 14 to 17 . -
Fig. 14 illustrates acore model 70, which has the same profile and dimensions as those of the core 40 except for omission of the rod-shaped projection, loaded on thecore supporter 58 of thecore securing device 50. Thecore securing device 50 inFig. 14 is illustrated in a core loading position offset from an axis of theupper mold 60, at a fixed position, held by theupper mold holder 80. - The
core securing device 50 moves from the position ofFig. 14 to a position ofFig. 15 where an axis of thecore model 70 coincides with an axis of theupper mold 60 held at the predetermined position. In the state that thecore model 70 is aligned co-axially with theupper mold 60, the drivingcylinder 54 is started to extend thepiston rod 56 and to bring thecore model 70 on thecore supporter 58 in close contact with theupper mold 60. As thecore model 70 comes into contact with theupper mold 60, a pressure applied to thepiston rod 56 from theupper mold 60 rises. Further extension of thepiston rod 56 abruptly raises the pressure. An upward motion of thecore model 70 after coming into contact with theupper mold 60 leads to an increase in a contact pressure applied to theupper mold 60. If the contact pressure excessively increases, theupper mold 60 and/or thecore model 70 would be damaged. In this consequence, operation of the drivingcylinder 54 shall be stopped at a time when the contact pressure reaches a proper value for sticking thecore model 70 to theupper mold 60 with a proper engaging relation. -
Fig. 17 is a graph representing a relationship between a stroke (abscissas) of thepiston rod 56 and a pressure (ordinate) applied to thepiston rod 56 from theupper mold 60 when bringing thecore model 70 into close contact with theupper mold 60. A proper contact pressure is estimated to a value near a point X (i.e. a value range of 0.008 to 0.009 MPa). - From the graph of
Fig. 17 , it is possible to confirm a stroke of thepiston rod 56 need to bring thecore model 70 into close contact with theupper mold 60. The stroke of thepiston rod 56 thus confirmed is preset as a movement distance of the core 40 at a controller of the derivingcylinder 54, when thecore 40 is loaded and secured to theupper mold 60 in an actual preliminary work for casting, so that securing of the core 40 to theupper mold 60 is constantly performed at a proper position for mass production of casting molds capable of producing a high-quality casting. -
- 10
- a lower mold
- 12
- a hollow
- 20
- an upper mold assembly
- 22
- an upper mold
- 22a
- recesses
- 24
- a core
- 26
- a projection
- 28a
- a bolt
- 28b
- a nut
- 30
- a guide rod
- 32
- a lift
- 40
- a core
- 42
- a rod-shaped projection
- 50
- a core securing device
- 52
- a guide rod
- 54
- a driving cylinder
- 56
- a piston rod
- 58
- a core supporter
- 60
- an upper mold
- 62
- a recess
- 70
- a core model
- 80
- an upper mold holder
- 90
- a frame
- 100
- a frame
- B
- an adhesive
Claims (11)
- A casting process with use of a lower mold (10) having a hollow (12) corresponding to a partial profile of a casting, and an upper mold (22) which supports a core (24) and defines a mold cavity in cooperation with the lower mold (10), wherein the casting process comprises the steps of:preparing an upper mold assembly (20) by securing a core to an upper mold (22);pouring a necessary minimum amount of a molten metal for obtaining a casting in the hollow of the lower mold (10);moving downwardly the upper mold assembly (20) at a predetermined first speed to a predetermined height level just before the upper mold assembly (20) comes into contact with a surface of the molten metal in the hollow of the lower mold (10);further moving downwardly the upper mold assembly (20), from the predetermined height level, at a predetermined second speed by changing the descending speed of the upper mold assembly (20) from the first speed to the second speed;detecting a status information of the upper mold assembly (20) in a state when the upper mold assembly (20) is superimposed on the lower mold (10), or arrived at the lower mold (10); andstopping the descending movement of the upper mold assembly (20) after detecting that the status information comes at a predetermined state.
- The casting process according to claim 1, wherein the status information of the upper mold assembly is of a pressure applied from the upper mold assembly (20) to the molten metal in the hollow (12) and/or the lower mold (10), or of a total descending movement distance of the upper mold assembly (20).
- An upper mold assembly (20) which comprises an upper mold (22) and a core (24) secured to the upper mold (22), and which defines a mold cavity in cooperation with the lower mold (10).
- The upper mold assembly according to claim 3, wherein the core (24) is secured to the upper mold (22) by a mechanical means.
- The upper mold assembly according to claim 3, wherein the core (24A) is secured to the upper mold (22) "by an adhesive.
- The upper mold assembly according to claim 3, wherein the core (24B) is secured to the upper mold (22) by frictional fitting relationship between a projection (24b) formed on the core (24B) and a recess (22b) formed in the upper mold (22) .
- The upper mold assembly according to claim 3, wherein the core (24C) is secured to the upper mold (22) by an engagement relationship between an engaging projection (24c) formed on the core (24C) and a stamped molding sand of the upper mold (22).
- The upper mold assembly according to any one of claims 3 to 7, wherein a plurality of cores are secured to the upper mold (22).
- A method of securing a core (24B) to an upper mold (22) with use of a frictional force,
wherein a casting mold consisting of the upper mold (22) and a mating lower mold (10) is used, which upper and lower molds (22, 10) are prepared by foundry molding, respectively, and which are superimposed on each other so as to define a mold cavity having a product profile for obtaining a casting,
wherein the core (24B) has a partial profile of the casting, and
wherein the method comprises steps of:preparing the upper mold (22) having a recess (22b) for securing the core (24B) therein and the core (24B) having a projection (24b) to be fitted into the recess (22b); andpress-fitting the projection (24b) of the core into the recess (22b) of the upper mold (22) by relatively moving a core supporter (58) for supporting the core (24B) to the upper mold (22) such that with use of an information value of securing the core (24B) to the upper mold (22), the press-fitting operation is effected until the information value meets a predetermined information value of securing the core (24B) to the upper mold (22). - The method according to claim 9, wherein the core (24B) has one or more projections (24b), and the upper mold (22) has one or more recesses (22b) for receiving the one or more projections (24b), wherein the projections (24b) and the recesses (22b) are so formed that at least a deep region of each of the recesses (22b) has an inner diameter smaller than an outer diameter of a complementary contact part of each of the projections (24b).
- The method according to claim 10, wherein with use of a core model (70) without a projection, the core supporter (58) supporting the core model (70) is moved relatively to the upper mold (60) so as to bring the core model (70) into contact with the upper mold (60), whereby the information value of securing the core (24B) to the upper mold (60) is a travel distance of the core supporter (58) from an initial position when a pressure applied to the core model (70) from the upper mold (60) meets a predetermined information value.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006325303 | 2006-12-01 | ||
JP2007152473 | 2007-06-08 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1927415A1 true EP1927415A1 (en) | 2008-06-04 |
EP1927415B1 EP1927415B1 (en) | 2013-04-10 |
Family
ID=39137004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07120818.5A Not-in-force EP1927415B1 (en) | 2006-12-01 | 2007-11-15 | Casting process, upeer mold assembly and method of securing core to upper mold |
Country Status (8)
Country | Link |
---|---|
US (1) | US20100018664A1 (en) |
EP (1) | EP1927415B1 (en) |
JP (1) | JP4991755B2 (en) |
KR (1) | KR20080050307A (en) |
CN (1) | CN101573195B (en) |
BR (1) | BRPI0705825A (en) |
EA (1) | EA012717B1 (en) |
WO (1) | WO2008068947A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102814485A (en) * | 2012-08-07 | 2012-12-12 | 成都市虹筑路桥机械有限公司 | Anchor ring manufacturing method and mould |
CN104439119A (en) * | 2014-12-11 | 2015-03-25 | 莱芜钢铁集团有限公司 | Casting mould and fixing device of dangling hanging core thereof |
CN113828760A (en) * | 2021-09-24 | 2021-12-24 | 含山县天宇机械铸造厂 | Stable supporting device for mechanical casting |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DK2357050T3 (en) * | 2010-02-10 | 2013-01-02 | Loramendi S Coop | Molding machine for cashless molding |
EP2441537A1 (en) * | 2010-10-18 | 2012-04-18 | Siemens Aktiengesellschaft | Tool for producing cores with variable pins and method for producing a core |
CN103447461A (en) * | 2013-09-09 | 2013-12-18 | 梧州漓佳铜棒有限公司 | Copper anode plate casting mold with overflow-prevention boss |
CN103801664B (en) * | 2014-01-14 | 2015-11-25 | 桐乡合德机械有限公司 | Top box core fixed structure and fixing means |
DE102014207333A1 (en) * | 2014-04-16 | 2015-10-22 | Mahle International Gmbh | Apparatus for producing a piston |
CN104439099A (en) * | 2014-12-05 | 2015-03-25 | 沈阳工业大学 | Suspension pressing casting method for preparing compressor cylinder cover |
CN104859019B (en) * | 2015-06-05 | 2017-09-29 | 大连瑞丰达机械制造有限公司 | The embedded fixture pressing mechanism of horizontal frame processing machine |
CN106311977B (en) * | 2015-06-29 | 2018-06-22 | 共享装备有限公司 | The method of fixed blowhole built-in fitting |
CN105710310A (en) * | 2016-04-29 | 2016-06-29 | 江苏锡华铸造有限公司 | Mud core unloading device for cast mud cores |
CN105710352A (en) * | 2016-05-10 | 2016-06-29 | 芜湖求精紧固件有限公司 | Casting mold with water-cooling system |
RU2634108C1 (en) * | 2016-08-19 | 2017-10-23 | Александр Анатольевич Овсиенко | Method to produce metal casting |
CN108262456A (en) * | 2018-01-03 | 2018-07-10 | 罗诗敏 | A kind of handware multi-angle die casting equipment |
CN109093101A (en) * | 2018-09-26 | 2018-12-28 | 东莞市天合机电开发有限公司 | Casting die equipment with demoulding mechanism at bottom |
KR102185401B1 (en) * | 2020-07-06 | 2020-12-01 | 주식회사 에치디엘 | A part manufacturing device and a part manufacturing system |
CN112355276B (en) * | 2020-10-30 | 2021-10-19 | 临沂市铸信机械有限公司 | Die casting equipment and die casting method |
PL241319B1 (en) * | 2020-11-02 | 2022-09-05 | Lothar Thoni | Hybrid casting mold and method of making a hybrid casting mold, especially for the production of castings from metal alloys |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB294441A (en) * | 1928-01-21 | 1928-07-26 | H B Smith Company | An improved process of and means for preparing sand moulds |
CH600964A5 (en) | 1975-12-22 | 1978-06-30 | Fischer Ag Georg | Automatic insertion of foundry cores in moulds |
JPS60102250A (en) | 1983-11-07 | 1985-06-06 | Toyota Motor Corp | Supporting method of sand core in casting mold |
JPS60102251A (en) | 1983-11-07 | 1985-06-06 | Toyota Motor Corp | Supporting method of sand core in casting mold |
JPH0957396A (en) | 1995-08-22 | 1997-03-04 | Isuzu Motors Ltd | Assembled core for mold |
DE19821770C1 (en) * | 1998-05-14 | 1999-04-15 | Siemens Ag | Mold for producing a hollow metal component |
JP2005205437A (en) | 2004-01-21 | 2005-08-04 | Yamaha Motor Co Ltd | Casting machine |
US20060021727A1 (en) * | 2004-07-30 | 2006-02-02 | Norberto Rizzo | Article casting method |
US7013948B1 (en) * | 2004-12-01 | 2006-03-21 | Brunswick Corporation | Disintegrative core for use in die casting of metallic components |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2716792A (en) * | 1950-10-05 | 1955-09-06 | Kroyer Karl Kristian Kobs | Method of cast-forging metals |
SU598691A1 (en) * | 1975-11-24 | 1978-03-25 | Предприятие П/Я В-8772 | Method of pressing liquid-metal castings |
SU1133027A1 (en) * | 1983-02-28 | 1985-01-07 | Предприятие П/Я В-8231 | Press mould for molten metal pressing of hollow articles |
JPH0763805B2 (en) * | 1986-10-15 | 1995-07-12 | マツダ株式会社 | Joining core molding machine |
JPH0318457A (en) * | 1989-06-14 | 1991-01-28 | Mazda Motor Corp | Method for sticking mold and structure thereof |
GB2241452B (en) * | 1990-03-02 | 1993-08-11 | Gkn Technology Ltd | Tooling |
JP3086711B2 (en) * | 1991-03-27 | 2000-09-11 | 松尾工業株式会社 | Casting method |
US5303761A (en) * | 1993-03-05 | 1994-04-19 | Puget Corporation | Die casting using casting salt cores |
JP3344818B2 (en) * | 1994-03-24 | 2002-11-18 | マツダ株式会社 | Sand mold for casting and method of molding sand mold |
JPH0871699A (en) * | 1994-09-07 | 1996-03-19 | Shinmori Shoji Kk | Core supporting body of metal mold for casting |
US6527039B2 (en) * | 2001-06-11 | 2003-03-04 | General Motors Corporation | Casting of engine blocks |
JP2005052871A (en) * | 2003-08-06 | 2005-03-03 | Sintokogio Ltd | Casting method and mold therefor |
-
2007
- 2007-09-27 US US12/516,092 patent/US20100018664A1/en not_active Abandoned
- 2007-09-27 CN CN200780044258XA patent/CN101573195B/en active Active
- 2007-09-27 WO PCT/JP2007/068855 patent/WO2008068947A1/en active Search and Examination
- 2007-09-27 JP JP2008548186A patent/JP4991755B2/en active Active
- 2007-11-14 KR KR1020070116217A patent/KR20080050307A/en not_active Application Discontinuation
- 2007-11-14 BR BRPI0705825-0A patent/BRPI0705825A/en not_active Application Discontinuation
- 2007-11-15 EP EP07120818.5A patent/EP1927415B1/en not_active Not-in-force
- 2007-11-16 EA EA200702259A patent/EA012717B1/en not_active IP Right Cessation
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB294441A (en) * | 1928-01-21 | 1928-07-26 | H B Smith Company | An improved process of and means for preparing sand moulds |
CH600964A5 (en) | 1975-12-22 | 1978-06-30 | Fischer Ag Georg | Automatic insertion of foundry cores in moulds |
JPS60102250A (en) | 1983-11-07 | 1985-06-06 | Toyota Motor Corp | Supporting method of sand core in casting mold |
JPS60102251A (en) | 1983-11-07 | 1985-06-06 | Toyota Motor Corp | Supporting method of sand core in casting mold |
JPH0957396A (en) | 1995-08-22 | 1997-03-04 | Isuzu Motors Ltd | Assembled core for mold |
DE19821770C1 (en) * | 1998-05-14 | 1999-04-15 | Siemens Ag | Mold for producing a hollow metal component |
JP2005205437A (en) | 2004-01-21 | 2005-08-04 | Yamaha Motor Co Ltd | Casting machine |
US20060021727A1 (en) * | 2004-07-30 | 2006-02-02 | Norberto Rizzo | Article casting method |
US7013948B1 (en) * | 2004-12-01 | 2006-03-21 | Brunswick Corporation | Disintegrative core for use in die casting of metallic components |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102814485A (en) * | 2012-08-07 | 2012-12-12 | 成都市虹筑路桥机械有限公司 | Anchor ring manufacturing method and mould |
CN102814485B (en) * | 2012-08-07 | 2015-08-26 | 成都市虹筑路桥机械有限公司 | A kind of anchor circle preparation method and mould |
CN104439119A (en) * | 2014-12-11 | 2015-03-25 | 莱芜钢铁集团有限公司 | Casting mould and fixing device of dangling hanging core thereof |
CN113828760A (en) * | 2021-09-24 | 2021-12-24 | 含山县天宇机械铸造厂 | Stable supporting device for mechanical casting |
Also Published As
Publication number | Publication date |
---|---|
CN101573195B (en) | 2012-11-21 |
CN101573195A (en) | 2009-11-04 |
EA012717B1 (en) | 2009-12-30 |
JPWO2008068947A1 (en) | 2010-03-18 |
EA200702259A1 (en) | 2008-06-30 |
BRPI0705825A (en) | 2008-07-15 |
JP4991755B2 (en) | 2012-08-01 |
KR20080050307A (en) | 2008-06-05 |
WO2008068947A1 (en) | 2008-06-12 |
EP1927415B1 (en) | 2013-04-10 |
US20100018664A1 (en) | 2010-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1927415B1 (en) | Casting process, upeer mold assembly and method of securing core to upper mold | |
CN107661965B (en) | Automatic core setting mechanism and core setting method | |
US8327913B2 (en) | Casting method to produce a casting and press used for the casting method | |
CN117123740A (en) | Spliced flywheel casting mold and splicing method thereof | |
JPWO2019093093A1 (en) | Mold casting equipment | |
CN218983119U (en) | Multi-cavity die-casting mould | |
JP2009172664A (en) | Mold release device | |
CN210996386U (en) | Continuous processing mould pressing forming die | |
KR20070114617A (en) | Aluminum wheel casting machine | |
JP6075533B2 (en) | Molding device | |
CN200981102Y (en) | Gravity casting machine | |
CN203426410U (en) | Passenger car belt pulley die-casting die | |
CN222328933U (en) | Machining die for automobile thermostat shell | |
CN218876159U (en) | Die sinking linkage inclined core pulling die | |
CN219968326U (en) | Driving apron well seat steel mould | |
CN220329874U (en) | Fork type flange finish forging die | |
KR200274711Y1 (en) | Diecast mould | |
CN117087069A (en) | An automatic shearing burr molding machine based on press modification | |
CN220163032U (en) | Rope pulley casting mold for elevator production | |
CN105964978A (en) | Squeeze casting mold | |
JP4430739B2 (en) | Casting method for casting products and press device used in the casting method | |
CN210080693U (en) | Complicated disconnect-type precision mold structure | |
CN202571244U (en) | Mold inclined core-pulling mechanism | |
RU1770079C (en) | Method of producing flaskless mould for articles of complex forms | |
CN113799333A (en) | A kind of hot-pressing mould with pop-top structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
17P | Request for examination filed |
Effective date: 20080724 |
|
17Q | First examination report despatched |
Effective date: 20080917 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 605696 Country of ref document: AT Kind code of ref document: T Effective date: 20130415 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007029614 Country of ref document: DE Effective date: 20130606 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 605696 Country of ref document: AT Kind code of ref document: T Effective date: 20130410 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D Ref country code: NL Ref legal event code: VDEP Effective date: 20130410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130721 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130711 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130810 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130812 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
26N | No opposition filed |
Effective date: 20140113 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602007029614 Country of ref document: DE Representative=s name: WUESTHOFF & WUESTHOFF PATENT- UND RECHTSANWAEL, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602007029614 Country of ref document: DE Representative=s name: WUESTHOFF & WUESTHOFF, PATENTANWAELTE PARTG MB, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007029614 Country of ref document: DE Effective date: 20140113 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20131115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131130 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131130 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140731 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131202 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131115 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20071115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130410 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20161128 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602007029614 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180602 |