EG20565A - Method of producing a fluid from an earth formation - Google Patents
Method of producing a fluid from an earth formationInfo
- Publication number
- EG20565A EG20565A EG17995A EG17995A EG20565A EG 20565 A EG20565 A EG 20565A EG 17995 A EG17995 A EG 17995A EG 17995 A EG17995 A EG 17995A EG 20565 A EG20565 A EG 20565A
- Authority
- EG
- Egypt
- Prior art keywords
- fluid
- producing
- earth formation
- earth
- formation
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title 1
- 239000012530 fluid Substances 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Earth Drilling (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Jet Pumps And Other Pumps (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Fertilizers (AREA)
- Lubricants (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP94200629A EP0671549A1 (en) | 1994-03-10 | 1994-03-10 | Method of producing a fluid from an earth formation |
Publications (1)
Publication Number | Publication Date |
---|---|
EG20565A true EG20565A (en) | 1999-08-30 |
Family
ID=8216703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EG17995A EG20565A (en) | 1994-03-10 | 1995-03-09 | Method of producing a fluid from an earth formation |
Country Status (16)
Country | Link |
---|---|
US (1) | US5520247A (es) |
EP (2) | EP0671549A1 (es) |
CN (1) | CN1056211C (es) |
AU (1) | AU688877B2 (es) |
BR (1) | BR9507015A (es) |
CA (1) | CA2185020C (es) |
CO (1) | CO4440464A1 (es) |
DE (1) | DE69504314T2 (es) |
EG (1) | EG20565A (es) |
MX (1) | MX9603924A (es) |
MY (1) | MY114261A (es) |
NO (1) | NO309876B1 (es) |
NZ (1) | NZ282411A (es) |
OA (1) | OA10310A (es) |
RU (1) | RU2136852C1 (es) |
WO (1) | WO1995024543A1 (es) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6167966B1 (en) * | 1998-09-04 | 2001-01-02 | Alberta Research Council, Inc. | Toe-to-heel oil recovery process |
US6488087B2 (en) * | 2000-03-14 | 2002-12-03 | Halliburton Energy Services, Inc. | Field development methods |
BR0107018B1 (pt) * | 2001-12-28 | 2011-07-12 | método para a construção de um arranjo de poços de grande afastamento para produção, transporte e explotação de jazidas minerais, arranjo de poços assim construìdo e método para a construção de uma rede de dutos para transporte e armazenagem de fluidos. | |
US20060124360A1 (en) | 2004-11-19 | 2006-06-15 | Halliburton Energy Services, Inc. | Methods and apparatus for drilling, completing and configuring U-tube boreholes |
AU2006314601B2 (en) | 2005-11-16 | 2010-09-09 | Shell Internationale Research Maatschappij B.V. | Wellbore system |
US9429004B2 (en) * | 2006-06-19 | 2016-08-30 | Joseph A. Affholter | In situ retorting and refining of hygrocarbons |
KR100784174B1 (ko) * | 2006-11-27 | 2007-12-10 | 김동항 | 초연약지반의 표층처리가 되게 한 투수와 배수를 겸한 부재의 집배수 장치와 이에 의한 초연약지반 표층 처리 공법 |
US8056629B2 (en) * | 2010-01-07 | 2011-11-15 | GEOSCIENCE Support Services, Inc. | Slant well desalination feedwater supply system and method for constructing same |
US8479815B2 (en) * | 2010-01-07 | 2013-07-09 | GEOSCIENCE Support Services, Inc. | Desalination subsurface feedwater supply and brine disposal |
WO2011130254A1 (en) * | 2010-04-14 | 2011-10-20 | Shell Oil Company | Slurry generation |
US8656995B2 (en) * | 2010-09-03 | 2014-02-25 | Landmark Graphics Corporation | Detecting and correcting unintended fluid flow between subterranean zones |
US8517094B2 (en) | 2010-09-03 | 2013-08-27 | Landmark Graphics Corporation | Detecting and correcting unintended fluid flow between subterranean zones |
CA2762498C (en) * | 2011-05-11 | 2015-02-03 | Gilman A. Hill | Integrated in situ retorting and refining of hydrocarbons from oil shale, tar sands and depleted formations |
US9291043B1 (en) * | 2012-05-15 | 2016-03-22 | Joseph A. Affholter | In situ retorting of hydrocarbons and a selected metal |
RU2656266C2 (ru) * | 2012-06-21 | 2018-06-04 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | Способ обработки подземного пласта суспензией цементного раствора с возможностью образования проницаемого отвердевшего цементного раствора |
CN102913208B (zh) * | 2012-11-01 | 2014-03-26 | 中国海洋石油总公司 | 气藏之间建立套管内筛管式人造天然气运移通道的方法 |
CN102900402B (zh) * | 2012-11-01 | 2014-05-07 | 中国海洋石油总公司 | 一种海上小规模气藏的开发方法 |
CN102900401B (zh) * | 2012-11-01 | 2014-03-26 | 中国海洋石油总公司 | 气藏之间建立套管射孔式人造天然气运移通道的方法 |
CN102913203B (zh) * | 2012-11-01 | 2014-05-07 | 中国海洋石油总公司 | 一种开发低渗透气藏的方法 |
CN102913206B (zh) * | 2012-11-01 | 2014-11-26 | 中国海洋石油总公司 | 气藏之间建立套管射孔压裂式人造天然气运移通道的方法 |
CN102913209A (zh) * | 2012-11-01 | 2013-02-06 | 中国海洋石油总公司 | 气藏之间建立筛管式人造天然气运移通道的方法 |
CN102943654A (zh) * | 2012-11-01 | 2013-02-27 | 中国海洋石油总公司 | 利用高含co2气藏提高高含烃气藏采收率的方法 |
CN102926719A (zh) * | 2012-11-01 | 2013-02-13 | 中国海洋石油总公司 | 一种异常高压气藏的开发方法 |
CN102913207B (zh) * | 2012-11-01 | 2014-03-26 | 中国海洋石油总公司 | 建立套管内筛管外砾石充填式人造天然气运移通道的方法 |
CN102913204B (zh) * | 2012-11-01 | 2014-11-26 | 中国海洋石油总公司 | 气藏之间建立筛管外砾石充填式天然气运移通道的方法 |
US9388678B2 (en) * | 2014-01-22 | 2016-07-12 | Joseph A. Affholter | In situ retorting of hydrocarbons and a selected metal |
WO2018165256A1 (en) * | 2017-03-07 | 2018-09-13 | Saudi Arabian Oil Company | Method of encapsulating signaling agents for use downhole |
EP3592713A2 (en) * | 2017-03-07 | 2020-01-15 | Saudi Arabian Oil Company | Wellbore cement having polymer capsule shells |
CN112431578B (zh) * | 2020-12-02 | 2022-07-29 | 山西潞安环保能源开发股份有限公司常村煤矿 | 一种含有断层的低渗透煤层抽采矿井瓦斯的方法 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US459826A (en) * | 1891-09-22 | Flowing well | ||
US702006A (en) * | 1900-08-09 | 1902-06-10 | James G Huffman | Well-casing and strainer. |
US2365428A (en) * | 1941-10-16 | 1944-12-19 | Gulf Research Development Co | Recovery of oil from oil fields |
US2548059A (en) * | 1947-10-08 | 1951-04-10 | Ralph H Ramsey | Rearrangement of oil and gas deposits in sealed domes and like natural formations |
US2736381A (en) * | 1953-10-26 | 1956-02-28 | Texas Co | Method of increasing recovery from a subsurface oil or condensate reservoir |
US2856000A (en) * | 1954-07-20 | 1958-10-14 | Texaco Development Corp | Production of hydrocarbons from subsurface reservoirs |
US3258069A (en) * | 1963-02-07 | 1966-06-28 | Shell Oil Co | Method for producing a source of energy from an overpressured formation |
US3361202A (en) * | 1965-08-05 | 1968-01-02 | Phillips Petroleum Co | Process and apparatus for producing crude oil from separate strata |
US3354952A (en) * | 1965-08-09 | 1967-11-28 | Phillips Petroleum Co | Oil recovery by waterflooding |
US3442333A (en) * | 1967-10-11 | 1969-05-06 | Phillips Petroleum Co | Wellbore visbreaking of heavy crude oils |
US4194580A (en) * | 1978-04-03 | 1980-03-25 | Mobil Oil Corporation | Drilling technique |
US4519463A (en) * | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
FR2656650B1 (fr) * | 1989-12-29 | 1995-09-01 | Inst Francais Du Petrole | Methode et dispositif pour stimuler une zone souterraine par injection controlee de fluide provenant d'une zone voisine que l'on relie a la premiere par un drain traversant une couche intermediaire peu permeable. |
FR2656651B1 (fr) * | 1989-12-29 | 1995-09-08 | Inst Francais Du Petrole | Methode et dispositif pour stimuler une zone souterraine par injection differee de fluide provenant d'une zone voisine, le long de fractures faites depuis un drain fore dans une couche intermediaire peu permeable. |
-
1994
- 1994-03-10 EP EP94200629A patent/EP0671549A1/en not_active Withdrawn
-
1995
- 1995-03-08 RU RU96118498A patent/RU2136852C1/ru not_active IP Right Cessation
- 1995-03-08 EP EP95912239A patent/EP0749517B1/en not_active Expired - Lifetime
- 1995-03-08 AU AU19502/95A patent/AU688877B2/en not_active Ceased
- 1995-03-08 BR BR9507015A patent/BR9507015A/pt not_active IP Right Cessation
- 1995-03-08 DE DE69504314T patent/DE69504314T2/de not_active Expired - Fee Related
- 1995-03-08 MX MX9603924A patent/MX9603924A/es not_active IP Right Cessation
- 1995-03-08 NZ NZ282411A patent/NZ282411A/en unknown
- 1995-03-08 CA CA002185020A patent/CA2185020C/en not_active Expired - Fee Related
- 1995-03-08 CN CN95192042A patent/CN1056211C/zh not_active Expired - Fee Related
- 1995-03-08 WO PCT/EP1995/000898 patent/WO1995024543A1/en active IP Right Grant
- 1995-03-08 MY MYPI95000579A patent/MY114261A/en unknown
- 1995-03-09 EG EG17995A patent/EG20565A/xx active
- 1995-03-09 CO CO95009411A patent/CO4440464A1/es unknown
- 1995-03-10 US US08/401,826 patent/US5520247A/en not_active Expired - Lifetime
-
1996
- 1996-09-06 NO NO963734A patent/NO309876B1/no not_active IP Right Cessation
- 1996-09-06 OA OA60886A patent/OA10310A/en unknown
Also Published As
Publication number | Publication date |
---|---|
BR9507015A (pt) | 1997-09-09 |
EP0671549A1 (en) | 1995-09-13 |
CN1143992A (zh) | 1997-02-26 |
NO309876B1 (no) | 2001-04-09 |
EP0749517B1 (en) | 1998-08-26 |
DE69504314T2 (de) | 1999-02-11 |
AU688877B2 (en) | 1998-03-19 |
OA10310A (en) | 1997-10-07 |
NO963734L (no) | 1996-11-04 |
MX9603924A (es) | 1997-04-30 |
CA2185020A1 (en) | 1995-09-14 |
US5520247A (en) | 1996-05-28 |
NZ282411A (en) | 1997-11-24 |
DE69504314D1 (de) | 1998-10-01 |
CA2185020C (en) | 2005-12-27 |
WO1995024543A1 (en) | 1995-09-14 |
CN1056211C (zh) | 2000-09-06 |
NO963734D0 (no) | 1996-09-06 |
CO4440464A1 (es) | 1997-05-07 |
AU1950295A (en) | 1995-09-25 |
MY114261A (en) | 2002-09-30 |
RU2136852C1 (ru) | 1999-09-10 |
EP0749517A1 (en) | 1996-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EG20565A (en) | Method of producing a fluid from an earth formation | |
EG20665A (en) | Method of creating a borehole in an earth formation | |
EP0807202A4 (en) | METHOD FOR MONITORING FLUIDS ENTERING A WELLBORE | |
EG20651A (en) | Method of creating a casing in a borehole | |
GB2329210B (en) | Method of performing a desired operation downhole | |
EP0602980A3 (en) | Process for perforating a borehole. | |
GB9519339D0 (en) | A method of separating production fluid from an oil well | |
AU7031094A (en) | Method of stimulation of a subterranean formation | |
AU4205296A (en) | A method of producing iron carbide | |
EG21249A (en) | Method of qualifying a borehole survey | |
GB9720399D0 (en) | Method for improving the feasibility of a drilling rig of jack-up type and a drilling rig of jack-up type | |
GB2268592B (en) | Method of connecting a string of pipes | |
GB9519687D0 (en) | Method of determining earth formation characteristics | |
AU3200593A (en) | A method of filling a borehole | |
PL323356A1 (en) | Method of producing backward flow | |
GB2315565A9 (en) | Method of producing a holographic screen | |
GB2298541B (en) | Method of producing a colouring-in medium | |
GB2327524B (en) | Method of producing a location map | |
ZA932279B (en) | Method of forming a pipe | |
AU4937596A (en) | Method of inserting a pipe into the ground | |
ZA939235B (en) | A method of producing azadirachtin. | |
PL305215A1 (en) | Method of making a retaining wall | |
SG63653A1 (en) | Method of forming connection hole | |
GB9522016D0 (en) | A method of producing a surfactant | |
PL308438A1 (en) | Method of making a liquid face-powder |