DE801228C - Method of making monolithic reinforced concrete ceilings - Google Patents
Method of making monolithic reinforced concrete ceilingsInfo
- Publication number
- DE801228C DE801228C DEL261A DEL0000261A DE801228C DE 801228 C DE801228 C DE 801228C DE L261 A DEL261 A DE L261A DE L0000261 A DEL0000261 A DE L0000261A DE 801228 C DE801228 C DE 801228C
- Authority
- DE
- Germany
- Prior art keywords
- boards
- formwork
- reinforced concrete
- concrete
- monolithic reinforced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Die Herstellung vori Decken wird im allgemeinen so vorgenommen, daß man fertige Hohldielen oder Volldielen aus Stahlbeton auf Stahlbetont 'iger auflegt oder mit diesen verbindet. Beide ri Teile, Balken und Diele, sind fertige Betonteile. Derartige Konstruktionen haben den Nachteil der hohen Einbaugewichte, da die Balken und Dielen ja in fertigem Zustand an die Baustelle gelangen. Hinzu kommt, daß bei diesem Aufeinanderlegen oder Einfügen der Dielen auf bzw. in die Fertigbetonbalken kein monolithischer Verband erzielt wird.The production of blankets is generally carried out in such a way that finished hollow or solid reinforced concrete planks are laid on reinforced concrete or connects with them. Both ri parts, joists and floorboards, are finished concrete parts. Such constructions have the disadvantage of high installation weights, since the beams and planks arrive at the construction site in a finished state. In addition, at this laying on top of one another or inserting the boards on or into the precast concrete beams no monolithic bond is achieved.
Diese Nachteile der bekannten Konstruktionen werden nach dem Gegenstand der Erfindung dadurch vermieden, daß nur die Dielen als Fertigteile zum Einbau kommen, während die Balken nach dem Auflegen der Dielen auf eine entsprechend ausgebildete Verschalung an der Baustelle mit den Dielen vergossen werden.These disadvantages of the known constructions are according to the subject the invention avoided in that only the boards come as prefabricated parts for installation, while the beams after laying the boards on a suitably trained Formwork to be cast with the boards at the construction site.
Die Form der Balken bzw. der Verschalung richtet sich nach den Bauerfordernissen. Soll die Decke aus bautechnischen Gründen an ihrer Oberseite eben sein, dann wird die Verschalung so ausgeführt, daß die obere Fläche der Balken mit der oberen Fläche der Betondielen in einer Ebene liegt. Soll die Decke dagegen an ihrer Unterseite eben sein, dann stehen die Balken nach oben über die Dielen hinaus. Es kann aber auch eine Zwischenlösung erzielt werden, bei der die zu gießenden Balken über die Betondielen oben und unten hinausragen.The shape of the bars or the cladding depends on the building requirements. If the ceiling is to be flat on the top for structural reasons, then will the formwork carried out so that the upper surface of the beams with the upper surface the concrete boards are in one plane. On the other hand, the ceiling should be on its underside be level, then the beams protrude above the floorboards. But it can an interim solution can also be achieved in which the beams to be cast over the Concrete boards protrude at the top and bottom.
Weitere Merkmale und Einzelheiten werden an Hand von Ausführungsbeispielen in der Beschreibung erläutert.Further features and details are given on the basis of exemplary embodiments explained in the description.
Fig. i zeigt eine Decke aus Fertigdielen und gegossenen Balken, bei der die obere Deckenfläche eben ist, mit der Verschalung an einem Balken. .Fig. I shows a ceiling made of prefabricated floorboards and cast beams, at which the upper ceiling surface is flat, with the cladding on a beam. .
Fig. 2 zeigt eine Decke, bei der der zu gießende Balken die Dielen umfaßt.Fig. 2 shows a ceiling in which the beam to be poured is the floorboards includes.
Fig. 3 zeigt eine Decke, deren Unterseite eben ist. Die Fertigdielen, Voll- oder Hohldielen, werden an die Baustelle geliefert. An der Stelle, an der die Balken liegen sollen, wird eine Verschalung i vorgesehen, die im Beispiel der Fig. i einen U-förmigen Querschnitt besitzt. Auf die oberen Kanten 2 der Verschalung i legt man die Dielen 3 so auf, daß diese die seitlich liegenden Schalbretter 4 etwas überragen, wobei es zweckmäßig ist, die Bewehrung j der Dielen nach unten umzubiegen oder miteinander zu verdrehen, so daß deren Enden innerhalb der Verschalung i liegen. Jetzt gießt man von oben in die Verschalung Frischbeton hinein, der eine geeignete Zusammensetzung aufweist. Der Beton erstarrt z. B. innerhalb voll 3 Wochen und es ergibt sich eine Decke, die allen Anforderungen entspricht.Fig. 3 shows a ceiling, the underside of which is flat. The prefabricated floorboards, Solid or hollow planks are delivered to the construction site. At the point where the bars should lie, a casing i is provided, which in the example of Fig. I has a U-shaped cross section. On the upper edges 2 of the casing i the boards 3 are laid in such a way that these form boards 4 protrude slightly, whereby it is advisable to move the reinforcement j of the planks downwards bend or twist with one another so that their ends are within the formwork i lie. Now fresh concrete is poured into the formwork from above, one of them Has a suitable composition. The concrete solidifies z. B. within 3 weeks and the result is a ceiling that meets all requirements.
Soll der zu gießende Balken die Dielen umfassen, so wird ebenfalls eine U-förmige Verschalung 6 errichtet, auf diese dann die Dielen 7 gelegt und auf die Dielen Kanthölzer 8 aufgesetzt, die z. B. durch Bügel 9 festgelegt werden. Auch hier werden die Enden der Dielenbewehrung io nach unten bzw. nach oben in die Verschalung hineingebogen oder miteinander verdreht, so daß nach dem Eingießen des Frischbetons ein fester \-erband erzielt wird.If the beam to be poured is to encompass the floorboards, this is also done erected a U-shaped cladding 6, then placed the boards 7 on them and placed them on the planks of squared timber 8 put on, the z. B. be determined by bracket 9. Even here the ends of the plank reinforcement go down or up into the boarding bent in or twisted together, so that after pouring the fresh concrete a firm band is achieved.
Die einfachste Form dieser Decke, die insbesondere bei Decken mit verhältnismäßig geringen Spannweiten besonders vorteilhaft und billig ist, wird erreicht, wenn man als Verschalung nur ein ebenes Brett i i als Unterlage vorsieht, auf dieses die Dielen 12 auflegt und auf die Dielen dann, wie im Beispiel der Fig. 2, seitliche Schalbretter 13 mit Hilfe von Bügeln 14 befestigt, so daß auch hier nach dem Umbiegen der Bewehrung 15 und Eingießen von Frischbeton eine feste Einheit erzeugt wird.The simplest form of this blanket, especially for blankets with relatively small spans is particularly advantageous and cheap achieved if only a flat board i i is provided as a base for the cladding, on this the boards 12 are placed and then on the boards, as in the example of Fig. 2, lateral shuttering boards 13 attached with the help of brackets 14, so that here too after bending the reinforcement 15 and pouring fresh concrete a fixed unit is produced.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEL261A DE801228C (en) | 1949-11-01 | 1949-11-01 | Method of making monolithic reinforced concrete ceilings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEL261A DE801228C (en) | 1949-11-01 | 1949-11-01 | Method of making monolithic reinforced concrete ceilings |
Publications (1)
Publication Number | Publication Date |
---|---|
DE801228C true DE801228C (en) | 1950-12-28 |
Family
ID=7254811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEL261A Expired DE801228C (en) | 1949-11-01 | 1949-11-01 | Method of making monolithic reinforced concrete ceilings |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE801228C (en) |
-
1949
- 1949-11-01 DE DEL261A patent/DE801228C/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1709404A1 (en) | SPACE BOX | |
EP0051101A1 (en) | Cement slab, and process and device for producing the same | |
DE19805571C2 (en) | Structural concrete member | |
DE3609780A1 (en) | Prefabricated shuttering element | |
AT239496B (en) | Method for the production of a hollow ceiling and prefabricated plate for carrying out the method | |
DE801228C (en) | Method of making monolithic reinforced concrete ceilings | |
DE814936C (en) | Reinforcement for the ribs of reinforced concrete rib ceilings | |
DE846612C (en) | Construction element for reinforced concrete rib ceilings without shuttering | |
DE19720637C1 (en) | Process for producing a component from reinforced concrete and formwork for carrying out the process | |
DE896860C (en) | Pre-stressed reinforcement element made of shaped stones | |
DE810302C (en) | Ceiling construction | |
DE831764C (en) | Reinforced concrete I-beam and process for its manufacture | |
DE812596C (en) | Ceiling construction | |
AT129436B (en) | Method and device for manufacturing components. | |
DE940424C (en) | Method and device for the production of a ready-to-install tile partition and the tile partition produced with it | |
DE1220990B (en) | Method for creating wall fractures | |
DE737944C (en) | Reinforced concrete ceiling made from molded pieces | |
DE813767C (en) | Method and device for producing a ceiling with a finished sub-surface | |
DE933168C (en) | Procedure for installing suspension links on the underside of a concrete ceiling | |
AT200778B (en) | Slab formwork and process for its manufacture | |
DE571338C (en) | Process for the manufacture of reinforced concrete poles | |
DE2264362A1 (en) | LOST SHUTTERING PANEL | |
DE8005298U1 (en) | COMPONENT FOR SUPPORTING A SOLID CONCRETE CEILING TO THE EDGE SIDES | |
AT223364B (en) | Building contractors, in particular formwork supports | |
DE803949C (en) | Formwork for wall recesses, especially windows |