CN2584986Y - Device for fixing submarine pipeline - Google Patents
Device for fixing submarine pipeline Download PDFInfo
- Publication number
- CN2584986Y CN2584986Y CN 02255892 CN02255892U CN2584986Y CN 2584986 Y CN2584986 Y CN 2584986Y CN 02255892 CN02255892 CN 02255892 CN 02255892 U CN02255892 U CN 02255892U CN 2584986 Y CN2584986 Y CN 2584986Y
- Authority
- CN
- China
- Prior art keywords
- submarine pipeline
- jack
- cutting ferrule
- fixing
- ferrule body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model relates to a device for fixing submarine pipelines, which belongs to the technical field of underwater constructions and pile foundations. The utility model is composed of a U-shaped clamp, a cantilever cross beam, connecting bolts, fixing pile pipes, a clamping sleeve body, locking nuts, a rotating support, an adjusting plate, connecting pins, a jack and an adjusting spanner thereof, and a supporting bottom board, wherein, the U-shaped clamp clamps a naked suspension segment of a submarine pipeline, and both ends of the U-shaped clamp are fixed on the cantilever cross beam through the bolts and the nuts; the cantilever cross beam is welded on the clamping sleeve body which is sheathed outside the fixing pile pipe and locked; the rotating support is also sheathed outside the fixing pile pipe and arranged on the lower part of the clamping sleeve body; besides, the adjusting plate, the jack and the supporting bottom board are sequentially arranged in the fixing pile pipe from top to bottom. The utility model utilizes the U-shaped clamp and the cantilever cross beam to fix the suspension segment of the submarine pipeline on the sea bed, which can prevent the submarine pipeline from being broken because the submarine pipeline exceeds the fatigue limit because of reciprocating swing motion caused by the impact of ocean currents and ocean waves. The utility model is favorable to the long-time safe operation of submarine pipelines.
Description
(1) technical field
The utility model relates to submerged structure and pile foundation, particularly is a kind of submarine pipeline fixing device.
(2) background technique
The Shengli Oil Field neritic area is because the particularity of sea situation and ocean current and artificial structure's influence make submarine pipeline unsettled section phenomenon occur near platform.Exposed unsettled section of submarine pipeline because of swung back and forth by ocean current, alluvion.When its local location surpassed fatigue limit, pipeline just might rupture, and oil accident takes place, and caused great economic loss and seawater pollution.This problem must solve as early as possible.Patent documentation and relevant scientific and technological data are not found the patented technology and the effective measures that address this problem by retrieval.
(3) summary of the invention
The purpose of this utility model just is to provide a kind of submarine pipeline fixing device, and exposed unsettled section pressure of submarine pipeline is fixed on the sea bed, prevents to rupture because of swinging repeatedly, guarantees the operation of submarine pipeline long-term safety.
Above-mentioned purpose is realized by following technical proposals:
The submarine pipeline fixing device is made up of U-shaped clamp, cantilever beams, fixing stake pipe, cutting ferrule body, locking nut, revolution support, adjustment plate, attachment pegs, jack and adjustment spanner thereof, supporting baseplate.The U-shaped clamp clamps exposed unsettled section of submarine pipeline, and the clamp two ends are fixed to above the cantilever beams with screw bolt and nut.Cantilever beams is welded on the cutting ferrule body.The cutting ferrule body is enclosed within the fixing stake tube outside, and is locked on the pipe with locking nut.Revolution is supported and also is enclosed within the fixing stake tube outside, and places cutting ferrule body bottom, and the outer shroud that revolution is supported is integrally welded by the lower end of pin and cutting ferrule body.Adjust plate and place fixing stake pipe inside, and support following in revolution.Jack also places fixing stake pipe inside, and is adjusting plate bottom.The upper end of jack is connected with the adjustment plate by attachment pegs.Supporting baseplate also places fixing stake pipe inside, and plays a supportive role in jack bottom.
Cantilever beams in the above-mentioned submarine pipeline fixing device is formed by left beam slab, right beam slab and last beam slab welding assembly.An oblique angle is respectively cut away in the bottom of its left beam slab and right beam slab, to alleviate deadweight.Upper surface of beam slab is processed into rough surface on it, skids under the U-shaped clamp preventing.
Revolution in the above-mentioned submarine pipeline fixing device is supported for toroidal, is made up of bottom plate, bearing and attachment bolt.The outer shroud of bearing is integrally welded by pin and cutting ferrule body lower end.The interior ring of bearing welds together by pin and bottom plate.Bottom plate welds together with the adjustment plate.After submarine pipeline is fixing, cutting ferrule body, revolution support and bottom plate etc. are connected into one with attachment bolt.
The submarine pipeline fixing device that it becomes according to the technique scheme manufacturing, can be fixed to exposed unsettled section of submarine pipeline on the sea bed firmly, no longer swing back and forth because of ocean current, sea beat, also just the pipeline fracture accident can not take place, its economic benefit, environmental benefit and social benefit are conspicuous.
(4) description of drawings
Accompanying drawing 1 is an overall structure plan view of the present utility model.
Accompanying drawing 2 is that the A of Fig. 1 is to left view.
Accompanying drawing 3 is that the B of Fig. 1 is to plan view.
In the accompanying drawing, the 1st, U-shaped clamp, the 2nd, cantilever beams, the 3rd, the attachment bolt that revolution is supported, the 4th, fixing stake pipe, the 5th, the cutting ferrule body, the 6th, locking nut, the 7th, revolution is supported, and the 8th, adjust plate, the 9th, attachment pegs, the 10th, jack, the 11st, jack is adjusted spanner, the 12nd, supporting baseplate.
(5) embodiment
As shown in drawings, this installs by U-shaped clamp 1, cantilever beams 2, and attachment bolt 3, fixing stake pipe 4, cutting ferrule body 5, locking nut 6, revolution supports 7, adjusts plate 8, attachment pegs 9, spanner 11 adjusted by jack 10, jack and supporting baseplate 12 is formed.U type clamp 1 clamps exposed unsettled section of submarine pipeline, and the clamp two ends are fixed to above the cantilever beams 2 with screw bolt and nut.Cantilever beams 2 is welded on the outer surface of cutting ferrule body 5.Cutting ferrule body 5 is enclosed within fixing stake pipe 4 outsides, and is locked on the fixing stake pipe 4 with locking nut 6.Revolution is supported 7 and also is enclosed within fixing stake pipe 4 outsides, and places cutting ferrule body 5 bottoms, and the outer shroud of revolution support 7 is integrally welded by the lower end of pin and cutting ferrule body 5.Adjust plate 8 and place fixing stake pipe 4 inside, and support 7 bottom in revolution.Jack 10 also places fixing stake pipe 4 inside, and in the bottom that adjusts plate 8.The upper end of jack 10 is connected with adjustment plate 8 by attachment pegs 9.Supporting baseplate 12 also places fixing stake pipe 4 inside, and plays a supportive role in the bottom of jack 10.With attachment bolt 3 cutting ferrule body 5, revolution support 7 and adjustment plate 8 etc. are connected into one.
The on-site construction operations process of this device is: earlier this device and fixing stake pipe 4 are assembled into an integral installation shipping to the job site.Be placed in the centralizing bracket again, together sling by the crane barge on the workboat, make fixing stake pipe 4 keep plumbness, its lower end is inserted into the exact position of sea bed, and notices that its cantilever beams 2 is not directly over submarine pipeline.Under the cooperation of centralizing bracket, pile driver is squeezed into fixing stake pipe 4 under the sea bed together with other parts then, until overhang 2 near sea bed and a little less than submarine pipeline.Loosen locking nut 6, rotate revolution and support 7, cantilever beams 2 is forwarded to below the submarine pipeline.Operation jack 10 upwards promotes adjustment plate 8, and plate 8 upwards promotes revolution support 7 and cantilever beams 2 is moved upwards up to appropriate position together by adjusting.With U-shaped clamp 1 submarine pipeline is fixed on the overhang horizontal stroke 2 for unsettled section.Fixing stake pipe 4 and the submarine pipeline distance between the two can be by overhang horizontal stroke 2 the slotted hole of last beam slab finely tune, adjusting finishes promptly tightens the screw bolt and nut at U-shaped clamp 1 two ends.Underwater operation will be assisted to carry out by the diver.
Claims (3)
1. submarine pipeline fixing device, it is characterized in that by U-shaped clamp (1) cantilever beams (2), attachment bolt (3), fixing stake pipe (4), cutting ferrule body (5), locking nut (6), (7) are supported in revolution, adjust plate (8), attachment pegs (9), spanner (11) adjusted by jack (10), jack and supporting baseplate (12) is formed.U type clamp (1) clamps exposed unsettled section of submarine pipeline, the clamp two ends are fixed to above the cantilever beams (2) with screw bolt and nut, cantilever beams (2) is welded on the cutting ferrule body (5), cutting ferrule body (5) is enclosed within fixing stake pipe (4) outside, and be locked on the fixing stake pipe (4) with locking nut (6), revolution is supported (7) and also is enclosed within fixing stake pipe (4) outside, and place cutting ferrule body (5) bottom, the outer shroud of revolution support (7) is integrally welded by the lower end of pin and cutting ferrule body (5), adjust plate (8) and place fixing stake pipe (4) inside, and turning round the bottom that supports (7), jack (10) also places fixing stake pipe (4) inside, and in the bottom that adjusts plate (8), the upper end of jack (10) is connected with adjustment plate (8) by attachment pegs (9), supporting baseplate (12) also places fixing stake pipe (4) inside, and plays a supportive role in the bottom of jack (10).
2. submarine pipeline fixing device according to claim 1, it is characterized in that cantilever beams (2) is formed by left beam slab, right beam slab and last beam slab welding assembly, an oblique angle is respectively cut away in the bottom of its left beam slab and right beam slab, and upper surface of beam slab is processed into rough surface on it.
3. submarine pipeline fixing device according to claim 1, it is characterized in that (7) are supported in revolution is toroidal, form by bottom plate, bearing and attachment bolt (3), the outer shroud of bearing is integrally welded by the lower end of pin and cutting ferrule body (5), the interior ring of bearing welds together by pin and bottom plate, bottom plate welds together with adjustment plate (8), with attachment bolt (3) cutting ferrule body (5), revolution support (7) and bottom plate is connected into one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02255892 CN2584986Y (en) | 2002-12-10 | 2002-12-10 | Device for fixing submarine pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02255892 CN2584986Y (en) | 2002-12-10 | 2002-12-10 | Device for fixing submarine pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2584986Y true CN2584986Y (en) | 2003-11-05 |
Family
ID=33724296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02255892 Expired - Fee Related CN2584986Y (en) | 2002-12-10 | 2002-12-10 | Device for fixing submarine pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2584986Y (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104421491A (en) * | 2013-08-22 | 2015-03-18 | 天津市海王星海上工程技术股份有限公司 | Operation device and operation method for deepwater hanging subsea pipeline |
CN105605318A (en) * | 2015-10-28 | 2016-05-25 | 林佳一 | Pipeline rigid support mechanism of centrifugal pump test bed and ascending and descending adjustment method of pipeline rigid support mechanism |
CN105605321A (en) * | 2015-10-28 | 2016-05-25 | 林佳一 | Pipeline rigid support mechanism of centrifugal pump test bed |
CN105822834A (en) * | 2016-05-27 | 2016-08-03 | 安徽省水利水电勘测设计院 | Underwater pipeline fixing device with multidirectional adjustment function and installation method of underwater pipeline fixing device |
CN106438605A (en) * | 2016-11-01 | 2017-02-22 | 山东电力建设第工程公司 | Jacking assisting device of vertical equipment and jacking construction method |
CN106931239A (en) * | 2017-03-29 | 2017-07-07 | 广东国利先进复合材料研发有限公司 | A kind of water-bed pipeline suspended span method for supporting and device |
CN107166096A (en) * | 2017-06-28 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of U-tube beam |
CN110107740A (en) * | 2019-05-08 | 2019-08-09 | 哈尔滨工程大学 | It is a kind of for handling the vertical stake support device of submarine pipeline suspended span |
CN112680570A (en) * | 2020-10-10 | 2021-04-20 | 中国重型机械研究院股份公司 | Rotary bidirectional telescopic type blanking connecting pipe device and using method |
-
2002
- 2002-12-10 CN CN 02255892 patent/CN2584986Y/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104421491A (en) * | 2013-08-22 | 2015-03-18 | 天津市海王星海上工程技术股份有限公司 | Operation device and operation method for deepwater hanging subsea pipeline |
CN105605318A (en) * | 2015-10-28 | 2016-05-25 | 林佳一 | Pipeline rigid support mechanism of centrifugal pump test bed and ascending and descending adjustment method of pipeline rigid support mechanism |
CN105605321A (en) * | 2015-10-28 | 2016-05-25 | 林佳一 | Pipeline rigid support mechanism of centrifugal pump test bed |
CN105822834A (en) * | 2016-05-27 | 2016-08-03 | 安徽省水利水电勘测设计院 | Underwater pipeline fixing device with multidirectional adjustment function and installation method of underwater pipeline fixing device |
CN105822834B (en) * | 2016-05-27 | 2017-10-24 | 安徽省水利水电勘测设计院 | Can multidirectional regulation submarine pipeline fixing device and its installation method |
CN106438605A (en) * | 2016-11-01 | 2017-02-22 | 山东电力建设第工程公司 | Jacking assisting device of vertical equipment and jacking construction method |
CN106438605B (en) * | 2016-11-01 | 2019-03-12 | 山东电力建设第一工程公司 | A kind of the jacking auxiliary device and jack-up construction method of vertical equipment |
CN106931239A (en) * | 2017-03-29 | 2017-07-07 | 广东国利先进复合材料研发有限公司 | A kind of water-bed pipeline suspended span method for supporting and device |
CN107166096A (en) * | 2017-06-28 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of U-tube beam |
CN110107740A (en) * | 2019-05-08 | 2019-08-09 | 哈尔滨工程大学 | It is a kind of for handling the vertical stake support device of submarine pipeline suspended span |
CN112680570A (en) * | 2020-10-10 | 2021-04-20 | 中国重型机械研究院股份公司 | Rotary bidirectional telescopic type blanking connecting pipe device and using method |
CN112680570B (en) * | 2020-10-10 | 2023-12-08 | 中国重型机械研究院股份公司 | Rotary bidirectional telescopic blanking connecting pipe device and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102482860B (en) | Offshore support structure and associated method of installing | |
CN2584986Y (en) | Device for fixing submarine pipeline | |
US20110006538A1 (en) | Monopile foundation for offshore wind turbine | |
CN201151909Y (en) | Deep foundation pit composite structure annular inner support | |
EP1101935A2 (en) | Method and vessel for installation of off-shore windmills | |
GB2130623A (en) | System for drilling from a water surface which is insensitive to the swell | |
CN1246619C (en) | Construction method and device for fixing seabed pipeline | |
CN102398860A (en) | Installation device and method for offshore wind power equipment | |
US20230392582A2 (en) | Floating reinforced concrete platform applicable to the marine wind power sector industry | |
CN201330136Y (en) | Arc crane boom | |
CN202992399U (en) | Underwater pipeline supporting pile | |
CN110185057B (en) | Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation | |
CN101177933A (en) | Bridge rib hoisting and supporting rack integral construction method and device | |
CN219930915U (en) | Integral offshore photovoltaic support platform structure system | |
JP5035505B2 (en) | Temporary scaffolding for pile-type offshore structures | |
CN219315788U (en) | Modularized offshore photovoltaic fixing support foundation and offshore photovoltaic system | |
CN214530590U (en) | Single-pile stabilizing platform of large-diameter pile body | |
CN116378087A (en) | Offshore photovoltaic support and connection structure thereof with pile foundation | |
CN215925671U (en) | Quick butt joint levelling device of steel case roof beam | |
CN211735482U (en) | Single-pile foundation integrated auxiliary structure for integral installation of offshore wind turbine | |
CN210942162U (en) | Ocean FPSO upper portion module combination bearing structure | |
CN220550577U (en) | Double-wall steel cofferdam top heightening flood control structure | |
Sarkar et al. | Study on a new methodology proposed to install a monopile | |
CN118811653A (en) | A node pipe hoisting framework | |
CN213202078U (en) | Large-scale tubular pile makeup stands up and overhead hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |