CN105822834B - Can multidirectional regulation submarine pipeline fixing device and its installation method - Google Patents

Can multidirectional regulation submarine pipeline fixing device and its installation method Download PDF

Info

Publication number
CN105822834B
CN105822834B CN201610359786.5A CN201610359786A CN105822834B CN 105822834 B CN105822834 B CN 105822834B CN 201610359786 A CN201610359786 A CN 201610359786A CN 105822834 B CN105822834 B CN 105822834B
Authority
CN
China
Prior art keywords
bolt
crossbeam
sleeve
stake top
adjusting pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610359786.5A
Other languages
Chinese (zh)
Other versions
CN105822834A (en
Inventor
韩士标
占红波
朱佳莉
张学喜
苑敬舜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Water Conservancy And Hydropower Survey And Design Research Institute Co ltd
Original Assignee
ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER filed Critical ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER
Priority to CN201610359786.5A priority Critical patent/CN105822834B/en
Publication of CN105822834A publication Critical patent/CN105822834A/en
Application granted granted Critical
Publication of CN105822834B publication Critical patent/CN105822834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • F16L3/04Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing and pressing it against a wall or other support
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats or weights

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Revetment (AREA)

Abstract

The present invention can multidirectional regulation submarine pipeline fixing device, its feature is:Described stake top sleeve is enclosed on pile sinking upper end, is fastenedly connected with leveling screw;Beam erection is on two stake top sleeves, it is bolted connection, the beam-ends sleeve at crossbeam two ends entangles stake top sleeve, is fastenedly connected with fixing bolt, circular hole pad and adjusting pad are housed, adjusting pad limits the gap location being arranged between beam-ends sleeve lining and stake top sleeve outer wall on fixing bolt;Bearing is fixedly mounted on by carrier setting bolt in the middle part of the upper surface of crossbeam, and pipeline construction is fixedly connected on bearing with clip, bolt and carrier setting bolt with crossbeam, and rubber lower bolster is provided between pipeline and bearing, and rubber upper padding plate is provided between pipeline and clip.The present invention reduces installation difficulty under water, and the especially fixation efficiency of construction to multiline pile under water is higher, can significantly reduce the duration, so as to reduce construction cost;Its structural integrity is strong, improves fixing device security and service life.

Description

Can multidirectional regulation submarine pipeline fixing device and its installation method
Technical field
The invention belongs to the Design of The Hydraulic Structure technical field of Hydraulic and Hydro-Power Engineering, and in particular to one kind multidirectional can be adjusted Submarine pipeline fixing device.
Background technology
Submarine pipeline fixing device is the important component of profundal zone pipeline building, and pipeline is typically disposed in two pile sinking On the crossbeam on top.The fixation of profundal zone pipeline is difficult to construction at dry land, and piling construction is often aboard ship carried out, by current, The influence of the factors such as stormy waves, the construction error of pile sinking is difficult to avoid that, further, since pipeline length, rigidity are big, all using multiple rows of(Group) Stake is fixed, multiple rows of(Group)Stake stake position is more difficult to accurate control.Current submarine pipeline fixing device, using solid between pile sinking and crossbeam Determine bolt connection, bolt position is unadjustable.
Prior art, which exists, to be disadvantageous in that:
Due to being connected between pile sinking and crossbeam using fixing bolt, bolt position can not be adjusted, because piling construction error The deflected file caused, makes fixing bolt on pile sinking be difficult to penetrate in hole corresponding on crossbeam, further, since underwater visibility Low, particularly under the influence of having current, uncontrollable fixed installation difficulty of construction is big under water, long in time limit, or even occurs not Situation about install.
The content of the invention
It is an object of the invention to:Designed using cross chute and strip groove, enable fixing bolt in cross chute and Mobile in strip groove to install, crossbeam two ends are provided with beam-ends sleeve, and beam-ends sleeve entangles pile sinking and fastened with leveling screw, so that There is provided it is a kind of can multidirectional regulation submarine pipeline fixing device, its structural integrity is strong, and security performance is high, is easily installed, saves Man-hour, reduction construction cost.
To achieve these goals, the present invention is adopted the following technical scheme that:
The present invention can multidirectional regulation submarine pipeline fixing device, its feature is:It is heavy that described stake top sleeve is enclosed on Stake upper end, is fastenedly connected with leveling screw;Beam erection is bolted connection on two stake top sleeves, crossbeam two ends Beam-ends sleeve entangles stake top sleeve, is fastenedly connected with fixing bolt, and circular hole pad and adjusting pad, adjusting pad are housed on fixing bolt Limit the gap location being arranged between beam-ends sleeve lining and stake top sleeve outer wall;Bearing is fixedly mounted on crossbeam by carrier setting bolt Upper surface in the middle part of, pipeline construction is fixedly connected, in pipeline on bearing with clip, connecting bolt and carrier setting bolt with crossbeam Rubber lower bolster is provided between bearing, rubber upper padding plate is provided between pipeline and clip.
The features of the present invention is also resided in:
Two beam-ends sleeves at described crossbeam two ends are square, are connected between two beam-ends sleeves provided with reinforcing plate, beam Sleeve lining is held to be provided with equidistant spacing with stake top sleeve outer wall, distance values are more than two piling construction relative positions and allow to miss Difference.
The beam-ends sleeve at described crossbeam two ends and the groove of installation bolt at stake top sleeve top center are set to cross cunning Groove, bolt can arbitrarily be moved in cross chute;In the middle part of the upper surface of crossbeam the groove of erection support bolt be set to strip lead to Groove, carrier setting bolt can arbitrarily be moved in strip groove.
Described adjusting pad is made up of adjustment base and adjusting pad lid, using threaded connection, and adjustment the cylindrical of base is provided with External screw thread, the endoporus of adjusting pad lid is provided with internal thread, and the height of adjusting pad is adjusted by rotating screw thread.
Described rubber lower bolster and rubber upper padding plate are supporting steel plate and clip press-in rubber on fluted body strip, bearing In the groove of lower bolster and rubber upper padding plate.
It is described can multidirectional regulation submarine pipeline fixing device installation method, comprise the following steps:
Step 1:Pile sinking, detects the relative position error of two pile sinking in allowed band under water;
Step 2:Stake top sleeve is installed, the bolt that will be equipped with circular hole pad is placed in the cross chute at the top of stake top sleeve, Stake top sleeve is enclosed on pile sinking upper end afterwards, connected with two leveling screws for being mutually perpendicular to intersect;
Step 3:Crossbeam is installed, beam-ends sleeve on crossbeam is enclosed on to the pile sinking upper end for having installed stake top sleeve, with two It is mutually perpendicular on the fixing bolt connection intersected, fixing bolt equipped with circular hole pad and adjustment base and adjusting pad lid, adjusting pad Seat and adjusting pad lid limit the gap location being arranged between beam-ends sleeve lining and stake top sleeve outer wall, and nut wouldn't be locked;
Step 4:Pipe laying, pipeline is placed on the bearing for having laid rubber lower bolster, then install rubber upper padding plate and Clip, two clips are integrated with connecting bolt, and are fixed on carrier setting bolt on crossbeam;
Step 5:Adjust and fixed, because the position of two pile sinking is fixed, the position of crossbeam can only be adjusted, The bolt for enabling step 2 to be placed at the top of stake top sleeve is penetrated in two on crossbeam cross chutes;Adjusting pad is adjusted, with one Spanner fixed adjustment base is motionless, and adjusting pad lid is rotated with another spanner, rotates threaded adjusting adjustment base and adjusting pad lid Distance between both ends of the surface, intimate contact is realized between adjusting pad both ends of the surface and beam-ends sleeve lining and stake top sleeve outer wall;Treat After each position bolt regulation is installed in place, fixing bolt is tightened, bolt is finally tightened;All bolts are fixed using double nut.
Beneficial effects of the present invention embody in the following areas:
1)Designed using cross chute and strip groove, enable bolt is mobile in cross chute and strip groove to install, It can move to adjust pile sinking pile position deviation by the multidirectional regulation of crossbeam, reduce installation difficulty under water, especially to multiline pile under water Fixation efficiency of construction it is higher, can significantly reduce the duration, so as to reduce construction cost.
2)Design is improved to beam structure, crossbeam two ends are connected provided with two beam-ends sleeves, and provided with reinforcing plate 20, Beam-ends sleeve entangles pile sinking and fixed with the leveling screw 11 for being mutually perpendicular to intersect, because employ both horizontally and vertically simultaneously Two kinds of modes that are connected, its structural integrity is strong, reduces the fatigue rupture produced under the course under cyclic loading such as wave, carries High fixing device security and service life.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is A-A sectional views in Fig. 1;
Fig. 3 is C-C sectional views in Fig. 1;
Fig. 4 is B-B sectional views in Fig. 1;
Fig. 5 is clip schematic diagram;
Fig. 6 is adjusting pad structural representation;
Fig. 7 is Fig. 6 left side views.
Sequence number in figure:Pile sinking 1, stake top sleeve 2, beam-ends sleeve 3, crossbeam 4, bearing 5, rubber lower bolster 6, pad on rubber Plate 7, pipeline 8, fixing bolt 9, bolt 10, leveling screw 11, clip 12, carrier setting bolt 13, circular hole pad 14, adjustment base 15th, connecting bolt 16, cross chute 17, strip groove 18, adjusting pad lid 19, reinforcing plate 20.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is further described by embodiment.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, Fig. 1 is schematic structural view of the invention;Fig. 2 is A-A sectional views in Fig. 1;Fig. 3 is C-C sectional views in Fig. 1;Fig. 4 is B-B sectional views in Fig. 1.
The present invention can multidirectional regulation submarine pipeline fixing device, its feature is:It is heavy that described stake top sleeve 2 is enclosed on 1 upper end of stake, is fastenedly connected with leveling screw 11;Crossbeam 4 is erected on two stake top sleeves 2, is fastenedly connected with bolt 10, crossbeam The beam-ends sleeve 3 at 4 two ends entangles stake top sleeve 2, is fastenedly connected with fixing bolt 9, and circular hole pad 14 is housed on fixing bolt 9 And adjusting pad, adjusting pad restriction is installed in the gap location between the inwall of beam-ends sleeve 3 and the outer wall of stake top sleeve 2;Bearing 5 is by propping up Seat bolt 13 is fixedly mounted in the middle part of the upper surface of crossbeam 4, and pipeline 8 is erected on bearing 5, with clip 12, the and of connecting bolt 16 Carrier setting bolt 13 is fixedly connected with crossbeam 4, and rubber lower bolster 6 is provided between pipeline 8 and bearing 5, pipeline 8 and clip 12 it Between be provided with rubber upper padding plate 7.
The features of the present invention is also resided in:
Two beam-ends sleeves 3 at the described two ends of crossbeam 4 are square, and the phase of reinforcing plate 20 is provided between two beam-ends sleeves 3 Company, the inwall of beam-ends sleeve 3 is provided with equidistant spacing with the outer wall of stake top sleeve 2, and distance values are constructed with respect to position more than two pile sinking 1 Put allowable error value.
The beam-ends sleeve 3 at the described two ends of crossbeam 4 and the groove of installation bolt 10 at the top center of stake top sleeve 2 are set to ten Word chute 17, bolt 10 can arbitrarily be moved in cross chute 17;Erection support bolt 13 is logical in the middle part of the upper surface of crossbeam 4 Groove is set to strip groove 18, and carrier setting bolt 13 can arbitrarily be moved in strip groove 18.
Described adjusting pad is made up of adjustment base 15 and adjusting pad lid 19, using threaded connection, adjusts the outer of base 15 Circle is provided with external screw thread, and the endoporus of adjusting pad lid 19 is provided with internal thread, and the height of adjusting pad is adjusted by rotating screw thread.Referring to figure 6 and Fig. 7, Fig. 6 be adjusting pad structural representation, Fig. 7 be Fig. 6 left side views.
Described rubber lower bolster 6 and rubber upper padding plate 7 are that supporting steel plate and clip 12 are pressed on fluted body strip, bearing 5 In the groove for entering rubber lower bolster 6 and rubber upper padding plate 7.Clip 12 is referring to Fig. 5, and Fig. 5 is clip schematic diagram;
It is described can multidirectional regulation submarine pipeline fixing device installation method, comprise the following steps:
Step 1:Pile sinking, detects the relative position error of two pile sinking 1 in allowed band under water;
Step 2:Stake top sleeve 2 is installed, the bolt 10 that will be equipped with circular hole pad 14 is placed on the cross cunning at the top of stake top sleeve 2 In groove 17, after stake top sleeve 2 is enclosed on the upper end of pile sinking 1, with two be mutually perpendicular to intersect leveling screws 11 fix;
Step 3:Crossbeam 4 is installed, beam-ends sleeve 3 on crossbeam 4 is enclosed on to the upper end of pile sinking 1 for having installed stake top sleeve 2, is used Two fixing bolts 9 for being mutually perpendicular to intersect are connected, equipped with circular hole pad 14 and adjustment base 15 and adjusting pad on fixing bolt 9 Lid 19, adjustment base 15 and adjusting pad lid 19 limit the gap being arranged between the inwall of beam-ends sleeve 3 and the outer wall of stake top sleeve 2 Place, nut wouldn't be locked;
Step 4:Pipe laying 8, pipeline 8 is placed on the bearing 5 for having laid rubber lower bolster 6, then installs pad on rubber Plate 7 and clip 12, two clips 12 are integrated with connecting bolt 16, and are fixed on carrier setting bolt 13 on crossbeam 4;
Step 5:Adjust and fixed, because the position of two pile sinking 1 is fixed, the position of crossbeam 4 can only be adjusted It is whole, the bolt 10 that step 2 is placed on the top of stake top sleeve 2 is penetrated in two on crossbeam 4 cross chutes 17;Regulation adjustment Pad, it is motionless with a spanner fixed adjustment base 15, adjusting pad lid 19 is rotated with another spanner, threaded adjusting adjusting pad is rotated Distance between seat 15 and the both ends of the surface of adjusting pad lid 19, between adjusting pad both ends of the surface and the inwall of beam-ends sleeve 3 and the outer wall of stake top sleeve 2 Realize intimate contact;After the regulation of each position bolt is installed in place, fixing bolt 9 is tightened, bolt 10 is finally tightened;All spiral shells Bolt is fixed using double nut.
In order to improve underwater visibility, convenient installation under water, improve speed of application, the fine day that stormy waves should be selected small enters Row construction;Have welding mark in drawing is full weld;All parts, particularly welding, polishing part, will be carried out in a pre-installation Derusting and preservative treatment.

Claims (6)

1. can multidirectional regulation submarine pipeline fixing device, it is characterised in that:Stake top sleeve(2)It is enclosed on pile sinking(1)Upper end, uses water Flat bolt(11)It is fastenedly connected;Crossbeam(4)It is erected at two stake top sleeves(2)On, use bolt(10)It is fastenedly connected, crossbeam(4) The beam-ends sleeve at two ends(3)Entangle stake top sleeve(2), use fixing bolt(9)It is fastenedly connected, fixing bolt(9)It is upper that circular hole is housed Pad(14)And adjusting pad, adjusting pad, which is limited, is arranged on beam-ends sleeve(3)Inwall and stake top sleeve(2)Gap between outer wall Place;Bearing(5)By carrier setting bolt(13)It is fixedly mounted on crossbeam(4)Upper surface in the middle part of, pipeline(8)It is erected at bearing(5)On, Use clip(12), connecting bolt(16)And carrier setting bolt(13)With crossbeam(4)It is fixedly connected, in pipeline(8)With bearing(5)Between Provided with rubber lower bolster(6), in pipeline(8)With clip(12)Between be provided with rubber upper padding plate(7).
2. it is according to claim 1 can multidirectional regulation submarine pipeline fixing device, it is characterised in that:Described crossbeam (4)Two beam-ends sleeves at two ends(3)For square, two beam-ends sleeves(3)Between be provided with reinforcing plate(20)It is connected, beam-ends sleeve (3)Inwall and stake top sleeve(2)Outer wall is provided with equidistant spacing, and distance values are more than two pile sinking(1)Relative position of constructing permits Perhaps error amount.
3. it is according to claim 1 or 2 can multidirectional regulation submarine pipeline fixing device, it is characterised in that:Described horizontal stroke Beam(4)The beam-ends sleeve at two ends(3)With stake top sleeve(2)Installation bolt at top center(10)Groove be set to cross chute (17), bolt(10)Can be in cross chute(17)In arbitrarily move;In crossbeam(4)Upper surface in the middle part of erection support bolt(13) Groove be set to strip groove(18), carrier setting bolt(13)Can be in strip groove(18)In arbitrarily move.
4. it is according to claim 1 can multidirectional regulation submarine pipeline fixing device, it is characterised in that:Described adjusting pad By adjustment base(15)With adjusting pad lid(19)Composition, using threaded connection, adjusts base(15)It is cylindrical be provided with external screw thread, adjust Whole pad lid(19)Endoporus be provided with internal thread, the height of adjusting pad adjusts by rotating screw thread.
5. it is according to claim 1 can multidirectional regulation submarine pipeline fixing device, it is characterised in that:Under described rubber Backing plate(6)With rubber upper padding plate(7)For fluted body strip, bearing(5)Upper supporting steel plate and clip(12)It is pressed into rubber lower bolster (6)With rubber upper padding plate(7)Groove in.
6. it is a kind of as claimed in claim 1 can multidirectional regulation submarine pipeline fixing device installation method, it is characterised in that Comprise the following steps:
Step 1:Pile sinking, detects two pile sinking under water(1)The relative position error in allowed band;
Step 2:Stake top sleeve is installed(2), will be equipped with circular hole pad(14)Bolt(10)It is placed on stake top sleeve(2)The ten of top Word chute(17)In, after by stake top sleeve(2)It is enclosed on pile sinking(1)Upper end, with two leveling screws for being mutually perpendicular to intersection(11) It is fixed;
Step 3:Crossbeam is installed(4), by crossbeam(4)Upper beam-ends sleeve(3)It is enclosed on and stake top sleeve had been installed(2)Pile sinking(1) Upper end, with two fixing bolts for being mutually perpendicular to intersection(9)Connection, fixing bolt(9)It is upper that circular hole pad is housed(14)And adjustment Base(15)With adjusting pad lid(19), adjust base(15)With adjusting pad lid(19)Limit and be arranged on beam-ends sleeve(3)Inwall and Stake top sleeve(2)Gap location between outer wall, nut wouldn't be locked;
Step 4:Pipe laying(8), pipeline(8)It is placed on and has laid rubber lower bolster(6)Bearing(5)On, then rubber is installed Upper padding plate(7)And clip(12), two clips(12)Use connecting bolt(16)It is integrated, and uses carrier setting bolt(13)It is fixed on Crossbeam(4)On;
Step 5:Adjust and fixed, due to two pile sinking(1)Position be it is fixed, can only be to crossbeam(4)Position adjusted It is whole, step 2 is placed on stake top sleeve(2)The bolt at top(10)Crossbeam can be penetrated(4)On two cross chutes(17)In; Adjusting pad is adjusted, with a spanner fixed adjustment base(15)It is motionless, rotate adjusting pad lid with another spanner(19), rotate spiral shell Line regulation adjustment base(15)With adjusting pad lid(19)Distance between both ends of the surface, adjusting pad both ends of the surface and beam-ends sleeve(3)Inwall With stake top sleeve(2)Intimate contact is realized between outer wall;After the regulation of each position bolt is installed in place, fixing bolt is tightened (9), finally tighten bolt(10);All bolts are fixed using double nut.
CN201610359786.5A 2016-05-27 2016-05-27 Can multidirectional regulation submarine pipeline fixing device and its installation method Active CN105822834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610359786.5A CN105822834B (en) 2016-05-27 2016-05-27 Can multidirectional regulation submarine pipeline fixing device and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610359786.5A CN105822834B (en) 2016-05-27 2016-05-27 Can multidirectional regulation submarine pipeline fixing device and its installation method

Publications (2)

Publication Number Publication Date
CN105822834A CN105822834A (en) 2016-08-03
CN105822834B true CN105822834B (en) 2017-10-24

Family

ID=56531465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610359786.5A Active CN105822834B (en) 2016-05-27 2016-05-27 Can multidirectional regulation submarine pipeline fixing device and its installation method

Country Status (1)

Country Link
CN (1) CN105822834B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108591658A (en) * 2018-05-17 2018-09-28 苏州罗克莱堆焊科技有限公司 A kind of deep-sea high temperature high voltage resistant forging structure
CN111237849B (en) * 2020-01-17 2021-09-28 安徽理工大学 Indirect heating device for abandoned mine and method for heating by adopting indirect heating device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2584986Y (en) * 2002-12-10 2003-11-05 胜利油田胜利石油化工建设有限责任公司 Device for fixing submarine pipeline
RU2265768C1 (en) * 2004-11-11 2005-12-10 Общество С Ограниченной Ответственностью "Газпромэнергодиагностика" Movable support of a pipeline
CN202992399U (en) * 2012-12-05 2013-06-12 中国石油大学(华东) Underwater pipeline supporting pile
CN104676113A (en) * 2013-11-29 2015-06-03 大连鑫永工业制造有限公司 Adjustable cable fixed mount
CA2942828A1 (en) * 2014-03-28 2015-10-01 Public Joint Stock Company "Transneft" Stationary pipeline support
CN205938179U (en) * 2016-05-27 2017-02-08 安徽省水利水电勘测设计院 Underwater pipeline fixing device that can multidirectionally adjust

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2584986Y (en) * 2002-12-10 2003-11-05 胜利油田胜利石油化工建设有限责任公司 Device for fixing submarine pipeline
RU2265768C1 (en) * 2004-11-11 2005-12-10 Общество С Ограниченной Ответственностью "Газпромэнергодиагностика" Movable support of a pipeline
CN202992399U (en) * 2012-12-05 2013-06-12 中国石油大学(华东) Underwater pipeline supporting pile
CN104676113A (en) * 2013-11-29 2015-06-03 大连鑫永工业制造有限公司 Adjustable cable fixed mount
CA2942828A1 (en) * 2014-03-28 2015-10-01 Public Joint Stock Company "Transneft" Stationary pipeline support
CN205938179U (en) * 2016-05-27 2017-02-08 安徽省水利水电勘测设计院 Underwater pipeline fixing device that can multidirectionally adjust

Also Published As

Publication number Publication date
CN105822834A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN108138751B (en) For tying the tower segments of formula wind turbine tower
CN106758787B (en) A kind of Precast Pier Columns mounting and positioning device
JP2013159945A (en) Connection structure of superstructure and pile
CN102433935A (en) Shock insulation support mounting and positioning frame
CN105822834B (en) Can multidirectional regulation submarine pipeline fixing device and its installation method
WO2013057459A1 (en) Monopile transition piece
CN102747782A (en) Adjustable locating device for steel structural support
CN205938179U (en) Underwater pipeline fixing device that can multidirectionally adjust
CN113566023A (en) A multi-directional swing type seismic pipeline support
JP5356482B2 (en) Fundamental structure of solar cell module or solar cell array mount
CN215829625U (en) Node that strength nature concrete column and girder steel are connected
CN202370098U (en) Positioning frame for mounting shock-insulation support
JP3215605U (en) Support structure
CN203346897U (en) Foundation raft embedded steel column positioning support
CN113529776B (en) Three-way position adjustable photovoltaic module support stand column connection conversion device
CN104319487A (en) Large radio telescope with actuator foundation embedded part reserved threaded hole structure
CN202627204U (en) Adjustable steel structure support positioning device
KR20170115122A (en) Liftable pile foundation connecting device
CN201739319U (en) Movable nut assembly structure
CN221441912U (en) Floor slab and steel bar protection layer thickness control cushion block
CN221702389U (en) Eccentric spiral ground stake of adjustable
CN213974368U (en) Tool for shipping and fixing four-pipe jacket
CN102747783A (en) Adjustable locating device of steel structural bearing
CN219653712U (en) Pile foundation positioning deviation preventing device for pile foundation engineering
CN221590903U (en) Drilling angle control device for foot locking anchor rod in tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 230088 No. 185 Haitang Road, hi tech Zone, Anhui, Hefei

Patentee after: Anhui water resources and Hydropower Survey, design and Research Institute Co.,Ltd.

Address before: 230088 No. 185 Haitang Road, hi tech Zone, Anhui, Hefei

Patentee before: ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER

CP01 Change in the name or title of a patent holder
CB03 Change of inventor or designer information

Inventor after: Han Shibiao

Inventor after: Zhan Hongbo

Inventor after: Zhu Jiali

Inventor after: Zhang Xuexi

Inventor after: Yuan Jingshun

Inventor before: Han Shibiao

Inventor before: Zhan Hongbo

Inventor before: Zhu Jiali

Inventor before: Zhang Xuexi

Inventor before: Yuan Jingshun

CB03 Change of inventor or designer information
CP03 Change of name, title or address

Address after: No. 185 Haitang Road, High tech Development Zone, Hefei City, Anhui Province, 230031

Patentee after: Anhui water conservancy and hydropower survey and design research institute Co.,Ltd.

Country or region after: China

Address before: 230088 No. 185 Haitang Road, Hefei High-tech Zone, Anhui Province

Patentee before: Anhui water resources and Hydropower Survey, design and Research Institute Co.,Ltd.

Country or region before: China