CN208105008U - A kind of urban viaduct prestress steel bundle arrangement structure - Google Patents

A kind of urban viaduct prestress steel bundle arrangement structure Download PDF

Info

Publication number
CN208105008U
CN208105008U CN201820566379.6U CN201820566379U CN208105008U CN 208105008 U CN208105008 U CN 208105008U CN 201820566379 U CN201820566379 U CN 201820566379U CN 208105008 U CN208105008 U CN 208105008U
Authority
CN
China
Prior art keywords
chamber
box
box beam
bridge
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820566379.6U
Other languages
Chinese (zh)
Inventor
张帅
冯德飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC comprehensive planning and Design Institute Co.,Ltd.
Original Assignee
China Finance Bureau Highway Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Finance Bureau Highway Survey And Design Institute Co Ltd filed Critical China Finance Bureau Highway Survey And Design Institute Co Ltd
Priority to CN201820566379.6U priority Critical patent/CN208105008U/en
Application granted granted Critical
Publication of CN208105008U publication Critical patent/CN208105008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of urban viaduct prestress steel bundle arrangement structures, including bridge upper element, bridge lower component and steel tread assembly, the bridge upper element includes concrete box girder, box girder web, box beam top plate, edge of a wing cantilever, box beam bottom plate and chamber, the inside of the concrete box girder offers the chamber, the chamber quantity is two, and is symmetrically distributed in the left and right ends inside the concrete box girder;Box beam top plate is adjusted to by beam-ends, it can avoid in beam-ends stretch-draw prestressing force steel beam, it can avoid in terms of construction organization, can only effectively solving the problems, such as that working procedure arranges aspect using by the shortcomings that constructing is joined because of the limitation in beam-ends prestressed strand tensioning space, it can effectively shorten the construction period, bridge bigger, connection number is more long for bridge, using beam-ends not tensioning Strands Layout scheme, realization is multi-joint to construct simultaneously, save the time by connection number be doubled and redoubled, the duration shorten effect it is also more significant.

Description

A kind of urban viaduct prestress steel bundle arrangement structure
Technical field
The utility model belongs to road and bridge construction technical field, and in particular to a kind of urban viaduct prestressed strand arrangement knot Structure.
Background technique
With the development of urban modernization, the requirement of traffic various aspects is increasingly improved.In recent years with China city height The quantity of bridge formation is increasing, and the scale of road and bridge undertaking of construction is also constantly expanding, to new technology and novel construction The application aspect of material is at rank first.But it is still asked there is some in urban viaduct work progress Topic, these problems largely all highlight in terms of overpass Key Techniques in Construction.In the municipal construction duration, to meet quality, Safety, time etc. limitation require, in the case where not influencing local transit, urban viaduct design and construction technical aspect It is required that increasing therewith.The raising of construction technology inherently improves speed of application, so that shortening the duration reduces cost, it is high to improve city The economy of bridge formation construction.
Multispan Cast-in-Situ Continuous Beam prestressed strand is located at connection end along the long elongated setting of connection, stretching end at present, when bridge compared with It is long, when connection number is more, since prestressing force pull end is located at connection end, it can only construct by connection, it is tighter for construction period Project can seriously affect construction speed.
Utility model content
The purpose of this utility model is to provide a kind of urban viaduct prestress steel bundle arrangement structures, to solve above-mentioned back Current multispan Cast-in-Situ Continuous Beam prestressed strand is proposed in scape technology along the long elongated setting of connection, stretching end is located at connection end, works as bridge Beam is longer, when connection number is more, since prestressing force pull end is located at connection end, can only construct by connection, construction period is compared Tight project, the problem of construction speed can be seriously affected.
To achieve the above object, the utility model provides the following technical solutions:A kind of urban viaduct prestressed strand cloth Structure, including bridge upper element, bridge lower component and steel tread assembly are set, the bridge upper element includes concrete box Beam, box girder web, box beam top plate, edge of a wing cantilever, box beam bottom plate and chamber, the inside of the concrete box girder offer the case Room, the chamber quantity is two, and is symmetrically distributed in the left and right ends inside the concrete box girder, the top of the chamber The box beam top plate is installed, the box beam top plate is fixedly connected with the concrete box girder, and the edge of a wing cantilever is located at described The outside of box beam top plate, and be fixedly connected with the box beam top plate, the box beam bottom plate is located at the bottom end of the chamber, and described Box beam bottom plate is fixedly connected with the concrete box girder, and the box girder web is located at the two sides of the chamber, and the box beam abdomen The top and bottom end of plate are separately connected the box beam top plate and the box beam bottom plate, and the bridge lower component includes bridge pier branch Column, bridge pier crossbeam, vase pier shaft and connection frame, the vase pier shaft are located at the lower section of the concrete box girder, and the vase The top of pier shaft is embedded in the concrete box girder, and is fixedly connected with the box beam bottom plate, the inside of the vase pier shaft Be fixedly connected by the connection frame, the bridge pier crossbeam is installed on the bottom end of the vase pier shaft, and with the vase pier shaft It is fixedly connected, the bridge pier pillar is fixedly installed in the lower section of the bridge pier crossbeam, and the steel tread assembly includes prestressed strand With stretch-draw anchor end anchorage, the prestressed strand is embedded in the box girder web, the box beam top plate and the box beam bottom plate Inside, and the both ends of the prestressed strand are equipped with stretch-draw anchor end anchorage, prestressed strand described in every two passes through institute Stretch-draw anchor end anchorage is stated to be fixedly connected.
Preferably, chamber internal gear is equipped in the chamber, the chamber internal gear is fixedly mounted on the interior of the chamber Side wall, and the prestressed strand is fixedly connected on the chamber internal gear.
Preferably, the box girder web both ends offer expansion joint preformed groove, the box beam top plate and the box beam bottom plate Both ends offer the expansion joint preformed groove, the length of the expansion joint preformed groove is six centimetres.
Preferably, the concrete box girder is the high prestressed concrete continuous box girder structures such as single box double room skew web plate, and The concrete box girder uses longitudinal and transverse two dimension prestressing system.
Preferably, the bridge pier struts number is two, and is separately mounted to the left and right ends of the bridge pier below the crossbeam, The vase pier shaft quantity is two, and is separately mounted to the left and right ends above the bridge pier crossbeam.
Compared with prior art, the utility model has the beneficial effects that:The stretch-draw anchor end of prestressed strand, by beam-ends tune Whole is box beam top plate or chamber tooth plate, can avoid to can avoid in beam-ends stretch-draw prestressing force steel beam because of beam-ends prestressed strand The shortcomings that limitation in tensioning space can only be using constructing by connection, in terms of construction organization, can effectively solve working procedure arrangement side The problem in face, can effectively shorten the construction period, bridges bigger, connection number is more long for bridge, using beam-ends not tensioning steel beam cloth Set scheme, realize it is multi-joint constructs simultaneously, save the time is doubled and redoubled by connection number, and the effect that the duration shortens is also more significant.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is that the utility model central sill both ends not tensioning web prestressed strand arranges elevation;
Fig. 3 is that the utility model central sill both ends not tensioning top plate prestressed strand arranges elevation;
Fig. 4 is the utility model central sill both ends not stretch-draw prestressing force Strands Layout typical section figure;
In figure:10- bridge upper element, 11- concrete box girder, 12- box girder web, the expansion joint 121- preformed groove, 13- case Back plate, the edge of a wing 14- cantilever, 15- box beam bottom plate, 16- chamber, 20- bridge lower component, 21- bridge pier pillar, 22- bridge pier are horizontal Beam, 23- vase pier shaft, 24- connection frame, 30- steel tread assembly, 31- prestressed strand, 32- stretch-draw anchor end anchorage.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution:A kind of urban viaduct prestressed strand arrangement knot Structure, including bridge upper element 10, bridge lower component 20 and steel tread assembly 30, bridge upper element 10 include concrete box girder 11, box girder web 12, box beam top plate 13, edge of a wing cantilever 14, box beam bottom plate 15 and chamber 16, the inside of concrete box girder 11 open up There is chamber 16,16 quantity of chamber is two, and is symmetrically distributed in the left and right ends inside concrete box girder 11, the top of chamber 16 Box beam top plate 13 is installed, box beam top plate 13 is fixedly connected with concrete box girder 11, and edge of a wing cantilever 14 is located at box beam top plate 13 Outside, and be fixedly connected with box beam top plate 13, box beam bottom plate 15 is located at the bottom end of chamber 16, and box beam bottom plate 15 and concrete box Beam 11 is fixedly connected, and box girder web 12 is located at the two sides of chamber 16, and the top of box girder web 12 and bottom end are separately connected box beam Top plate 13 and box beam bottom plate 15, bridge lower component 20 include bridge pier pillar 21, bridge pier crossbeam 22, vase pier shaft 23 and connection frame 24, vase pier shaft 23 is located at the lower section of concrete box girder 11, and the top of vase pier shaft 23 is embedded in concrete box girder 11, and It is fixedly connected with box beam bottom plate 15, the inside of vase pier shaft 23 is fixedly connected by connection frame 24, and bridge pier crossbeam 22 is installed on flower The bottom end of bottle pier shaft 23, and be fixedly connected with vase pier shaft 23, bridge pier pillar 21 is fixedly installed in the lower section of bridge pier crossbeam 22, steel Tread assembly 30 includes prestressed strand 31 and stretch-draw anchor end anchorage 32, and prestressed strand 31 is embedded in box girder web 12, box beam Inside top plate 13 and box beam bottom plate 15, and the both ends of prestressed strand 31 are equipped with stretch-draw anchor end anchorage 32, every two prestressing force Steel beam 31 is fixedly connected by stretch-draw anchor end anchorage 32.
In the present embodiment, chamber internal gear is equipped in chamber 16, chamber internal gear is fixedly mounted on the inner sidewall of chamber 16, And prestressed strand 31 is fixedly connected on chamber internal gear, the stretch-draw anchor end of prestressed strand is adjusted to box beam by beam-ends Top plate or chamber tooth plate can avoid to can avoid in beam-ends stretch-draw prestressing force steel beam because of beam-ends prestressed strand tensioning space Limitation can only using by connection construct the shortcomings that, box beam bottom plate 15 is located at the bottom end of chamber 16, and box beam bottom plate 15 and concrete Box beam 11 is fixedly connected, and box girder web 12 is located at the two sides of chamber 16, and the top of box girder web 12 and bottom end are separately connected case Back plate 13 and box beam bottom plate 15, bridges bigger, connection number is more long for bridge, using beam-ends not tensioning Strands Layout scheme, Realize multi-joint while constructing, save the time by connection number be doubled and redoubled, the duration shorten effect it is also more significant.
Further, chamber internal gear is equipped in chamber 16, chamber internal gear is fixedly mounted on the inner sidewall of chamber 16, and Prestressed strand 31 is fixedly connected on chamber internal gear.
In the present embodiment, chamber internal gear is equipped in chamber 16, chamber internal gear is fixedly mounted on the inner sidewall of chamber 16, And prestressed strand 31 is fixedly connected on chamber internal gear, it can avoid to can avoid in beam-ends stretch-draw prestressing force steel beam because of beam The shortcomings that holding the limitation in prestressed strand tensioning space can only be using constructing by connection.
Further, 12 both ends of box girder web offer expansion joint preformed groove 121, box beam top plate 13 and box beam bottom plate 15 Both ends offer expansion joint preformed groove 121, and the length of expansion joint preformed groove 121 is six centimetres.
In the present embodiment, 12 both ends of box girder web offer expansion joint preformed groove 121, box beam top plate 13 and box beam bottom plate 15 Both ends offer expansion joint preformed groove 121, the length of expansion joint preformed groove 121 is six centimetres, can make box girder web 12 In expanded by heating, there are certain extendable rooms.
Further, concrete box girder 11 is the high prestressed concrete continuous box girder structures such as single box double room skew web plate, and Concrete box girder 11 uses longitudinal and transverse two dimension prestressing system.
In the present embodiment, concrete box girder 11 is the high prestressed concrete continuous box girder structures such as single box double room skew web plate, And concrete box girder 11 use longitudinal and transverse two dimension prestressing system, 11 longitudinal prestressing of concrete box girder using 15-22,15-19, Tetra- seed type of 15-16,15-12, is respectively adopted M15-22, M15-19, M15-16, M15-12 type anchorage, pre- in box girder web 12 Stress steel beam 31 uses 15-22,15-19, and prestressed strand 31 uses 15-16,15-12, part box girder web 12 in top, bottom plate Middle prestressed strand 31 is elongated continuous beam, and notch, bridge floor tensioning is arranged in top plate, sets tooth plate tensioning in remaining steel Shu Caiyong beam Anchored end anchorage 32.
Further, 21 quantity of bridge pier pillar is two, and is separately mounted to the left and right ends of 22 lower section of bridge pier crossbeam, flower Bottle 23 quantity of pier shaft is two, and is separately mounted to the left and right ends of 22 top of bridge pier crossbeam.
In the present embodiment, 21 quantity of bridge pier pillar is two, and is separately mounted to the left and right ends of 22 lower section of bridge pier crossbeam, 23 quantity of vase pier shaft is two, and is separately mounted to the left and right ends of 22 top of bridge pier crossbeam, carrys out stabilizing concrete box beam 11。
The working principle and process for using of the utility model:It, will be along the long elongated setting of connection after the utility model installs Prestressed strand 31, be adjusted to the short beam in the 16 internal gear tensioning of box beam top plate 13 or chamber, short beam arrangement exists certain Staggeredly overlap, by the stretch-draw anchor end anchorage 32 of prestressed strand 13, box beam top plate 13 or chamber tooth are adjusted to by beam-ends On plate, in cast-in-situ box girder, beam-ends stretch-draw prestressing force steel beam 31 and beam-ends not stretch-draw prestressing force Strands Layout, two kinds of layout pattern meters Obtained section stress result is smaller compared to difference, is all satisfied code requirement.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of urban viaduct prestress steel bundle arrangement structure, it is characterised in that:Including under bridge upper element (10), bridge Parts (20) and steel tread assembly (30), the bridge upper element (10) include concrete box girder (11), box girder web (12), The inside of box beam top plate (13), edge of a wing cantilever (14), box beam bottom plate (15) and chamber (16), the concrete box girder (11) opens up Have the chamber (16), chamber (16) quantity is two, and is symmetrically distributed in the internal left side of the concrete box girder (11) Right both ends, the top of the chamber (16) are equipped with the box beam top plate (13), the box beam top plate (13) and the concrete Box beam (11) is fixedly connected, and the edge of a wing cantilever (14) is located at the outside of the box beam top plate (13), and with the box beam top plate (13) be fixedly connected, the box beam bottom plate (15) is located at the bottom end of the chamber (16), and the box beam bottom plate (15) with it is described Concrete box girder (11) is fixedly connected, and the box girder web (12) is located at the two sides of the chamber (16), and the box girder web (12) top and bottom end is separately connected the box beam top plate (13) and the box beam bottom plate (15), the bridge lower component It (20) include bridge pier pillar (21), bridge pier crossbeam (22), vase pier shaft (23) and connection frame (24), vase pier shaft (23) position It is embedded in the top of the lower section of the concrete box girder (11), and the vase pier shaft (23) in the concrete box girder (11) It is interior, and be fixedly connected with the box beam bottom plate (15), the inside of the vase pier shaft (23) is fixed by the connection frame (24) Connection, the bridge pier crossbeam (22) is installed on the bottom end of the vase pier shaft (23), and fixes and connect with the vase pier shaft (23) It connects, the bridge pier pillar (21) is fixedly installed in the lower section of the bridge pier crossbeam (22), and the steel tread assembly (30) includes answering in advance Power steel beam (31) and stretch-draw anchor end anchorage (32), the prestressed strand (31) are embedded in the box girder web (12), described Box beam top plate (13) and the box beam bottom plate (15) are internal, and the both ends of the prestressed strand (31) are equipped with the stretch-draw anchor It holds anchorage (32), prestressed strand (31) described in every two is fixedly connected by stretch-draw anchor end anchorage (32).
2. a kind of urban viaduct prestress steel bundle arrangement structure according to claim 1, it is characterised in that:The chamber (16) chamber internal gear is equipped in, the chamber internal gear is fixedly mounted on the inner sidewall of the chamber (16), and the chamber The prestressed strand (31) are fixedly connected on internal gear.
3. a kind of urban viaduct prestress steel bundle arrangement structure according to claim 1, it is characterised in that:The box beam Web (12) both ends offer expansion joint preformed groove (121), the both ends of the box beam top plate (13) and the box beam bottom plate (15) The expansion joint preformed groove (121) is offered, the length of the expansion joint preformed groove (121) is six centimetres.
4. a kind of urban viaduct prestress steel bundle arrangement structure according to claim 1, it is characterised in that:The coagulation Native box beam (11) is the high prestressed concrete continuous box girder structures such as single box double room skew web plate, and the concrete box girder (11) is adopted With longitudinal and transverse two dimension prestressing system.
5. a kind of urban viaduct prestress steel bundle arrangement structure according to claim 1, it is characterised in that:The bridge pier Pillar (21) quantity is two, and is separately mounted to the left and right ends below the bridge pier crossbeam (22), the vase pier shaft (23) quantity is two, and is separately mounted to the left and right ends above the bridge pier crossbeam (22).
CN201820566379.6U 2018-04-20 2018-04-20 A kind of urban viaduct prestress steel bundle arrangement structure Active CN208105008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820566379.6U CN208105008U (en) 2018-04-20 2018-04-20 A kind of urban viaduct prestress steel bundle arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820566379.6U CN208105008U (en) 2018-04-20 2018-04-20 A kind of urban viaduct prestress steel bundle arrangement structure

Publications (1)

Publication Number Publication Date
CN208105008U true CN208105008U (en) 2018-11-16

Family

ID=64119292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820566379.6U Active CN208105008U (en) 2018-04-20 2018-04-20 A kind of urban viaduct prestress steel bundle arrangement structure

Country Status (1)

Country Link
CN (1) CN208105008U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005429A (en) * 2019-05-22 2019-07-12 河南省交通规划设计研究院股份有限公司 The box top board structure of city tunnel bifurcation mouth
CN110042865A (en) * 2019-05-22 2019-07-23 河南省交通规划设计研究院股份有限公司 Box top board structure for large span city tunnel
CN110438886A (en) * 2019-08-20 2019-11-12 中国铁路设计集团有限公司 A kind of railway precast segment spliced girder beam-ends processing structure and method
CN113338161A (en) * 2021-04-15 2021-09-03 广东省交通规划设计研究院集团股份有限公司 Concrete box girder top surface prestress steel beam tensioning structure and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005429A (en) * 2019-05-22 2019-07-12 河南省交通规划设计研究院股份有限公司 The box top board structure of city tunnel bifurcation mouth
CN110042865A (en) * 2019-05-22 2019-07-23 河南省交通规划设计研究院股份有限公司 Box top board structure for large span city tunnel
CN110005429B (en) * 2019-05-22 2024-09-13 河南省交通规划设计研究院股份有限公司 Box-type top plate structure of urban tunnel bifurcation
CN110438886A (en) * 2019-08-20 2019-11-12 中国铁路设计集团有限公司 A kind of railway precast segment spliced girder beam-ends processing structure and method
CN113338161A (en) * 2021-04-15 2021-09-03 广东省交通规划设计研究院集团股份有限公司 Concrete box girder top surface prestress steel beam tensioning structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN208105008U (en) A kind of urban viaduct prestress steel bundle arrangement structure
CN103938546B (en) Simply supported non-uniform construction method
CN102704406B (en) Roadbed slab non-tensile stress construction method based on combined channel girder
CN104389261B (en) Prefabricated ultra-high performance concrete π ellbeam unit, bridge structure and construction method thereof
CN101487332A (en) Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab
CN203741730U (en) T-shaped bridge reinforcing structure
CN104313994A (en) Hybrid girder and extradossed cable-stayed bridge without back-cables
CN203559333U (en) Steel truss-channel girder combined bridge structure of railway
CN103938549A (en) Construction method for fabricated type corrugated steel inclined web combined beam
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
CN108316164B (en) Structure for reinforcing old assembled hollow slab girder bridge by using new girder and construction method
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN103882797B (en) A corrugated steel web composite box girder and its construction technology
CN103572707A (en) Box girder steel outer template and construction method thereof
CN204151663U (en) A kind of hybrid beam is without dorsal funciculus low-pylon cable-stayed bridge
CN105625573B (en) The bean column node of intensity presstressed reinforcing steel and regular reinforcement sleeve connection in beam bottom
CN105696453A (en) Steel-concrete composite beam
CN104047223B (en) Light assembling structure bridge and construction method thereof
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN203807928U (en) Corrugated-steel-web combined box girder
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use
CN211815533U (en) Prefabricated assembled solid single-column pier based on root-enlarged cross section
CN206090272U (en) Can promote wave form steel abdomen plate girder bridge of whole cracking resistance
CN201738227U (en) Ground-anchored and self-anchored hauling combined system bridge
CN104032741B (en) The rapid constructing method of a kind of hydraulic engineering large volume temperature control

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee after: CCCC comprehensive planning and Design Institute Co.,Ltd.

Address before: 100024 No. 1 Design Institute, zhoujiajing courtyard, Guanzhuang, Chaoyang District, Beijing

Patentee before: CCCC HIGHWAY SURVEY & DESIGN Co.,Ltd. OF FHEC

CP03 Change of name, title or address