[go: up one dir, main page]

CN204492227U - Assembling House on stilts - Google Patents

Assembling House on stilts Download PDF

Info

Publication number
CN204492227U
CN204492227U CN201420854971.8U CN201420854971U CN204492227U CN 204492227 U CN204492227 U CN 204492227U CN 201420854971 U CN201420854971 U CN 201420854971U CN 204492227 U CN204492227 U CN 204492227U
Authority
CN
China
Prior art keywords
back timber
stair
bolt
column
bolted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420854971.8U
Other languages
Chinese (zh)
Inventor
邓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Shi Gang Industrial Co Ltd
Original Assignee
Sichuan Shi Gang Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Shi Gang Industrial Co Ltd filed Critical Sichuan Shi Gang Industrial Co Ltd
Priority to CN201420854971.8U priority Critical patent/CN204492227U/en
Application granted granted Critical
Publication of CN204492227U publication Critical patent/CN204492227U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model is assembling House on stilts, and solve the mobile house function had the sixth of the twelve Earthly Branches few, anti-tidal range, daylighting is poor, poor stability, installs the problem of inconvenience.The lower end of four root posts (3) is connected with concrete foundation (1) bolt, the upper end of column (3) is fixed with the cross recess of angle steel formation, floor joist (20) is positioned at cross recess by bolt (19) and Bolted angle connection, platform (13) of registering one's residence is bolted with floor joist (20), floor is connected with floor joist (20), lower end and the floor joist (20) of square wall column (14) are bolted, upper end and the back timber (21) of wall column (14) are bolted, roof truss (16) is connected with back timber (21) with bolt by angle steel, purlin (15) is connected with roof truss (16) by bolt, roof is connected with purlin (15), the groove of wallboard (5) and wall column (14) clamping, gap location is coated with fluid sealant, stair (2) and platform (13) chain connection of registering one's residence, the pulley that stair suspension rod (18) upper end walked around by the wire rope be fixed in the stairlift mechanism (17) on back timber (21) is connected with back timber (21), stair suspension rod (18) lower end and stair (2) are hinged.

Description

Assembling House on stilts
technical field:
The utility model relates to the light steel House on stilts of a kind of assembling, and especially with detachable reusable scenic area and scenic spot distributing guest room, hills, the interim office occupancy in mountain area, interim residential occupancy is relevant.
background technology:
At present, scenic spot visitor generally concentrates the hotel, hotel, Peasants Joy etc. moved near scenic spot to be fixed buildings, and cost is high, and occupation of land is many, is unsuitable for being distributed in viewing area.Visitor can only have a glance at, can not be on the spot in person, and physical experience scenic spot fresh air, in thawing cylinders view.The mobile house function had the sixth of the twelve Earthly Branches is few, anti-tidal range, and daylighting is poor, poor stability, installs inconvenience.
utility model content:
It is many that the purpose of this utility model is to provide a kind of function, and moisture resistance is good, and daylighting is good, and safety is good, assembling House on stilts easy for installation.
The utility model is achieved in that
The lower end of four root posts 3 is connected with concrete foundation 1 bolt, the upper end of column 3 is fixed with the cross recess of angle steel formation, floor joist 20 is positioned at cross recess by bolt 19 and Bolted angle connection, platform 13 of registering one's residence is bolted with floor joist 20, floor is connected with floor joist 20, lower end and the floor joist 20 of square wall column 14 are bolted, upper end and the back timber 21 of wall column 14 are bolted, roof truss 16 is connected with back timber 21 with bolt by angle steel, purlin 15 is connected with roof truss 16 by bolt, roof is connected with purlin 15, the groove of wallboard 5 and wall column 14 clamping, gap location is coated with fluid sealant, stair 2 and platform 13 chain connection of registering one's residence, the pulley that stair suspension rod 18 upper end walked around by the wire rope be fixed in the stairlift mechanism 17 on back timber 21 is connected with back timber 21, stair suspension rod 18 lower end and stair 2 are hinged.
Column 3, floor joist 20, back timber 21, wall column 14 are hollow section, and forceful electric power cable 22, weak-current cable 23, feed pipe 24, blow-off pipe 10 are entered within doors by the empty stomach of column 3.
Roof installing Unpowered ventilation machine 8, roofing solar energy collector 7, wallboard 5 is large area hollow glass curtain wall 9.
Wallboard, floor, roof all adopt chromatic steel sandwich plate to combine, and chromatic steel sandwich plate surrounding is hermetically sealed.
The daily life sewage that blow-off pipe 10 is discharged is after septic tank 11 processes, and the porose osmos tube 12 in soil penetrates into soil.
The hotel, hotel, Peasants Joy etc. moved near scenic spot is generally concentrated in order to overcome existing scenic spot visitor, can not be on the spot in person, physical experience scenic spot fresh air, natural landscape, incorporates wherein.The utility model provides a kind of and dispersibles the separate flat being arranged in scenic spot, takes House on stilts structure of encorbelmenting, liftable stair, makes room both aeration-drying, effectively can prevent again snake class, wild beast infringement, also can prevent lawless person from entering indoor, guarantee safety.
The utility model solves the technical scheme that its technical problem adopts: adopt four root posts to support whole house, and adopt cantilevered structure (external wall of house is with a certain distance from column); Stair can electronic, hand-operated lifting; Unpowered ventilation machine 8 is established on roof, with fresh air in holding chamber; Adopt the supply of solar energy collector 7 hot water, environmental protection and energy saving; Adopt large area hollow curtain wall 9, ensure that the visual field is broad, illumination is sufficient; Indoor fire-fighting automatic sprinkler fire-extinguishing system is set, guarantees residential security; House on stilts indoor are by parlor, bedroom, kitchen, washroom subregion, and function is comprehensive; Be equipped with Autoamtic cold-warm air conditioner system, recreational facilities are complete; House on stilts producing in serial form, variable spaces designs, and user can select size specification as required, and indoor space is arranged; Body of wall, floor, roof all adopt special chromatic steel sandwich plate to combine assembling mode, and lightweight, good heat preservation performance, fireproof performance are up to standard, and monolithic sandwiched plate adopts surrounding all-sealed structure, the peculiar smell of isolated sandwich material and cementing agent, prevents fibrous material from flying away, causes environment pollution; Column adopts hollow cylinder and square column structure, and square column structure climbs better effects if to preventing poisonous snake; The all water supply and draining of House on stilts, strong and weak electricity pipeline enter indoor, safety respectively by four hollow columns, attractive in appearance.The equal factorial praluction of all components of House on stilts, Assembling, all with bolts, scene does not need welding operation; After House on stilts Assembling, without the need to secondary decoration, can come into operation, convenience quick for installation.And can use by being dismounted for multiple times; Column component galvanizing, other component electrogalvanizing antirust treatment, surface spraying and decorating layer, good antirust property, specious; Daily life sewage ecology process: daily life sewage carries after septic tank process through House on stilts, adopts pipe laying penetration mode directly to enter soil, by vegetation absorption cleaning, and environmental protection, pollution-free.
The utility model provides one to install on the spot for scenic spot, do not need busy at putting up installations, not vegetation destruction, only need the assembling House on stilts of four independently cylinder concrete foundations, scenic spot management unit can according to concrete landform dispersed placement guest room, and according to the change of domestic visitors, guest room quantity can be increased in real time; Visitor can be on the spot in person, and physical experience scenic spot fresh air, natural landscape, incorporates wherein.
accompanying drawing illustrates:
Fig. 1 is the utility model elevation.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the rear elevation of Fig. 1.
Fig. 4 is stair raised configuration figure of the present utility model.
Fig. 5 is column and floor joist connection layout.
Fig. 6 is wall column and floor joist, back timber connection layout.
Fig. 7 is roof truss and back timber connection layout.
Fig. 8 is wallboard installation drawing.
Fig. 9 is hydroelectric line arrangement diagram
detailed description of the invention:
1. concrete foundations, 2. stair, 3. column, 4. air-conditioner host in figure, 5. wallboard, 6. roof, 7. solar energy collector, 8. Unpowered ventilation machine, 9. hollow glass curtain wall, 10. blow-off pipe, 11. septic tanks, 12. osmos tubes, 13. register one's residence platform, 14. wall columns, 15. purlins, 16. roof trusses, 17. stairlift mechanisms, 18. stair suspension rods, 19. bolts, 20. floor joists, 21. back timbers, 22. forceful electric power cables, 23. weak-current cables, 24. feed pipes.
Detailed description of the invention
In Fig. 1, Fig. 2, Fig. 3, Fig. 4, adopt four root posts 3 to support whole house, and adopt cantilevered structure (external wall of house is with a certain distance from column), column adopts hollow cylinder and square column structure; Stair 2 with register one's residence platform 13 chain connection, in stairlift mechanism 17, stair suspension rod 18 middle pulley walked around by wire rope, can electronic, hand-operated lifting stair, shown in stair raised configuration sketch 3; Roof installing Unpowered ventilation machine 8, can be with fresh air in holding chamber; By living water use in roofing solar energy collector 7 heating water tank, the supply of multiple spot hot water can be provided, environmental protection and energy saving; Adopt large area hollow glass curtain wall 9, ensure that the visual field is broad, illumination is sufficient; Indoor fire-fighting automatic sprinkler fire-extinguishing system is set, guarantees residential security; Body of wall, floor, roof all adopt special chromatic steel sandwich plate to combine assembling mode, and monolithic sandwiched plate surrounding is hermetically sealed, and the peculiar smell of isolated sandwich material and cementing agent, prevents fibrous material from flying away, cause environment pollution; The equal factorial praluction of all components of House on stilts, Assembling, all with bolts, scene does not need welding operation; After House on stilts Assembling, without the need to secondary decoration, can come into operation, convenience quick for installation.And can use by being dismounted for multiple times; Column component galvanizing, other component electrogalvanizing antirust treatment, surface spraying and decorating layer, rustless property is high, specious; The all water supply and draining of House on stilts, strong and weak electricity pipeline enter indoor respectively by four hollow columns 3, and daily life sewage is discharged from blow-off pipe 10, carry after septic tank 11 process through House on stilts, directly soil is entered by osmos tube 12, by vegetation absorption cleaning, environmental protection, pollution-free.
In Fig. 5, floor joist 20 is placed in the support slot of column 3, and is connected by bolt 19.
In Fig. 6, wall column 14 is all connected by bolt 19 with floor joist 20 and back timber 21.
In Fig. 7, roof truss 16 is placed on back timber 21, and is connected by bolt 19.
The groove of Fig. 8 deadlight 5 directly blocks wall column 14, and gap location is coated with fluid sealant.
In Fig. 9, feed pipe 24, blow-off pipe 10, forceful electric power cable 22, weak-current cable 23 enter indoor by concrete foundation 1 and column 3, and feed pipe and blow-off pipe are directly embedded in concrete foundation; Forceful electric power cable and weak-current cable adopt pre-buried conduit to protect.

Claims (5)

1. assembling House on stilts, it is characterized in that the lower end of four root posts (3) is connected with concrete foundation (1) bolt, the upper end of column (3) is fixed with the cross recess of angle steel formation, floor joist (20) is positioned at cross recess by bolt (19) and Bolted angle connection, platform (13) of registering one's residence is bolted with floor joist (20), floor is connected with floor joist (20), lower end and the floor joist (20) of square wall column (14) are bolted, upper end and the back timber (21) of wall column (14) are bolted, roof truss (16) is connected with back timber (21) with bolt by angle steel, purlin (15) is connected with roof truss (16) by bolt, roof is connected with purlin (15), the groove of wallboard (5) and wall column (14) clamping, gap location is coated with fluid sealant, stair (2) and platform (13) chain connection of registering one's residence, the pulley that stair suspension rod (18) upper end walked around by the wire rope be fixed in the stairlift mechanism (17) on back timber (21) is connected with back timber (21), stair suspension rod (18) lower end and stair (2) are hinged.
2. assembling House on stilts according to claim 1, it is characterized in that column (3), floor joist (20), back timber (21), wall column (14) are hollow section, forceful electric power cable (22), weak-current cable (23), feed pipe (24), blow-off pipe (10) are entered within doors by the empty stomach of column (3).
3. assembling House on stilts according to claim 1, is characterized in that roof installing Unpowered ventilation machine (8), roofing solar energy collector (7), and wallboard (5) adopts large area hollow glass curtain wall (9).
4. assembling House on stilts according to claim 1, it is characterized in that wallboard, floor, roof all adopt chromatic steel sandwich plate to combine, chromatic steel sandwich plate surrounding is hermetically sealed.
5. assembling House on stilts according to claim 2, it is characterized in that daily life sewage that blow-off pipe (10) discharges is after septic tank (11) process, the porose osmos tube (12) in soil penetrates into soil.
CN201420854971.8U 2014-12-30 2014-12-30 Assembling House on stilts Expired - Fee Related CN204492227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420854971.8U CN204492227U (en) 2014-12-30 2014-12-30 Assembling House on stilts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420854971.8U CN204492227U (en) 2014-12-30 2014-12-30 Assembling House on stilts

Publications (1)

Publication Number Publication Date
CN204492227U true CN204492227U (en) 2015-07-22

Family

ID=53571545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420854971.8U Expired - Fee Related CN204492227U (en) 2014-12-30 2014-12-30 Assembling House on stilts

Country Status (1)

Country Link
CN (1) CN204492227U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421819A (en) * 2015-12-09 2016-03-23 云南中乾集成房屋有限公司 Building method for railing type dwelling
CN105432481A (en) * 2015-12-05 2016-03-30 余平 Quick animal house mounting method
CN105926982A (en) * 2016-06-29 2016-09-07 四川是钢实业有限公司 Assembly lightweight steel stilted building
CN108729700A (en) * 2018-05-08 2018-11-02 深圳市晓控通信科技有限公司 A kind of communication machine room for being easily installed air-conditioning that barrier propterty is good
CN113494126A (en) * 2021-06-28 2021-10-12 五冶集团上海有限公司 Construction method of engineering observation platform combined with office area packaging room

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105432481A (en) * 2015-12-05 2016-03-30 余平 Quick animal house mounting method
CN105421819A (en) * 2015-12-09 2016-03-23 云南中乾集成房屋有限公司 Building method for railing type dwelling
CN105926982A (en) * 2016-06-29 2016-09-07 四川是钢实业有限公司 Assembly lightweight steel stilted building
CN105926982B (en) * 2016-06-29 2018-06-29 四川是钢实业有限公司 The light steel House on stilts of assembled
CN108729700A (en) * 2018-05-08 2018-11-02 深圳市晓控通信科技有限公司 A kind of communication machine room for being easily installed air-conditioning that barrier propterty is good
CN108729700B (en) * 2018-05-08 2020-06-26 广州市康知汇技术有限公司 Communication machine room with good protection performance and convenient for installation of air conditioner
CN113494126A (en) * 2021-06-28 2021-10-12 五冶集团上海有限公司 Construction method of engineering observation platform combined with office area packaging room

Similar Documents

Publication Publication Date Title
CN204492227U (en) Assembling House on stilts
CN105649207A (en) Construction method and structure of spliced type standard temporary houses
CN101476401B (en) Semi-opened underground garage
CN101864804A (en) Composite type low-carbon square warehouse building
CN204753823U (en) Have enough to meet need double -decker that room constitutes by standard
CN106034833A (en) Intelligent glass greenhouse
CN103017081B (en) A daylighting system for ground floors of high-rise buildings and low-rise buildings
CN107269106B (en) Noiseless closed fireproof high-rise building without digging ground well and with natural air conditioner two-storey building garage
CN203531129U (en) Green building
Creţu et al. CIRCULAR ECONOMY, GREEN BUILDINGS AND ENVIRONMENTAL PROTECTION.
CN101205767A (en) Combined type air ecological villa
CN206024654U (en) Glasshouse big -arch shelter
CN111636727A (en) Integrated system for fully underground water plants
CN106069362A (en) A kind of view glasshouse booth
CN1811084A (en) Artificial overhead construction site
CN206571204U (en) A kind of prizing liquefied oil gas bottle gas supply station
CN101307658A (en) Spring type anti-seismic disaster-preventing architecture
CN110725567A (en) House building structure based on thing networking
CN205962043U (en) Intelligent glass greenhouse
CN201056864Y (en) New countryside functional homestead
RU2312191C1 (en) Method for modular building erection (variants)
RU65924U1 (en) MODULAR BUILDING (OPTIONS) AND MEANS OF DELIVERY OF THE MODULAR BUILDING TO THE CONSTRUCTION SITE
CN205962041U (en) View glasshouse big -arch shelter
CN205153587U (en) A Marine Green Habitat System
JP2004003222A (en) Reinforced concrete building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722