CN204210710U - Remove underwater hull attachment robot with splicing umbilical fast - Google Patents
Remove underwater hull attachment robot with splicing umbilical fast Download PDFInfo
- Publication number
- CN204210710U CN204210710U CN201420615796.7U CN201420615796U CN204210710U CN 204210710 U CN204210710 U CN 204210710U CN 201420615796 U CN201420615796 U CN 201420615796U CN 204210710 U CN204210710 U CN 204210710U
- Authority
- CN
- China
- Prior art keywords
- umbilical
- fast
- splicing
- cable
- underwater hull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 230000008878 coupling Effects 0.000 claims abstract description 5
- 238000010168 coupling process Methods 0.000 claims abstract description 5
- 238000005859 coupling reaction Methods 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 23
- 238000004140 cleaning Methods 0.000 description 19
- 239000003921 oil Substances 0.000 description 19
- 238000005516 engineering process Methods 0.000 description 14
- 238000004519 manufacturing process Methods 0.000 description 9
- 238000011161 development Methods 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 229920000049 Carbon (fiber) Polymers 0.000 description 5
- 239000000956 alloy Substances 0.000 description 5
- 229910045601 alloy Inorganic materials 0.000 description 5
- 239000004917 carbon fiber Substances 0.000 description 5
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 238000007667 floating Methods 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 4
- 239000003082 abrasive agent Substances 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 238000005488 sandblasting Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000002788 crimping Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 101800004637 Communis Proteins 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 241000195493 Cryptophyta Species 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- -1 fouling Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000005693 optoelectronics Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 235000015170 shellfish Nutrition 0.000 description 1
- 238000005480 shot peening Methods 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 238000004506 ultrasonic cleaning Methods 0.000 description 1
- 210000002268 wool Anatomy 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of underwater hull attachment robot of removing with splicing umbilical fast, comprise ball float, described ball float lower end is connected with opening and closing head, the first side of opening and closing is connected with circuit board, circuit board is connected with umbilical, and described umbilical inside is wound around by overflow oil tube, cable, oil transportation oil return pipe and air pipe the structure formed, and described umbilical one end is provided with quick coupling, described air pipe two ends are provided with air tight joint, and described cable two ends are provided with watertight Quick connector; One of the present utility model is removed underwater hull attachment robot and is had the following advantages with splicing umbilical fast: structure is simple, and safe and reliable, equipment investment cost is low, and work efficiency is high.
Description
Technical field
The utility model relates to a kind of underwater hull attachment robot of removing with splicing umbilical fast.
Background technology
In broad terms: since there being boats and ships just to have shipping cleaning, shipping cleaning is the same with other professional cleaning fields, experienced by from original manual cleaning, the roasting shovel of simple machine, develops into sandblasting, except white, mechanical cleaning, chemical souring.Clean development of new techniques in recent years very fast, produce and repair ship technological requirement more and more higher, shipping cleaning technology also there occurs significant change, the method that state's wash-in ship is used: under the Technolgy of High Pressure Water jet Cleaning, sandblasting cleaning, neutral no-sour cleaner, gas shot-peening, PIG cleaning technique, biological cleaning technique, artificial treatment technology, robot water, Removal Technology, ultrasonic cleaning technology have all successfully been applied to shipping cleaning field.Up-to-date a kind of technology is by the portable abrasive material water jet cleaning equipment of sharp fast security protection special technology development corporation, Ltd. development & production.High pressure water is utilized to drive abrasive material to realize efficient cleansing power.Technically developing at Portable water cutting equipment.This kind of technological synthesis technology such as ball blast, sandblasting, high pressure water cleaning, reach high-effect, low stain, the feature such as easy and simple to handle.
Large ship, after long-term navigation, the ship outer casing below its floating line can be formed the dirty layer that one deck is thick.These dirty layers are made up of algae, shellfish attachment, tight and hard.On the other hand, boats and ships, after operation for many years, inevitably produce the situation of large area corrosion.Therefore, when large ship carries out large repairs, generally all require by the coating on hull, fouling and old especially and iron rust remove, and then coat new paint, the normal/cruise of such guarantee boats and ships and extend its service life.At present, the removing of coating, dirty layer on ship outer casing, also has plenty of workman's hand and holds hammer scoop and carry out beaing and shovel is scraped, and because of dirty layer hard and compact and area is large, keep in repair long in time limit, labor strength is large.Abroad starting exploration in late 1980s utilizes high pressure water jet to clean boats and ships and eliminate rust paint-removing work, and achieves successfully, and this technology abroad maintenance of the vessel industry is extensively promoted and adopted.In recent years, along with the development of China's high pressure water jet, this technology application of result in shipbuilding industry.The principle of work of this technology utilizes high-pressure hydraulic pump, and the pressure of aqua communis is increased to 40-250MPa, and single rifle flow is about 20-39L/min, from nozzle injection, forms ultra-high pressure water fluid jet or abrasive water-jet.Utilize the powerful impulsive force of water jet, erosional force and stripping ability, can rapidly coating, fouling, iron rust and paint be removed clean.When cleaning, pure water jets cleaning and abrasive water-jet can be adopted to clean two kinds of modes.When adopting pure water cleaning, the pressure of water jet is very high, can adopt rotary nozzle, and cleaning speed is fast, and equipment is simple.When adopting abrasive water-jet cleaning, the pressure of water jet is relatively little, and abrasive material is cheap quarz sand, and operation is existing to more complex.Utilizing high pressure water jet to carry out cleaning to boats and ships is a kind of high-effect high-quality maintenance maintenance method efficiently.
Remove underwater hull attachment robot, manipulated by the technical personnel on the water surface, can dive beneath the water, be adsorbed on operation on hull, the attachment that 1000 to 1500 sq ms can be removed per hour.In operation process, attachment can cut, pulverize by robot, and delivers to water surface jolly boat in time after being collected, and more than 30 tons per hour of attachment yield, can avoid halobiontic cross pollution.
Remove underwater hull attachment robot and serve various ships, when at sea constructing, water surface jolly boat is operated by umbilical control.Due to various ships vary in size, hull bottom area is different, during construction, umbilical length alters a great deal.For ease of transporting, simplifying the structure of water surface jolly boat in way, need develop special " splicing umbilical fast ".In construction, umbilical length can be spliced according to actual needs.
Develop along with science and technology is with rapid changepl. never-ending changes and improvements in telecontrol engineering field, submarine pipeline and cable (comprising power cable, control umbilical, signal monitoring cable etc.), as the important means of power transmission and wired remote control Signal transmissions, has been widely used in the development and production aspect of domestic and international offshore oil and gas field.Due to the reliability of its performance, the features such as the stability of function and longer service life, electric power required for offshore oil and gas field Development and Production and various control signal are transmitted between offshore platform, between platform and floating production storage unit accurately and effectively, between subsea wellhead and platform or floating production storage unit, make the telecontrol engineering of offshore oil and gas field production operation step forward major step, substantially increase the level of management that offshore oil and gas field is produced.The range of use of current China offshore oil and gas field submarine pipeline and cable, be roughly divided into two kinds of situations, at the oil-gas field that the depth of water is relatively shallow, between platform and platform, between platform and floating production storage unit, usually use the electric power required for the production of power cable transmission oil-gas field.But, along with the introduction of new ideas and the popularization of new and high technology, in recent years, in order to develop deepwater oilfield, make the application of submarine pipeline and cable have the development of advancing by leaps and bounds, be mainly manifested in the application of subsea wellheads telecontrol engineering, it is not merely for transferring electric power, transmit various control signal, the production operation for deepwater oilfield has played vital function simultaneously.
Chinese patent ZL201220676190.5 discloses a kind of cable fast connect sealing device, for connecting and sealing nuclear level cable, comprises pedestal, Connector Clip, insulated enclosure assembly; Pedestal is tubular structure, it comprise several hollows be provided at its inner portion plug, be filled in insulating packing between pedestal and plug; Connector Clip one end is provided with several plugs, and the other end has the crimping cable hole for crimping with cable; Plug is plugged in plug; Insulated enclosure component sealing is sleeved on the outside of pedestal and cable junction.This cable connecting arrangement has the features such as miniaturization, resistance to irradiation, high temperature resistant, fast demountable, can realize the functions such as the splicing of power cable, reducing.But can not show its accurate location when the cable of this technical scheme is in the sea, therefore application is not enough.Chinese patent ZL 201220170751.4 discloses a kind of carbon fiber optical fiber composite wire, comprises carbon fiber heart yearn, is provided with twisting fibers line, is provided with copper pipe sheath between twisting fibers line and carbon fiber heart yearn in its carbon fiber heart yearn; Described carbon fiber heart yearn is wrapped with alloy conductive layer, and alloy conductive layer is many alloy wires and closes to form, and is engaged between two alloy wires by splicing groove; Described alloy conductive layer is wrapped with insulating barrier, is provided with bend resistance metal wool in insulating barrier.The utility model has the features such as structure is simple, long service life, power transmission and opto-electronic communications technology are combined, fibre-optic cable can be monitored the temperature of whole transmission and distribution circuit, periodic recording is carried out to the current-carrying capacity of wire, transmission and distribution circuit is broken down, artificial or disaster, freeze as circuit in winter and the situations such as the accident that causes destroy transmission line time, alerting signal can be sent in time, power department is allowed to react fast, reduce the loss of property, ensure that electric power conveying is more safe and reliable.But this technical scheme structure is too complicated, is unfavorable for extensive popularization.
In sum, produce a kind of manipulation under-water robot umbilical to necessitate.
Utility model content
The purpose of this utility model, is to overcome above-mentioned limitation, thus provides a kind of structure simple, and safe and reliable, equipment investment cost is low, and the high removing underwater hull attachment robot of work efficiency is with splicing umbilical fast.
According to various ships size, hull bottom area, umbilical length change during construction.For ease of transporting, simplifying the structure of water surface jolly boat in way, develop special " splicing umbilical fast ".In construction, umbilical length can be spliced according to actual needs.
The purpose of this utility model is achieved through the following technical solutions: a kind of underwater hull attachment robot of removing is with splicing umbilical fast, comprise ball float, described ball float lower end is connected with opening and closing head, the first side of opening and closing is connected with circuit board, circuit board is connected with umbilical, described umbilical inside is wound around by overflow oil tube, cable, oil transportation oil return pipe and air pipe the structure formed, described umbilical one end is provided with quick coupling, described air pipe two ends are provided with air tight joint, and described cable two ends are provided with watertight Quick connector.
Preferably, the length of overflow oil tube, cable, oil transportation oil return pipe and air pipe is 4 meters.
Preferably, ball float surface indicates scale.
In sum, removing underwater hull attachment robot of the present utility model has the following advantages with splicing umbilical fast: structure is simple, and safe and reliable, equipment investment cost is low, and work efficiency is high.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is left view of the present utility model;
Number in the figure: 1-robot, 2-air bag, 3-nylon rubber layer, 4-charge valve, 5-carbon dioxide cylinder, 6-air extracting pump, 7-blow off valve, 8-warning device, 9-distance-sensor.
Detailed description of the invention
In order to deepen understanding of the present utility model, below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, and this embodiment, only for explaining the utility model, does not form the restriction to the utility model protection domain.
A kind of underwater hull attachment robot of removing is with splicing umbilical fast as shown in Figure 1 and Figure 2, it is characterized in that: comprise ball float 1, described ball float 1 lower end is connected with opening and closing 2, opening and closing 2 side are connected with circuit board 3, circuit board 3 is connected with umbilical 4, described umbilical 4 inside is wound around by overflow oil tube 5, cable 6, oil transportation oil return pipe 7 and air pipe 8 structure formed, described umbilical 4 one end is provided with quick coupling 9, described air pipe 8 two ends are provided with air tight joint, and described cable 6 two ends are provided with watertight Quick connector.
The length of overflow oil tube 5, cable 6, oil transportation oil return pipe 7 and air pipe 8 is 4 meters.
Ball float 1 surface indicates scale.
Specific works step is:
Quick coupling 9 is all equipped with at oil pipe two ends, and when two pipelines connect, inner cavity of pipe is opened automatically, and when two pipelines disconnect, pipe ends is then closed automatically, to guarantee that the oils of inner cavity of pipe does not leak; Air tight joint is then equipped with in air pipe 8 two ends; Watertight Quick connector is equipped with at cable 6 two ends.
Between two umbilicals 4, excessive circuit board 3 is housed, circuit board 3 is equipped with ball float 1, to show position, to increase umbilical 4 buoyancy.
In sum, removing underwater hull attachment robot of the present utility model has the following advantages with splicing umbilical fast: structure is simple, and safe and reliable, equipment investment cost is low, and work efficiency is high.
Claims (3)
1. remove underwater hull attachment robot with splicing umbilical fast for one kind, it is characterized in that: comprise ball float (1), described ball float (1) lower end is connected with opening and closing head (2), opening and closing head (2) side is connected with circuit board (3), circuit board (3) is connected with umbilical (4), described umbilical (4) inside is by overflow oil tube (5), cable (6), oil transportation oil return pipe (7) and air pipe (8) are wound around the structure of composition, described umbilical (4) one end is provided with quick coupling (9), described air pipe (8) two ends are provided with air tight joint, described cable (6) two ends are provided with watertight Quick connector.
2. one according to claim 1 removes underwater hull attachment robot with splicing umbilical fast, it is characterized in that: the length of described overflow oil tube (5), cable (6), oil transportation oil return pipe (7) and air pipe (8) is 4 meters.
3. one according to claim 1 removes underwater hull attachment robot with splicing umbilical fast, it is characterized in that: described ball float (1) surface indicates scale.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420615796.7U CN204210710U (en) | 2014-10-23 | 2014-10-23 | Remove underwater hull attachment robot with splicing umbilical fast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420615796.7U CN204210710U (en) | 2014-10-23 | 2014-10-23 | Remove underwater hull attachment robot with splicing umbilical fast |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204210710U true CN204210710U (en) | 2015-03-18 |
Family
ID=52979407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420615796.7U Withdrawn - After Issue CN204210710U (en) | 2014-10-23 | 2014-10-23 | Remove underwater hull attachment robot with splicing umbilical fast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204210710U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104326068A (en) * | 2014-10-23 | 2015-02-04 | 南通市海鸥救生防护用品有限公司 | Fast splicing joint pipe cable for robot for clearing underwater boat body attachments |
-
2014
- 2014-10-23 CN CN201420615796.7U patent/CN204210710U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104326068A (en) * | 2014-10-23 | 2015-02-04 | 南通市海鸥救生防护用品有限公司 | Fast splicing joint pipe cable for robot for clearing underwater boat body attachments |
CN104326068B (en) * | 2014-10-23 | 2016-07-06 | 南通市海鸥救生防护用品有限公司 | Remove under-water body attachment robot with quickly splicing umbilical |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2007275960B2 (en) | System and vessel hydrocarbon production and method for intervention on subsea equipment | |
JPS5822631B2 (en) | Mooring and relay terminal | |
CN108672425B (en) | Automatic pipe cleaning method for deepwater underwater pipeline | |
WO2011163239A1 (en) | Universal subsea oil containment system and method | |
CN204210710U (en) | Remove underwater hull attachment robot with splicing umbilical fast | |
CN104326068B (en) | Remove under-water body attachment robot with quickly splicing umbilical | |
CN210482418U (en) | Deepwater non-contact burying device | |
CN104790911B (en) | A kind of burnisher for deep-sea marine riser | |
CN110834707B (en) | An underwater hybrid self-driving device for riser flaw detection | |
CN202609060U (en) | A deep seawater oil storage and transportation system | |
CN205136840U (en) | Dive formula sea cable sealing plug device | |
KR101580974B1 (en) | Apparatus for extraction of seabed minerals | |
CN105220726A (en) | Native device is broken through in the controlled spray of flow | |
KR101526365B1 (en) | Ship And Arrangement Method Of The Same | |
CN114658370B (en) | Deepwater pipe cable connection protection device for offshore oil drilling and use method | |
CN222572487U (en) | A single pile leg loading system | |
CN204220571U (en) | A kind of hydrate administers sledge | |
CN203186554U (en) | Wellhead platform and single point mooring integrated electric rotating mechanism | |
Chen et al. | Connectors of VLFS | |
Liu | Concrete Platform | |
Wang | Catenary mooring | |
CN109000709A (en) | Fixing layer position ocean observation apparatus under a kind of induction type Arctic pack | |
Habrekke et al. | Deep water pipeline welding and repairs using modern computer technology to create a diverless future for Statoil | |
Wu | Collector and Crusher | |
Hyunwook | Cutting Technology of Steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150318 Effective date of abandoning: 20160706 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |