AU2007275960B2 - System and vessel hydrocarbon production and method for intervention on subsea equipment - Google Patents
System and vessel hydrocarbon production and method for intervention on subsea equipment Download PDFInfo
- Publication number
- AU2007275960B2 AU2007275960B2 AU2007275960A AU2007275960A AU2007275960B2 AU 2007275960 B2 AU2007275960 B2 AU 2007275960B2 AU 2007275960 A AU2007275960 A AU 2007275960A AU 2007275960 A AU2007275960 A AU 2007275960A AU 2007275960 B2 AU2007275960 B2 AU 2007275960B2
- Authority
- AU
- Australia
- Prior art keywords
- vessel
- equipment
- well
- water surface
- disposed below
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 49
- 229930195733 hydrocarbon Natural products 0.000 title claims abstract description 33
- 150000002430 hydrocarbons Chemical class 0.000 title claims abstract description 33
- 239000004215 Carbon black (E152) Substances 0.000 title claims abstract description 12
- 238000000034 method Methods 0.000 title claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 64
- 238000004873 anchoring Methods 0.000 claims abstract description 27
- 241000282887 Suidae Species 0.000 claims abstract description 23
- 239000000126 substance Substances 0.000 claims abstract description 16
- 238000004891 communication Methods 0.000 claims abstract description 6
- 238000012545 processing Methods 0.000 claims description 27
- 238000010438 heat treatment Methods 0.000 claims description 11
- 238000012423 maintenance Methods 0.000 claims description 10
- 239000000446 fuel Substances 0.000 claims description 8
- 238000003860 storage Methods 0.000 claims description 7
- 230000008439 repair process Effects 0.000 claims description 4
- 238000000926 separation method Methods 0.000 claims description 3
- 230000032258 transport Effects 0.000 description 14
- 238000007667 floating Methods 0.000 description 9
- 230000008901 benefit Effects 0.000 description 4
- 238000012805 post-processing Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000010248 power generation Methods 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 102100028572 Disabled homolog 2 Human genes 0.000 description 2
- 101710197163 Disabled homolog 2 Proteins 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 239000001993 wax Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000002828 fuel tank Substances 0.000 description 1
- 239000003112 inhibitor Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
- B63B25/082—Arrangements for minimizing pollution by accidents
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Earth Drilling (AREA)
Abstract
A system for operation and service of at least one hydrocarbon-producing well (24) and of equipment (27, 35), which is disposed under water, for further transport of the well stream, where the system comprises - at least one pipeline (32), - at least one booster unit (27), - a vessel (10) comprising - an anchoring system about which the vessel can rotate or swivel, - means (60, 61, 62) for conducting an intervention on subsea equipment, - means for communication with and control of the at least one well (24) and other equipment (35), - means for injecting chemicals into the well streams (25, 32), - means (73) for transferring to and inserting pigs in the pipeline (32), - means (14, 15) for production of energy for operation of subsea equipment, - means (22) for transferring energy from the means (14, 15) for production of energy to the booster unit (27) and any other subsea equipment.
Description
C:\NRPortbl\DCC\IXA\4291465_ .DOC-2/05/2012 -1 System and vessel for hydrocarbon production and method for intervention on subsea equipment The present patent application relates to a system for operation and service of 5 hydrocarbon-producing wells, a vessel for use in operation and maintenance of hydrocarbon-producing wells and a method for intervention on subsea equipment which is in use in connection with production and further transport of a well stream. The principle is known of producing oil and gas from a ship lying anchored/DP-positioned 10 over a subsea field of hydrocarbons. Until now the main task of this ship has been to receive, process and store the well stream. The unprocessed well stream is processed and electric power and other energy required for running the process is generated on board the ship. In recent years systems have been developed where parts of the processing equipment are located on the seabed, for example multiphase pumps and water injection pumps. In 15 this case, electric power is passed in a riser/umbilical system from the ship down to the bottom-mounted equipment. Where environmentally vulnerable areas are involved, it is desirable to reduce the environmental exposure to a minimum during the production of oil and gas. Concepts are 20 therefore being considered which are based on transportation of unprocessed well stream in pipelines from the field to a land-based plant or processing plant on other adjacent platforms or floating platforms for further processing. The principal challenge with concepts of this type appears to be the actual pipe transport (flow assurance problems) and operation of pressure booster equipment such as multiphase pumps and wet gas 25 compressors with associated electric power system. When the field and the land-based plant are at a great distance apart, offshore power generation seems to be the most attractive solution. From the prior art, in US 6, 263,971 BI a system is disclosed for subsea production of 30 hydrocarbons where an intermediate platform is arranged between the seabed and the water surface and a floating platform on the surface. The well stream is taken up to the C:\NRPoribl\DCC\JXA\4291465_-IDOC-2/0o2
-IA
intermediate platform on which are mounted various pieces of equipment including pumping equipment and equipment for measuring volume flow. Gas from the produced well stream can be separated and taken up to the floating platform where it is used for production of electrical energy, while a riser connected to the intermediate platform 5 transports the rest of the well stream to a processing destination near the hydrocarbon field. In GB 2 292 760 A a production vessel is disclosed, the aft end of which is provided with a device for receiving a buoy, and round which the vessel can pivot, the vessel being anchored to the bottom. The risers transporting the well stream are connected to the buoy. 10 At the other end of the vessel a rig is provided for use in maintenance of the production well.
C:\NRPortbl\DCCVJXA 291465_LDOC-2/0/2012 -2 US 6,364,021 BI discloses a system comprising a riser from the wellhead to a floating buoy on the ocean surface. The system further comprises a vessel which can go alongside the buoy and conduct predetermined maintenance operations. 5 The proposed system seeks to provide an integrated system for production of hydrocarbons from subsea wells which will have a number of advantages when compared with the prior art. Since the hydrocarbons will not be processed on the vessel, the normal processing 10 equipment will be superfluous, and this results in a number of advantages. Since the vessel will not be provided with processing equipment, the usual "rules and regulations" applying to production vessels are avoided, thereby making the vessel cheaper to build. When the vessel has no processing equipment on board, space is also made available for storing, for example, equipment for use in intervention on subsea equipment, spare parts, pigs and 15 equipment for launching pigs, chemicals for injecting into the well stream, fuel for energy production, etc. The fact that the well stream is not taken up to the vessel for processing also reduces the environmental risk associated with production, an aspect of offshore production of hydrocarbons which will become increasingly important in the future. Another advantage of the system is the possibility it offers of simultaneous intervention 20 and production, which may be important for maintaining flow and temperature in the transport pipe. In one form there is provided a system for offshore production of hydrocarbons where the risk of accidents resulting in environmental damage is reduced. 25 In another form there is provided a system which permits the combination of power generation and intervention on subsea installations. In another form there is provided a system for offshore production of hydrocarbons with 30 improved assurance of uninterrupted production of hydrocarbons, and particularly assurance that the transport system for the hydrocarbons is in continuous operation.
C :NRPortbi\DCCVXA\4291465_I.DOC-2/05/2Ot2 - 2A Furthermore, in another form there is provided a system which results in simplified operation and maintenance of subsea equipment, such as well, wellhead, pressure booster equipment and other equipment disposed below the surface of the water. 5 A system is provided for operation and service of at least one hydrocarbon-producing well, and of equipment for further transport of the well stream and any equipment required for treatment of the well stream. The equipment and the at least 10 WO 2008/010726 PCT/N02007/000273 3 one well are disposed below a water surface, preferably on a seabed or an ocean floor. The system further comprises at least one pipeline for transport of the well stream to the desired destination, and at least one pressure booster unit for driving the well stream through the at least one pipeline, a vessel for operation and service 5 of the at least one well and the equipment disposed below the water surface, where the vessel comprises means for controlling operating and service functions, together with means for conducting an intervention on equipment disposed below the water surface. The system further comprises means for production of energy for operation of the equipment disposed below the water surface, as well as means for 10 transferring energy from the means for production of energy to at least the at least one pressure booster unit which drives the well stream of hydrocarbons through the at least one pipeline and means for communication with and control of the at least one well and the equipment disposed below the water surface. The system may also comprise two or more hydrocarbon-producing wells. In this 15 case a pressure booster unit may be mounted at each well or the system may be provided with a pressure booster station where the well streams from the hydrocarbon-producing wells are gathered and pressurised. From the pressure booster station at least one pipeline is provided for further transport of the well streams to the desired destination. 20 In a preferred embodiment the vessel is provided with an anchoring system comprising a mooring system, a dynamic positioning system or a combination of the two. The anchoring system will advantageously be arranged in such a manner that the vessel can rotate about the anchor point on the vessel or swivel around the 25 anchoring system when the vessel is anchored via one or more mooring lines to an anchored buoy. The buoy may be arranged in such a manner that it is lying on the surface of the water or it may be arranged so that it is located between the surface and the bottom. The vessel will then be able to pivot round the buoy. It will also be possible to fasten the vessel directly to an anchor on the seabed or ocean floor, in 30 which case the vessel will be able to pivot round this point. When the vessel is anchored to a buoy, risers or umbilicals may be arranged in such a manner that they either extend from the vessel to the buoy and from there on to a swivel device at the anchor on the bottom, or they may extend directly from the vessel down to the swivel device at the anchor on the bottom. 35 When one or more adjacent wells are developed, it will be advantageous to place essential equipment, which has to be disposed below the water surface, under or within the curve described by the vessel's outer point as the vessel rotates about or swivels around the anchoring system, i.e. the vessel rotates about an anchor point in the vessel or pivots around a buoy to which the vessel is anchored. This will make it 40 easy to position the vessel when maintenance or repairs have to be carried out on WO 2008/010726 PCT/N02007/000273 4 equipment located below the surface of the water, and preferably on the seabed or ocean floor. The vessel is advantageously arranged so that it can be disconnected from its anchoring system and riser and umbilical system for positioning over the 5 intervention object on the seabed or ocean floor if this object is not located within the above-mentioned curve. This will also be advantageous in bad weather when it may be necessary to perform a rapid disconnection of the anchoring system and riser and umbilical system. The means for production of energy for operation of equipment disposed below the 10 water surface may either be mounted in its entirety on the vessel or in its entirety below the water surface. Parts of the means for energy production may possibly be mounted on the vessel, while the rest of the means are mounted below the water surface. In order to provide energy, the system may be provided with means below the 15 surface of the water, preferably on the seabed or ocean floor in connection with the well or the at least one pipeline, in order to remove a part of the gas in the well stream together with means for transporting the gas up to the vessel. The transport of gas up to the platform may be carried out by means of a separate pipeline or through an umbilical, which is also used for other purposes in connection with the 20 operation of the well. One of the advantages of not taking the well stream of hydrocarbons up to the vessel for processing is that the vessel is not encumbered with all the processing equipment with which the production vessels are normally equipped today. This absence of processing equipment for processing the well stream makes a great deal 25 of space available on the vessel. The vessel is therefore provided with storage capacity for necessary contributory factors in connection with operation and maintenance of the system, such as chemicals for injecting into the well stream, pigs and equipment for launching and receiving pigs, spare parts and equipment for use in intervention on equipment below the water surface and possibly fuel required 30 for energy production. In order to ensure that the stream of hydrocarbons in the at least one pipeline does not come to a stop, the system may be provided with means for transferring chemicals from the vessel to the at least one pipeline. These are chemicals which are injected in order to prevent the formation of wax and hydrate in the pipes and 35 they can be transferred from the vessel by means of a separate pipeline or through an umbilical which is also used for other purposes in connection with the operation of the well or wells. The system is also provided with necessary equipment such as valves for injecting the chemicals into the well stream in the pipeline.
WO 2008/010726 PCT/N02007/000273 5 The system will also advantageously comprise means for launching and receiving pigs in the at least one pipeline and means for transferring pigs down from the vessel to the at least one pipeline or from the at least one pipeline to the vessel. These may be pigs for scraping and cleaning the at least one pipeline in order to 5 avoid shutdown or they may be intelligent pigs that are passed through the at least one pipeline for inspection of the pipeline's integrity. The system may also advantageously comprise heating means for heating the at least one pipeline as an additional preventive measure against stoppage of the production of hydrocarbons, as well as means for transferring energy from the 10 vessel required for the heating means provided in connection with the at least one pipeline. The energy transferred from the vessel to the at least one pipeline will preferably be electrical energy, and the means for transferring the energy from the vessel to the at least one pipeline will therefore be an electric cable. This may be a separate cable or it may form a part of an umbilical. These heating means for the at 15 least one pipeline may extend over a shorter or longer distance along the pipeline which transports the hydrocarbons to the desired destination where processing will take place. The heating means may also be arranged along the entire length of the pipeline. In addition to the equipment already mentioned above, the system may also include 20 additional equipment for treatment of the well stream, disposed below the surface of the water, and particularly on the seabed or ocean floor. This may include equipment for mixing, desanding and water separation. Furthermore, it will be necessary to monitor the production of hydrocarbons and the rest of the system. The system will therefore advantageously include means for 25 communicating production and control data from the at least one well and other equipment, which is disposed below the water surface, to the vessel. Similarly, the system will advantageously include means for transferring control signals from the vessel to the at least one well and other equipment disposed below the surface of the water. Such signals will normally be transmitted through an umbilical containing 30 both electric cables for electrical signals and pipes for hydraulic or pneumatic signals. A vessel is also provided for use in connection with operation and maintenance of a system for production of a well stream containing hydrocarbons from at least one well, where the at least one well and the equipment are disposed below a water 35 surface, particularly on a seabed or an ocean floor. The vessel is provided with a system for anchoring, e.g. a mooring system, a dynamic positioning system or a combination of the two.
WO 2008/010726 PCT/N02007/000273 6 Furthermore, the vessel may advantageously comprise means for production of energy for operation of equipment disposed below the water surface, and also possibly for heating at least one pipeline disposed below the water surface. Moreover, the vessel may advantageously comprise means for transferring 5 chemicals to at least one pipeline disposed below the water surface. The chemicals are added to the well stream in order to prevent hydrate formation and they can be transferred from the vessel to the at least one pipeline through a separate pipeline or through an umbilical which can also be used for other purposes in connection with the production of the hydrocarbons. 10 Moreover, the vessel may advantageously comprise storage space for storing the chemicals which are to be injected into the pipeline as explained above. Furthermore, the vessel may advantageously comprise means for carrying out an intervention on equipment disposed below the water surface. These means include tool systems which can be lowered through an opening in the vessel or from a 15 lifting arrangement which is normally located at the after end of the vessel. The anchor point and location of the equipment for lowering and raising the tool systems will normally be located in different parts of the vessel so that the vessel covers a greater area when it rotates or pivots round the anchor. The tool system used in a given situation will be dependent on what kind of equipment is to be worked on and 20 which operations have to be performed on the equipment. Furthermore, the vessel may advantageously comprise storage space for storing tool systems and equipment used during intervention on equipment below the water surface and spare parts for said equipment below the water surface. In particular this will be parts for equipment which is critical for the production of hydrocarbons 25 and for ensuring that the well stream can flow uninterruptedly through the at least one pipeline. Furthermore, the vessel may advantageously comprise means for transferring pigs to a pipeline disposed below the water surface. A pig is transferred from the vessel to a subsea receiving station either in a tool which is lowered and connected to the at 30 least one pipeline or in a flexible transfer riser which may be secured to the at least one pipeline's pig launching system which can be hoisted up to the vessel as required. The pig is installed in a controlled environment on the vessel and passed through the flexible riser in a controlled manner down to the pig receiving system. It is expedient to pass both sophisticated instrument pigs through the pipe in order 35 to monitor the pipe's integrity and simpler scraper pigs to remove wax, sand, water, etc. that have been deposited in the pipe. Furthermore, the vessel may advantageously comprise storage space for storing pigs and equipment for transferring pigs to the pipeline.
WO 2008/010726 PCT/N02007/000273 7 The anchoring system may be arranged in such a manner that the vessel rotates about an anchor body on the vessel. Anchor lines extend from the anchor body for anchoring the anchor body and thereby also the vessel. Alternatively, the vessel may swivel around the anchoring system by the vessel being anchored via a 5 mooring line to an anchored buoy. The vessel will then be able to pivot round the buoy. It will also be possible to fasten the vessel directly to an anchor on the seabed or ocean floor, in which case the vessel will be able to pivot round this point. The vessel will advantageously be arranged in such a manner that it can be disconnected from the anchor as well as communication line(s), umbilical(s) and 10 other devices connecting the vessel to the at least one well and the equipment disposed below the surface of the water. As mentioned above, this will be particularly advantageous where bad weather, possibly combined with a mishap or an accident, make it necessary for the said equipment to be disconnected from the vessel. 15 The means for producing energy on board the vessel may consist of at least one generator set. This may typically comprise a diesel engine or a gas turbine driving an electric generator. In this case the vessel will advantageously also include storage space for necessary fuel such as diesel or gas for operation of the at least one generator set. The vessel may advantageously be provided with two or more 20 generator sets so that the vessel has at least one spare set in case a set breaks down. The means for producing energy for operation of the at least one well and equipment disposed below the water surface may also comprise a small processing plant. In this case an appropriate amount of gas will be removed from the well stream and transferred to the vessel for processing. The vessel will then also be 25 provided with at least one generator set for production of energy from the processed gas. As in the above case, the vessel will advantageously be provided with two or more generator sets in case operational problems should arise with one of the sets. The vessel is furthermore advantageously provided with means for transferring the produced energy from the vessel to subsea equipment and possibly the at least one 30 pipeline. This may involve a separate electric cable or an electric cable which is a part of an umbilical. If the energy transferred is in the form of hydraulic or pneumatic energy, these means could be a separate pipeline or a pipeline which is a part of an umbilical. As mentioned earlier, parts of or all the equipment for energy production may be 35 provided below the water surface instead of on the vessel. A method is also provided for intervention on equipment in use in connection with production of hydrocarbons from at least one well and equipment for further transport of the well stream, where said equipment is disposed below a water WO 2008/010726 PCT/N02007/000273 8 surface, particularly on a seabed or ocean floor. The intervention is conducted from a vessel which is specially arranged for operation and maintenance of equipment disposed below the water surface. The vessel is provided with a system for anchoring, e.g. a mooring system, a dynamic positioning system or a combination of 5 the two, where the anchoring system is arranged in such a manner that the vessel can rotate about or swivel round the anchoring system. The vessel is further provided with means for conducting an intervention on one or more intervention objects disposed below the water surface and preferably on the seabed or ocean floor, and means for lowering intervention equipment and possibly spare parts down 10 to the intervention object or intervention objects. The method for conducting the intervention consists of the following steps: o the operating and service vessel is positioned in such a manner that means for lowering intervention equipment and any spare parts are located substantially above the intervention object, 15 o the operating and service vessel may be disconnected from its anchoring system as well as communication line(s), umbilical(s) and other devices connecting the vessel to one or more wells and equipment disposed below the water surface, thus enabling it to be positioned over the intervention object, 20 o the intervention equipment and any spare parts are lowered down to the intervention object, o necessary service or repair is carried out on the intervention object, o if necessary, both service and repair are carried out on the intervention object, 25 o the intervention equipment is lifted up to the operating and service vessel. When the operating and service vessel is positioned for lowering necessary tool systems and any spare parts for carrying out an intervention, underwater currents, for example, may make it necessary to position the vessel slightly to the side instead of being located vertically directly above the intervention object. The term 30 "substantially above" should therefore be understood to mean that the vessel may be located slightly to the side relative to a vertical line from the intervention object if so dictated by the existing conditions. An embodiment of the invention will now be described with reference to the figures, in which: 35 Figure 1 illustrates the system with some of its elements, Figures 2-4 illustrate alternative methods of anchoring the vessel, WO 2008/010726 PCT/N02007/000273 9 Figure 5 illustrates an intervention situation on equipment located below the surface of the water, Figure 6 illustrates an example of how equipment for launching pigs can be arranged. 5 Figure 1 is a general schematic view including most of the system's main components. A vessel 10 or other floating structure is kept in position by means of an anchoring system where anchor lines 11 are attached to a lower part of the swivel system 13 mounted on the vessel 10, thus enabling the vessel to rotate about the anchoring system. At their other end the anchor lines are secured by the anchors 12. 10 The vessel or floating structure 10 may also be anchored by alternative means, which will be explained below. The ship is positioned in a suitable position relative to a subsea production system for oil and gas. The production system may be organised with one or more wells 24 with templates 34 with at least one integrated pressure booster unit 27 on each 15 template or the well streams 25 may be collected in a central pressure booster station 35, where the pressure boosting is provided by at least one pressure booster unit 27, comprising one or more pumps or compressors. If necessary, several such pressure booster stations 35 may be provided. At the front edge of the at least one pressure booster unit 27, pre-processing means 26 may be provided for pre 20 processing the well stream and in the same way at the after edge of the at least one pressure booster unit 27, post-processing means 28 may be provided for post processing the well stream. These pre- and post-processing means may, for example, be mixers, desanding equipment, water separation equipment and chemical injection equipment. The bottom-mounted equipment communicates with 25 the ship through one or more risers 20 or umbilicals 21. The vessel 10 is provided with at least one suitable power generating unit 14 which produces electric power and delivers it through the vessel's swivel system 13 and on through an electrical umbilical 22 to a termination point 30. If necessary, several electrical umbilicals 22 may be installed. At least one power regulating unit 15 may 30 either be mounted on the vessel in its entirety, or the whole or parts of this at least one unit 15 may be mounted underwater in connection with associated power consumers such as pumps and compressors. For operation of the vessel's at least one power generating unit 14, two possible solutions are suggested. The vessel 10 may carry the necessary fuel, such as, e.g., 35 diesel, stored in separate fuel tanks 16 on the vessel. These tanks 16 may be refilled from other ships through a conventional transfer system. Alternatively, a small portion of the process flow, removed from the gas phase, may be passed up to the vessel 10 through a suitable riser 23. A compact little processing plant 36 pre processes this gas flow so that it can be used as fuel in the power generating unit 14.
WO 2008/010726 PCT/N02007/000273 10 A processing plant of this kind may also be provided under water, preferably on the seabed. Parts of the processing plant may also be provided on the vessel while the rest is mounted under water. In order to ensure regularity and fuel during start-up and shutdown phases, it may also be expedient to have a compact little intermediate 5 store 19 for gas. Alternatively, operating conditions of this kind may be met by supplying the power generating unit 14 with fuel from the ship's tanks 16. It may also be expedient to mount parts of or all the power generating equipment under water if public regulations or other legislation dictate that it is necessary. In figures 2-4 various alternative methods are indicated for anchoring the vessel 10. 10 In general the vessel or floating structure can be anchored by means of a mooring system or a dynamic positioning system or a combination of the two. In figure 2 the vessel is moored to a floating buoy 40 via a mooring line 47 which is connected to the vessel and the buoy by suitable connections 41, 42. The buoy is secured via at least one anchor line 48 to a swivel device 44 mounted on an anchor 45. One or 15 more risers 49 and one or more umbilicals 46 pass from the ship down to the swivel 44 on the seabed and continue from there to subsea equipment (not shown in the figure). In figure 3 an anchoring method is illustrated where riser 50 and umbilicals 51 together with one or more anchor lines 52 extend directly from the vessel 10 down to a swivel device 44 connected to an anchor 45. The riser and umbilical 20 system continues to, for example, a pressure booster station 35 or other subsea equipment. In figure 4 a vessel 10 is illustrated where riser 56 and umbilical(s) 57 together with one or more mooring lines 59 are connected to a buoy 55. The buoy is secured via one or more anchor lines 58 to a swivel device 44 connected to an anchor 45. 25 Riser 56 and umbilical(s) 57 continue from the buoy 55 to the swivel 44 and from there on to subsea equipment such as a pressure booster station 35. In figures 2 and 4 the buoys 40, 55 are shown floating on the surface of the water. These buoys 40, 55 may also be arranged in a submerged position, located between the water surface and the seabed or ocean floor, thereby providing a simpler riser system. 30 The vessel 10 may be positioned in such a manner that by pivoting the vessel to given positions it can be employed as an intervention platform for subsea-mounted equipment such as, for example, a pressure booster station 35, i.e. the at least one pressure booster unit, pre- and post-processing means 26, 28, etc. as illustrated in figure 5. Alternatively, the vessel 10 may be disconnected from its anchoring and 35 riser system and positioned freely over the intervention object. When the vessel 10 is in position, relevant tool systems 62 (figure 5) are lowered in the conventional manner to subsea equipment 63, 64 from the vessel through either an opening 60 in the vessel or from a lifting arrangement 61 which will normally be positioned in the after end of the vessel 10. When the vessel 10 is positioned without disconnection, 40 in many cases the intervention system may be arranged so that the vessel can WO 2008/010726 PCT/N02007/000273 11 continue to deliver electric power and other contributory factors to parts of the production system not affected by the ongoing, simultaneous intervention operation. An important operation which can be conducted from the vessel 10 will be installation and operation of a subsea system for launching pigs. A pig is transferred 5 from the vessel 10 to its subsea receiving station either in a tool 73 (figure 6) which is connected to the pipe system through a subsea station 71, or in a flexible pig transport pipe (not shown in the figure) which is secured to the pipe system's pig launching system, and is hoisted up to the vessel when required. The flexible pig transport pipe may be laid on the seabed or suspended under the vessel in a suitable 10 manner when not in use. The pig is installed in a controlled fashion on the vessel and passed in a controlled fashion down through the riser to the pig receiving system. It may be expedient to pass both sophisticated instrument pigs through the pipe in order to monitor the pipe's integrity and simpler scraper pigs in order to remove wax, sand, water, etc. which have been deposited in the pipe. Equipment, 15 pigs and any spare parts used in connection with pigging and other intervention on the subsea installations in the system may be stored in suitable storage spaces 18 (figure 1) on board the vessel 10. In addition to power generation and monitoring functions, in most cases it will be desirable to add chemicals to the well stream in order to safeguard the integrity of 20 the pipe and an efficient flow (corrosion, wax and/or hydrate inhibitors) in the pipe system 32 to shore 33 where further processing will take place. These chemicals will advantageously be able to be stored in separate tanks 17 (figure 1) on the vessel 10 and transferred to the subsea equipment through the umbilical system. By injecting the chemicals on the suction side of the pressure booster unit 27 (the 25 pump(s)/compressor(s)), very good distribution of the fluid volume will be obtained, i.e. good mixing. It may also be expedient, either under special conditions (for example at start-up), or on a permanent basis, to supply electric power through at least one heating means 31 (figure 1) for direct heating of the pipeline system, from the well or other 30 equipment located on the seabed or ocean floor and some distance towards land 33 or possibly all the way to land 33. Such a system may also be employed together with pipe monitoring systems, thereby enabling the vessel 10 to regulate in an efficient manner processing equipment and injection equipment according to the state of the transport system (pipe). 35 The vessel 10 will also be a platform for necessary monitoring and control systems for parts of, or preferably all subsea-mounted equipment. This may be operated from onshore or locally from the vessel.
C:\NRPonbl\DCCVXAM2945_ I DOC-V/05OI2 -12 Throughout this specification and the claims which follow, unless the context requires otherwise, the word "comprise", and variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. 5 The reference in this specification to any prior publication (or information derived from it), or to any matter which is known, is not, and should not be taken as, an acknowledgement or admission or any form of suggestion that that prior publication (or information derived from it) or known matter forms part of the common general knowledge in the field of 10 endeavour to which this specification relates. Whilst the present invention has been hereinbefore described with reference to a particular embodiment, it will be understood that numerous variations and modifications will be envisaged by persons skilled in art. All such variations and modifications should be 15 considered to fall within the scope of the invention as broadly hereinbefore described and as hereinafter claimed.
Claims (14)
1. A system for operation and service of at least one hydrocarbon-producing well and of equipment for further transport of the well stream and any equipment for treatment of 5 the well stream, where said equipment and at least one well are disposed below a water surface, particularly on a seabed or an ocean floor, which system comprises: at least one pipeline for transport of the well stream to the desired destination; at least one pressure booster unit for driving the well stream through the at least one pipeline; 10 a vessel for operation and service of the at least one well and the equipment disposed below the water surface, which vessel comprises: an anchoring system comprising a mooring system, a dynamic positioning system or a combination of the two; means for conducting an intervention on equipment disposed below the 15 water surface; means for communication with and control of the at least one well and other equipment disposed below the water surface; means for transferring chemicals from the vessel to the well streams and the at least one pipeline and means for injecting the chemicals into the well stream and the well stream 20 in the pipeline; means for inserting pigs in the at least one pipeline and means for transferring pigs from the vessel to the at least one pipeline; means for production of energy for operation of equipment disposed below the water surface; and 25 means for transferring energy from the means for production of energy to the at least one pressure booster unit and any other subsea equipment; wherein the anchoring system is arranged in such a manner that the vessel can rotate about or swivel around the anchoring system, where the system further comprises means for removing a part of the gas in the well stream as well as means for transporting 30 the gas to means for production of energy, where the means for producing the energy for operation of equipment and the at least one well also comprise a processing plant adapted C :NRPor~,i\DCCUXA\4291465_ I DOC-2M5/2012 -14 for processing the gas removed from the well stream for operation of the power generating unit.
2. The system according to claim 1, wherein at least one pressure booster unit is 5 mounted at each well.
3. The system according to claim 1, wherein the system comprises a pressure booster station where the well streams from the hydrocarbon-producing wells are collected and pressurised and from which at least one pipeline is provided for further transport of the 10 well streams to the desired destination.
4. The system according to one of the claims 1-3, wherein equipment disposed below the water surface is arranged below and within the curve described by the vessel's outer point as the vessel rotates about or swivels around the anchoring system. 15
5. The system according to one of the claims 1-4, wherein the means for production of energy for operation of equipment disposed below the water surface is either provided in its entirety on the vessel or in its entirety below the water surface. 20
6. The system according to one of the claims 1-4, wherein parts of the means for production of energy for operation of equipment disposed below the water surface is provided on the vessel, while the rest of the means are provided below the water surface.
7. The system according to one of the claims 1-6, wherein the vessel is provided with 25 storage capacity for necessary contributing factors in connection with operation and maintenance of the system, such as chemicals for injecting into the well stream, pigs and equipment for launching and receiving pigs, spare parts and equipment for use in intervention on equipment below the water surface. 30 C :NRPob\DCCJXA\291465_LDOC-2/05/2012 -15
8. The system according to one of the claims 1-7, wherein the system comprises heating means for heating the at least one pipeline, and means for transferring necessary energy from the means for production of energy to the heating means. 5
9. The system according to one of the claims 1-8, wherein the system also comprises additional equipment for treatment of the well stream disposed below the water surface, and particularly on the seabed or ocean floor, such as equipment for mixing, descending and water separation. 10
10. The system according to one of the claims 1-9, wherein the system comprises means for communicating production and control data from the at least one well and other equipment, which is disposed below the water surface, to the vessel. 15
11. The system according to one of the claims 1-10, wherein the system comprises means for transmitting control signals from the vessel to the at least one well and other equipment disposed below the water surface.
12. A method for intervention on equipment in use in connection with production of a 20 well stream containing hydrocarbons from at least one well and equipment for further transport of the well stream, where said equipment is disposed below a water surface, particularly on a seabed or ocean floor, and where the intervention is conducted from a vessel for operation and maintenance of equipment disposed below the water surface, where the vessel is arranged in such a manner that it can rotate about or swivel round its 25 anchoring system, and which vessel comprises means for removing a part of the gas in the well stream as well as means for transporting the gas to means for production of energy, where the means for production of energy comprises a processing plant adapted for processing the gas removed from the well stream for operation of the power generating unit, the vessel further comprising means for conducting an intervention on subsea 30 equipment disposed below the water surface, and means for lowering a tool system and any spare parts down to the subsea equipment, the method including the steps of: C:\NRPortb\DCCXA\4291463I.DOC.2/05/20l2 -16 removing a part of the gas phase of the well stream and transporting said gas to the vessel; processing said gas in the processing plant such that the gas can be used as fuel for the power generating unit; 5 positioning the operating and service vessel in such a manner that means for lowering a tool system and any spare parts are located substantially over the subsea equipment; the operating and service vessel can be disconnected from the vessel's anchoring system as well as communication line(s), umbilical(s) and other devices connecting 10 the vessel to one or more wells and equipment disposed below the water surface, thus enabling it to be positioned over the subsea equipment; lowering the tool system and any spare parts down to the subsea equipment, to enable carrying out service and/or repair on the subsea equipment, if necessary; and lifting the tool system up to the operating and service vessel. 15
13. A system for operation and service of at least one hydrocarbon-producing well, substantially as hereinbefore described with reference to the accompanying figures.
14. A method for intervention on equipment in use in connection with production of a 20 well stream containing hydrocarbons from at least one well, substantially as herein before described with reference to the accompanying figures.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20063352A NO326575B1 (en) | 2006-07-19 | 2006-07-19 | Hydrocarbon production system and vessel and method for intervention on subsea equipment |
NO20063352 | 2006-07-19 | ||
PCT/NO2007/000273 WO2008010726A1 (en) | 2006-07-19 | 2007-07-19 | System and vessel hydrocarbon production and method for intervention on subsea equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2007275960A1 AU2007275960A1 (en) | 2008-01-24 |
AU2007275960B2 true AU2007275960B2 (en) | 2012-05-24 |
Family
ID=38669876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2007275960A Ceased AU2007275960B2 (en) | 2006-07-19 | 2007-07-19 | System and vessel hydrocarbon production and method for intervention on subsea equipment |
Country Status (6)
Country | Link |
---|---|
US (1) | US20100025043A1 (en) |
EP (1) | EP2047063A1 (en) |
AU (1) | AU2007275960B2 (en) |
BR (1) | BRPI0714301A2 (en) |
NO (1) | NO326575B1 (en) |
WO (1) | WO2008010726A1 (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8469101B2 (en) * | 2007-09-25 | 2013-06-25 | Exxonmobil Upstream Research Company | Method and apparatus for flow assurance management in subsea single production flowline |
US7963335B2 (en) * | 2007-12-18 | 2011-06-21 | Kellogg Brown & Root Llc | Subsea hydraulic and pneumatic power |
BRPI1007926A2 (en) * | 2009-02-09 | 2019-09-24 | Prad Research And Development Limited | system for subsea cleaning and intervention operations in a subsea installation or well, and method for subsea cleaning and intervention operations in a subsea installation or well. |
US8779614B2 (en) * | 2011-11-04 | 2014-07-15 | Schlumberger Technology Corporation | Power generation at a subsea location |
WO2013083663A1 (en) * | 2011-12-05 | 2013-06-13 | Blue Wave Co S.A. | Loading-offloading buoys for cng operations |
WO2014086417A1 (en) * | 2012-12-05 | 2014-06-12 | Blue Wave Co S.A. | Loading-offloading buoy for cng operations |
WO2014086418A1 (en) * | 2012-12-05 | 2014-06-12 | Blue Wave Co S.A. | Loading-offloading buoy for cng operations |
US20150240578A1 (en) * | 2014-02-21 | 2015-08-27 | Hydril Usa Manufacturing Llc | Modular mud lift pump assembly |
NO337223B1 (en) * | 2014-06-05 | 2016-02-15 | Aker Subsea As | Cable installation tools and procedures for such installation |
WO2015196234A1 (en) * | 2014-06-26 | 2015-12-30 | Aquadownunder Pty Ltd | Support buoy |
FR3042839B1 (en) * | 2015-10-26 | 2018-05-04 | Saipem S.A. | METHOD FOR DRAINING AN UNDERWATER DUCT FROM FLUID TRANSPORT WHICH IS IMMERED AND FILLED WITH WATER |
GB2554075B (en) * | 2016-09-15 | 2021-05-19 | Equinor Energy As | Optimising fire protection for an offshore platform |
GB2554077B (en) | 2016-09-15 | 2021-05-19 | Equinor Energy As | Handling of hydrocarbons on an offshore platform |
MX2019008636A (en) * | 2017-01-26 | 2019-09-09 | Equinor Energy As | Offshore hydrocarbon processing facility and method of operation. |
GB2560378B (en) | 2017-03-10 | 2022-05-18 | Equinor Energy As | Power supply system for an offshore platform |
DE102019110506A1 (en) * | 2019-04-23 | 2020-10-29 | Innogy Se | Foundation of an offshore structure with a transmission cable and a protective element |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2299108A (en) * | 1995-03-20 | 1996-09-25 | Norske Stats Oljeselskap | Offshore production of hydrocarbons |
WO2002088509A1 (en) * | 2001-04-25 | 2002-11-07 | Exxonmobil Upstream Research Company | Offshore floating production method |
US6536528B1 (en) * | 1998-03-30 | 2003-03-25 | Kellogg Brown & Root, Inc. | Extended reach tie-back system |
WO2005090152A1 (en) * | 2004-03-23 | 2005-09-29 | Single Buoy Moorings Inc. | Field development with centralised power generation unit |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3129774A (en) * | 1960-09-09 | 1964-04-21 | California Research Corp | Method and apparatus for drilling and working in offshore wells |
US3261398A (en) * | 1963-09-12 | 1966-07-19 | Shell Oil Co | Apparatus for producing underwater oil fields |
NO312282B1 (en) | 1994-08-22 | 2002-04-22 | Norske Stats Oljeselskap | Vessel for use in the production of hydrocarbons from offshore fields |
US6012530A (en) * | 1997-01-16 | 2000-01-11 | Korsgaard; Jens | Method and apparatus for producing and shipping hydrocarbons offshore |
FR2780442B1 (en) * | 1998-06-30 | 2000-07-28 | Inst Francais Du Petrole | POLYPHASIC PRODUCTION SYSTEM SUITABLE FOR LARGE WATER DEPTHS |
US7234524B2 (en) * | 2002-08-14 | 2007-06-26 | Baker Hughes Incorporated | Subsea chemical injection unit for additive injection and monitoring system for oilfield operations |
US6278095B1 (en) * | 1999-08-03 | 2001-08-21 | Shell Oil Company | Induction heating for short segments of pipeline systems |
NO312821B1 (en) * | 1999-09-15 | 2002-07-08 | Kvaerner Oil & Gas As | Procedure for exploiting natural resources below the seabed and facilities for drilling a well in the seabed |
NO313767B1 (en) * | 2000-03-20 | 2002-11-25 | Kvaerner Oilfield Prod As | Process for obtaining simultaneous supply of propellant fluid to multiple subsea wells and subsea petroleum production arrangement for simultaneous production of hydrocarbons from multi-subsea wells and supply of propellant fluid to the s. |
US6364021B1 (en) * | 2000-07-11 | 2002-04-02 | Halliburton Energy Services, Inc. | Well management system and method of operation |
US6363971B1 (en) | 2000-11-20 | 2002-04-02 | Whirlpool Corporation | Integrated gas valve assembly |
US7958938B2 (en) * | 2004-05-03 | 2011-06-14 | Exxonmobil Upstream Research Company | System and vessel for supporting offshore fields |
US7219740B2 (en) * | 2004-11-22 | 2007-05-22 | Energy Equipment Corporation | Well production and multi-purpose intervention access hub |
-
2006
- 2006-07-19 NO NO20063352A patent/NO326575B1/en not_active IP Right Cessation
-
2007
- 2007-07-19 US US12/374,322 patent/US20100025043A1/en not_active Abandoned
- 2007-07-19 EP EP07793925A patent/EP2047063A1/en not_active Withdrawn
- 2007-07-19 BR BRPI0714301A patent/BRPI0714301A2/en not_active Application Discontinuation
- 2007-07-19 WO PCT/NO2007/000273 patent/WO2008010726A1/en active Application Filing
- 2007-07-19 AU AU2007275960A patent/AU2007275960B2/en not_active Ceased
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2299108A (en) * | 1995-03-20 | 1996-09-25 | Norske Stats Oljeselskap | Offshore production of hydrocarbons |
US6536528B1 (en) * | 1998-03-30 | 2003-03-25 | Kellogg Brown & Root, Inc. | Extended reach tie-back system |
WO2002088509A1 (en) * | 2001-04-25 | 2002-11-07 | Exxonmobil Upstream Research Company | Offshore floating production method |
WO2005090152A1 (en) * | 2004-03-23 | 2005-09-29 | Single Buoy Moorings Inc. | Field development with centralised power generation unit |
Also Published As
Publication number | Publication date |
---|---|
NO326575B1 (en) | 2009-01-12 |
US20100025043A1 (en) | 2010-02-04 |
EP2047063A1 (en) | 2009-04-15 |
BRPI0714301A2 (en) | 2018-10-23 |
WO2008010726A1 (en) | 2008-01-24 |
AU2007275960A1 (en) | 2008-01-24 |
NO20063352L (en) | 2008-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2007275960B2 (en) | System and vessel hydrocarbon production and method for intervention on subsea equipment | |
US5226482A (en) | Installation and method for the offshore exploitation of small fields | |
US7628224B2 (en) | Shallow/intermediate water multipurpose floating platform for arctic environments | |
US7793724B2 (en) | Subsea manifold system | |
RU2330154C1 (en) | System and vessel for technical servicing of offshore deposits | |
US7793725B2 (en) | Method for preventing overpressure | |
US7798233B2 (en) | Overpressure protection device | |
OA10308A (en) | Hydrocarbon fluid transport system | |
EP4053009A1 (en) | Buoy for injecting fluid in a subterranean void and methods for connecting and disconnecting a fluid passage from a vessel to the buoy | |
AU2007227849B2 (en) | Connection system and method for connecting and disconnecting a floating unit to and from a buoy which is connected to a subsea installation | |
GB2299108A (en) | Offshore production of hydrocarbons | |
AU2011215983B2 (en) | Rigless intervention | |
US20150128840A1 (en) | Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments | |
US20120037376A1 (en) | System and Method For Well Clean-Up | |
US6012530A (en) | Method and apparatus for producing and shipping hydrocarbons offshore | |
CA2751810A1 (en) | System and method for hydrocarbon production | |
CA3158906A1 (en) | Operation of an unmanned production platform | |
Millmaker et al. | The Challenges of Lufeng 22-1 Development | |
Davison et al. | Fast-Track Development of Deepwater Kuito Field, Offshore Angola | |
Drawe III et al. | Technical and economic considerations in developing offshore oil and gas prospects using floating production systems | |
Henry et al. | Innovations in subsea development and operation | |
WO2002076818A1 (en) | Riser system for use for production of hydrocarbons with a vessel of the epso-type with a dynamic positioning system (dp) | |
Hopson | Explorations of an artificially boosted sub-sea production system | |
Walker | Deep Water Oil Production System | |
Chimisso et al. | Deepwater FPSO for Aquila Field Development in the Adriatic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |