[go: up one dir, main page]

CN110485278A - A kind of half stealth of falling T bent cap construction - Google Patents

A kind of half stealth of falling T bent cap construction Download PDF

Info

Publication number
CN110485278A
CN110485278A CN201910810255.7A CN201910810255A CN110485278A CN 110485278 A CN110485278 A CN 110485278A CN 201910810255 A CN201910810255 A CN 201910810255A CN 110485278 A CN110485278 A CN 110485278A
Authority
CN
China
Prior art keywords
bent cap
bridge
sides
simply supported
inverted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910810255.7A
Other languages
Chinese (zh)
Inventor
俞雷
王玉祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201910810255.7A priority Critical patent/CN110485278A/en
Publication of CN110485278A publication Critical patent/CN110485278A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

一种半倒T隐形盖梁构造,两侧简支梁搁置在倒T形盖梁上,简支梁中梁设置牛腿,两侧牛腿位于盖梁倒T部分顶部上方,在顺桥向,两侧简支梁中梁牛腿端面之间设有间隙,两侧简支梁边梁端面之间设有间隙,所述间隙通过桥面连续或伸缩缝构造进行处理;在顺桥向,盖梁倒T部分位于左右两侧简支梁之间,在横桥向,盖梁倒T部分位于两侧边梁之间,在高度方向,盖梁倒T部分位于中梁牛腿下方,使得盖梁倒T部分在以上三个方向均被两侧简支梁遮挡,达到隐形效果。它具有常规倒T盖梁建筑高度低的优点,同时盖梁倒T部分可被简支梁遮挡,且桥面处仅剩一道间隙,相比常规倒T盖梁,具有桥面连续施工简便、行车舒适性好、景观效果好的独特优势。

A semi-inverted T invisible cover beam structure. The simply supported beams on both sides rest on the inverted T-shaped cover beam. The middle beam of the simply supported beam is provided with corbels. , there is a gap between the end faces of the middle beam corbels of the simply supported beams on both sides, and a gap between the end faces of the side girders of the simply supported beams on both sides. The inverted T part of the cover beam is located between the simply supported beams on the left and right sides. In the transverse bridge direction, the inverted T part of the cover beam is located between the side beams on both sides. The inverted T part of the cover beam is blocked by the simply supported beams on both sides in the above three directions to achieve an invisible effect. It has the advantages of low building height of the conventional inverted T cover beam, and at the same time, the inverted T part of the cover beam can be blocked by simply supported beams, and there is only one gap left on the bridge deck. Compared with the conventional inverted T cover beam, it has the advantages of simple and convenient continuous bridge deck construction The unique advantages of good driving comfort and good landscape effect.

Description

一种半倒T隐形盖梁构造A Half Inverted T Invisible Cover Beam Structure

技术领域technical field

本发明涉及桥梁结构设计技术领域,尤其涉及一种半倒T隐形盖梁构造。The invention relates to the technical field of bridge structure design, in particular to a semi-inverted T invisible cover beam structure.

背景技术Background technique

目前,简支梁因具有构造简单、适宜采用预制装配工艺、施工速度快等优点,在中小跨径桥梁中得到很广泛的应用。将多片简支梁搁置在倒T形盖梁上是一种常用的桥梁结构型式,常规倒T盖梁具有结构高度低的优点,在城市高架中应用广泛,但其倒T部分与左右两侧简支梁形成两道间隙,由此带来桥面连续构造施工要求高、耐久性能不佳,伸缩缝处双缝设置影响行车舒适性,以及外观效果不佳等缺点。At present, simply supported beams are widely used in small and medium span bridges because of their simple structure, suitable prefabricated assembly technology, and fast construction speed. Placing multiple pieces of simply supported beams on an inverted T-shaped cover beam is a commonly used bridge structure type. The conventional inverted T-shaped cover beam has the advantage of low structural height and is widely used in urban viaducts. The side simply supported girders form two gaps, resulting in high construction requirements for the continuous structure of the bridge deck, poor durability, double slits at the expansion joints affect driving comfort, and poor appearance.

发明内容Contents of the invention

本发明的目的在于提供一种半倒T隐形盖梁构造,它具有常规倒T盖梁建筑高度低的优点,同时其经过简支梁以及盖梁的特殊构造处理后,盖梁倒T部分在顶面、立面及侧面均可被简支梁遮挡,且桥面处仅剩一道间隙(桥面伸缩缝及连续缝相比普通倒T盖梁减少一半),相比常规倒T盖梁,具有桥面连续施工简便、行车舒适性好、景观效果好的独特优势。The object of the present invention is to provide a semi-inverted T invisible cover beam structure, which has the advantages of low construction height of conventional inverted T cover beams, and at the same time, after the special structure treatment of simply supported beams and cover beams, the inverted T part of the cover beam The top surface, facade and sides can be covered by simply supported beams, and there is only one gap left on the bridge deck (expansion joints and continuous joints on the bridge deck are reduced by half compared with ordinary inverted T cover beams). Compared with conventional inverted T cover beams, It has the unique advantages of simple continuous bridge deck construction, good driving comfort and good landscape effect.

为了实现上述目的,本发明的技术方案如下:一种半倒T隐形盖梁构造,其特征在于在两侧简支梁搁置在倒T形盖梁上,简支梁中梁两端的上缘设置顺桥向牛腿,两侧顺桥向牛腿位于盖梁倒T部分顶部上方,横桥向盖梁倒T部分延伸至距盖梁端部一定距离,在盖梁横桥向端部形成横桥向牛腿,使得两侧边梁可以不受倒T部分的间隔;在顺桥向,两侧简支梁中梁的顺桥向牛腿端面之间设有间隙,两侧简支梁边梁从盖梁倒T部分两侧通过,其端面之间设有间隙,以上所述间隙通过桥面连续或伸缩缝构造进行处理;在顺桥向,盖梁倒T部分位于左右两侧简支梁之间,在横桥向,盖梁倒T部分位于两侧边梁之间,在高度方向,盖梁倒T部分位于中梁的顺桥向牛腿下方,使得盖梁倒T部分在以上三个方向均被两侧简支梁遮挡,达到隐形效果。In order to achieve the above object, the technical solution of the present invention is as follows: a semi-inverted T invisible cover beam structure, which is characterized in that the simply supported beams on both sides rest on the inverted T-shaped cover beams, and the upper edges of the two ends of the simply supported beam middle beams are arranged Along the bridge to the corbel, both sides are located above the top of the inverted T part of the cover beam along the bridge, and the transverse bridge extends to the inverted T part of the cover beam to a certain distance from the end of the cover beam, forming a transverse bridge at the end of the cover beam. Bridge to the corbel, so that the side girders on both sides can not be separated from the interval of the inverted T part; along the bridge direction, there is a gap between the end faces of the simply supported beam on both sides to the bridge, and the simply supported beam sides on both sides The beam passes through both sides of the inverted T part of the cover beam, and there is a gap between the end faces. The above-mentioned gap is processed by the bridge deck continuous or expansion joint structure; along the bridge direction, the inverted T part of the cover beam is simply supported on the left and right sides. Between the girders, in the transverse bridge direction, the inverted T part of the cover girder is located between the side girders on both sides; The three directions are blocked by simply supported beams on both sides to achieve an invisible effect.

进一步地,倒T形盖梁两侧牛腿上设置永久支座,用于搁置两侧简支梁。Further, permanent supports are provided on the corbels on both sides of the inverted T-shaped cover beam to rest the simply supported beams on both sides.

进一步地,在顺桥向,两侧简支梁中梁端部即顺桥向牛腿根部与盖梁倒T部分之间设有间隙;在横桥向,简支梁边梁侧面与盖梁倒T部分侧面之间设有间隙,在高度方向,简支梁中梁的顺桥向牛腿底部与盖梁倒T部分顶部之间设有间隙;以上所述间隙不需进行桥面连续或伸缩缝构造处理。Further, in the direction of the bridge, there is a gap between the end of the middle girder of the simply supported beam on both sides, that is, the root of the corbel in the direction of the bridge and the inverted T part of the cover beam; in the direction of the bridge, the side beam of the simply supported beam and the cover beam There is a gap between the sides of the inverted T part. In the height direction, there is a gap between the bottom of the bridge-facing corbel of the simply supported beam and the top of the inverted T part of the cover beam; the above gaps do not need to be continuous or Expansion joint construction treatment.

进一步地,半倒T隐形盖梁横向端部的横桥向牛腿构造为关键受力部位,预应力钢束在横桥向牛腿处下弯可以有效提高牛腿的抗剪能力。Furthermore, the cross-bridge corbel structure at the transverse end of the semi-inverted T invisible cover girder is the key stress-bearing part, and the bending of the prestressed steel beam at the cross-bridge corbel can effectively improve the shear resistance of the corbel.

进一步地,将预应力钢束延伸至盖梁侧面的一端设置为张拉端,延伸至盖梁底面的一端设置为固定端,避免了在盖梁底部进行预应力钢束的张拉和封锚施工,降低了施工难度。Further, the end of the prestressed steel beam extending to the side of the cover beam is set as the tension end, and the end extending to the bottom of the cover beam is set as the fixed end, which avoids the tensioning and anchoring of the prestressed steel beam at the bottom of the cover beam construction, reducing the difficulty of construction.

本发明的另一目的在于提供一种半倒T隐形盖梁构造的施工方法,包括以下步骤:Another object of the present invention is to provide a construction method of a semi-inverted T invisible cap beam structure, comprising the following steps:

A、浇筑半倒T形盖梁砼或安装半倒T形盖梁砼节段;A. Pouring half-inverted T-shaped cover beam concrete or installing half-inverted T-shaped cover beam concrete segment;

B、张拉盖梁第一批预应力钢束;B. The first batch of prestressed steel tendons of the tensioned cover beam;

C、吊装中梁及边梁;两侧简支梁通过支座搁置在倒T形盖梁上,中梁设置顺桥向牛腿,两侧中梁顺桥向牛腿位于盖梁倒T部分顶部上方,在顺桥向,两侧中梁顺桥向牛腿端面之间设有间隙,两侧简支梁边梁端面之间设有间隙;C. Hoisting the middle beam and side beams; the simply supported beams on both sides are rested on the inverted T-shaped cover beam through the support, the middle beam is set along the bridge to the corbel, and the middle beams on both sides are located above the top of the inverted T part of the cover beam along the bridge to the corbel , in the bridge direction, there is a gap between the end faces of the center girder on both sides along the bridge direction, and there is a gap between the end faces of the side beams of the simply supported beams on both sides;

D、张拉盖梁第二批预应力钢束;D. The second batch of prestressed steel tendons of the tensioned cover beam;

E、根据设计方案对C中所述间隙进行桥面连续或伸缩缝构造处理。E. According to the design plan, carry out bridge deck continuous or expansion joint construction treatment on the gap mentioned in C.

本发明的“半倒T隐形盖梁”是相对常规倒T形盖梁而言,在横桥向盖梁倒T部分未延伸至盖梁端部,使得两侧边梁可以不受倒T部分的间隔;在高度方向倒T部分顶部高度低于简支梁顶部高度,使得中梁可以通过顶部设置牛腿的方式从倒T上方通过。The "half inverted T invisible cover beam" of the present invention is relative to the conventional inverted T-shaped cover beam. The inverted T part of the cover beam in the direction of the cross bridge does not extend to the end of the cover beam, so that the side beams on both sides can not be separated from the interval of the inverted T part. ; In the height direction, the top height of the inverted T part is lower than the top height of the simply supported beam, so that the middle beam can pass above the inverted T by setting corbels on the top.

本发明的技术方案具有明显的技术特点,其一,盖梁倒T部分被两侧简支梁遮挡,达到隐形的效果;其二,通过本发明所述构造将桥面连续缝及伸缩缝的位置由常规倒T盖梁的两侧简支梁与倒T部分之间转移至两侧简支梁之间,桥面伸缩缝及连续缝由常规倒T盖梁的两道减少至一道,性能更加可靠,工艺更加简单,行车舒适性更好;其三,受力计算时,盖梁免受温度梯度影响,提高了结构安全性。The technical solution of the present invention has obvious technical characteristics. First, the inverted T part of the cover beam is blocked by simply supported beams on both sides to achieve an invisible effect; The position is transferred from between the simply supported beams on both sides of the conventional inverted T cover beam and the inverted T part to between the simply supported beams on both sides, and the bridge deck expansion joints and continuous joints are reduced from two to one in the conventional inverted T cover beam. It is more reliable, the process is simpler, and the driving comfort is better; third, when calculating the force, the cover beam is not affected by the temperature gradient, which improves the structural safety.

附图说明Description of drawings

图1为本发明构造顺桥向立面布置详图(盖梁构造轮廓为示意,不限于图中外轮廓形状);Fig. 1 is a detailed diagram of the layout of the structure along the bridge to the facade of the present invention (the outline of the cover beam structure is schematic, not limited to the shape of the outer outline in the figure);

图2为本发明构造A-A横断面布置图(断面简支梁以小箱梁结构作为示意,不限于使用小箱梁);Fig. 2 is a cross-sectional layout diagram of structure A-A of the present invention (the simply supported beam of the section is illustrated by a small box girder structure, and is not limited to the use of a small box girder);

图3为本发明构造B-B横断面布置图(断面简支梁以小箱梁结构作为示意,不限于使用小箱梁)。Fig. 3 is a cross-sectional layout diagram of structure B-B of the present invention (the simply supported beam in the section is illustrated by a small box girder structure, and is not limited to the use of a small box girder).

图4为本发明构造的预应力钢束立面布置示意图之一(盖梁构造轮廓及预应力钢束的根数和形状为参考,不限于图中示意);Fig. 4 is one of the schematic diagrams of the facade layout of the prestressed steel tendons constructed in the present invention (the outline of the cover beam structure and the number and shape of the prestressed steel tendons are for reference, not limited to the illustration in the figure);

图5为本发明构造的预应力钢束立面布置示意图之二(盖梁构造轮廓及预应力钢束的根数和形状为参考,不限于图中示意);Fig. 5 is the second schematic diagram of the facade layout of the prestressed steel tendons constructed in the present invention (the outline of the cover beam structure and the number and shape of the prestressed steel tendons are for reference, not limited to the illustration in the figure);

图6为本发明构造的预应力钢束横断面布置示意图(盖梁构造轮廓及预应力钢束的根数和形状为参考,不限于图中示意)。Figure 6 is a schematic diagram of the cross-sectional layout of the prestressed steel tendons constructed in the present invention (the outline of the cover beam structure and the number and shape of the prestressed steel tendons are for reference, not limited to the illustration in the figure).

具体实施方式Detailed ways

下面结合附图对本发明作进一步的描述:Below in conjunction with accompanying drawing, the present invention will be further described:

本发明为一种半倒T隐形盖梁构造方案,本构造主要由以下几部门组成:半倒T形盖梁1、两侧简支梁(边梁2a、中梁2b)、中梁顺桥向牛腿3、两侧简支梁支座(含垫石)4、半倒T形盖梁倒T部分5、在横桥向简支梁边梁侧面与倒T侧面之间的第一间隙6、简支梁中梁顺桥向牛腿底部与倒T顶部之间的第二间隙7、简支梁中梁顺桥向牛腿端面之间以及简支梁边梁端面之间的第三间隙8、两侧简支梁中梁端部(牛腿根部)与盖梁倒T之间的第四间隙9、盖梁横向端部的横桥向牛腿10。The present invention is a semi-inverted T invisible cover beam structure scheme. This structure is mainly composed of the following parts: semi-inverted T-shaped cover beam 1, simply supported beams on both sides (side beam 2a, middle beam 2b), middle beam along the bridge direction Leg 3. Simply supported beam supports on both sides (including pad stones) 4. The inverted T part of the semi-inverted T-shaped cover beam 5. The first gap between the side beam of the transverse bridge and the side of the inverted T side of the simply supported beam 6. The second gap between the bottom of the simply supported beam center girder along the bridge to the corbel and the top of the inverted T 7, the third gap between the end faces of the simply supported beam center girder along the bridge to the corbel and between the end faces of the side girders of the simply supported beam 8, the simple support on both sides The fourth gap 9 between the end of the middle beam of the support beam (the root of the corbel) and the inverted T of the cover beam, and the cross bridge direction corbel 10 at the lateral end of the cover beam.

一种半倒T隐形盖梁构造,其具体实施方式为:两侧简支梁(边梁2a、中梁2b)通过支座4搁置在倒T形盖梁1上,在顺桥向,盖梁倒T部分5位于左右两侧简支梁(边梁2a、中梁2b)之间,在横桥向,盖梁倒T部分5位于两侧边梁2a之间,在高度方向,盖梁倒T部分5位于中梁顺桥向牛腿3下方。A semi-inverted T invisible cover beam structure, the specific implementation method is: the simply supported beams on both sides (side beam 2a, middle beam 2b) rest on the inverted T-shaped cover beam 1 through the support 4, in the direction of the bridge, the cover The beam inverted T part 5 is located between the left and right simply supported beams (side girder 2a, center beam 2b). In the transverse direction, the cover beam inverted T part 5 is located between the two side beams 2a. The inverted T part 5 is located below the corbel 3 of the center girder along the bridge.

盖梁倒T部分5在横桥向、顺桥向及高度方向均被两侧简支梁(边梁2a、中梁2b)遮挡,达到隐形的景观效果;同时将桥面连续缝及伸缩缝的位置由常规倒T盖梁的两侧简支梁与倒T部分之间(第四间隙9)转移至两侧简支梁之间(第三间隙8),其个数相比常规倒T形盖梁减少了一半,具有桥面连续施工简便、行车舒适性好的独特优势。The inverted T part 5 of the cover beam is blocked by simply supported beams on both sides (side girder 2a, middle girder 2b) in the transverse bridge direction, along the bridge direction and in the height direction, so as to achieve an invisible landscape effect; at the same time, the continuous joints and expansion joints of the bridge deck The position of the conventional inverted T cover beam is transferred from between the simply supported beams on both sides and the inverted T part (the fourth gap 9) to between the simply supported beams on both sides (the third gap 8), and its number is compared with that of the conventional inverted T The shape cap beam is reduced by half, which has the unique advantages of simple continuous construction of the bridge deck and good driving comfort.

在本发明中,盖梁底部横向端部设横桥向牛腿10,而该横桥向牛腿10为关键受力部位,所述盖梁横桥向设有设置在盖梁倒T部分的第一批钢束N1、以及第二批钢束,其中第二批预应力钢束包括交错设置的第二钢束N2、第三钢束N3、第四钢束N4、和第五钢束N5,第二批预应力钢束在横桥向牛腿处下弯可有效提高牛腿的抗剪能力;In the present invention, the horizontal end of the bottom of the cover beam is provided with a cross bridge facing the corbel 10, and the cross bridge facing the corbel 10 is a key stress-bearing part. The first batch of steel tendons N1, and the second batch of steel tendons, wherein the second batch of prestressed steel tendons includes the second steel tendons N2, the third steel tendons N3, the fourth steel tendons N4, and the fifth steel tendons N5 arranged in a staggered manner , the second batch of prestressed steel tendons are bent down towards the corbel at the cross bridge, which can effectively improve the shear resistance of the corbel;

第一批预应力钢束N1的两端均为张拉端,设置在盖梁倒T部的侧面,而第二批预应力钢束延伸至盖梁侧面的一端设置为张拉端,延伸至盖梁底面的一端设置为固定端,避免了在盖梁底部进行预应力钢束的张拉和封锚施工,降低了施工难度。Both ends of the first batch of prestressed steel tendons N1 are tension ends, which are set on the side of the inverted T part of the cover beam, while the end of the second batch of prestressed steel tendons extending to the side of the cover beam is set as a tension end, extending to One end of the bottom surface of the cover beam is set as a fixed end, which avoids the tensioning and anchoring construction of the prestressed steel beam at the bottom of the cover beam, and reduces the difficulty of construction.

一种半倒T隐形盖梁构造,其细节描述如下:在顺桥向,两侧简支梁中梁2b的中梁顺桥向牛腿3端面之间以及两侧简支梁边梁2a端面之间设有第三间隙8,对第三间隙8进行桥面连续或伸缩缝构造处理。在顺桥向,两侧简支梁中梁2b端部(中梁顺桥向牛腿3根部)与盖梁倒T部分5之间设有第四间隙9;在横桥向,简支梁边梁2a侧面与倒T部分5侧面之间设有第一间隙6;在高度方向,简支梁中梁2a的中梁顺桥向牛腿3底部与倒T部分5顶部之间设有第二间隙7;上述第四间隙9、第一间隙6、第二间隙7不需进行桥面连续或伸缩缝构造处理。A semi-inverted T invisible cover beam structure, the details of which are described as follows: along the bridge direction, between the end faces of the middle girder 2b of the simply supported beam on both sides along the bridge direction corbel 3 and between the end faces of the simply supported beam side girder 2a on both sides A third gap 8 is provided, and the bridge deck continuous or expansion joint construction treatment is performed on the third gap 8 . In the direction along the bridge, there is a fourth gap 9 between the end of the middle girder 2b of the simply supported beam on both sides (3 roots of the center girder along the bridge to the corbel) and the inverted T part 5 of the cover beam; A first gap 6 is provided between the side of 2a and the side of the inverted T part 5; in the height direction, a second gap 7 is provided between the bottom of the corbel 3 and the top of the inverted T part 5; The above-mentioned fourth gap 9, first gap 6, and second gap 7 do not need to be treated with bridge deck continuity or expansion joint construction.

一种半倒T隐形盖梁构造,其具体实施步骤为:A semi-inverted T invisible cover beam structure, its specific implementation steps are:

A、浇筑半倒T形盖梁砼或安装半倒T形盖梁砼节段;A. Pouring half-inverted T-shaped cover beam concrete or installing half-inverted T-shaped cover beam concrete segment;

B、在两侧简支梁施工之前,张拉盖梁第一批预应力钢束(图4中第一钢束N1);B. Before the construction of simply supported beams on both sides, the first batch of prestressed steel tendons of the tension cover beam (the first steel tendon N1 in Figure 4);

C、施工两侧简支梁(边梁2a、中梁2b)及中梁顺桥向牛腿3,两侧简支梁搁置在倒T形盖梁上,简支梁中梁设置中梁顺桥向牛腿,两侧中梁顺桥向牛腿位于盖梁倒T部分顶部上方,在顺桥向,两侧简支梁中梁2b的中梁顺桥向牛腿3端面之间以及两侧简支梁边梁2a端面之间设有间隙8;C. Construction of simply supported girders on both sides (side girder 2a, middle girder 2b) and middle girder along the bridge to the corbel 3, the simply supported girders on both sides are placed on the inverted T-shaped cover beam, and the middle girder of the simply supported beam is set along the bridge to the corbel , the middle girder on both sides along the bridge direction corbel is located above the top of the inverted T part of the cover beam, and along the bridge direction, the center girder on both sides of the simply supported beam 2b between the end faces of the bridge direction corbel 3 and the end face of the simply supported beam edge beam 2a on both sides There is a gap 8 between them;

D、待两侧简支梁施工后,张拉盖梁第二批预应力钢束(第二批预应力钢束包括交错设置的第二钢束N2、第三钢束N3、第四钢束N4、和第五钢束N5);D. After the construction of the simply supported beams on both sides, the second batch of prestressed steel tendons of the tensioned cover beam (the second batch of prestressed steel tendons include the second steel tendons N2, the third steel tendons N3, and the fourth steel tendons arranged in a staggered manner) N4, and the fifth steel beam N5);

E、根据设计方案对C中所述间隙8进行桥面连续或伸缩缝构造处理。E. According to the design plan, carry out bridge deck continuous or expansion joint construction treatment on the gap 8 mentioned in C.

在本发明描述中,需要解释的是,术语“上”、“下”、“两侧”、“侧面”、“顺桥向”、“横桥向”、“高度方向”、“顶”、“底”等所指示的方位或相对位置关系均为基于附图所示的方位或位置关系,仅是为了便于描述本发明构造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位,因此不能理解为对本发明的限制。In the description of the present invention, it should be explained that the terms "upper", "lower", "both sides", "side", "along the bridge direction", "horizontal bridge direction", "height direction", "top", The orientations or relative positional relationships indicated by "bottom" are all based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the structure of the present invention and simplifying the description, rather than indicating or implying that the referred devices or elements must have specific orientation and therefore should not be construed as limiting the invention.

虽然上述内容描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这仅是举例说明,本发明的保护范围是所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质内容的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本发明的保护范围。Although the above content describes the specific implementation of the present invention, those skilled in the art should understand that this is only an example, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims (6)

1. a kind of half stealth of falling T bent cap construction, it is characterised in that in two sides, simply supported beam is shelved on inverted T-shaped bent cap, in simply supported beam The upper limb at beam both ends is arranged along bridge to bracket, and two sides are located above the bent cap atop part of falling T along bridge to bracket, and direction across bridge bent cap falls T is extended partially into away from bent cap end certain distance, forms direction across bridge bracket in bent cap direction across bridge end, so that two sides side bar can be with Not by the interval for the part of falling T;In suitable bridge to for the suitable bridge of two sides simply supported beam central sill to gap is equipped between bracket end face, two sides are simple Strutbeam side bar passes through from the bent cap part of falling T two sides, gap is equipped between end face, gap described above is continuous by bridge floor or stretches Contracting seam construction is handled;At left and right sides of being located at along bridge to, bent cap fall T part between simply supported beam, in direction across bridge, bent cap falls T Part is between the side bar of two sides, and in short transverse, the bent cap part of falling T is located at the suitable bridge of central sill to bracket lower section, so that bent cap The part of falling T is blocked by two sides simply supported beam in three above direction, reaches stealthy effect.
2. half stealth of falling T bent cap construction as described in claim 1, which is characterized in that be arranged forever on the bracket of inverted T-shaped bent cap two sides Long support, for shelving two sides simply supported beam.
3. half stealth of falling T bent cap construction as described in claim 1, which is characterized in that in suitable bridge to beam-ends in the simply supported beam of two sides Portion i.e. along bridge between bracket root and the bent cap part of falling T be equipped with gap;In direction across bridge, simply supported beam side bar side and bent cap fall T Gap is equipped between surface, in short transverse, suitable the bridge of simply supported beam central sill to bracket bottom and the bent cap atop part of falling T it Between be equipped with gap;Gap described above is not required to carry out bridge floor continuously or expansion joint structure is handled.
4. half stealth of falling T bent cap construction as described in claim 1, which is characterized in that the cross of half stealth of falling T bent cap lateral ends Bridge is configured to crucial force part to bracket, prestressed strand at the direction across bridge bracket under the curved shearing resistance energy to effectively improve bracket Power.
5. half stealth of falling T bent cap construction as claimed in claim 4, which is characterized in that prestressed strand is extended to bent cap side The one end in face is set as stretching end, and the one end for extending to bent cap bottom surface is set as fixing end, avoids and carries out in advance in bent cap bottom The tensioning of stress steel beam and sealing off and covering anchorage construction, reduce difficulty of construction.
6. a kind of construction method of half stealth of falling T bent cap construction, comprising the following steps:
A, half inverted T-shaped bent cap concrete segment of half inverted T-shaped bent cap concrete or installation is poured;
B, first prestressed strand of tensioning bent cap;
C, central sill and side bar are lifted;Two sides simply supported beam is shelved on inverted T-shaped bent cap by support, and central sill is arranged along bridge to bracket, Two sides central sill is located above the bent cap atop part of falling T along bridge to bracket, in suitable bridge to two sides central sill is along bridge between bracket end face Equipped with gap, gap is equipped between the simply supported beam side bar end face of two sides;
D, tensioning bent cap second batch prestressed strand;
E, bridge floor is carried out continuously to gap described in C according to design scheme or expansion joint structure is handled.
CN201910810255.7A 2019-08-29 2019-08-29 A kind of half stealth of falling T bent cap construction Pending CN110485278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910810255.7A CN110485278A (en) 2019-08-29 2019-08-29 A kind of half stealth of falling T bent cap construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910810255.7A CN110485278A (en) 2019-08-29 2019-08-29 A kind of half stealth of falling T bent cap construction

Publications (1)

Publication Number Publication Date
CN110485278A true CN110485278A (en) 2019-11-22

Family

ID=68555216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910810255.7A Pending CN110485278A (en) 2019-08-29 2019-08-29 A kind of half stealth of falling T bent cap construction

Country Status (1)

Country Link
CN (1) CN110485278A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455830A (en) * 2020-03-24 2020-07-28 广东省交通规划设计研究院股份有限公司 Large cantilever cover beam type bridge pier and construction method thereof
CN113512929A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Steel-concrete combined structural hidden cover beam structure system and construction method thereof
CN113512932A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
CN113652966A (en) * 2021-07-13 2021-11-16 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system
CN113718620A (en) * 2021-09-27 2021-11-30 上海市政工程设计研究总院(集团)有限公司 Novel prefabricated inverted T shuttle type bent cap structure system
CN113718637A (en) * 2021-09-10 2021-11-30 上海市城市建设设计研究总院(集团)有限公司 Bridge deck continuous structure for simply supported beam and inverted T-shaped capping beam system and construction method
CN114016423A (en) * 2021-11-25 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
CN114214969A (en) * 2021-12-01 2022-03-22 广州市市政工程设计研究总院有限公司 A kind of wide-splitting structure and method of split-width bridge
CN115418938A (en) * 2022-08-12 2022-12-02 上海通亿橡塑制品有限公司 An expansion device combining two continuous seams and comb-tooth expansion joints

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2061871A1 (en) * 1991-02-28 1992-08-29 Stanley J. Grossman Composite, prestressed structural member and method of forming same
KR100948896B1 (en) * 2009-06-01 2010-03-24 주식회사 오케이컨설턴트 Continuous construction method of psc composite concrete girders by using a precast cross-beam
CN102021885A (en) * 2011-01-04 2011-04-20 上海市城市建设设计研究院 Bridge deck continuous seam structure
WO2012044094A2 (en) * 2010-09-30 2012-04-05 (주)써포텍 Upper structure for bridge
CN103938533A (en) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 Simple-supported continuous structure and construction method thereof
JP2015200156A (en) * 2014-04-10 2015-11-12 清水建設株式会社 Floor pit structure and construction method thereof
US20170356144A1 (en) * 2015-09-18 2017-12-14 Hohai University Assembled type pier column member with steel-concrete composite structure
CN108867345A (en) * 2018-09-11 2018-11-23 中建五局土木工程有限公司 A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space
CN208455445U (en) * 2018-04-26 2019-02-01 上海市政交通设计研究院有限公司 A kind of continuous small box girder bridge of bridge floor
CN211006316U (en) * 2019-08-29 2020-07-14 上海市政工程设计研究总院(集团)有限公司 Half-inverted T-shaped invisible bent cap structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2061871A1 (en) * 1991-02-28 1992-08-29 Stanley J. Grossman Composite, prestressed structural member and method of forming same
KR100948896B1 (en) * 2009-06-01 2010-03-24 주식회사 오케이컨설턴트 Continuous construction method of psc composite concrete girders by using a precast cross-beam
WO2012044094A2 (en) * 2010-09-30 2012-04-05 (주)써포텍 Upper structure for bridge
CN102021885A (en) * 2011-01-04 2011-04-20 上海市城市建设设计研究院 Bridge deck continuous seam structure
CN103938533A (en) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 Simple-supported continuous structure and construction method thereof
JP2015200156A (en) * 2014-04-10 2015-11-12 清水建設株式会社 Floor pit structure and construction method thereof
US20170356144A1 (en) * 2015-09-18 2017-12-14 Hohai University Assembled type pier column member with steel-concrete composite structure
CN208455445U (en) * 2018-04-26 2019-02-01 上海市政交通设计研究院有限公司 A kind of continuous small box girder bridge of bridge floor
CN108867345A (en) * 2018-09-11 2018-11-23 中建五局土木工程有限公司 A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space
CN211006316U (en) * 2019-08-29 2020-07-14 上海市政工程设计研究总院(集团)有限公司 Half-inverted T-shaped invisible bent cap structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455830A (en) * 2020-03-24 2020-07-28 广东省交通规划设计研究院股份有限公司 Large cantilever cover beam type bridge pier and construction method thereof
CN113512929A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Steel-concrete combined structural hidden cover beam structure system and construction method thereof
CN113512932A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
CN113652966A (en) * 2021-07-13 2021-11-16 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system
CN113652966B (en) * 2021-07-13 2022-11-25 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system
CN113718637A (en) * 2021-09-10 2021-11-30 上海市城市建设设计研究总院(集团)有限公司 Bridge deck continuous structure for simply supported beam and inverted T-shaped capping beam system and construction method
CN113718620A (en) * 2021-09-27 2021-11-30 上海市政工程设计研究总院(集团)有限公司 Novel prefabricated inverted T shuttle type bent cap structure system
CN114016423A (en) * 2021-11-25 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Construction method for simply supporting hidden cover beam and then continuously constructing small box beam
CN114214969A (en) * 2021-12-01 2022-03-22 广州市市政工程设计研究总院有限公司 A kind of wide-splitting structure and method of split-width bridge
CN114214969B (en) * 2021-12-01 2024-07-30 广州市市政工程设计研究总院有限公司 Width splicing structure and method of width splicing bridge
CN115418938A (en) * 2022-08-12 2022-12-02 上海通亿橡塑制品有限公司 An expansion device combining two continuous seams and comb-tooth expansion joints

Similar Documents

Publication Publication Date Title
CN110485278A (en) A kind of half stealth of falling T bent cap construction
CN103938546B (en) Simply supported non-uniform construction method
CN105256713B (en) Semi-assembly type steel concrete composite beam and construction method thereof
CN203411898U (en) Bridge deck with steel and concrete composite structure
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN104612050A (en) Simply supported girder bridge floor continuous new construction and construction method
CN107326794A (en) A kind of assembled integral prestress steel Combined concrete beam type bridge
CN106638259A (en) Upper structure of prefabricated cover-beam-free type combined steel plate bridge and assembling construction method of upper structure
CN110258353A (en) And of Varying Depth steel-concrete composite beams bridge construction technique with support
CN109267470A (en) A kind of assembled type steel-concrete preflex composite continuous bridge and its construction method
CN106677051B (en) A kind of steel boxboard beam mixing beam bridge suitable for mountain area condition
CN208105008U (en) A kind of urban viaduct prestress steel bundle arrangement structure
CN105696453B (en) A kind of steel-concrete combination beam
CN109056496A (en) A kind of super-span steel truss continuous bridge having initial curvature and construction method
CN209619850U (en) A Staggered Longitudinal Rib Structure of Sectional Steel-UHPC Composite Plate
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN105648898B (en) Prefabricated ultra-high performance concrete half-through beam element, bridge structure and construction method
CN204703055U (en) Based on the steel-ultra-high performance concrete combined beam structure of fin-plate type bridge floor
KR20080107567A (en) Truss structure of temporary bridge
CN103321137B (en) a trough bridge
CN204059178U (en) A kind of prefabricated T-shaped beam
CN108505428B (en) Large-included-angle small-radius multi-tower curve cable-stayed bridge
CN203256628U (en) Continuously-transforming structure of existing simply-supported T-type girder bridge
CN211006316U (en) Half-inverted T-shaped invisible bent cap structure
JP2006322153A (en) Bridge structure in unequal span

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yu Lei

Inventor after: Wang Yuxiang

Inventor after: Chen Yan

Inventor after: Wang Tao

Inventor after: Sun Qiang

Inventor before: Yu Lei

Inventor before: Wang Yuxiang

CB03 Change of inventor or designer information