[go: up one dir, main page]

CN108456879B - A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails - Google Patents

A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails Download PDF

Info

Publication number
CN108456879B
CN108456879B CN201810063575.6A CN201810063575A CN108456879B CN 108456879 B CN108456879 B CN 108456879B CN 201810063575 A CN201810063575 A CN 201810063575A CN 108456879 B CN108456879 B CN 108456879B
Authority
CN
China
Prior art keywords
laser
rail
cladding
heat source
steel rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810063575.6A
Other languages
Chinese (zh)
Other versions
CN108456879A (en
Inventor
曾晓雁
孟丽
王邓志
胡乾午
郭平华
许晓明
牛莅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan New Research And Development Laser Co ltd
Huazhong University of Science and Technology
Original Assignee
Wuhan New Research And Development Laser Co ltd
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan New Research And Development Laser Co ltd, Huazhong University of Science and Technology filed Critical Wuhan New Research And Development Laser Co ltd
Priority to CN201810063575.6A priority Critical patent/CN108456879B/en
Publication of CN108456879A publication Critical patent/CN108456879A/en
Priority to US16/639,746 priority patent/US20200199698A1/en
Priority to PCT/CN2019/072300 priority patent/WO2019144843A1/en
Application granted granted Critical
Publication of CN108456879B publication Critical patent/CN108456879B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C24/00Coating starting from inorganic powder
    • C23C24/08Coating starting from inorganic powder by application of heat or pressure and heat
    • C23C24/10Coating starting from inorganic powder by application of heat or pressure and heat with intermediate formation of a liquid phase in the layer
    • C23C24/103Coating with metallic material, i.e. metals or metal alloys, optionally comprising hard particles, e.g. oxides, carbides or nitrides
    • C23C24/106Coating with metal alloys or metal elements only
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C24/00Coating starting from inorganic powder
    • C23C24/08Coating starting from inorganic powder by application of heat or pressure and heat
    • C23C24/10Coating starting from inorganic powder by application of heat or pressure and heat with intermediate formation of a liquid phase in the layer
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/06Surface hardening
    • C21D1/09Surface hardening by direct application of electrical or wave energy; by particle radiation
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/04Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for rails
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • C21D2211/009Pearlite

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Laser Beam Processing (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

本发明公开了一种激光‑辅助热源高效复合熔覆强化钢轨的方法,激光与辅助热源同时作用于钢轨表面待熔覆区域,激光作为主要热源使熔覆层材料和钢轨表面部分基底材料同时快速熔融形成熔池,辅助热源与激光热源同向同速移动,对激光熔池、热影响区及钢轨基底表层进行同步预热或/和后热,降低其温度梯度,从而降低其冷却速率,避免了热影响区马氏体转变以及开裂现象。本发明通过复合作用可使热影响区冷却时间大于CCT曲线或TTT曲线中奥氏体向珠光体转变的临界降温时间,使熔覆层、热影响区和基底三者之间力学性能合理匹配,硬度曲线分布光滑,整体疲劳性能良好。该方法可在铁路钢轨现场表面在线熔覆金属层,也可在生产车间对钢轨表面实现熔覆加工。

Figure 201810063575

The invention discloses a method for high-efficiency composite cladding strengthening of a steel rail with a laser-assisted heat source. The laser and the auxiliary heat source simultaneously act on the area to be clad on the surface of the steel rail. Melt to form a molten pool, the auxiliary heat source and the laser heat source move in the same direction and the same speed, and synchronously preheat or/and post-heat the laser molten pool, the heat-affected zone and the surface of the rail base to reduce their temperature gradient, thereby reducing their cooling rate. The martensitic transformation and cracking phenomenon in the heat-affected zone were observed. The invention can make the cooling time of the heat-affected zone longer than the critical cooling time of austenite to pearlite transformation in the CCT curve or TTT curve through compound action, so that the mechanical properties of the cladding layer, the heat-affected zone and the substrate are reasonably matched. The hardness curve distribution is smooth and the overall fatigue performance is good. The method can clad the metal layer on the site surface of the railway rail, and can also realize the cladding process on the surface of the rail in the production workshop.

Figure 201810063575

Description

Method for strengthening steel rail by efficient composite cladding of laser-auxiliary heat source
Technical Field
The invention belongs to the field of material processing, and particularly relates to a method for efficiently preparing a metal cladding layer on the surface of a steel rail by adopting laser-auxiliary heat source composite cladding. The method can be used for improving the wear resistance and the contact fatigue performance of the steel rail, and can also be used for solving the problems of poor railway shunting, repairing of damaged steel rails and the like.
Background
China has rapid rail transit development, and the national railway operation mileage reaches 12.4 kilometers by 2016. With the increase of railway traffic and train speed and axle weight, the problem of rail damage, such as rail wear, rolling contact fatigue, rail corrosion, etc., is increasingly prominent. The damage of the steel rail mainly occurs on the surface, so the preparation of the coating on the surface of the steel rail has important significance for prolonging the service life of the steel rail.
Thermal spraying, electroplating and surfacing are the main methods for preparing metal coatings on the surfaces of steel rails at present. The thermal spraying and electroplating coating is mechanically combined with the steel rail substrate, the binding force is weak, and the coating is easy to fall off in the friction process of the wheel rail. The surfacing layer and the steel rail substrate are metallurgically bonded, but the method has large heat input and heat affected zone, the surfacing layer has poor structure and performance uniformity, and martensite structure is easily induced in the steel rail substrate.
Compared with plasma arc and electric arc surfacing, laser cladding has the advantages of high energy density, small heat affected zone, small heat input, low residual stress, small substrate penetration, high cladding efficiency and the like, is widely applied to preparation of surface strengthening coatings of metal parts, additive manufacturing and the like, and Chinese invention patent No. CN 107099793A discloses a method for improving the wear resistance of heavy-duty wheel rails by laser cladding cobalt alloy coatings, and the method utilizes high-power laser to clad cobalt alloy powder on the surfaces of the wheel rails so as to reduce the surface friction coefficient, improve the wear resistance and prolong the service life of the wheel rails. However, due to the rapid heating and cooling effect of the laser, a high-carbon acicular martensite structure is generated in the heat affected zone of the rail. The martensite structure has high hardness, but the toughness is low, so that the rail fracture risk is easily caused, and the martensite structure in the steel rail is prohibited in the standard TB/T2344-2003 of the railway industry. Secondly, under the high laser scanning speed, the cladding layer and the heat affected zone are easy to crack due to the high cooling speed and the large temperature gradient between the cladding layer and the steel rail substrate, and the safe operation of the train is influenced.
The high-energy laser beam and the auxiliary heat source are combined to realize composite processing, so that the problems can be effectively solved. Patent document (publication No. CN101125394A) discloses an automatic powder feeding laser induction hybrid cladding method and device, which adopts laser and induction heat source hybrid processing, not only can greatly improve cladding efficiency, but also can solve the problem that an alloy material with poor weldability is easy to crack in the laser cladding process. However, the method does not consider the problems of how to reduce and avoid the martensite transformation of the heat affected zone when cladding the coating on the large-sized high-carbon steel substrate (such as a steel rail), and the technical problems of matching the mechanical properties of the cladding layer, the heat affected zone and the substrate in a specific service environment (rolling contact of a wheel rail).
Disclosure of Invention
The invention provides a method for efficiently preparing a high-performance cladding layer on the surface of a steel rail by adopting a laser-auxiliary heat source so as to fulfill the aims of strengthening and repairing the surface of the steel rail and the like. The laser and the auxiliary heat source act on the steel rail to-be-clad processing surface simultaneously, so that the cracking phenomenon of a cladding layer and a heat affected zone at a high scanning speed can be avoided, the generation of harmful tissues such as martensite in the heat affected zone can be avoided, and the good matching of the mechanical properties of the cladding layer, the heat affected zone and a substrate is ensured. The invention can be used for preparing the high-performance cladding layer on the surface of the steel rail so as to improve the wear resistance and the contact fatigue performance of the steel rail, and can also be used for solving the problems of poor shunting of the railway, repair of damaged steel rails and the like.
The invention provides a method for strengthening a steel rail by high-efficiency composite cladding by using a laser-auxiliary heat source, which is characterized in that the laser and the auxiliary heat source simultaneously act on a region to be clad on the surface of the steel rail, the laser is used as a main heat source to rapidly melt a cladding layer material and a partial substrate material on the surface of the steel rail to form a molten pool, the auxiliary heat source is positioned in front of or/and behind the laser heat source and moves in the same direction and at the same speed as the laser heat source to synchronously preheat or/and post-heat the laser molten pool, a laser heat affected zone and the surface layer of the steel rail substrate so as to reduce the cooling rate of the laser molten pool and the heat affected zone and avoid the phenomena of martensite transformation of the.
As an improvement of the technical scheme, the laser and the auxiliary heat source reasonably regulate and control the temperature cycle curve of the heat affected zone under the action of the laser through composite action, so that the cooling time of the heat affected zone is longer than the critical cooling time for the transformation from austenite to pearlite in a continuous cooling curve (CCT curve) and an isothermal transformation curve (TTT curve) of a steel rail material, the critical condition for the complete transformation from austenite to pearlite is met, the interval between sheets of the heat affected zone is smaller than or equal to the sheet pearlite of a steel rail substrate, the hardness is between a cladding layer and the substrate, the mechanical properties of the cladding layer, the heat affected zone and the substrate are reasonably matched, the hardness curve is distributed smoothly, and the overall fatigue performance is good.
As a further improvement of the technical proposal, the auxiliary heat source adopts any one or the combination of any several of induction heating, oxyacetylene flame and propane blowtorch; preheating at 100-1000 deg.C, and post-heating at 300-700 deg.C; the thickness of the metal cladding layer obtained by single processing is 0.1-2mm, the width is 3-20mm, and the hardness of the cladding layer can be adjusted within the range of HV250-HV500 according to the specific requirements of the track; the width of the laser heat affected zone is less than 1mm, the hardness is HV250-HV400, and the martensitic transformation of the heat affected zone can be avoided; the induction heating is realized by adopting an induction power supply and an induction coil. Wherein, the induction coil is formed by bending and welding a copper pipe, a magnetizer is embedded on the copper pipe in a working area, the lower surface of the copper pipe is parallel to a cladding surface of the steel rail, and the gap is 0.5-15 mm; the heating surface is in a straight-line structure along the length direction of the steel rail, and the length of the heating surface is 10-500 mm.
The method comprises the following concrete implementation steps:
(1) firstly, polishing the area to be clad on the surface of the steel rail to remove rust and pollutants on the surface;
(2) adjusting the defocusing amount of a laser beam, and setting a laser spot into a round shape with the diameter of 3-10 mm or a rectangular shape with the diameter of (1-3) mmx (6-30) mm;
(3) adjusting the relative position of the laser spot and the auxiliary heat source to enable the laser spot to be in front of, in the middle of or behind the auxiliary heat source;
(4) starting a laser and an auxiliary heat source, synchronously feeding or presetting a coating material in a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam and then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a cladding layer on the surface of the steel rail after the molten pool is solidified; the auxiliary heat source has the effects of preheating, post-heating and preheating and post-heating on the steel rail, wherein the preheating temperature is 100-1000 ℃, and the post-heating temperature is 300-700 ℃;
(5) after a metal cladding layer is cladded, judging whether the thickness of the cladding layer meets the requirement of a working condition, if so, ending the cladding process; if not, repeating the steps (2), (3) and (4) until the required thickness is reached;
(6) after cladding, detecting the surface of the corrosion-resistant cladding layer by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(7) according to application requirements, the tread of the steel rail is selected to be cleaned and profile-trimmed, so that the surface is smooth.
The cladding layer material can be an iron-based alloy, and the main chemical components are (Wt.%): C (0.01-0.60), (10-40) Cr, (5-18) Ni, (0.1-3.0) Si, (0-3) B, (0-3) Mo, (1-3) Mn and the balance Fe;
the cladding layer material can be nickel-based alloy, and comprises the following main chemical components (Wt.%): (0.01-0.50) C, (20-30) Cr, (5-10) W, (3-5) Si, (0-3) B, (5-10) Fe, and the balance of Ni;
the cladding layer material can be a cobalt-based alloy, and the main chemical components are (Wt.%): (0.01-0.5) C, (20-35) Cr, (1-10) Ni, (1-3) Si, (5-15) W, (0-3) B, (0.5-2) Mn and the balance of Co.
The invention has the following advantages:
the method comprises the following steps that firstly, laser and an auxiliary heat source act on a region to be clad on the surface of a steel rail at the same time, a cladding layer material and a thin layer material on the surface of the steel rail are rapidly melted to form a molten pool by a high-energy laser beam, the auxiliary heat source synchronously preheats and afterheats the laser molten pool, a heat affected zone and the surface of a steel rail substrate, and the temperature gradients of the molten pool, the heat affected zone and a steel rail substrate are reduced, so that the cooling rate is reduced, and the cracking and peeling phenomena of a metal cladding layer and the;
② the relative position of the laser and the auxiliary heat source, the laser processing power, the laser scanning rate and the heating temperature of the auxiliary heat source to the steel rail, reasonably controlling the temperature cycle curve of the heat affected zone, ensuring that the cooling time is longer than the critical cooling time for transforming austenite to pearlite in a CCT curve and a TTT curve, meeting the critical condition for completely transforming austenite to pearlite, transforming the heat affected zone into a fine lamellar pearlite structure with the lamellar spacing smaller than or equal to that of the steel rail substrate, and ensuring that the hardness is between the cladding layer and the substrate, so that the cladding layer, the heat affected zone and the substrate are reasonably matched in mechanical properties, the hardness curve is smoothly distributed, and the overall fatigue performance is good.
compared with other methods such as plasma arc, electric arc and the like, the laser energy density is high, the heat affected zone is small, the martensite structure of the induction coil and other auxiliary heat sources can be eliminated only by heating the width and the depth of the induction coil and other auxiliary heat sources to be larger than the width of the heat affected zone, the whole heat input is small, the residual stress and the deformation of the steel rail in machining are small, the stability is high, the flexibility of the device is good, the machining precision is high, and the steel rail damaged in different degrees can be repaired.
and fourthly, the dilution rate of the cladding layer is low, and the coating is particularly effective for cladding of a thinner coating, and when the thickness of the cladding layer is less than 0.5mm, the dilution rate of the coating is less than 5 percent, so that the wear resistance and the corrosion resistance of the cladding layer can be ensured.
when the laser power is 1-20kW, the deposition rate of the cladding layer can reach 10-250g/min, and the scanning speed reaches 0.4-30m/min, compared with the pure laser cladding process, the deposition efficiency is improved by 3-15 times;
the method has strong universality, can directly and efficiently prepare the wear-resistant and corrosion-resistant cladding layer, the fatigue-resistant cladding layer and the like with uniform components and matched mechanical properties on the surface of the steel rail, and can also repair the locally damaged steel rail. The reinforced or repaired steel rail has smooth hardness distribution curve along the depth direction, the mechanical properties of the cladding layer, the heat affected zone and the substrate are mutually matched, the integral fatigue performance is good, and the coating can not fall off in the service process. Meanwhile, each process assembly adopted by the method is high in integration level, is convenient to integrate with a related processing platform, can be used for a fixed laser processing machine tool to perform off-line processing, and can also be applied to mobile laser processing equipment (such as a mobile laser processing vehicle) to perform on-line processing strengthening or repairing on a railway site.
Drawings
FIG. 1 is a top view of laser-induction post-thermal composite cladding of a rail surface before laser spots are positioned on induction heating;
FIG. 2 is a top view of the steel rail surface laser-induction preheating and post-induction thermal composite cladding with laser spots positioned in the middle of induction heating;
FIG. 3 is a top view of the laser-induction heating + oxyacetylene flame (or laser-induction heating + propane torch) heating composite cladding on the surface of the steel rail;
FIG. 4 is a top view of the laser-oxyacetylene flame (or laser-propane torch) heating composite cladding on the surface of the steel rail;
FIG. 5 is a hardness distribution diagram of a steel rail with a Fe-based metal cladding layer prepared by laser-induction post-thermal composite cladding along the depth direction;
FIG. 6 is a hardness distribution diagram of a Ni-based metal cladding layer steel rail prepared by laser-induction preheating and induction post-thermal composite cladding along the depth direction;
fig. 7 is a hardness distribution diagram of a Co-based metal cladding layer steel rail prepared by laser-induction heating and oxyacetylene flame (or laser-induction heating and propane torch) heating composite cladding along the depth direction.
FIG. 8 is a depth-direction hardness distribution diagram of a Fe-based metal cladding layer steel rail prepared by laser-oxyacetylene flame (or laser-propane torch) composite cladding;
in the figure, 1, laser spot, 2, induction heating coil, 2(a), induction preheating coil, 2(b), induction post-heating coil, 3, oxyacetylene (or propane torch) flame.
Detailed Description
The following further describes embodiments of the present invention with reference to the drawings. It should be noted that the description of the embodiments is provided to help understanding of the present invention, but the present invention is not limited thereto. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
The invention takes laser as a main heat source to clad alloy materials on the surface of the steel rail, the auxiliary heat source preheats or/and afterheats the steel rail to reduce the cooling rate of a cladding layer and a heat affected zone, a functional cladding layer with wear resistance, fatigue resistance and corrosion resistance can be efficiently prepared on the surface of the steel rail or the damaged steel rail can be repaired, the thickness of the cladding layer obtained by single processing is 0.1-2mm, the hardness can be adjusted in the range of HV250-HV500 according to the specific requirements of a track. Meanwhile, by adopting the technical route provided by the invention, martensite is not generated in the heat affected zone of the steel rail, and the cladding layer is reasonably matched with the mechanical property of the steel rail substrate, so that the steel rail has better bending fatigue and contact fatigue properties while being reinforced and repaired. The invention is further illustrated with reference to the figures and examples.
The invention provides a method for strengthening a steel rail by efficient composite cladding of a laser-auxiliary heat source. The method can be integrated with fixed laser processing equipment to process the steel rail off line, and can also be integrated with a vehicle-mounted laser processing platform to process, reinforce or repair the steel rail on line on a railway site. The implementation steps comprise:
(1) firstly, polishing the area to be clad on the surface of the steel rail to remove rust and pollutants on the surface;
(2) adjusting the defocusing amount of a laser beam, and setting a laser spot into a round shape with the diameter of 3-20mm or a rectangular shape with the diameter of (1-3) mmx (6-30) mm;
(3) adjusting the relative position of the laser spot and the auxiliary heat source to enable the laser spot to be in front of, in the middle of or behind the auxiliary heat source;
(4) starting a laser and an auxiliary heat source, synchronously feeding (or pre-arranging) alloy powder materials into a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam, then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a metal coating on the surface of the steel rail after the molten pool is solidified; the auxiliary heat source has the effects of preheating, post-heating and preheating and post-heating on the steel rail, wherein the preheating temperature is 100-1000 ℃, and the post-heating temperature is 300-700 ℃;
(5) after a metal cladding layer is cladded, judging whether the thickness of the cladding layer meets the requirement of a working condition, if so, ending the cladding process; if not, repeating the steps (2), (3) and (4) until the required thickness is met;
(6) after cladding, detecting the surface of the corrosion-resistant cladding layer by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(7) and (4) selecting to clean and trim the tread of the steel rail according to application requirements, and flattening the surface to obtain a finished product.
Example (c):
the first embodiment is as follows: railway online laser-induction post-heating efficient composite cladding
The steel rail repairing method is used for efficiently strengthening and repairing a service steel rail on a railway site, induction heating is used as an auxiliary heat source, and an industrial manipulator or a three-dimensional motion shaft is adopted as a processing motion and position control unit. And heating the area to be clad on the surface of the steel rail through the induction heating assembly and the temperature control mechanism, and controlling the heating temperature and time. The induction heating assembly comprises an induction power supply and an induction coil, the temperature control mechanism comprises an infrared thermometer and a temperature controller, the induction coil is connected with the induction power supply, the infrared thermometer is connected with the temperature controller, and the temperature controller is connected with the induction power supply through a data line. And a detection signal of the infrared thermometer is input into the temperature controller, and after operation, the temperature controller outputs a control signal to adjust the output power of the induction heating power supply, so that the control of the induction heating temperature of the steel rail is realized. The laser spot is focused in front of the induction coil as shown in fig. 1. Preparing a metal cladding layer on the surface of a steel rail by laser-induction post-thermal composite cladding, which basically comprises the following implementation steps:
(1) the iron-based alloy powder is selected as a cladding material, and the main chemical components (Wt.%) are (0.01-0.60) C, (10-40) Cr, (5-18) Ni, (0.1-3.0) Si, (0-3) B, (0-3) Mo, (1-3) Mn and the balance Fe.
(2) Firstly, polishing a cladding area on the surface of the steel rail to remove rust and pollutants on the surface;
(3) adjusting the position of the induction coil to enable the lower surface of the induction coil to be parallel to the region to be cladded on the surface of the steel rail, wherein the gap is 5 mm; aiming at the induction heating area on the surface of the rail by an infrared thermometer, connecting the infrared thermometer with a temperature controller and an induction power supply, detecting and controlling the induction heating temperature, and setting the induction heating temperature to 700 ℃;
(4) and adjusting the defocusing amount of the laser beam and the relative position of the laser spot and the induction coil to focus the laser spot on the surface of the steel rail in front of the induction coil. The laser facula is a circular facula with the diameter of 3mm, the powder feeding amount of the powder feeder is 10g/min, the laser power is 1kW, and the laser scanning speed is 0.4 m/min.
(5) And starting the motion control unit, the laser and the induction heating power supply. Synchronously feeding powder (or pre-arranging) to a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam, then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a metal coating on the surface of the steel rail after the molten pool is solidified;
(6) after cladding a layer, judging whether the thickness of the cladding layer meets the requirement of the working condition, if so, ending the cladding process; if not, repeating the processes (2), (3), (4) and (5) until the thickness requirement is met;
(7) after cladding, detecting the surface of the metal coating by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(8) and according to application requirements, cleaning and profile trimming are carried out on the tread of the steel rail, so that the surface is smooth, and a finished product is obtained.
The thickness of the iron-based metal cladding layer prepared in the example is 0.1mm, the mechanical properties of the cladding layer, the heat affected zone and the steel rail substrate are reasonably matched, and the hardness distribution along the depth direction of the steel rail is shown in figure 5.
Example two: railway online laser-induction preheating and post-induction heat efficient composite cladding
In the embodiment, the service steel rail is efficiently strengthened and repaired on the railway site, induction heating is used as an auxiliary heat source, the induction heating control mechanism is the same as that in the first embodiment, and the machining motion and position control unit adopts an industrial manipulator or a three-dimensional motion shaft. Focusing laser spots on the middle of the induction coil, as shown in fig. 2, preparing a metal cladding layer on the surface of the steel rail by laser-induction preheating and post-induction thermal composite cladding, which basically comprises the following implementation steps:
(1) the nickel-based alloy powder is selected as a cladding material, and the main chemical components are as follows (Wt.%): (0.01-0.50) C, (20-30) Cr, (5-10) W, (3-5) Si, (0-3) B, (5-10) Fe, and the balance of Ni;
(2) firstly, polishing a cladding area on the surface of the steel rail to remove rust and pollutants on the surface;
(3) adjusting the position of the induction coil to enable the lower surface of the induction coil to be parallel to the region to be cladded on the surface of the steel rail, wherein the gap is 0.5 mm; aiming at the induction heating area on the surface of the rail by an infrared thermometer, connecting the infrared thermometer with a temperature controller and an induction power supply, detecting and controlling the induction heating temperature, and setting the induction heating temperature to be 500 ℃;
(4) and adjusting the defocusing amount of the laser beam and the relative position of the laser spot and the induction coil to focus the laser spot on the surface of the steel rail in front of the induction coil. The laser facula is a rectangle with the diameter of 1 multiplied by 6mm, the powder feeding quantity of the powder feeder is 50g/min, the laser power is 5kW, and the laser scanning speed is 2 m/min.
(5) And starting the motion control unit, the laser and the induction heating power supply. Synchronously feeding powder (or pre-arranging) to a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam, then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a metal cladding layer on the surface of the steel rail after the molten pool is solidified;
(6) after cladding one layer, judging whether the thickness of the cladding layer meets the requirement of the working condition, if so, ending the cladding process; if not, repeating the processes (2), (3), (4) and (5) until the thickness requirement is met;
(7) after cladding, detecting the surface of the metal coating by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(8) and according to application requirements, cleaning and profile trimming are carried out on the tread of the steel rail, so that the surface is smooth, and a finished product is obtained.
In this example, the induction coil is composed of two parts, 4(a) and 4(b), and the two parts are connected by a copper pipe, 4(a) plays a role in preheating the steel rail, and 4(b) plays a role in delaying the cooling rate of the steel rail. In practical application, on the premise of reasonable matching of mechanical properties, cladding efficiency can be effectively improved, and energy conservation is facilitated. The thickness of the prepared nickel-based metal cladding layer is 0.5mm, the mechanical properties of the cladding layer, the heat affected zone and the steel rail substrate are reasonably matched, and the hardness distribution along the depth direction of the steel rail is shown in figure 6.
Example three: off-line type steel rail surface laser-induction heating and oxyacetylene flame (propane torch) heating efficient composite cladding
This example provides off-line rail reinforcement and repair with induction heating and oxyacetylene flame (or propane torch) as the auxiliary heat source. The laser spot is focused in front of the induction coil, the oxyacetylene flame (or propane torch) preheats the surface of the steel rail to be clad, as shown in fig. 3, the laser and the induction coil move in the same direction and at the same speed, and the induction heating synchronously heats the steel rail laser melting pool and the heat affected zone, and the basic implementation steps are as follows:
(1) selecting cobalt-based alloy powder as a cladding material, wherein the main chemical components are as follows (Wt.%): (0.01-0.5) C, (20-35) Cr, (1-10) Ni, (1-3) Si, (5-15) W, (0-3) B, (0.5-2) Mn, and the balance of Co;
(2) firstly, polishing a cladding area on the surface of the steel rail to remove rust and pollutants on the surface;
(3) adjusting the position of the induction coil to enable the lower surface of the induction coil to be parallel to the region to be cladded on the surface of the steel rail, wherein the gap is 15 mm; aiming at the induction heating area on the surface of the rail by an infrared thermometer, connecting the infrared thermometer with a temperature controller and an induction power supply, detecting and controlling the induction heating temperature, and setting the induction heating temperature to be 300 ℃;
(4) and adjusting the defocusing amount of the laser beam and the relative position of the laser spot and the induction coil to focus the laser spot on the surface of the steel rail in front of the induction coil. The laser beam is a rectangle of 3 multiplied by 30mm, the powder feeding quantity of the powder feeder is 250g/min, the laser power is 20kW, and the laser scanning speed is 30 m/min;
(5) preheating the surface to be clad of the steel rail by adopting an oxyacetylene flame/propane blast burner, aiming an infrared thermometer 6-2 at a heating area on the surface of the steel rail, monitoring the preheating temperature of the surface of the steel rail to reach 100-200 ℃, and then closing the oxyacetylene flame/propane blast burner device;
(6) starting a laser and an induction heating power supply, synchronously feeding powder (or pre-arranging) to a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam, then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a metal cladding layer on the surface of the steel rail after the molten pool is solidified;
(7) and after cladding one layer, judging whether the thickness of the cladding layer meets the working condition requirement. If yes, finishing the cladding process; if not, repeating the processes (3), (4), (5) and (6) until the required thickness is met;
(8) after cladding, detecting the surface of the metal coating by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(9) and according to application requirements, cleaning and profile trimming are carried out on the tread of the steel rail, so that the surface is smooth, and a finished product is obtained.
The thickness of the cobalt-based metal cladding layer prepared in the example is 2mm, the mechanical properties of the cladding layer, the heat affected zone and the steel rail substrate are reasonably matched, and the hardness distribution along the depth direction of the steel rail is shown in figure 7.
Example four: off-line steel rail surface laser-oxyacetylene flame (propane torch) heating efficient composite cladding
This example was used for off-line rail reinforcement and repair, with an oxyacetylene flame (or propane torch) as the auxiliary heat source. Preparing a metal cladding layer on the surface of the steel rail by laser-oxyacetylene flame (or laser-propane torch) composite cladding, as shown in fig. 4, the basic implementation steps are as follows:
(1) selecting iron-based alloy powder as a cladding material, wherein the main chemical components comprise (Wt.%) C (0.01-0.60), (10-40) Cr, (5-18) Ni, (0.1-3.0) Si, (0-3) B, (0-3) Mo, (1-3) Mn and the balance Fe;
(2) firstly, polishing a cladding area on the surface of the steel rail to remove rust and pollutants on the surface;
(3) adjusting the laser beam to be in a circular shape with the diameter of 20mm, wherein the power of a laser is 15kW, the powder feeding speed is 180g/min, and the scanning speed is 10 m/min;
(4) preheating the surface of the steel rail to be clad by adopting an oxyacetylene flame/propane blast burner, aiming an infrared thermometer at a heating area on the surface of the steel rail, and monitoring the preheating temperature of the surface of the steel rail to be 800-1000 ℃;
(5) starting a laser, synchronously feeding alloy powder materials into (or pre-arranging in) a laser irradiation area on the surface of the steel rail by adopting an automatic powder feeder, focusing a laser beam, then injecting the laser beam onto a steel rail substrate to form a molten pool, and forming a metal coating on the surface of the steel rail after the molten pool is solidified; simultaneously, heating the steel rail cladding surface by using an oxyacetylene flame/propane torch, monitoring the post-heating temperature by using an infrared thermometer to be 300-400 ℃, and turning off the oxyacetylene flame/propane torch after the heat preservation time is reached;
(6) after cladding one layer, judging whether the thickness of the cladding layer meets the requirement of the working condition, if so, ending the cladding process; if not, repeating the processes (3), (4) and (5) until the thickness requirement is met;
(7) after cladding, detecting the surface of the metal coating by adopting penetration or ultrasonic flaw detection to ensure that the cladding layer has no metallurgical defects;
(8) and (4) selecting to clean and trim the tread of the steel rail according to application requirements, and flattening the surface to obtain a finished product.
The thickness of the iron-based metal cladding layer prepared in the example is 2mm, the mechanical properties of the cladding layer, the heat affected zone and the steel rail substrate are reasonably matched, and the hardness distribution along the depth direction of the steel rail is shown in figure 8.
The above description is a preferred embodiment of the present invention, but the present invention should not be limited to the disclosure of the embodiment and the drawings. Therefore, it is intended that all equivalents and modifications which do not depart from the spirit of the invention disclosed herein are deemed to be within the scope of the invention.

Claims (6)

1.一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于,该方法利用激光与辅助热源同时作用于钢轨表面待熔覆区域,激光作为主要热源使所添加的粉末材料和钢轨表面部分基底材料同时快速熔融形成熔池并形成熔覆层,辅助热源位于激光热源的前方或/和后方,与激光热源同向同速移动,对激光熔池、激光热影响区及钢轨基底表层进行同步预热或/和后热,降低激光熔池和热影响区与钢轨基底间的温度梯度和冷却速率,使热影响区的冷却时间大于CCT曲线或TTT曲线中奥氏体向珠光体转变的临界降温时间,满足奥氏体向珠光体完全转变的临界条件,从而避免热影响区产生马氏体组织,并使其转变为片间距小于或等于钢轨基底的细片状珠光体组织,使熔覆层、热影响区和基底三者之间力学性能合理匹配,硬度曲线分布光滑,整体疲劳性能良好;其中,粉末材料同步送入或预置于钢轨表面激光辐照区域,预热温度为100-1000℃,后热温度为300-700℃,激光功率为1-20kW时,送粉速率为10-250g/min,扫描速度为0.4-30m/min,单次加工获得的熔覆层厚度为0.1-2mm,宽度为3-20mm,硬度为HV250-HV500,热影响区宽度小于1mm,硬度为HV250-HV400,介于熔覆层和基底之间,钢轨表面的加热面呈“一”字型结构,与钢轨长度方向平行,长度为10-500mm。1. a method for high-efficiency composite cladding of a laser-assisted heat source to strengthen a rail, it is characterized in that, the method utilizes laser and auxiliary heat source to simultaneously act on the area to be cladding on the rail surface, and the laser is used as the main heat source to make the added powder material and the rail. Part of the base material on the surface rapidly melts at the same time to form a molten pool and a cladding layer. The auxiliary heat source is located in front of or/and behind the laser heat source, and moves in the same direction and speed as the laser heat source. Simultaneous preheating or/and post-heating is performed to reduce the temperature gradient and cooling rate between the laser molten pool and the heat-affected zone and the rail base, so that the cooling time of the heat-affected zone is longer than the transformation from austenite to pearlite in the CCT curve or TTT curve The critical cooling time can meet the critical condition for the complete transformation of austenite to pearlite, so as to avoid the martensite structure in the heat-affected zone, and make it transform into a fine flaky pearlite structure with a lamella spacing less than or equal to the rail base, so that the The mechanical properties of the cladding layer, the heat-affected zone and the substrate are reasonably matched, the hardness curve distribution is smooth, and the overall fatigue performance is good; among them, the powder material is simultaneously fed into or pre-placed in the laser irradiation area on the surface of the rail, and the preheating temperature is 100-1000℃, post-heating temperature is 300-700℃, laser power is 1-20kW, powder feeding rate is 10-250g/min, scanning speed is 0.4-30m/min, thickness of cladding layer obtained by single processing The width is 0.1-2mm, the width is 3-20mm, the hardness is HV250-HV500, the width of the heat affected zone is less than 1mm, the hardness is HV250-HV400, between the cladding layer and the base, the heating surface of the rail surface is in the shape of "one" Type structure, parallel to the length of the rail, the length is 10-500mm. 2.根据权利要求1所述的一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于:辅助热源采用感应加热、氧乙炔焰和丙烷喷灯中的任一种或任几种的组合。2. the method for a kind of laser-assisted heat source efficient composite cladding strengthening rail according to claim 1, is characterized in that: the auxiliary heat source adopts any one or any of several in induction heating, oxyacetylene flame and propane torch combination. 3.根据权利要求1或2所述的一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于:该方法的具体实现步骤为:3. The method for a laser-assisted heat source high-efficiency composite cladding strengthening rail according to claim 1 or 2, characterized in that: the specific implementation steps of the method are: (1)先将钢轨表面待熔覆区域进行打磨处理,去除表面锈迹和污染物;(1) Grinding the area to be cladding on the rail surface to remove surface rust and contaminants; (2)调整激光束离焦量,将激光光斑设置为直径3~20mm的圆形或为(1~3)mm×(6~30)mm的矩形;(2) Adjust the defocus amount of the laser beam, and set the laser spot to be a circle with a diameter of 3-20mm or a rectangle with a diameter of (1-3)mm×(6-30)mm; (3)调整激光光斑与辅助热源的相对位置,使光斑在辅助热源的前方、中间或后方;(3) Adjust the relative position of the laser spot and the auxiliary heat source so that the spot is in front, in the middle or behind the auxiliary heat source; (4)开启激光器和辅助热源,采用自动送粉器将涂层材料同步送入或预置于钢轨表面激光辐照区域,激光束聚焦后入射到钢轨基体上形成熔池,熔池凝固后在钢轨表面形成金属熔覆层;辅助热源对钢轨起到预热、后热和预热+后热的作用,预热温度为100-1000℃,后热温度为300-700℃;(4) Turn on the laser and auxiliary heat source, and use an automatic powder feeder to synchronously feed or pre-place the coating material into the laser irradiation area on the surface of the rail. After focusing, the laser beam is incident on the rail substrate to form a molten pool. A metal cladding layer is formed on the surface of the rail; the auxiliary heat source plays the role of preheating, post-heating and pre-heating + post-heating for the rail, the pre-heating temperature is 100-1000°C, and the post-heating temperature is 300-700°C; (5)熔覆完一层金属熔覆层后,判断熔覆层厚度是否达到工况需求,如果是,则结束熔覆过程;如果否,则重复上述步骤(2)(3)和(4),直至达到满足需求的厚度;(5) After cladding a layer of metal cladding layer, judge whether the thickness of the cladding layer meets the requirements of the working conditions, if so, end the cladding process; if not, repeat the above steps (2) (3) and (4) ), until the required thickness is reached; (6)熔覆完之后采用渗透或者超声探伤检测耐蚀熔覆层表面,保证熔覆层无冶金缺陷;(6) After the cladding is completed, use penetration or ultrasonic flaw detection to detect the surface of the corrosion-resistant cladding layer to ensure that the cladding layer has no metallurgical defects; (7)根据应用需求,选择对钢轨踏面进行清理和廓形修整,使表面平整。(7) According to the application requirements, choose to clean and profile the rail tread to make the surface smooth. 4.根据权利要求1或2所述的一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于:该方法与固定式加工平台集成,实现钢轨的离线加工,或者与钢轨在线移动激光加工车集成,在铁路现场对钢轨进行在线激光熔覆强化或修复。4. A method of laser-assisted heat source high-efficiency composite cladding strengthening steel rail according to claim 1 or 2, characterized in that: the method is integrated with a fixed processing platform to realize off-line processing of the steel rail, or move online with the steel rail The integration of laser processing vehicles enables on-line laser cladding strengthening or repairing of steel rails at the railway site. 5.根据权利要求2所述的一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于,所述感应加热通过采用感应电源和感应线圈实现,其中,感应线圈由铜管弯折、焊接而成,工作区铜管上嵌有导磁体,铜管下表面与钢轨熔覆面平行,间隙为0.5-15mm。5 . The method of claim 2 , wherein the induction heating is realized by using an induction power source and an induction coil, wherein the induction coil is bent by a copper pipe. 6 . , welded, the copper tube in the working area is embedded with a magnetic conductor, the lower surface of the copper tube is parallel to the cladding surface of the rail, and the gap is 0.5-15mm. 6.根据权利要求1或2所述的一种激光-辅助热源高效复合熔覆强化钢轨的方法,其特征在于,所述熔覆材料为铁基合金,主要化学成分为(Wt.%):(0.01-0.60)C,(10-40)Cr,(5-18)Ni,(0.1-3.0)Si,(0-3)B,(0-3)Mo,(1-3)Mn,Fe余量;或者6. the method for a kind of laser-assisted heat source high-efficiency composite cladding strengthening rail according to claim 1 and 2, is characterized in that, described cladding material is iron-based alloy, and main chemical composition is (Wt.%): (0.01-0.60)C,(10-40)Cr,(5-18)Ni,(0.1-3.0)Si,(0-3)B,(0-3)Mo,(1-3)Mn,Fe margin; or 所述熔覆材料为镍基合金或钴基合金,镍基合金的主要化学成分为(Wt.%):(0.01-0.50)C,(20-30)Cr,(5-10)W,(3-5)Si,(0-3)B,(5-10)Fe,Ni余量;钴基合金的主要化学成分为(Wt.%):(0.01-0.5)C,(20-35)Cr,(1-10)Ni,(1-3)Si,(5-15)W,(0-3)B,(0.5-2)Mn,Co余量。The cladding material is a nickel-based alloy or a cobalt-based alloy, and the main chemical components of the nickel-based alloy are (Wt.%): (0.01-0.50) C, (20-30) Cr, (5-10) W, ( 3-5) Si, (0-3) B, (5-10) Fe, Ni balance; the main chemical composition of cobalt-based alloy is (Wt.%): (0.01-0.5) C, (20-35) Cr,(1-10)Ni,(1-3)Si,(5-15)W,(0-3)B,(0.5-2)Mn,Co balance.
CN201810063575.6A 2018-01-23 2018-01-23 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails Active CN108456879B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810063575.6A CN108456879B (en) 2018-01-23 2018-01-23 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails
US16/639,746 US20200199698A1 (en) 2018-01-23 2019-01-18 Method for reinforcing rail by laser and auxiliary heat source efficient hybrid cladding
PCT/CN2019/072300 WO2019144843A1 (en) 2018-01-23 2019-01-18 Method for laser-assisted heat source efficient hybrid cladding reinforcing steel rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810063575.6A CN108456879B (en) 2018-01-23 2018-01-23 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails

Publications (2)

Publication Number Publication Date
CN108456879A CN108456879A (en) 2018-08-28
CN108456879B true CN108456879B (en) 2020-05-19

Family

ID=63238669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810063575.6A Active CN108456879B (en) 2018-01-23 2018-01-23 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails

Country Status (3)

Country Link
US (1) US20200199698A1 (en)
CN (1) CN108456879B (en)
WO (1) WO2019144843A1 (en)

Families Citing this family (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108456879B (en) * 2018-01-23 2020-05-19 华中科技大学 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails
CN110080049B (en) * 2019-04-04 2020-08-11 华中科技大学 Device and method for adding and subtracting materials to repair rails combined with laser cladding-machining
CN111256859B (en) * 2019-05-09 2021-09-07 清华大学 System and method and storage medium for detecting heat affected zone temperature
CN111962060A (en) * 2019-05-20 2020-11-20 李庆杰 Manufacturing method of surface high-speed laser cladding passenger special line railway turnout sliding type bedplate
CN110172546A (en) * 2019-05-31 2019-08-27 武汉华工激光工程有限责任公司 Based on laser-induction heat source Rail Surface functionally gradient strengthening layer preparation method
JP7215964B2 (en) * 2019-06-04 2023-01-31 株式会社日立製作所 Anisotropic composite material molding method, mold using anisotropic composite material
CN110344048B (en) * 2019-07-17 2021-06-22 株洲辉锐增材制造技术有限公司 Laser cladding layer of high manganese steel frog, preparation method of laser cladding layer and high manganese steel frog
CN111005022B (en) * 2019-12-31 2020-10-20 南京中科煜宸激光技术有限公司 Method for preparing high-hardness iron-based coating on surface of beryllium bronze copper roller by utilizing three lasers in synergy mode
CN111230306B (en) * 2020-02-17 2021-07-13 西安交通大学 A method for synchronous regulation of F/A ratio of bimetallic penetration laser welding cladding structure
CN111575706A (en) * 2020-07-03 2020-08-25 王绥义 Method and equipment for quickly preparing anti-corrosion hydraulic rod
CN111979538B (en) * 2020-07-06 2022-04-26 江苏大学 A device and method for improving cladding defects based on eddy current induction technology
CN112281082A (en) * 2020-09-24 2021-01-29 山东镭研激光科技有限公司 Laser cladding material and train rail laser cladding repair process
CN112853345B (en) * 2021-01-06 2022-06-24 北京工业大学 A laser preparation method of a material for improving the strength of a rail weld
CN113249717A (en) * 2021-04-22 2021-08-13 宁夏恒泰化工设备有限公司 Laser cladding method for nickel-based alloy laser cladding powder
CN113337813A (en) * 2021-05-25 2021-09-03 丹阳宏图激光科技有限公司 Laser repair process for heat treatment penetrating cracks of gear
CN113293371B (en) * 2021-05-28 2023-02-28 武汉飞能达激光技术有限公司 Laser cladding method based on step tempering
CN113547117B (en) * 2021-07-09 2023-04-07 华中科技大学 Laser cladding alloy powder, steel rail and preparation method
CN113584971B (en) * 2021-07-12 2023-05-09 武汉新瑞达激光工程有限责任公司 A cladding strengthening and toughening treatment method for rail welded joints and its application
CN115704096A (en) * 2021-08-04 2023-02-17 宝山钢铁股份有限公司 Gradient coating for shaft sleeve surface and manufacturing method thereof
CN113427109B (en) * 2021-08-09 2022-11-29 攀钢集团攀枝花钢铁研究院有限公司 A welding method for copper-containing corrosion-resistant steel rail
CN113637873B (en) * 2021-08-18 2023-03-31 沈阳大陆激光先进制造技术创新有限公司 Functional layer alloy material for remanufacturing minimum flow valve sealing surface by utilizing laser technology and preparation method of cover
CN113737173B (en) * 2021-08-25 2023-12-26 武汉瀚海智能激光工程有限公司 Laser cladding head device
CN115725929A (en) * 2021-08-30 2023-03-03 长沙理工大学 A new method of surface rolling modification of rod-shaped Cu material with synchronous powder feeding by induction heating
CN114082990B (en) * 2021-11-22 2024-04-16 沈阳工业大学 Method and device for dynamically regulating and controlling temperature of laser additive manufacturing matrix
CN115156651B (en) * 2022-04-29 2024-09-06 深圳汇北川科技股份有限公司 Laser welding method for copper bar of electronic device
CN114807933A (en) * 2022-06-13 2022-07-29 华北理工大学 Laser cladding coating and preparation method thereof
CN115233131A (en) * 2022-06-17 2022-10-25 武汉凌云光电科技有限责任公司 A method for laser cladding and polishing after non-ferrous metal immersion tin plating
CN115106544B (en) * 2022-06-30 2024-05-14 天津大学 Powder feeding system and forming device for laser arc and laser cladding integrated forming
CN115233212A (en) * 2022-07-01 2022-10-25 大连理工大学 Preparation method of ultrahigh-speed laser rapid cladding-waste heat cutting coating
CN115161632A (en) * 2022-07-11 2022-10-11 山东雷石智能制造股份有限公司 Laser cladding modification method for cast iron engine cylinder cover and valve stem grinding surface
CN114990547A (en) * 2022-07-26 2022-09-02 江西瑞曼增材科技有限公司 Method for strengthening railway wheel through ultra-high-speed laser cladding
CN115216766B (en) * 2022-08-01 2023-11-17 乐清市明实车辆配件有限公司 Local anticorrosive alloy layer cladding device of railway freight car side door
CN115747793B (en) * 2022-11-23 2024-12-03 长沙理工大学 A cutting tool and its cutting edge laser cladding strengthening method
CN116288330B (en) * 2023-02-24 2024-10-08 西北工业大学 Repair method for local damage of nickel-based superalloy hot end component
CN116334617B (en) * 2023-03-14 2025-02-18 武汉瀚海智能激光工程有限公司 Laser cladding method and device for preparing composite layer on rail surface
CN116065001A (en) * 2023-04-04 2023-05-05 浙江工业大学 Apparatus and method for preparing medium-high carbon steel surface and regulating strengthening and toughening multiphase structure
CN116676597A (en) * 2023-07-04 2023-09-01 天津大学 High-hardness pitting-resistant iron-based alloy powder for laser cladding
CN117467995B (en) * 2023-09-28 2024-09-17 中国长江三峡集团有限公司 ZG40Mn2 guide groove laser repairing process based on ultra-thick cladding layer
CN117535664B (en) * 2023-12-01 2024-08-06 河北钨泰固机械设备有限公司 Double-frequency induction heating composite laser cladding method and equipment thereof
CN118147634B (en) * 2024-03-12 2024-09-17 山东磁浮列车轨道工程有限公司 High-reliability wear-resistant anti-corrosion treatment method for magnetic levitation track panel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101125394A (en) * 2007-06-13 2008-02-20 华中科技大学 Automatic powder feeding laser induction composite cladding method and device
CN106987838A (en) * 2017-04-26 2017-07-28 华中科技大学 Remove the laser cladding apparatus and method of laser cladding layer stomata/field trash

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000054027A (en) * 1998-08-06 2000-02-22 Nippon Seiko Kk Production of linear guide rail
US6710280B2 (en) * 2001-05-22 2004-03-23 The P.O.M. Group Focusing optics for adaptive deposition in rapid manufacturing
CN1542224A (en) * 2003-04-28 2004-11-03 张准胜 Laser surface strengthened rail switch tongue
CN100547113C (en) * 2007-06-13 2009-10-07 华中科技大学 Method and device for preparing material coating by laser induction composite cladding
CN102373468A (en) * 2010-08-23 2012-03-14 孝感市科隆实业公司 Wide-band laser-induced hybrid cladding restoration and surface strengthening method for dies
DE102011102602A1 (en) * 2011-05-27 2012-11-29 Mtu Aero Engines Gmbh Cold gas spraying process with improved adhesion and reduced layer porosity
CN102909325B (en) * 2012-11-12 2014-07-16 南昌航空大学 Laser-induction compounded cladding method for repairing continuous casting crystallizer
US20150083710A1 (en) * 2013-09-25 2015-03-26 Illinois Tool Works Inc. Metal heating and working system and method
CN103540931A (en) * 2013-11-01 2014-01-29 铜陵学院 Method and device for alloying composite processing of laser surface through mechanical vibration assisted induction heating
CN105154875B (en) * 2015-09-14 2017-08-11 温州大学 A kind of laser induction composite covers process equipment
CN106862719B (en) * 2017-02-21 2019-02-19 北京工业大学 A kind of preparation method of rail surface conductive layer
CN108456879B (en) * 2018-01-23 2020-05-19 华中科技大学 A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101125394A (en) * 2007-06-13 2008-02-20 华中科技大学 Automatic powder feeding laser induction composite cladding method and device
CN106987838A (en) * 2017-04-26 2017-07-28 华中科技大学 Remove the laser cladding apparatus and method of laser cladding layer stomata/field trash

Also Published As

Publication number Publication date
US20200199698A1 (en) 2020-06-25
CN108456879A (en) 2018-08-28
WO2019144843A1 (en) 2019-08-01

Similar Documents

Publication Publication Date Title
CN108456879B (en) A method of laser-assisted heat source high-efficiency composite cladding to strengthen rails
JP6884737B2 (en) A method for manufacturing an aluminum-plated steel sheet that is welded and then press-cured.
CN110129674A (en) A Gradient Material Rail Frog Fabricated by Laser Cladding
CN103668182B (en) Without the need to the laser repairing process of the vehicle mould of annealing
US8367960B2 (en) Process for rail restoration and rail manufacture using welding
CN102373468A (en) Wide-band laser-induced hybrid cladding restoration and surface strengthening method for dies
CN101249510A (en) A repaired roll and a method for repairing a roll
US10086462B2 (en) Hardfacing with low carbon steel electrode
CN112281082A (en) Laser cladding material and train rail laser cladding repair process
CN109158760A (en) A kind of narrow gap scanning galvanometer laser-heated filament complex welding method and device
CN104148806B (en) A kind of cast steel with high chromium roll top layer fatigue statistic rapid laser repair method
CN109079421B (en) A kind of method that locomotive buffer bar surface reconditioning remanufactures
CN103252589A (en) Laser-MAG (Metal-Active-Gas) compound welding method used for welding and splicing high-strength or ultrahigh-strength steel of thick plate
CN101070595A (en) Method and apparatus for preparing material coating by laser inductive composite melt-coating
CN101125394A (en) Automatic powder feeding laser induction composite cladding method and device
CN111676477A (en) Ultrahigh-speed laser-induction composite cladding method and device
CN102380688A (en) Method and device for controlling welding hot cracking during welding by performing electromagnetic induction heating
CN201792078U (en) Device for controlling welding thermal crack by adopting electromagnetic induction heating while welding
CN101532121B (en) Technology for processing metal surface by arc spray melting
WO2016110159A1 (en) Method for welding and repairing rack crack of four-roll plate bending machine
CN110373666B (en) Electromagnetic-assisted laser synchronous cladding device and method for remanufacturing of metal parts
JP2011251335A (en) Flash butt welding method for rail steel
CN110405372B (en) Duplex stainless steel heat exchange plate composite welding method based on residual stress regulation
CN112877569A (en) Nickel-based alloy powder for laser cladding and laser cladding method
CN111962060A (en) Manufacturing method of surface high-speed laser cladding passenger special line railway turnout sliding type bedplate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant