CN106639341A - Construction method for water-saving moisture-preserving curing film of concrete structure - Google Patents

Construction method for water-saving moisture-preserving curing film of concrete structure Download PDF

Info

Publication number
CN106639341A
CN106639341A CN201611090001.5A CN201611090001A CN106639341A CN 106639341 A CN106639341 A CN 106639341A CN 201611090001 A CN201611090001 A CN 201611090001A CN 106639341 A CN106639341 A CN 106639341A
Authority
CN
China
Prior art keywords
film
water
curing
concrete
centimeters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611090001.5A
Other languages
Chinese (zh)
Inventor
王耀斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Gaoxin Industry Co Ltd
Original Assignee
Shaanxi Gaoxin Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Gaoxin Industry Co Ltd filed Critical Shaanxi Gaoxin Industry Co Ltd
Priority to CN201611090001.5A priority Critical patent/CN106639341A/en
Publication of CN106639341A publication Critical patent/CN106639341A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to curing which is applicable to concrete structural objects such as a road bridge girder and a culvert, a cement concrete structure and a structural basic layer, in particular to a construction method for a water-saving moisture-preserving curing film of a concrete structure. The method comprises the following steps that after cast-in-place concrete is demoulded, dirty objects on a to-be-cured concrete vertical face are thoroughly removed firstly, and a strip of double-faced adhesive tape is stuck on the vertical face by every 1.5 m-2 m from top to bottom; according to the construction method of the water-saving moisture-preserving curing film of the concrete structure, a plastic film serves as a carrier, watering is conducted for one time during paving, after water absorption, the liquid water is changed into solid water, 600 g-1000 g water can be stored in the film of per square meter, and then a small reservoir is formed; then, in the degradation process of macromolecule materials, the water is delivered to the curing face through thin glass tubes, meanwhile steamed water in concrete or in the basic layer hydration process is constantly absorbed and then acts on the surface of a curing object; and circulating and repeating are conducted in such a way, and the efficient moisture-preserving effect can be achieved without watering within a curing period.

Description

A kind of construction method of xoncrete structure water-saving moist keeping maintenance film
Technical field
The present invention relates to be applied to the concrete structures such as highway bridge, culvert, cement concrete constructions and structured base layer Maintenance, more particularly to a kind of construction method of xoncrete structure water-saving moist keeping maintenance film.
Background technology
In xoncrete structure irrigation process, mostly moisturizing is carried out using work cloth gunnysack, geotextiles, gunnysack need to be by not stopping Water and can be only achieved the effect of moisturizing, this should ensure there are enough waterwheels, ensure that Shi Shuizhe has enough sense of responsibility again, And this human factor be difficult control in optimum state, it is impossible to ensure-individual preserving period in geotextiles, gunnysack be always to maintain height Wet condition, does not have the effect of lasting moisturizing, and in summer high-temperature season, the method for this health of watering is more readily formed health layer Wet, suddenly cold and hot when doing during face, causes the generation of microcrack, and is also unfavorable factor to slight formation.
The content of the invention
The present invention proposes the construction method of xoncrete structure water-saving moist keeping maintenance film.
A kind of construction method of xoncrete structure water-saving moist keeping maintenance film of the present invention, comprises the following steps:
(1)The booty on the concrete vertical face for needing health should be removed first after the cast-in-place concrete demoulding it is clean, every 1.5 meters- 2 meters are sticked from top to bottom a double faced adhesive tape, and at -2 meters of 1 between two double faced adhesive tapes meter, 5 centimeters of fritters of uniform perpendicular patch are two-sided Glue, so that the edge of film is viscous steady in facade;23 centimeters of long double faced adhesive tapes are uniformly pasted at isolated edge 0.5 or 1 meter, so as to Center membrane is viscous steady in facade.The barrier paper on double faced adhesive tape should not now be torn;
(2)The concrete vertical face for needing health is uniformly irrigated with clear water, is most much poured 5-9 time, mix after curing film with ensureing to be sticked Solidifying soil has in a short time more steam water to absorb by curing film;
(3)After watering, the double faced adhesive tape barrier paper of be attached to concrete vertical face is torn;
(4)Pad pasting should be followed and got on, get off, horizontal paving, curing film volume is erect and the one side that curing film has hole is close to into coagulation Native health facade:Transversal moving forward is moved, and the upper edge of curing film should be close to the centre of 5 centimeters of double faced adhesive tapes:Curing film is allowed to be close to On double faced adhesive tape;
(5)After the completion of curing film paving, just water into film along facade from the top down, make film inner macromolecule absorbing material abundant Water suction, curing film just can tightly be adsorbed in health facade after water suction, and humidity can reach 95% in two to three days caudacorias, play moisturizing What is be incubated drags bang effect;In Arid Area, 9-15 can be poured in the 2nd road flow process all over water;
(6)After the completion of watering, the broken end for taking egress edge and film between film and film is sealed using 5 centimeters of wide adhesive tapes Extremely.
Preferably, a kind of construction method of xoncrete structure water-saving moist keeping maintenance film, it is characterised in that the concrete road The step of face method for moisturizing, is as follows:
(1)After concrete road surface paves 30 to 40 minutes, road surface is touched with hand, just should cover plastics when on hand without open fire big Film;
(2)After concrete road surface cuts expansion joint, the residues such as the sawdust on expansion joint and panel should be cleaned up;
(3)Product external packaging is opened, the inner bag end socket at product two is removed, curing film is arranged in road surface echelon, two is adjacent Film lap width is no less than 5 centimeters;
(4)With 10 meters of distance as curing film-and the individual laying stage, the following operation of repetition:First sprinkle water, until road surface free water is thick Spend for 3-4mm, by the curing film for arranging in road surface rolls forward, make film inner macromolecule absorbing material fully absorb water, to thickness For 5~Omm;
(5)In whole process of deployment, two adjacent film lap widths will be kept all the time on 5 centimeters;
(6)There is overlap joint glue on the both sides of film, are capable of achieving the stickup of film and film overlap joint, reuse transparent adhesive tape that width is 5 centimeters by film Lap-joint pastes;
(7)A small amount of cement block or aggregate are pressed again:The mould reality paved at center isolation strip and curb;
(8)Film will cover the both sides sidewall edge of concrete plate, and mono- 20 centimeters of reserved 1O is used with pressure sandstone.
The present invention pours a water with plastic foil as carrier in laying, after water suction, aqueous water is changed into solid water, often puts down The moisture content of 600 grams~1 000 grams of the film energy retaining of square rice, forms a little reservoir, thereafter in the degradation process of macromolecular material In, health-preserving noodle is delivered to moisture content by capillary, while and the continuous evaporation water drawn in mixed doubtful native or basic unit's hydration process, Remake for conserving thing surface, so circulation repeatedly, just can be in-individual preserving period without the efficient moisture-retention that also can reach that rewaters Effect, under normal circumstances, humidity can reach 95% in first three day in film, can reach 90% within seven days.Simultaneously because the heat of water Capacitive is very big, so curing film can play good insulation effect after fully water suction to concrete curing face.
Specific embodiment
Embodiment 1.
A kind of construction method of xoncrete structure water-saving moist keeping maintenance film of the present invention, comprises the following steps:
(1)The booty on the concrete vertical face for needing health should be removed first after the cast-in-place concrete demoulding it is clean, every 1.5 meters- 2 meters are sticked from top to bottom a double faced adhesive tape, and at -2 meters of 1 between two double faced adhesive tapes meter, 5 centimeters of fritters of uniform perpendicular patch are two-sided Glue, so that the edge of film is viscous steady in facade;23 centimeters of long double faced adhesive tapes are uniformly pasted at isolated edge 0.5 or 1 meter, so as to Center membrane is viscous steady in facade.The barrier paper on double faced adhesive tape should not now be torn;
(2)The concrete vertical face for needing health is uniformly irrigated with clear water, is most much poured 5-9 time, mix after curing film with ensureing to be sticked Solidifying soil has in a short time more steam water to absorb by curing film;
(3)After watering, the double faced adhesive tape barrier paper of be attached to concrete vertical face is torn;
(4)Pad pasting should be followed and got on, get off, horizontal paving, curing film volume is erect and the one side that curing film has hole is close to into coagulation Native health facade:Transversal moving forward is moved, and the upper edge of curing film should be close to the centre of 5 centimeters of double faced adhesive tapes:Curing film is allowed to be close to On double faced adhesive tape;
(5)After the completion of curing film paving, just water into film along facade from the top down, make film inner macromolecule absorbing material abundant Water suction, curing film just can tightly be adsorbed in health facade after water suction, and humidity can reach 95% in two to three days caudacorias, play moisturizing What is be incubated drags bang effect;In Arid Area, 9-15 can be poured in the 2nd road flow process all over water;
(6)After the completion of watering, the broken end for taking egress edge and film between film and film is sealed using 5 centimeters of wide adhesive tapes Extremely.
Embodiment 2.
A kind of construction method of xoncrete structure water-saving moist keeping maintenance film of the present embodiment, the concrete road surface method for moisturizing The step of it is as follows:
(1)After concrete road surface paves 30 to 40 minutes, road surface is touched with hand, just should cover plastics when on hand without open fire big Film;
(2)After concrete road surface cuts expansion joint, the residues such as the sawdust on expansion joint and panel should be cleaned up;
(3)Product external packaging is opened, the inner bag end socket at product two is removed, curing film is arranged in road surface echelon, two is adjacent Film lap width is no less than 5 centimeters;
(4)With 10 meters of distance as curing film-and the individual laying stage, the following operation of repetition:First sprinkle water, until road surface free water is thick Spend for 3-4mm, by the curing film for arranging in road surface rolls forward, make film inner macromolecule absorbing material fully absorb water, to thickness For 5~Omm;
(5)In whole process of deployment, two adjacent film lap widths will be kept all the time on 5 centimeters;
(6)There is overlap joint glue on the both sides of film, are capable of achieving the stickup of film and film overlap joint, reuse transparent adhesive tape that width is 5 centimeters by film Lap-joint pastes;
(7)A small amount of cement block or aggregate are pressed again:The mould reality paved at center isolation strip and curb;
(8)Film will cover the both sides sidewall edge of concrete plate, and mono- 20 centimeters of reserved 1O is used with pressure sandstone.

Claims (2)

1. a kind of construction method of xoncrete structure water-saving moist keeping maintenance film, it is characterised in that comprise the following steps:
(1)The booty on the concrete vertical face for needing health should be removed first after the cast-in-place concrete demoulding it is clean, every 1.5 meters- 2 meters are sticked from top to bottom a double faced adhesive tape, and at -2 meters of 1 between two double faced adhesive tapes meter, 5 centimeters of fritters of uniform perpendicular patch are two-sided Glue, so that the edge of film is viscous steady in facade;23 centimeters of long double faced adhesive tapes are uniformly pasted at isolated edge 0.5 or 1 meter, so as to Center membrane is viscous steady in facade, should not now tear the barrier paper on double faced adhesive tape;
(2)The concrete vertical face for needing health is uniformly irrigated with clear water, is most much poured 5-9 time, mix after curing film with ensureing to be sticked Solidifying soil has in a short time more steam water to absorb by curing film;
(3)After watering, the double faced adhesive tape barrier paper of be attached to concrete vertical face is torn;
(4)Pad pasting should be followed and got on, get off, horizontal paving, curing film volume is erect and the one side that curing film has hole is close to into coagulation Native health facade, transversal moving forward is moved, and the upper edge of curing film should be close to the centre of 5 centimeters of double faced adhesive tapes, allow curing film to be close to On double faced adhesive tape;
(5)After the completion of curing film paving, just water into film along facade from the top down, make film inner macromolecule absorbing material abundant Water suction, curing film just can tightly be adsorbed in health facade after water suction, and humidity can reach 95% in two to three days caudacorias, play moisturizing What is be incubated drags bang effect;In Arid Area, 9-15 can be poured in the 2nd road flow process all over water;
(6)After the completion of watering, the broken end for taking egress edge and film between film and film is sealed using 5 centimeters of wide adhesive tapes Extremely.
2. a kind of construction method of xoncrete structure water-saving moist keeping maintenance film, it is characterised in that the concrete road surface method for moisturizing The step of it is as follows:
(1)After concrete road surface paves 30 to 40 minutes, road surface is touched with hand, just should cover plastics when on hand without open fire big Film;
(2)After concrete road surface cuts expansion joint, the residues such as the sawdust on expansion joint and panel should be cleaned up;
(3)Product external packaging is opened, the inner bag end socket at product two is removed, curing film is arranged in road surface echelon, two is adjacent Film lap width is no less than 5 centimeters;
(4)With 10 meters of distance as curing film-and the individual laying stage, the following operation of repetition:First sprinkle water, until road surface free water is thick Spend for 3-4mm, by the curing film for arranging in road surface rolls forward, make film inner macromolecule absorbing material fully absorb water, to thickness For 5~Omm;
(5)In whole process of deployment, two adjacent film lap widths will be kept all the time on 5 centimeters;
(6)There is overlap joint glue on the both sides of film, are capable of achieving the stickup of film and film overlap joint, reuse transparent adhesive tape that width is 5 centimeters by film Lap-joint pastes;
(7)A small amount of cement block or aggregate are pressed again:The mould reality paved at center isolation strip and curb;
(8)Film will cover the both sides sidewall edge of concrete plate, and mono- 20 centimeters of reserved 1O is used with pressure sandstone.
CN201611090001.5A 2016-12-01 2016-12-01 Construction method for water-saving moisture-preserving curing film of concrete structure Pending CN106639341A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611090001.5A CN106639341A (en) 2016-12-01 2016-12-01 Construction method for water-saving moisture-preserving curing film of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611090001.5A CN106639341A (en) 2016-12-01 2016-12-01 Construction method for water-saving moisture-preserving curing film of concrete structure

Publications (1)

Publication Number Publication Date
CN106639341A true CN106639341A (en) 2017-05-10

Family

ID=58814674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611090001.5A Pending CN106639341A (en) 2016-12-01 2016-12-01 Construction method for water-saving moisture-preserving curing film of concrete structure

Country Status (1)

Country Link
CN (1) CN106639341A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386668A (en) * 2017-08-16 2017-11-24 北京首钢建设集团有限公司 A kind of construction method of vertical concrete component conservation
CN107882333A (en) * 2017-11-15 2018-04-06 丁碧江 A kind of concrete construction method
WO2021135785A1 (en) * 2019-12-31 2021-07-08 江苏兆通新材料科技有限公司 Foam concrete curing device for roads
CN113146816A (en) * 2021-02-07 2021-07-23 中国铁道科学研究院集团有限公司铁道建筑研究所 Concrete heat-preservation and moisture-preservation curing blanket and application method thereof on top surface of concrete box girder
CN113463934A (en) * 2021-07-20 2021-10-01 江西省交通工程集团建设有限公司 Temperature-control anti-cracking curing method for mass concrete
CN113684743A (en) * 2021-09-13 2021-11-23 北方工业大学 Self-moisture-retaining concrete curing film and preparation and laying methods thereof
CN114207232A (en) * 2019-08-05 2022-03-18 株式会社奥村组 Maintenance structure and maintenance sheet for repaired part of concrete surface

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386668A (en) * 2017-08-16 2017-11-24 北京首钢建设集团有限公司 A kind of construction method of vertical concrete component conservation
CN107882333A (en) * 2017-11-15 2018-04-06 丁碧江 A kind of concrete construction method
CN114207232A (en) * 2019-08-05 2022-03-18 株式会社奥村组 Maintenance structure and maintenance sheet for repaired part of concrete surface
WO2021135785A1 (en) * 2019-12-31 2021-07-08 江苏兆通新材料科技有限公司 Foam concrete curing device for roads
CN113146816A (en) * 2021-02-07 2021-07-23 中国铁道科学研究院集团有限公司铁道建筑研究所 Concrete heat-preservation and moisture-preservation curing blanket and application method thereof on top surface of concrete box girder
CN113463934A (en) * 2021-07-20 2021-10-01 江西省交通工程集团建设有限公司 Temperature-control anti-cracking curing method for mass concrete
CN113684743A (en) * 2021-09-13 2021-11-23 北方工业大学 Self-moisture-retaining concrete curing film and preparation and laying methods thereof

Similar Documents

Publication Publication Date Title
CN106639341A (en) Construction method for water-saving moisture-preserving curing film of concrete structure
CN206903071U (en) A kind of discharge structure of planted roof
CN206855716U (en) Water-saving moisture-keeping curing film for concrete
CN201695580U (en) inverted roof structure
US20070294976A1 (en) Spray applied building wrap coating material, spray applied building wrap, and building construction assembly
CN107060226A (en) A kind of construction method of planted roof construction
CN108317304A (en) A kind of passive type super low energy consumption external wall casing and construction
CN109322412A (en) Waterproof roll is mechanically fixed construction technology
CN105421178B (en) A kind of zone of heating construction Craft for cold district
CN107558640B (en) A passive cooling system for water cut-off exterior walls
CN201943294U (en) Heat insulation decorative composite plate
CN203080724U (en) Building outer wall outer waterproof structure
CN201991147U (en) Novel roof water-proof, heat insulation and flame-retardant decoration system
CN201784030U (en) Water-saving and moisture conservation concrete curing membrane modified through grafting
CN202672509U (en) Inversed ceramsite concrete planting roof
CN105178151A (en) Technique for constructing water-saving moisture-preserving maintenance film and geogrid combined maintenance cement stabilizing structural layer
CN103790400A (en) Greening energy-saving public toilet in parks and at streets
CN108237617A (en) A kind of compound moisturizing and curing membrane of Wet-dry
CN207403305U (en) Certainly waterproof roll is filled in a kind of crack
JP3839016B2 (en) Block-laying open-air floor structure
CN109487790A (en) A kind of concrete heat-insulating method suitable for the big temperature difference area of High aititude
CN211080603U (en) Assembled concrete wall waterproof construction
CN104120838A (en) Planted roof waterproof construction method
CN106381124A (en) Preparation method of high-stability waterproof roll
JP2004132143A (en) Water-retentive pavement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510

WD01 Invention patent application deemed withdrawn after publication