CN105910577B - A kind of tunnel arch top settlement plumb bob observation device and application method - Google Patents
A kind of tunnel arch top settlement plumb bob observation device and application method Download PDFInfo
- Publication number
- CN105910577B CN105910577B CN201610406501.9A CN201610406501A CN105910577B CN 105910577 B CN105910577 B CN 105910577B CN 201610406501 A CN201610406501 A CN 201610406501A CN 105910577 B CN105910577 B CN 105910577B
- Authority
- CN
- China
- Prior art keywords
- rod piece
- lasso
- plumb bob
- testing stand
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 18
- 238000012360 testing method Methods 0.000 claims abstract description 29
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 25
- 230000001012 protector Effects 0.000 claims abstract description 6
- 238000006073 displacement reaction Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 230000007423 decrease Effects 0.000 claims description 2
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 238000005259 measurement Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000019994 cava Nutrition 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 210000003739 neck Anatomy 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
The invention discloses a kind of tunnel arch top settlement plumb bob observation devices, the sinking plumb bob observation device includes testing stand, energy-saving bulb, supporting rod, tunnel vault, and the testing stand is made of connector, head protector, poling, assembled rod piece, pedestal, card slot, assembly rod piece a;Assembled rod piece is vertically installed on the pedestal, the upper end of the assembly rod piece is equipped with connector, the connector left and right directions is set with poling, the top of the testing stand is equipped with assembled rod piece a, the centre position of the assembly rod piece a is provided with card slot, it is set with the rod piece with lasso on the card slot, lasso is provided on the rod piece with lasso.
Description
Technical field
The present invention relates to a kind of construction detection device and application methods, and more specifically, it relates to a kind of tunnel arches
Push up sinking plumb bob observation device and application method.
Background technology
Deformation observation and monitoring measurement are the quality of work progress and the emphasis of security control during constructing tunnel, in tunnel
In road construction, the deformation and displacement of periphery displacement, vault sinking, ground settlement and surrounding building and pipeline are monitoring measurements
It must survey project, wherein vault sinking conventional observation method is that tape measure link is suspended to vault sinking to measure on hook, using spirit level,
Elevation is measured to obtain vault elevation numerical value.Such method by tape measure link hang up monitoring hook the step for take it is too long, 24
Monitoring point took close to 4 hours, and efficiency is low.The effect of vault sinking numerical value is when vault sinking rate of change is very fast,
It is possible that constructing tunnel is just faced with the danger that vault caves in.When vault sinking cumulative amount is excessive, then need at the beginning of changing tunnel
Branch supporting parameter carrys out strengthening supporting, ensures construction in later period safety.Also have and paste total powerstation reflecting piece using on vault sinking hook, make
The rate of deformation is determined by the comparison of height difference with total station survey elevation.By spirit level and total station observation method,
The measurement of people repeatedly is measured, it is longer to expend the time.In recent years, also had using sensor method, and be digitized observation deformation values, this
Kind method control is more convenient, but sensor economy is not strong, considers that economic benefit does not use generally in most constructing tunnels, or
It is not high using frequency, the requirement of safety and quality management cannot be reached.When tunnel vault happen suddenly displacement it is larger when, because use
The unpredictable emergency situations of traditional measurement method face prodigious safety problem in construction personnel constructs at the scene, to
It is difficult to predict be the problem that technical staff and safety quality management personnel explore all the time.
Invention content
The present invention is directed to the deficiency of existing product, and provides a kind of tunnel arch top settlement plumb bob observation device and user
Method.
The present invention a kind of tunnel arch top settlement plumb bob observation device, the sinking plumb bob observation device include testing stand,
Vertical line and plumb bob, supporting rod, tunnel vault, the testing stand is by connector, head protector, poling, assembled rod piece, pedestal, card slot, spelling
Fill rod piece a compositions;Assembled rod piece is vertically installed on the pedestal, the upper end of the assembly rod piece is equipped with connector, described
Connector left and right directions is set with poling, and the top of the testing stand is equipped with assembled rod piece a, the centre of the assembly rod piece a
Position is provided with card slot, and the rod piece with lasso is set on the card slot, lasso is provided on the rod piece with lasso,
Spring card is provided on four wall of inside of the lasso, the upper end of the lasso is provided with mounting head part, the mounting head
Partial upper end is provided with triangle and is inserted into head, and the triangle is inserted into head and is provided with multiple supporting rods, the upper end of the supporting rod
Top pressure is in the lower surface of tunnel vault;Link is provided with below the mounting head part, be equipped on the link vertical line and
It is corresponded at plumb bob, the vertical line and plumb bob position and scale is installed, the scale is vertically fixedly mounted on pedestal.
Four corners of the pedestal are provided with jacking screw rod.
A kind of application method of tunnel arch top settlement plumb bob observation device, the application method include the following steps;
Step 1, the height for measuring tunnel vault and bottom surface makes testing stand according to height;The testing stand passes through assembly
Rod piece is connected with pedestal, then increases different height assembly rod piece by connector, and testing stand is made to reach requirement for height;
Step 2, it being transversely mounted assembled rod piece a in the upper end of testing stand, the centre position of assembled rod piece a is provided with card slot,
Rod piece of the installation with lasso in card slot, is provided with lasso on the rod piece with lasso, is placed on four walls inside the lasso
Spring card;
Step 3, in the upper end of lasso setting mounting head part, the upper end of mounting head part is provided with triangle and is inserted into head,
Triangle is inserted into head and is installed with multiple supporting rods, and the upper end top pressure of supporting rod is in the lower surface of tunnel vault;
Step 4, it is provided with link below mounting head part, vertical line and plumb bob, the vertical line are installed on the link
And corresponded at plumb bob position and scale is installed, the scale is vertically fixedly mounted on pedestal;
Step 5, the height that testing stand is finely tuned by the jacking screw rod of four corners of pedestal, makes each supporting rod be in
Stress;
Step 6, when tunnel vault sinks, supporting rod acts on triangle and is inserted on head, to make triangle be inserted into head
It breaks through the constraint of spring card and declines, vertical line and plumb bob will produce vertical displacement, may know that position by the reading on scale
Shifting amount, to intuitively observe vault sinking and deformation.
The beneficial effects of the invention are as follows:Using plumb bob is hung under holder, plumb bob is read on scale by the deformation of supporting rack
Displacement record deformation values.The method simple to install, convenient disassembly can be seen along one of setting per 5O meters of tunnel central axes
It is convenient to survey, and is avoided that spirit level and Other Instruments peace tear temporal waste open, economically more practical, field technician can letter
Single operation does not need full-time survey crew and measures, constantly records, remarkable benefit, be widely used in tunnel construction site, to applying
Work person is prevented and possible trouble with reminding, and takes effective measures and big landslide and accident is avoided to occur.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the side view of the testing stand of the present invention;
Fig. 3 is the front view of the testing stand of the present invention;
Fig. 4 is the structural schematic diagram of the lasso of the present invention;
Fig. 5 is that the triangle of the present invention is inserted into the structural schematic diagram of head;
Fig. 6 is the spring card mounting structure schematic diagram of the present invention;
In figure:Connector 1, head protector 2, poling 3, assembled rod piece 4, pedestal 5, card slot 6, assembled rod piece a7, spring card 7-
1, the rod piece 8 with lasso, lasso 9, link 10, mounting head part 11, triangle be inserted into head 12, vertical line and plumb bob 13, scale 14,
Supporting rod 15, tunnel vault 16.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings.
In the figure a kind of tunnel arch top settlement plumb bob observation device of the invention mainly by connector 1, head protector 2, poling 3,
Assembled rod piece 4, pedestal 5, card slot 6, assembled rod piece a7, spring card 7-1, the rod piece 8 with lasso, lasso 9, link 10, peace
Fill head point 11, triangle is inserted into head 12, vertical line and plumb bob 13, scale 14, supporting rod 15, tunnel vault 16 form.
A kind of tunnel arch top settlement plumb bob observation device of the present invention, the sinking plumb bob observation device include testing stand, hang down
Line and plumb bob 13, supporting rod 14, tunnel vault 15, the testing stand is by connector 1, head protector 2, poling 3, assembled rod piece 4, pedestal
5, card slot 6, assembled rod piece a7 compositions;Assembled rod piece 4, the upper end installation of the assembly rod piece 4 are vertically installed on the pedestal 5
There are connector 1,1 left and right directions of the connector to be set with poling 3, the top of the testing stand is equipped with assembled rod piece a7, institute
The centre position for stating assembled rod piece a7 is provided with card slot 6, and the rod piece 8 with lasso is set on the card slot 6, described with set
It is provided with lasso 9 on the rod piece 8 of circle, spring card 7-1, the upper end of the lasso 9 are provided on four wall of inside of the lasso 9
It is provided with mounting head part 11, the upper end of the mounting head part 11 is provided with triangle and is inserted into head 12, and the triangle is inserted into head 12
Multiple supporting rods 14 are inside provided with, the upper end top pressure of the supporting rod 14 is in the lower surface of tunnel vault 15;The securement head
Points 11 lower section is provided with link 10, is equipped with vertical line and plumb bob 13 on the link 10, at 13 position of the vertical line and plumb bob
Correspondence is equipped with scale 14, and the scale 14 is vertically fixedly mounted on pedestal 5.
Four corners of the pedestal 5 are provided with jacking screw rod.
A kind of application method of tunnel arch top settlement plumb bob observation device, the application method include the following steps;
Step 1, the height for measuring tunnel vault 15 and bottom surface makes testing stand according to height;The testing stand passes through spelling
It fills rod piece 4 and pedestal 5 connects, then different height assembly rod piece 4 is increased by connector 1, testing stand is made to reach requirement for height;
Step 2, it is transversely mounted assembled rod piece a7 in the upper end of testing stand, the centre position of assembled rod piece a7 is provided with card slot
6, the rod piece 8 with lasso is installed in card slot 6, lasso 9 is provided on the rod piece 8 with lasso, on 9 four walls of inside of lasso
It is placed with spring card 7-1;
Step 3, in the upper end of lasso 9 setting mounting head part 11, the upper end of mounting head part 11 is provided with triangle insertion
First 12, it is inserted into head 12 in triangle and is installed with multiple supporting rods 14, the upper end top pressure of supporting rod 14 is in tunnel vault 15
Lower surface;
Step 4, the lower section of the mounting head part 11 is provided with link 10, and vertical line and plumb bob are equipped on the link 10
13, it corresponds at 13 position of the vertical line and plumb bob and scale 14 is installed, the scale 14 is vertically fixedly mounted on pedestal 5;
Step 5, the height that testing stand is finely tuned by the jacking screw rod of four corners of pedestal 5, makes each supporting rod 14
It is in stress;
Step 6, when tunnel vault 16 sinks, supporting rod 15 acts on triangle and is inserted on head 12, to make triangle
It is inserted into head 12 to break through the constraint of spring card 7-1 and decline, vertical line and plumb bob 13 will produce vertical displacement, by scale 14
Reading may know that displacement, to intuitively observe vault sinking and deformation.
The present invention uses and hangs plumb bob under holder, reads displacement of the plumb bob on scale by the deformation of supporting rack to record
Deformation values.The method simple to install, convenient disassembly can be along one of setting per 5O meters of tunnel central axes, and observation is convenient, is avoided that water
Quasi- instrument and Other Instruments peace tear temporal waste open, economically more practical, field technician can simple operations, need not be special
The survey crew of duty measures, and constantly records, remarkable benefit, is widely used in tunnel construction site.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair
Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks
Domain is included within the scope of the present invention.
Claims (3)
1. a kind of tunnel arch top settlement plumb bob observation device, characterized in that the sinking plumb bob observation device includes testing stand, hangs down
Line and plumb bob(13), supporting rod(15), tunnel vault(16), the testing stand is by connector(1), head protector(2), poling(3), spell
Fill rod piece(4), pedestal(5), card slot(6), assembled rod piece a(7)Composition;The pedestal(5)On be vertically installed with assembled rod piece
(4), the assembly rod piece(4)Upper end connector is installed(1), the connector(1)Left and right directions is set with poling(3),
The top of the testing stand is equipped with assembled rod piece a(7), the assembly rod piece a(7)Centre position be provided with card slot(6), institute
State card slot(6)On be set with the rod piece with lasso(8), the rod piece with lasso(8)On be provided with lasso(9), described
Lasso(9)Four wall of inside on be provided with spring card(7-1), the lasso(9)Upper end be provided with mounting head part(11),
The mounting head part(11)Upper end be provided with triangle be inserted into head(12), the triangle insertion head(12)Inside it is provided with multiple
Strut(15), the supporting rod(15)Upper end top pressure in tunnel vault(16)Lower surface;The mounting head part(11)'s
Lower section is provided with link(10), the link(10)On vertical line and plumb bob are installed(13), the vertical line and plumb bob(13)Position
Place's correspondence is equipped with scale(14), the scale(14)Vertically it is fixedly mounted on pedestal(5)On.
2. a kind of tunnel arch top settlement plumb bob observation device according to claim 1, characterized in that the pedestal(5)'s
Four corners are provided with jacking screw rod.
3. a kind of application method of tunnel arch top settlement plumb bob observation device, characterized in that the application method includes following step
Suddenly;
Step 1, tunnel vault is measured(16)With the height of bottom surface, testing stand is made according to height;The testing stand passes through assembly
Rod piece(4)And pedestal(5)Connection, then pass through connector(1)Increase different height assembly rod piece(4), testing stand is made to reach height
It is required that;
Step 2, it is transversely mounted assembled rod piece a in the upper end of testing stand(7), assembled rod piece a(7)Centre position be provided with card slot
(6), in card slot(6)Interior rod piece of the installation with lasso(8), carry the rod piece of lasso(8)On be provided with lasso(9), in lasso
(9)It is placed with spring card on internal four walls(7-1);
Step 3, in lasso(9)Upper end setting mounting head part(11), mounting head part(11)Upper end be provided with triangle insert
Enter head(12), head is inserted into triangle(12)Inside it is installed with multiple supporting rods(15), supporting rod(15)Upper end top pressure in tunnel
Road vault(16)Lower surface;
Step 4, the mounting head part(11)Lower section be provided with link(10), link(10)On vertical line and plumb bob are installed
(13), the vertical line and plumb bob(13)It is corresponded at position and scale is installed(14), scale(14)Vertically it is fixedly mounted on pedestal(5)
On;
Step 5, pass through pedestal(5)Four corners jacking screw rod fine tuning testing stand height, make each supporting rod(15)
It is in stress;
Step 6, work as tunnel vault(16)When sinking, supporting rod(15)It acts on triangle and is inserted into head(12)On, to make three
Head is inserted at angle(12)Break through spring card(7-1)Constraint and decline, vertical line and plumb bob(13)Vertical displacement is will produce, mark is passed through
Ruler(14)On reading may know that displacement, to intuitively observe vault sinking and deformation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406501.9A CN105910577B (en) | 2016-06-12 | 2016-06-12 | A kind of tunnel arch top settlement plumb bob observation device and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406501.9A CN105910577B (en) | 2016-06-12 | 2016-06-12 | A kind of tunnel arch top settlement plumb bob observation device and application method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105910577A CN105910577A (en) | 2016-08-31 |
CN105910577B true CN105910577B (en) | 2018-10-26 |
Family
ID=56750014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610406501.9A Active CN105910577B (en) | 2016-06-12 | 2016-06-12 | A kind of tunnel arch top settlement plumb bob observation device and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105910577B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816968A (en) * | 2017-11-24 | 2018-03-20 | 中国地质大学(武汉) | A kind of tunnel arch top settlement measurement apparatus and measuring method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100009902A (en) * | 2008-07-21 | 2010-01-29 | (주)성진지오텍 | Surveying target for measuring displacement and settlement |
CN102914282A (en) * | 2012-10-18 | 2013-02-06 | 中铁隧道集团有限公司 | Monitoring and measuring method using displacement sensor to measure tunnel deformation |
CN104697495A (en) * | 2015-03-03 | 2015-06-10 | 江西飞尚科技有限公司 | On-line monitoring method for settlement and convergence in building construction and operation periods |
CN104931006A (en) * | 2015-05-05 | 2015-09-23 | 中国矿业大学 | Dynamic monitoring device for surrounding rock deformation of filling roadway |
CN105136100A (en) * | 2015-04-29 | 2015-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Tunnel convergence deformation monitoring method and device |
CN204851268U (en) * | 2015-07-27 | 2015-12-09 | 重庆大学 | Efficient tunnel vault monitoring point erection equipment |
CN205228375U (en) * | 2015-12-19 | 2016-05-11 | 长安大学 | Experimental lining deformation monitoring devices of tunnel model |
-
2016
- 2016-06-12 CN CN201610406501.9A patent/CN105910577B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100009902A (en) * | 2008-07-21 | 2010-01-29 | (주)성진지오텍 | Surveying target for measuring displacement and settlement |
CN102914282A (en) * | 2012-10-18 | 2013-02-06 | 中铁隧道集团有限公司 | Monitoring and measuring method using displacement sensor to measure tunnel deformation |
CN104697495A (en) * | 2015-03-03 | 2015-06-10 | 江西飞尚科技有限公司 | On-line monitoring method for settlement and convergence in building construction and operation periods |
CN105136100A (en) * | 2015-04-29 | 2015-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Tunnel convergence deformation monitoring method and device |
CN104931006A (en) * | 2015-05-05 | 2015-09-23 | 中国矿业大学 | Dynamic monitoring device for surrounding rock deformation of filling roadway |
CN204851268U (en) * | 2015-07-27 | 2015-12-09 | 重庆大学 | Efficient tunnel vault monitoring point erection equipment |
CN205228375U (en) * | 2015-12-19 | 2016-05-11 | 长安大学 | Experimental lining deformation monitoring devices of tunnel model |
Also Published As
Publication number | Publication date |
---|---|
CN105910577A (en) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206037986U (en) | Tunnel surrouding rock deformation monitoring and early warning system | |
CN108180885B (en) | Automatic monitoring system and method for tunnel deformation | |
CN106092036A (en) | A kind of formwork-support deformation remote real time monitoring system and method | |
CN109374049A (en) | A kind of tunnel surrounding rock deformation monitoring and alarm device | |
CN101458069A (en) | Tunnel wall rock deformation monitoring method and monitoring system thereof | |
CN101982723B (en) | Method for monitoring deformation of convergence meter by equivalent method | |
CN103256918B (en) | Special ruler for measuring vault settlement of tunnel | |
CN104834012B (en) | Electromagnetic radiation monitoring early warning method of mine roof water inrush | |
CN105910577B (en) | A kind of tunnel arch top settlement plumb bob observation device and application method | |
CN103438933A (en) | Slope surface displacement and superficial layer survey integrated equipment | |
CN203024763U (en) | Construction beam posture monitoring system | |
CN202417485U (en) | Real-time monitoring system for well drilling well kick leakage | |
CN210036580U (en) | Real-time monitoring tool for displacement of surface mine side slope | |
CN203396426U (en) | An integrated device for measuring the surface displacement and the shallow layer inclination of a slope | |
CN203247568U (en) | Slope section lifting monitoring device | |
CN216206809U (en) | A groundwater level monitoring and alarm device | |
CN208172969U (en) | A kind of high slope surface deformation monitoring and warning system | |
CN213632072U (en) | Measuring device for deep longitudinal settlement of geological disaster | |
CN205748362U (en) | Architectural engineering vertical structure perpendicularity deviation measures guiding ruler | |
CN211121180U (en) | Portable tunnel monitoring multifunctional tower ruler | |
CN103344169B (en) | The method for monitoring deformation of convergence meter by equivalent method of expansion | |
CN106017410B (en) | The safety monitoring assembly and application method of a kind of tunnel arch top settlement | |
CN210774082U (en) | Template verticality measuring device | |
CN208996767U (en) | A kind of underground emergency water level monitoring system | |
CN115790773A (en) | Device for continuously monitoring water level in pipe well and using method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |