[go: up one dir, main page]

CN103866975A - Building formwork assembly method and used aluminium formwork connector - Google Patents

Building formwork assembly method and used aluminium formwork connector Download PDF

Info

Publication number
CN103866975A
CN103866975A CN201410073547.4A CN201410073547A CN103866975A CN 103866975 A CN103866975 A CN 103866975A CN 201410073547 A CN201410073547 A CN 201410073547A CN 103866975 A CN103866975 A CN 103866975A
Authority
CN
China
Prior art keywords
aluminum alloy
alloy pattern
frid
central layer
pattern plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410073547.4A
Other languages
Chinese (zh)
Other versions
CN103866975B (en
Inventor
苏鸿飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanhe Industrial Development Shenzhen Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410073547.4A priority Critical patent/CN103866975B/en
Publication of CN103866975A publication Critical patent/CN103866975A/en
Application granted granted Critical
Publication of CN103866975B publication Critical patent/CN103866975B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a building formwork assembly method. The building formwork assembly method, which uses an aluminium formwork connector to connect a plurality of aluminium formwork units together, includes the following steps: (S1) a connecting sleeve head and at least one extension plate are prepared, the sides of the connecting sleeve head are provided with sleeve holes, the extension plate comprises an upper channel plate and a lower core plate, and the core plate is fixed in the channel of the channel plate; (S2) sleeves detachably pass through the sleeve holes to extend to the core plate and are riveted on the core plate; (S3) the aluminium formwork building units are connected with both sides of the channel plate. The aluminium formwork connector disclosed by the invention, which is used for connecting the aluminium formwork units together, comprises the connecting sleeve head and at least one extension plate, the sides of the connecting sleeve head are provided with the sleeve holes, the extension plate comprises the upper channel plate and the lower core plate, the core plate is fixed in the channel of the channel plate, and after the sleeves pass through the sleeve holes, the ends of the sleeves are extended to and riveted on the core plate.

Description

The mounting method of construction formwork and the aluminum alloy pattern plate connector using
[technical field]
The present invention relates to a kind of construction formwork, particularly relate to a kind of mounting method of the construction formwork for the multiple aluminum alloy pattern plates of assembly and connection unit and the aluminum alloy pattern plate connector using.
[background technology]
According to statistics, all kinds of floor spaces that China will build up in the end of the year 2012 reach 8,500,000,000 square metres of left and right (not containing villages and small towns self-built housing), the basic wooden form that uses in engineering construction process, wooden form is the composite that the timber that intersects in length and breadth by multilayer and glue bond form, the whole nation needs to consume the timber of approximately 4600 ten thousand stere left and right every year, wooden form not only contains a large amount of hazardous substancess but also just become building waste after use several times, becomes a very large environmental issue.
Emerging of aluminum alloy mould plate will greatly reduce the use cost of template, the aluminum alloy mould plate of environmental protection because have lightweight, rigidity is high, stability is strong, long service life, efficiency of construction high and advantage, become template market new lover, aluminum dipping form usage ratio is just in cumulative year after year.
The aluminum alloy pattern plate unit of two same structures is all to adopt to connect pullover connection, and splicing sleeve is fixed by a pin on sidewall, then comes the isostructural aluminum alloy pattern plate of support and connection two-phase unit by splicing sleeve.Splicing sleeve is arranged on unit with grooves in outer wall like this, and in the time taking off the pin of fixed connecting sleeve, splicing sleeve easily comes off from the groove of sidewall, and splicing sleeve must be installed again again while again installing, uses very inconvenient.Owing to there being the existence of splicing sleeve on sidewall, it is impossible to allow other template be connected to have become on this pullover sidewall, has wasted a large amount of usable areas.Meanwhile, the simplicity don't fail to consider to install and use while connection by splicing sleeve time, agility when dismounting, iff using external splicing sleeve to connect multiple aluminum alloy pattern plates unit, the problems referred to above all can not get effective solution.
[summary of the invention]
In order to overcome, existing aluminum alloy building template use is inconvenient, structure design is unreasonable, not technical problem easily of dismounting, the invention provides a kind of easy to use, simple and reasonable, the dismounting mounting method of construction formwork and the aluminum alloy pattern plate connector using simply rapidly.
The scheme of technical solution problem of the present invention is to provide a kind of mounting method of construction formwork, by using aluminum alloy pattern plate connector that multiple aluminum alloy pattern plates unit is connected as one, comprise, step S1, provide a connection pullover and at least one extension board, adapter sleeve cephalic region is provided with collar aperture, and extension board comprises that a frid and that is positioned at upper strata is positioned at the central layer of lower floor, and central layer is fixed on the notch place of frid; Step S2, extends to central layer place by removable sleeve pipe through collar aperture, and is riveted on this central layer; And step S3, multiple aluminum alloy pattern plate building units are connected in to the both sides of frid.
Preferably, further comprise step S4, fix a column in the pullover bottom of connection.
Preferably, use multiple rivets to be fixedly connected with respectively described sleeve pipe and central layer, described frid and aluminum alloy pattern plate unit.
Preferably, the length that multiple aluminum alloy pattern plate building units of the same side are stitched together is less than or equal to the length sum that connects pullover and all extension boards.
Preferably, connection in step S1 is pullover is a square groove shape structure, and both sides are symmetrically arranged with two collar aperture towards inside, and this two shell clearance is engaged in collar aperture.
Preferably, the frid in step S1 is a square groove shape structure, and the dual-side bottom of frid is provided with an installation step, and this aluminum alloy pattern plate unit supports is positioned on this installation step.
Preferably, the central layer in step S1 comprises a welding bench and a fixed station, and this welding bench is weldingly fixed on the side inwall of frid, and described sleeve pipe riveted joint is fixed on this fixed station.
Preferably, the both sides of fixed station are provided with bushing slot, and this bushing slot is a semienclosed slot shape structure, and the degree of freedom that retains a direction after this bushing slot is inserted in the end of splicing sleeve.
A kind of aluminum alloy pattern plate connector, for multiple aluminum alloy pattern plates unit is connected as one, this aluminum alloy pattern plate connector comprises pullover and at least one extension board of a connection, adapter sleeve cephalic region is provided with collar aperture, extension board comprises that a frid and that is positioned at upper strata is positioned at the central layer of lower floor, central layer is fixed on the notch place of frid, and a sleeve pipe extends its end to be riveted on central layer after passing collar aperture.
Preferably, central layer comprises a welding bench and a fixed station, this welding bench is weldingly fixed on the side inwall of frid, described sleeve pipe riveted joint is fixed on this fixed station, the both sides of fixed station are provided with bushing slot, this bushing slot is a semienclosed slot shape structure, and the degree of freedom that retains a direction after this bushing slot is inserted in the end of splicing sleeve.
Compared with prior art, the mounting method of construction formwork of the present invention and aluminum alloy pattern plate connector are by connecting the linkage unit that a length can infinitely be expanded that is spliced to form of pullover and extension board, use sleeve pipe as extension board be connected pullover connector, and sleeve pipe is matched in clearance with being connected pullover, the position of adjusting sleeve pipe more easily, is convenient to the real-time permanent position of adjusting sleeve pipe according to the extension board of different model.Sleeve pipe is positioned at and connects pullover inside, so, no matter be installing or when dismounting, sleeve pipe can not can landing easily, and can, without taking off sleeve pipe, directly use in the time that used next time.
The frid of extension board upper end is for being connected and fixed outside aluminum alloy pattern plate building unit, the central layer of lower end is for fixedly realizing extension board and be connected pullover fixing with sleeve pipe riveted joint, by the layering syndeton of extension board, one can be convenient mounting sleeve, the position of adjusting sleeve pipe, the riveted joint of being convenient to sleeve pipe and central layer is fixed; Two rivets that come top only need through aluminum alloy pattern plate building unit and frid, through unnecessary parts, make at the multiple aluminum alloy pattern plate building units of splicing more conveniently without again, are easy to assembling.
Connect pullover top surface cushion hole is set, inside arranges two support slots, can well fixed support column and give column certain cushion space.The installation step arranging on extension board can be given aluminum alloy pattern plate unit pre-determined bit to be connected, supports aluminum alloy pattern plate unit simultaneously and prevents landing.
In size, the spacing of mounted sleeve pipe just equals the dual-side spacing of extension board, so arrange just can guarantee extension board without unnecessary connector both can be positioned to connect pullover on.The height of central layer protrudes from frid and rivets mutually with sleeve pipe, can effectively solve in the time that riveted joint is fixedly connected with pullover and extension board easily by a difficult problem for frid stop limits.Separately, the bushing slot on central layer is a semienclosed notch structure, convenient while making sleeve pipe insert this bushing slot, and also rivet is inserted in the position of convenient adjustment sleeve pipe simultaneously.Herein, rivet is also only need run through the two-layer thin-walled of sleeve pipe and one deck thin-walled of fixed station can be realized riveted joint, is also convenient to a certain extent existing riveted joint when mounted and fixes.
Sleeve pipe is in the matched in clearance structure connecting in pullover collar aperture, the structure of multiple riveted holes is set on sleeve pipe and central layer, and the structure that multiple riveted holes are set on frid and aluminum alloy pattern plate unit can realize adjustment link position and the number of elements of freedom and flexibility more when mounted.
[accompanying drawing explanation]
Fig. 1 is the perspective view of aluminum alloy pattern plate connector provided by the invention, and it comprises a plate and two extension boards.
Fig. 2 is the perspective view of junction plate shown in Fig. 1, and it comprises pullover and two sleeve pipes of a connection.
Fig. 3 is the pullover perspective view of the connection shown in Fig. 2.
Fig. 4 is the sleeve pipe perspective view shown in Fig. 2.
Fig. 5 is the perspective view of extension board shown in Fig. 1, and it comprises a frid and a central layer.
Fig. 6 is the side cut-away illustration of frid shown in Fig. 5.
Fig. 7 is the central layer perspective view shown in Fig. 5.
Fig. 8 connects package assembly schematic diagram pullover and central layer
Fig. 9 is the floor map of the pullover package assembly with central layer of the connection shown in Fig. 8.
Figure 10 is the solid blast structural representation of aluminum alloy pattern plate connector provided by the invention.
Figure 11 is the solid blast structural representation while using the assembling of aluminum alloy pattern plate connector to form construction formwork.
[specific embodiment]
In order to make object of the present invention, technical scheme and advantage are clearer, below in conjunction with accompanying drawing and embodiment, the present invention are further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Refer to Fig. 1, aluminum alloy pattern plate connector 10 provided by the invention comprises a plate 101 and two extension boards 103, and junction plate 101 two ends connect respectively this two extension board 103.Junction plate 101 and extension board 103 are square groove shape structure, and when placement, one of opening faces down, and the upper face of junction plate 101 and extension board 103 maintains an equal level.Be provided with a column 105 in the bottom of junction plate 101, this column 105 supports this aluminum alloy pattern plate connector 10, to multiple building unit parts are implemented to splicing at the height and position of specifying while installing and using at the scene aluminum alloy pattern plate connector 10.
Refer to Fig. 2, junction plate 101 comprises a connection pullover 1011 and two sleeve pipes 1013, and the symmetrical insertion of this sleeve pipe 1013 connects on pullover 1011, and keeps it connecting on pullover 1011 and can smoothly move.
Refer to Fig. 3, connect pullover 1011 and be symmetrical square groove shape structure, be symmetrical arranged respectively two collar aperture 1021 and two support slots 1022 at its dual-side inwall.Collar aperture 1021 is extended support slot 1022 towards connecting pullover 1011 notch places, and collar aperture 1021 and support slot 1022 are also symmetrical set.
Collar aperture 1021 is a square opening, and it is inner, and for inserting square sleeve pipe 1013, its inside dimension is greater than the external dimensions of sleeve pipe 1013, forms matched in clearance structure, and being convenient to sleeve pipe 1013 can freely plug collar aperture 1021 is interior.
After support slot 1022 is symmetrical set, between it, form the notch of a clamping column 105, in the time using, need to this aluminum alloy pattern plate connector 10 be supported in the air by column 105, so better grip column 105 by two support slots 1022 herein, prevent from being offset about column 105 is in the time supporting.The cross sectional shape of this support slot 1022 is " L " shape, forms a face contact type clamp structure to grip column 103 between the support slot 1022 of two " L " shapes, and the contact weld area of increase and column 105, makes to grip more firm.
Connecting pullover 1011 top surface has certain thickness, and at top surface, one cushion hole 1023 is set between two parties, and this cushion hole 1023 is arranged on the centre of top surface, and also correspondence is positioned on two support slots 1022, and its correspondence is withstood the column 105 while use.Column 105 just props up this cushion hole 1023 in use, can give column 105 certain error space by cushion hole 1023, is convenient to install and use.
Refer to Fig. 4, sleeve pipe 1013 is a square hollow, and its two ends are symmetrically arranged with respectively two sleeve pipe riveted holes 1025, and on this sleeve pipe riveted holes 1025, removable riveted joint has the rivet 1026 matching with it.So that sleeve pipe 1013 insert collar aperture 1021 interior after, extension board 103 can be fixed on sleeve pipe 1013 by rivet 1026.
Refer to Fig. 5, extension board 103 comprises a frid 1037 and a central layer 1039, and this central layer 1039 is welded on a wherein end of frid 1037.Frid 1037 is a square plate, and its groove 1035 arranges down, comprises a top margin 1031 and dual side-edge 1033, and the width of top margin 1031 equates with the top surface width that is connected pullover 1011.On dual side-edge 1033, be evenly distributed with three extension board riveted holes 1043, this extension board riveted holes 1043, for inserting after rivet, is fixedly connected with aluminum alloy pattern plate connector 10 with other construction formworks.
Refer to Fig. 6, side 1033 comprises an installation step 1045 and a groove 1041 in short transverse, and extension board riveted holes 1043 is arranged on the medium position of groove 1041 between two parties.On its length direction, this extension board riveted holes 1043 is the link with junction plate 101 away from extension board 103.
Please refer to Fig. 7, Fig. 8 and Fig. 9, central layer 1039 comprises a welding bench 1046 and a fixed station 1048, welding bench 1046 is one-body molded above fixed station 1048.Welding bench 1046 is an opening up notch-like, and its dual-side is weldingly fixed on the dual-side inwall of frid 1037.This fixed station 1048 that connects placed in the middle below of welding bench 1046, this fixed station 1048 is one " mouth " sub-shape.Fixed station 1048 dual-sides that the dual-side of welding bench 1046 extends certain length and " mouth " sub-shape down form a top near welding bench 1046 for sealing, the semi-enclosed bushing slot 1047 that bottom is not sealed near fixed station 1048, the size of this semi-enclosed bushing slot 1047 matches with the sectional dimension of sleeve pipe 1013, so that sleeve pipe 1013 can insert smoothly and can do suitable displacement down after this bushing slot 1047 and be convenient to take off this sleeve pipe 1013.Also be provided with two central layer riveted holes 1049 at the dual-side of fixed station 1048, the size of this central layer riveted holes 1049, spacing and shape are corresponding with sleeve pipe riveted holes 1025, because insert after sleeve pipe riveted holes 1025 and central layer riveted holes 1049 by rivet 1026 herein simultaneously, sleeve pipe 1013 and central layer 1039 are fixed together.
Dimensionally, the spacing of fixed station 1048 dual-sides of central layer 1039 equals the inside minimum spacing between two sleeve pipes 1013, so, extension board 103 be connected pullover 1011 connect time, just can the dual side-edge of central layer 1,039 1033 be erected fixing by two sleeve pipes 1013.On height, after central layer 1039 is welded on frid 1037, for the ease of connecting central layer 1039 and sleeve pipe 1013, fixed station 1048 need to protrude from the bottom of frid 1037 in short transverse, and guarantee after central layer 1039 is welded on frid 1037, the overall height of extension board 103 slightly equals to connect pullover 1011 overall height, needing to guarantee that the top margin for frid 1037 maintains an equal level with the top that is connected pullover 1011 herein topmost, is that the base of the base of fixed station 1048 and the base of sleeve pipe 1013 or collar aperture 1021 maintains an equal level bottom.
Refer to Figure 10 and Figure 11, when this aluminum alloy pattern plate connector 10 is made construction formwork 20, have following step installing and using:
Step 1, be ready to a connection pullover 1011, two sleeve pipes 1013 and two extension boards 103, the top width that guarantees connection pullover 1011 is identical with the top width of extension board 103, simultaneously, two sleeve pipes 1013 are square hollow, and it forms matched in clearance structure with the collar aperture 1021 that is connected pullover 1011 both sides.
Step 2, the end that central layer 1039 is welded on to frid 1037 forms extension board 103, and central layer 1039 is welded on extension board 103 and the one end that is connected pullover 1011 junction.When welding, the side of the both sides place of the welding bench of central layer 1,039 1046 and frid 1,037 1033 inwalls are formed to full weld welding, after having welded, the fixed station 1048 of central layer 1039 protrudes from the bottom of frid 1037, and maintains an equal level with the base that is connected sleeve pipe 1013 on pullover 1011.
Step 3, two sleeve pipes 1013 are inserted in the both sides collar aperture 1021 that connects pullover 1011, by matched in clearance structure, sleeve pipe 1013 can move left and right the position of adjusting sleeve pipe 1013 in collar aperture 1021, when adjustment, need guarantee that sleeve pipe 1013 all stretches out one end distance at the two ends that connect pullover 1011, and it is identical that the distance that stretch out left and right will keep, erect extension board 103 for use in left and right simultaneously and keep left and right balance to fix.Be exactly in addition, need to guarantee that sleeve pipe 1013 inserts respectively again on the bushing slot 1047 of central layer 1039 through the rear two ends of collar aperture 1021 that connect pullover 1011, and two sleeve pipe riveted holes 1025 that guarantee sleeve pipe 1013 are just corresponding to two central layer riveted holes 1049 on fixed station 1048.
Step 4, rivet 1026 is inserted at the two ends of sleeve pipe 1013 simultaneously, through sleeve pipe riveted holes 1025 and central layer riveted holes 1049.Because sleeve pipe 1013 inserts after connection pullover 1011, sleeve pipe riveted holes 1025 is set at two ends, so inserting after rivet 1026, adjust the position of connection pullover 1011 and extension board 103, when two extension boards 103 be connected pullover 1011 just seamless spliced together after, by rivet 1026 and sleeve pipe 1013 further by pullover connection 1011 and two extension board 103 be connected and fixed and be integrated, be assembled into aluminum alloy pattern plate connector 10 of the present invention.
Step 5, is inserted into column 105 between two support slots 1022 that connect pullover 1011, and cushion hole 1023 is withstood in top, and this aluminum alloy pattern plate connector 10 having spliced is supported.
Step 6, four aluminum alloy pattern plate unit 200 are placed on the aluminum alloy pattern plate connector 10 having spliced, when placement, need to place from top to bottom, because four equal correspondences in aluminum alloy pattern plate unit 200 are placed on the installation step 1045 of frid 1037 herein, aluminum alloy pattern plate unit 200 can be pre-fixed by this installation step 1045.200Fen both sides, four aluminum alloy pattern plate unit are symmetrical placement between two, one of them aluminum alloy pattern plate unit 200 of each side pre-fixes on the installation step 1045 of a frid 1037 therein, and the width sum of each two aluminum alloy pattern plate unit 200 of side is less than or equal to and connects the pullover 1011 length sums that add two extension boards 103, so, each aluminum alloy pattern plate connector 10 at least can splice four aluminum alloy pattern plate unit 200.Meanwhile, the side of aluminum alloy pattern plate unit 200 is also provided with multiple modular unit riveted holes 201, the arranging simultaneously corresponding to the extension board riveted holes 1043 on frid 1037 of this modular unit riveted holes 201.
Step 7 is used multiple rivets to run through to insert the extension board riveted holes 1043 on modular unit riveted holes 201 and the corresponding frid 1037 of aluminum alloy pattern plate unit 200 simultaneously.Four aluminum alloy pattern plate unit 200 are connected as one and formed construction formwork 20 by this aluminum alloy pattern plate connector 10.
When dismounting, first take off with the rivet of aluminum alloy pattern plate unit 200 connecting frid 1037, then four aluminum alloy pattern plate unit 200 are up mentioned and are placed into other places from installation step 1045.Aluminum alloy pattern plate connector 10 is removed, and then splicing sleeve 1011 and the rivet 1026 of central layer 1039 is taken off, and forms 103, two sleeve pipes 1013 of two extension boards that separate and is connected pulloverly 1011 with one, and so far whole aluminum alloy pattern plate connector 10 has been dismantled.
Herein, aluminum alloy pattern plate connector 10 only arranges two extension boards 103, if need to do the expansion of length, only need on extension board 103, increase a connection pullover 1011 and an extension board 103 again and can form similarly new one group of aluminum alloy pattern plate connector 10.Can, continuing to connect two aluminum alloy pattern plate unit 200, so go down so again, can be according to site operation needs, select many groups aluminum alloy pattern plate connector of the present invention 10 scenes to be spliced to form the connector of Len req.
Compared with prior art, the mounting method of construction formwork of the present invention and aluminum alloy pattern plate connector 10 by connect pullover 1011 and extension board 103 be spliced to form the linkage unit that a length can infinitely be expanded, use sleeve pipe 1013 as extension board 103 and the connector that is connected pullover 1011, and sleeve pipe 1013 is matched in clearance with being connected pullover 1011, the position of adjusting sleeve pipe 1013 more easily, is convenient to the real-time permanent position of adjusting sleeve pipe 1013 according to the extension board 103 of different model.Sleeve pipe 1013 is positioned at and connects pullover 1011 inside, so, no matter be installing or when dismounting, sleeve pipe 1013 can not can landing easily, and can, without taking off sleeve pipe 1013, directly use in the time that used next time.
The frid 1037 of extension board 103 upper ends is for being connected and fixed outside aluminum alloy pattern plate building unit 200, the central layer 1039 of lower end is for fixedly realizing extension board 103 and be connected pullover 1011 fix with sleeve pipe 1013 riveted joint, by the layering syndeton of extension board 103, one can be convenient mounting sleeve 1013, adjust the position of sleeve pipe 1013, be convenient to sleeve pipe 1013 and fix with the riveted joint of central layer 1039; Two rivets that come top only need through aluminum alloy pattern plate building unit 200 and frid 1037, through unnecessary parts, make at the multiple aluminum alloy pattern plate building units 200 of splicing more conveniently without again, are easy to assembling.
Connect pullover 1011 top surface buffering gift 1025 is set, inside arranges two support slots 1022, can well fixed support column 105 and give column 105 certain cushion space.The installation step 1045 arranging on extension board 103 can be given aluminum alloy pattern plate unit 200 pre-determined bit to be connected, supports aluminum alloy pattern plate unit 200 simultaneously and prevents landing.
In size, the spacing of mounted sleeve pipe 1013 just equals dual-side 1033 spacing of extension board 103, so arranges and just can guarantee that extension board 103 both can be positioned to connect on pullover 1011 without unnecessary connector.The height of central layer 1039 protrudes from frid 1037 and rivets mutually with sleeve pipe 1013, can effectively solve riveted joint be fixedly connected with pullover 1011 and when extension board 103 easily by a difficult problem for frid 1037 stop limits.Separately, the bushing slot 1047 on central layer 1039 is a semienclosed notch structure, and convenient while making sleeve pipe 1013 insert this bushing slot 1047, also rivet 1026 is inserted in the position of convenient adjustment sleeve pipe 1013 simultaneously.Herein, rivet 1026 is also only need run through the two-layer thin-walled of sleeve pipe 1013 and one deck thin-walled of fixed station 1048 can be realized riveted joint, is also convenient to a certain extent existing riveted joint when mounted and fixes.
The matched in clearance structure of sleeve pipe 1013 in the collar aperture 1021 that connects pullover 1011, the structure of multiple riveted holes is set on sleeve pipe 1013 and central layer 1039, and the structure that multiple riveted holes are set on frid 1037 and aluminum alloy pattern plate unit 200 can realize adjustment link position and the number of elements of freedom and flexibility more when mounted.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any modifications of doing within principle of the present invention, are equal to and replace and within improvement etc. all should comprise protection scope of the present invention.

Claims (10)

1. a mounting method for construction formwork, by using aluminum alloy pattern plate connector that multiple aluminum alloy pattern plates unit is connected as one, is characterized in that: comprises,
Step S1, provides a connection pullover and at least one extension board, and adapter sleeve cephalic region is provided with collar aperture, and extension board comprises that a frid and that is positioned at upper strata is positioned at the central layer of lower floor, and central layer is fixed on the notch place of frid;
Step S2, extends to central layer place by removable sleeve pipe through collar aperture, and is riveted on this central layer; And
Step S3, is connected in multiple aluminum alloy pattern plate building units the both sides of frid.
2. the mounting method of construction formwork as claimed in claim 1, is characterized in that: further comprise step S4, fix a column in the pullover bottom of connection.
3. the mounting method of construction formwork as claimed in claim 1, is characterized in that: use multiple rivets to be fixedly connected with respectively described sleeve pipe and central layer, described frid and aluminum alloy pattern plate unit.
4. the mounting method of construction formwork as claimed in claim 1, is characterized in that: the length that multiple aluminum alloy pattern plate building units of the same side are stitched together is less than or equal to the length sum that connects pullover and all extension boards.
5. the mounting method of construction formwork as claimed in claim 1, is characterized in that: connection in step S1 is pullover is a square groove shape structure, and both sides are symmetrically arranged with two collar aperture towards inside, and this two shell clearance is engaged in collar aperture.
6. the mounting method of construction formwork as claimed in claim 1, is characterized in that: the frid in step S1 is a square groove shape structure, and the dual-side bottom of frid is provided with an installation step, and this aluminum alloy pattern plate unit supports is positioned on this installation step.
7. the mounting method of construction formwork as claimed in claim 1, is characterized in that: the central layer in step S1 comprises a welding bench and a fixed station, and this welding bench is weldingly fixed on the side inwall of frid, and described sleeve pipe riveted joint is fixed on this fixed station.
8. the mounting method of construction formwork as claimed in claim 7, is characterized in that: the both sides of fixed station are provided with bushing slot, and this bushing slot is a semienclosed slot shape structure, and the degree of freedom that retains a direction after this bushing slot is inserted in the end of splicing sleeve.
9. an aluminum alloy pattern plate connector, for multiple aluminum alloy pattern plates unit is connected as one, it is characterized in that: this aluminum alloy pattern plate connector comprises pullover and at least one extension board of a connection, adapter sleeve cephalic region is provided with collar aperture, extension board comprises that a frid and that is positioned at upper strata is positioned at the central layer of lower floor, central layer is fixed on the notch place of frid, and a sleeve pipe extends its end to be riveted on central layer after passing collar aperture.
10. aluminum alloy pattern plate connector as claimed in claim 9, it is characterized in that: central layer comprises a welding bench and a fixed station, this welding bench is weldingly fixed on the side inwall of frid, described sleeve pipe riveted joint is fixed on this fixed station, the both sides of fixed station are provided with bushing slot, this bushing slot is a semienclosed slot shape structure, and the degree of freedom that retains a direction after this bushing slot is inserted in the end of splicing sleeve.
CN201410073547.4A 2014-02-28 2014-02-28 The mounting method of construction formwork and the aluminum alloy pattern plate connector used Expired - Fee Related CN103866975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410073547.4A CN103866975B (en) 2014-02-28 2014-02-28 The mounting method of construction formwork and the aluminum alloy pattern plate connector used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410073547.4A CN103866975B (en) 2014-02-28 2014-02-28 The mounting method of construction formwork and the aluminum alloy pattern plate connector used

Publications (2)

Publication Number Publication Date
CN103866975A true CN103866975A (en) 2014-06-18
CN103866975B CN103866975B (en) 2016-02-03

Family

ID=50905954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410073547.4A Expired - Fee Related CN103866975B (en) 2014-02-28 2014-02-28 The mounting method of construction formwork and the aluminum alloy pattern plate connector used

Country Status (1)

Country Link
CN (1) CN103866975B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715046A (en) * 2015-12-16 2016-06-29 绍兴县明煌建材科技有限公司 Steel and wood template component and construction method thereof
CN106401184A (en) * 2016-11-10 2017-02-15 湖北森峰铝模科技有限公司 Aluminum template connection piece
CN107282792A (en) * 2017-07-21 2017-10-24 广东万博电气有限公司 The riveting tool and method of a kind of solar heat collector frame
CN109441097A (en) * 2018-12-20 2019-03-08 山东新活新材料科技有限公司 One kind for building three connects aluminum dipping form
CN109653488A (en) * 2019-01-14 2019-04-19 广西汉瑞金属科技有限公司 A kind of modular unit and its installation method of building template support system
CN111827663A (en) * 2020-07-14 2020-10-27 唐山市丰润区玥泰金属制品有限公司 Wall form strutting arrangement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2424257Y (en) * 2000-05-10 2001-03-21 陈结源 Template Modified Structure
CN2491554Y (en) * 2000-10-09 2002-05-15 华汇系统板模有限公司 Systematic building formwork
KR100655505B1 (en) * 2005-12-02 2006-12-11 태성판넬 주식회사 Assembly structure of prefabricated formwork
KR20090003307U (en) * 2007-10-05 2009-04-09 방정운 Hanging slab formwork
CN101824907A (en) * 2010-04-30 2010-09-08 倪国荣 Connecting structure of aluminum alloy building template assembly
KR101310845B1 (en) * 2011-05-30 2013-09-25 (주)에이원알폼 Structure of beam for drop down of slab form

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2424257Y (en) * 2000-05-10 2001-03-21 陈结源 Template Modified Structure
CN2491554Y (en) * 2000-10-09 2002-05-15 华汇系统板模有限公司 Systematic building formwork
KR100655505B1 (en) * 2005-12-02 2006-12-11 태성판넬 주식회사 Assembly structure of prefabricated formwork
KR20090003307U (en) * 2007-10-05 2009-04-09 방정운 Hanging slab formwork
CN101824907A (en) * 2010-04-30 2010-09-08 倪国荣 Connecting structure of aluminum alloy building template assembly
KR101310845B1 (en) * 2011-05-30 2013-09-25 (주)에이원알폼 Structure of beam for drop down of slab form

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715046A (en) * 2015-12-16 2016-06-29 绍兴县明煌建材科技有限公司 Steel and wood template component and construction method thereof
CN105715046B (en) * 2015-12-16 2018-03-20 绍兴县明煌建材科技有限公司 A kind of Steel-wood forming board component and its construction method
CN106401184A (en) * 2016-11-10 2017-02-15 湖北森峰铝模科技有限公司 Aluminum template connection piece
CN107282792A (en) * 2017-07-21 2017-10-24 广东万博电气有限公司 The riveting tool and method of a kind of solar heat collector frame
CN107282792B (en) * 2017-07-21 2023-08-08 广东万和电气有限公司 Riveting tool and method for solar heat collector frame
CN109441097A (en) * 2018-12-20 2019-03-08 山东新活新材料科技有限公司 One kind for building three connects aluminum dipping form
CN109653488A (en) * 2019-01-14 2019-04-19 广西汉瑞金属科技有限公司 A kind of modular unit and its installation method of building template support system
CN111827663A (en) * 2020-07-14 2020-10-27 唐山市丰润区玥泰金属制品有限公司 Wall form strutting arrangement

Also Published As

Publication number Publication date
CN103866975B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN103866975A (en) Building formwork assembly method and used aluminium formwork connector
CN100476081C (en) Assembling method for large truss type pile leg structure
CN102535738A (en) A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method
CN113982111A (en) Double-beam modular steel structure interpolation self-locking node
CN104775517A (en) Connecting node for steel frame and steel structure module
CN107190847A (en) Prefabricated assembled light steel wallboard, building construction and its method of construction
KR101174562B1 (en) Construction method of diagrid node of concrete filled steel tube
CN203769314U (en) Aluminum die plate connector and aluminum die plate building unit
CN113431222A (en) Assembled steel bar clamping groove type composite shear wall and splicing method thereof
CN204551732U (en) A kind of steel frame and steel structure module connected node
CN203821851U (en) Aluminum template connecting piece and aluminum template building unit
CN208396013U (en) A kind of modularization composite structure connecting node
CN105625563B (en) A kind of frame structure for data center module
CN114263294A (en) Assembled cold-formed light steel keel frame structure and assembly thereof
CN210558761U (en) Butt joint node additionally provided with elevator shaft
CN103821352B (en) The mounting method of aluminum alloy pattern plate building unit and the aluminum alloy pattern plate connector used
CN106401184A (en) Aluminum template connection piece
CN113565207B (en) Assembly type beam-column joint structure and construction method
CN107386461B (en) Steel truss multidirectional cross connecting box type node welding die carrier and node assembling method
CN203716287U (en) Multi-layer stereo framework being composed of prefabricated reinforced concrete components
CN211501219U (en) Split formula elevator frame post connecting device
CN202744965U (en) Arch rib collecting mechanism of steel pipe concrete arch bridge
CN201706179U (en) Connecting joint for connecting embedded composite sections
CN201883538U (en) Rapidly constructed building pipe fitting connection device
CN204791669U (en) Realize bright dress and secretly adorn real standard simulation wall of double -deck comprehensive wiring of dismantling of function teaching

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160908

Address after: 518000 Guangdong city of Shenzhen province Futian District Fuhua Road No. 115 building 3 unit 01-4 investment bank

Patentee after: Shenzhen Ming Rui Technology Co.,Ltd. Weikang

Address before: 502, room 3, Huaxing street, Huizhou freshwater Street office, Huiyang District, Guangdong 516211, China

Patentee before: Su Hongfei

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170302

Address after: 518000 Guangdong city of Shenzhen province Luohu District Wong Pui Street Jinxing villa Chunfeng road building 51

Patentee after: Huayue Environmental Technology (Shenzhen) Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Luohu District Wong Pui Street Jinxing villa Chunfeng road building 51

Patentee before: Shi Lili

Effective date of registration: 20170302

Address after: 518000 Guangdong city of Shenzhen province Luohu District Wong Pui Street Jinxing villa Chunfeng road building 51

Patentee after: Shi Lili

Address before: 518000 Guangdong city of Shenzhen province Futian District Fuhua Road No. 115 building 3 unit 01-4 investment bank

Patentee before: Shenzhen Ming Rui Technology Co.,Ltd. Weikang

TR01 Transfer of patent right

Effective date of registration: 20210129

Address after: 518000 28-h, block a, Guanghao International Center, intersection of Meilong road and Zhongmei Road, Daling community, Minzhi street, Longhua District, Shenzhen City, Guangdong Province

Patentee after: Wanhe Industrial Development (Shenzhen) Co.,Ltd.

Address before: 518000 building 51, Jinxing villa, Chunfeng Road, Huangbei street, Luohu District, Shenzhen City, Guangdong Province

Patentee before: Huayue Environmental Technology (Shenzhen) Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20210228

CF01 Termination of patent right due to non-payment of annual fee