CN107190847A - Prefabricated assembled light steel wallboard, building construction and its method of construction - Google Patents

Prefabricated assembled light steel wallboard, building construction and its method of construction Download PDF

Info

Publication number
CN107190847A
CN107190847A CN201710580733.0A CN201710580733A CN107190847A CN 107190847 A CN107190847 A CN 107190847A CN 201710580733 A CN201710580733 A CN 201710580733A CN 107190847 A CN107190847 A CN 107190847A
Authority
CN
China
Prior art keywords
light steel
board body
wall board
cast
steelframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710580733.0A
Other languages
Chinese (zh)
Inventor
黄昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Grassroots Villa Housing Manufacturing Co Ltd
Original Assignee
Guangdong Grassroots Villa Housing Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Grassroots Villa Housing Manufacturing Co Ltd filed Critical Guangdong Grassroots Villa Housing Manufacturing Co Ltd
Priority to CN201710580733.0A priority Critical patent/CN107190847A/en
Publication of CN107190847A publication Critical patent/CN107190847A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/562Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • E04C2/384Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B2001/4192Connecting devices specially adapted for embedding in concrete or masonry attached to concrete reinforcing elements, e.g. rods or wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及预制装配式轻钢墙板、预制装配式房屋建筑及建造预制装配式房屋的方法,其包括墙板体,所述墙板体包括轻钢架和设于轻钢架外侧的板体,所述轻钢架包括至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架,所述浇注钢架包括在竖直方向设置的两个开口相对的条型轻钢,所述两个开口相对的条型轻钢围合成一个用于灌注混凝土浆的第一浇注腔,在所述墙板体的两侧设有墙墙连接结构。本发明在墙板体上设置多个第一浇注腔,在安装时定位钢筋可直接插装到第一浇注腔内,并且在第一浇注腔内浇灌混凝土浆,使墙板体与连接钢筋固定连接,同时增强了墙板体的承重力。

The invention relates to a prefabricated assembled light steel wall panel, a prefabricated assembled house building and a method for building a prefabricated assembled house. , the light steel frame includes at least one pouring steel frame that is vertically arranged and can be poured with concrete slurry inside, and the pouring steel frame includes two bar-type light steel bars with opposite openings that are arranged in the vertical direction, and the two The bar-type light steel with opposite openings encloses a first pouring cavity for pouring concrete slurry, and wall-wall connection structures are arranged on both sides of the wall board body. In the present invention, a plurality of first pouring cavities are arranged on the wallboard body, and the positioning steel bars can be directly inserted into the first pouring cavities during installation, and concrete slurry is poured in the first pouring cavities, so that the wallboard body and the connecting steel bars are fixed connection, while enhancing the load-bearing capacity of the wall panels.

Description

预制装配式轻钢墙板、房屋建筑及其建造方法Prefabricated light steel wall panel, building construction and construction method thereof

【技术领域】【Technical field】

本发明涉及预制装配式轻钢墙板、预制装配式房屋建筑及建造预制装配式房屋的方法。The invention relates to a prefabricated assembled light steel wall panel, a prefabricated assembled house building and a method for building a prefabricated assembled house.

【背景技术】【Background technique】

现有的预制房屋的墙板体通常是一整块的板体,只在墙板体底端设置连接孔用于与钢筋的安装连接,这种墙板体的承重力能力差,需要做出创新。The wall panels of existing prefabricated houses are usually a whole piece of panels, and only connection holes are provided at the bottom of the wall panels for installation and connection with steel bars. Such wall panels have poor load-bearing capacity and need to be made innovation.

现有的预制房屋的墙板与墙板之间连接时,需要用混凝土浇注柱子连接支撑,浇注时需要在两墙板之间连接处外侧固定模板,使得模板与墙体之间形成柱状空腔用于浇注柱子,这种浇注方式需要外加模板,不够方便。另外,安装建造效率低、安装速度慢、成本高。为了能实现在工厂工业化批量生产房屋,为了更加快捷的组装成房屋和在组装过程中不破坏已经在工厂完成的内外装饰,需要做出创新。When the wall panels of existing prefabricated houses are connected to each other, concrete pouring columns are required to connect and support them. During pouring, the formwork needs to be fixed on the outside of the connection between the two wall panels, so that a columnar cavity is formed between the formwork and the wall. It is used for pouring columns. This pouring method requires an external formwork, which is not convenient enough. In addition, the installation and construction efficiency is low, the installation speed is slow, and the cost is high. In order to realize the industrialized mass production of houses in the factory, in order to assemble the houses more quickly and not destroy the interior and exterior decorations that have been completed in the factory during the assembly process, innovations need to be made.

【发明内容】【Content of invention】

本发明克服了现有技术的不足,提供了一种承重能力好的预制装配式轻钢墙板。The invention overcomes the deficiencies of the prior art and provides a prefabricated assembled light steel wall panel with good load-bearing capacity.

本发明提供了一种安装方便、效率高、成本低的预制装配式房屋建筑。The invention provides a prefabricated house building with convenient installation, high efficiency and low cost.

本发明还提供了一种该预制装配式房屋建筑的建造方法。The invention also provides a construction method of the prefabricated building.

为解决上述技术问题,本发明采用以下技术方案:In order to solve the problems of the technologies described above, the present invention adopts the following technical solutions:

预制装配式轻钢墙板,包括墙板体1,所述墙板体1包括轻钢架101和设于轻钢架101外侧的板体102,所述轻钢架101包括至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,在所述墙板体1的两侧设有墙墙连接结构2。The prefabricated light steel wall panel includes a wall panel body 1, the wall panel body 1 includes a light steel frame 101 and a panel body 102 located outside the light steel frame 101, and the light steel frame 101 includes at least one vertically arranged And the pouring steel frame 1011 that can pour concrete slurry inside, the pouring steel frame 1011 includes two bar-shaped light steel 100 with opposite openings arranged in the vertical direction, and the bar-shaped light steel 100 with two openings opposite A first pouring cavity 111 for pouring concrete slurry is synthesized, and wall-wall connection structures 2 are provided on both sides of the wall panel body 1 .

所述墙墙连接结构2包括竖直设置在墙板体1两侧的开口向外的连接轻钢21,所述连接轻钢21呈“匚”字状,在所述“匚”字的开口端向内延伸形成凸缘211,所述两个开口相对的条型轻钢100的凸缘211通过螺钉固定连接,所述连接轻钢21通过螺钉固定在浇注钢架1011上。The wall-to-wall connection structure 2 includes connecting light steel 21 vertically arranged on both sides of the wall panel body 1 with openings outward. The connecting light steel 21 is in the shape of a "匚" character. The ends extend inwardly to form a flange 211, and the flanges 211 of the two bar-shaped light steel 100 with opposite openings are fixedly connected by screws, and the connecting light steel 21 is fixed on the cast steel frame 1011 by screws.

所述轻钢架101包括设置于浇注钢架1011两端的横向轻钢110,所述浇注钢架1011与横向轻钢110的连接处设有与第一浇注腔111相通的第一连接孔31。The light steel frame 101 includes transverse light steel frames 110 arranged at both ends of the pouring steel frame 1011 , and a first connection hole 31 communicating with the first pouring cavity 111 is provided at the junction of the pouring steel frame 1011 and the transverse light steel frames 110 .

所述墙墙连接结构2还包括竖直设置在墙板体1上可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,所述第二浇注腔121包括两个开口相对的条型轻钢100与设于条型轻钢100外侧的板体102结合而成。The wall-to-wall connection structure 2 also includes a connecting steel frame 1211 vertically arranged on the wall panel body 1 and capable of pouring concrete slurry inside, and a second pouring cavity 121 is arranged in the vertical direction of the connecting steel frame 1211, so that The second pouring cavity 121 is formed by combining two bar-shaped light steel 100 with opposite openings and a plate body 102 arranged outside the bar-shaped light steel 100 .

所述轻钢架101包括设置于连接钢架1211两端的横向轻钢110,所述连接钢架1211与横向轻钢110的连接处设有与第二浇注腔121相通的第二连接孔32。The light steel frame 101 includes transverse light steel frames 110 arranged at both ends of the connecting steel frame 1211 , and the connection between the connecting steel frame 1211 and the horizontal light steel frames 110 is provided with a second connection hole 32 communicating with the second pouring cavity 121 .

所述板体102通过螺钉固定在轻钢架101上,在所述墙板体1内设有填充层13。The board body 102 is fixed on the light steel frame 101 by screws, and a filling layer 13 is arranged inside the wall board body 1 .

所述填充层13为轻质混凝土,所述板体102包括挤塑板1021,在所述挤塑板1021的两侧设有水泥纤维板1022。The filling layer 13 is lightweight concrete, the board body 102 includes an extruded board 1021 , and cement fiber boards 1022 are arranged on both sides of the extruded board 1021 .

预制装配式房屋建筑,包括墙板体1,所述墙板体1包括轻钢架101和设于轻钢架101外侧的板体102,所述轻钢架101包括至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,所述墙板体1可分为相互连接的第一墙板体11和第二墙板体12,在所述第一墙板体11的两侧竖直设置有开口向外的连接轻钢21,所述连接轻钢21通过螺钉固定在浇注钢架1011上,在所述第二墙板体12的两侧设置有可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,所述第二浇注腔121由两个开口相对的条型轻钢100与设在条型轻钢100外侧的板体102组合而成,所述连接轻钢21的开口端与连接钢架1211组合形成第三浇注腔112,所述第二浇注腔121与第三浇注腔112之间设有连接件22,在所述第一浇注腔111、第二浇注腔121及第三浇注腔112内设有混凝土层4。The prefabricated house building includes a wall panel body 1, the wall panel body 1 includes a light steel frame 101 and a panel body 102 arranged outside the light steel frame 101, the light steel frame 101 includes at least one vertically arranged and can The pouring steel frame 1011 for pouring concrete slurry inside, the pouring steel frame 1011 includes two bar-shaped light steel 100 with opposite openings arranged in the vertical direction, and the two bar-shaped light steel 100 with opposite openings are enclosed into one The first pouring cavity 111 for pouring concrete slurry, the wall panel body 1 can be divided into a first wall panel body 11 and a second wall panel body 12 connected to each other, on both sides of the first wall panel body 11 The connecting light steel 21 with the opening outward is vertically arranged, and the connecting light steel 21 is fixed on the pouring steel frame 1011 by screws, and the two sides of the second wallboard body 12 are provided with holes for pouring concrete slurry inside. The connecting steel frame 1211 is provided with a second pouring cavity 121 in the vertical direction of the connecting steel frame 1211, and the second pouring cavity 121 is composed of two bar-shaped light steel 100 with opposite openings and a bar-shaped light steel 100 The outer plate body 102 is combined, the open end of the connecting light steel 21 is combined with the connecting steel frame 1211 to form the third pouring cavity 112, and a connecting piece is provided between the second pouring cavity 121 and the third pouring cavity 112 22. A concrete layer 4 is provided in the first pouring cavity 111 , the second pouring cavity 121 and the third pouring cavity 112 .

所述预制装配式房屋建筑还包括混凝土底座9,在所述混凝土底座9上设有可插入第一浇注腔111、第二浇注腔121底部的定位钢筋91,在所述第一浇注腔111及第二浇注腔121内还设有连接钢筋92,所述连接钢筋92的上端伸出第一浇注腔111及第二浇注腔121的上表面。The prefabricated house construction also includes a concrete base 9, on which is provided a positioning steel bar 91 that can be inserted into the bottom of the first pouring cavity 111 and the second pouring cavity 121, and in the first pouring cavity 111 and the bottom of the second pouring cavity 121. The second pouring cavity 121 is also provided with connecting steel bars 92 , the upper ends of the connecting steel bars 92 protrude from the upper surfaces of the first casting cavity 111 and the second casting cavity 121 .

所述两个开口相对的条型轻钢100的连接处通过螺钉固定连接,所述连接轻钢21呈“匚”字状,在所述“匚”字的开口端向内延伸形成凸缘211,所述两个开口相对的条型轻钢100的凸缘211通过螺钉固定连接。The joints of the two bar-shaped light steels 100 with opposite openings are fixedly connected by screws, and the connecting light steels 21 are in the shape of a "匚" character, and a flange 211 is formed by extending inward at the opening end of the "匚" character. , the two flanges 211 of the bar-shaped light steel 100 with opposite openings are fixedly connected by screws.

所述的连接件22为铆钉,在所述连接钢架1211上还设有安装槽122,所述安装槽122包话设置在两条型轻钢100之间的间隙与设置在两条型轻钢外侧的板体102组合形成,在所述安装槽122上设有多个安装孔1221,所述连接件22安装在安装孔1221内,在所述连接轻钢100上设有与所述连接件22卡合的卡板1001,在所述卡板1001上设有一端开口的卡槽1002,所述连接件22的一端置于第三浇注腔112内,另一端置于第二浇注腔121内。The connecting piece 22 is a rivet, and an installation groove 122 is also provided on the connecting steel frame 1211. The plate body 102 on the outside of the steel is combined to form a plurality of installation holes 1221 on the installation groove 122, and the connecting piece 22 is installed in the installation holes 1221, and the connecting light steel 100 is provided with the connection The card plate 1001 engaged with the piece 22 is provided with a card slot 1002 with one end open on the card plate 1001, one end of the connecting piece 22 is placed in the third casting cavity 112, and the other end is placed in the second casting cavity 121 Inside.

所述浇注钢架1011及连接钢架1211的两端分别设有横向轻钢110,在所述浇注钢架1011与横向轻钢110的连接处设有与第一浇注腔111相通的第一连接孔31,在所述连接钢架1211与横向轻钢110的连接处设有与第二浇注腔121相通的第二连接孔32。The two ends of the pouring steel frame 1011 and the connecting steel frame 1211 are respectively provided with transverse light steel 110, and at the junction of the pouring steel frame 1011 and the transverse light steel 110, there is a first connection with the first pouring cavity 111. The hole 31 is a second connection hole 32 communicating with the second pouring cavity 121 at the junction of the connecting steel frame 1211 and the transverse light steel 110 .

在相互连接的墙板体1的连接处的上方设有加强片5,所述加强片5上设有多个通孔51,所述通孔51分别与所述第一浇注腔111、第二浇注腔121及第三浇注腔112对应。A reinforcement sheet 5 is provided above the connection of the interconnected wallboard bodies 1, and a plurality of through holes 51 are provided on the reinforcement sheet 5, and the through holes 51 are respectively connected with the first pouring cavity 111, the second The casting cavity 121 corresponds to the third casting cavity 112 .

在所述墙板体1的上方设有楼板6,所述楼板6包括由多条轻钢100组成的桁架61和设在桁架61上方的楼面板62,在所述桁架61的两端设有多个凸台611,在所述凸台611的下方设有将相邻的凸台611连接的直角架612,所述直角架612的垂直面6121通过螺钉固定在桁架61上,所述直角架612和凸台611置于墙板体1上方,所述直角架612的横向面6122通过螺钉固定在墙板体1上方。A floor 6 is provided above the wallboard body 1, and the floor 6 includes a truss 61 composed of a plurality of light steel 100 and a floor panel 62 arranged above the truss 61, and at both ends of the truss 61 A plurality of bosses 611, below the bosses 611 are provided with a right-angled frame 612 connecting adjacent bosses 611, the vertical surface 6121 of the right-angled frame 612 is fixed on the truss 61 by screws, the right-angled frame 612 and boss 611 are placed above the wallboard body 1, and the transverse surface 6122 of the right-angle frame 612 is fixed above the wallboard body 1 by screws.

所述楼面板62包括泡沫层621,在所述泡沫层621的两边设置有复合板层622。The floor panel 62 includes a foam layer 621 , and composite board layers 622 are arranged on both sides of the foam layer 621 .

所述墙板体1围成多个独立的空间,在每个独立空间的上方设有与其空间大小相对应的楼板6,在所述墙板体1的上方沿墙板体1的外侧边设有围边7,在相邻的楼板6之间、围边7与楼板6之间设有圈钢8,在所述圈钢8的上方设有混凝土层4并使混凝土层4与楼板6处于同一平面。The wall panel body 1 encloses a plurality of independent spaces, and a floor 6 corresponding to the size of the space is provided above each independent space, and above the wall panel body 1 along the outer side of the wall panel body 1 Surrounding edge 7 is provided, ring steel 8 is arranged between adjacent floor 6, between surrounding edge 7 and floor 6, is provided with concrete layer 4 above described ring steel 8 and makes concrete layer 4 and floor 6 on the same plane.

所述预制装配式房屋建筑还包括电线管道201及自来水管道202,所述电线管道201及自来水管道202分别铺设在墙板体1及楼板6内,在所述电线管道201的接口处设有第一转接头2011,所述第一转接头2011与用电装置连接,所述自来水管道202的出口处设有第二转接头2021,所述第二转接头2021与用水装置连接,在所述墙板体1的顶端还设有屋顶斜板120。The prefabricated housing construction also includes wire conduits 201 and tap water conduits 202. The wire conduits 201 and tap water conduits 202 are respectively laid in the wallboard body 1 and the floor slab 6. An adapter 2011, the first adapter 2011 is connected to the electrical device, the outlet of the tap water pipe 202 is provided with a second adapter 2021, the second adapter 2021 is connected to the water device, on the wall The top of the board body 1 is also provided with a roof sloping board 120 .

预制装配式房屋建筑的建造方法,包括如下步骤:A method for building a prefabricated house, comprising the following steps:

A、先将混凝土底座9装到预定的位置水平固定;A. Install the concrete base 9 to the predetermined position and fix it horizontally;

B、取第一墙板体11,所述第一墙板体11上设有至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,将所述第一墙板体11上的第一浇注腔111对准混凝土底座9上的定位钢筋91插装到混凝土底座9上;B. Take the first wallboard body 11, the first wallboard body 11 is provided with at least one pouring steel frame 1011 that is vertically arranged and can pour concrete slurry inside, and the pouring steel frame 1011 includes Two bar-shaped light steel bars 100 with opposite openings are provided, and the two bar-shaped light steel bars 100 with opposite openings enclose a first pouring cavity 111 for pouring concrete slurry, and the first wallboard body 11 is placed The first pouring cavity 111 is aligned with the positioning steel bars 91 on the concrete base 9 and inserted onto the concrete base 9;

C、取第二墙板体12,所述第二墙板体12的两侧竖直设置有可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,所述第二浇注腔121由两个开口相对的条型轻钢100与设在条型轻钢100外侧的板体102组合而成,将所述第二墙板体12上的第二浇注腔121对准混凝土底座9上的定位钢筋91插装到混凝土底座9上;C. Take the second wall panel body 12, the two sides of the second wall panel body 12 are vertically provided with a connecting steel frame 1211 that can pour concrete slurry inside, and the vertical direction of the connecting steel frame 1211 is provided with The second pouring cavity 121, the second pouring cavity 121 is composed of two bar-shaped light steel 100 with opposite openings and the plate body 102 arranged on the outside of the bar-shaped light steel 100, the second wall plate body 12 The second pouring cavity 121 on the top is aligned with the positioning steel bars 91 on the concrete base 9 and inserted onto the concrete base 9;

D、将第一墙板体11和第二墙板体12进行组装,所述第一墙板体11的两侧设有连接轻钢21,所述连接轻钢21的开口端与连接钢架1211的外表面组合形成第三浇注腔112,所述第一墙板体11和第二墙板体12组装完成;D. Assemble the first wallboard body 11 and the second wallboard body 12, the two sides of the first wallboard body 11 are provided with connecting light steel 21, the open end of the connecting light steel 21 is connected with the connecting steel frame The outer surfaces of 1211 are combined to form the third pouring cavity 112, and the assembly of the first wallboard body 11 and the second wallboard body 12 is completed;

E、往第一浇注腔111、第二浇注腔121及第三浇注腔112内浇灌混凝土浆,使连接件22的两端同时固定在第二浇注腔121及第三浇注腔112内。E. Pour concrete slurry into the first pouring chamber 111 , the second pouring chamber 121 and the third pouring chamber 112 , so that both ends of the connector 22 are fixed in the second pouring chamber 121 and the third pouring chamber 112 at the same time.

在步骤A和步骤B之间还包括如下步骤:The following steps are also included between step A and step B:

A1:将所述连接件22安装在安装孔1221上,在所述墙板体1上铺设电线管道201和自来水管道202及与电线管道201连接的第一转接头2011、与自来水管道202连接的第二连接头2021,往墙板体1内浇灌轻质水泥。A1: Install the connector 22 on the installation hole 1221, lay the wire conduit 201 and the tap water conduit 202 and the first adapter 2011 connected to the wire conduit 201 and the first adapter 2011 connected to the tap water conduit 202 on the wallboard body 1. The second connector 2021 pours lightweight cement into the wallboard body 1 .

在步骤C之后还包括如下步骤:After step C, also include the following steps:

C1、将所述连接件22安装到连接孔1221上,所述连接件22的另一端与卡板1001上的卡槽1002卡接,使连接件22的一端置于第二浇注腔121内,另一端置于第三浇注腔112内。C1. Install the connecting piece 22 on the connecting hole 1221, the other end of the connecting piece 22 is engaged with the slot 1002 on the clamping plate 1001, so that one end of the connecting piece 22 is placed in the second pouring cavity 121, The other end is placed in the third pouring cavity 112 .

在步骤D和步骤E之间还包括如下步骤:The following steps are also included between step D and step E:

D1、将第一墙板体11和第二墙板体12组装完成后在第一墙板体11和第二墙板体12的顶端安装加强片5,所述加强片5的通孔51分别与第一浇注腔111、第二浇注腔121及第三浇注腔21相对应;D1, after assembling the first wallboard body 11 and the second wallboard body 12, install the reinforcement sheet 5 on the top of the first wallboard body 11 and the second wallboard body 12, and the through holes 51 of the reinforcement sheet 5 are respectively Corresponding to the first pouring chamber 111, the second pouring chamber 121 and the third pouring chamber 21;

D2、在所述第一浇注腔111、第二浇注腔121内插装连接钢筋92,使所述连接钢筋92的上端伸出第一浇注腔111及第二浇注腔121的上表面。D2. Insert the connecting steel bar 92 into the first pouring cavity 111 and the second pouring cavity 121 , so that the upper end of the connecting steel bar 92 protrudes from the upper surface of the first pouring cavity 111 and the second pouring cavity 121 .

在E步骤后还包括如下步骤:After the E step, the following steps are also included:

F、在墙板体1上方铺楼板6,将所述桁架61两端的凸台611置于墙板体1上方,将楼面板62置于桁架61的上方;F. Lay the floor slab 6 above the wall panel body 1, place the bosses 611 at both ends of the truss 61 above the wall panel body 1, and place the floor panel 62 above the truss 61;

G、在所述墙板体1的上方沿墙板体1的外侧边设置围边7,在相邻的楼板6之间、围边7与楼板6之间铺设圈钢8;G, above the wallboard body 1, a surrounding edge 7 is set along the outer side of the wallboard body 1, and ring steel 8 is laid between adjacent floor plates 6, between the surrounding edge 7 and the floor plate 6;

H、往所述圈钢8上浇灌混凝土浆,并使混凝土层4与楼板6的表面平齐;H, pour concrete slurry on the ring steel 8, and make the surface of the concrete layer 4 and the floor 6 flush;

I、在墙板体1上方铺设屋顶斜板120。1. Lay the roof sloping plate 120 above the wallboard body 1.

本发明与现有技术相比,有以下优点:Compared with the prior art, the present invention has the following advantages:

本发明在墙板体上设置多个第一浇注腔,在安装时定位钢筋可直接插装到第一浇注腔内,并且在第一浇注腔内浇灌混凝土浆,使墙板体与连接钢筋固定连接,同时增强了墙板体的承重力。In the present invention, a plurality of first pouring cavities are arranged on the wallboard body, and the positioning steel bars can be directly inserted into the first pouring cavities during installation, and concrete slurry is poured in the first pouring cavities, so that the wallboard body and the connecting steel bars are fixed connection, while enhancing the load-bearing capacity of the wall panels.

本发明在墙板体的两端设有墙墙连接结构,通过将连接件的两端分别置于第二浇注腔和第三浇注腔内,并通过浇灌混凝土浆使连接件的两端同时固定,从而使第二浇注腔和第三浇注腔固定连接在一起,结构简单,连接性好。In the present invention, a wall-wall connection structure is provided at both ends of the wallboard body, by placing the two ends of the connecting piece in the second pouring cavity and the third pouring cavity respectively, and fixing the two ends of the connecting piece at the same time by pouring concrete slurry , so that the second pouring cavity and the third pouring cavity are fixedly connected together, the structure is simple, and the connection is good.

【附图说明】【Description of drawings】

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following will briefly introduce the drawings that need to be used in the description of the embodiments.

图1是本发明实施例墙板体立体图;Fig. 1 is the three-dimensional view of wall panel body of the embodiment of the present invention;

图2是本发明实施例轻钢架立体图;Fig. 2 is a perspective view of a light steel frame according to an embodiment of the present invention;

图3是本发明实施例墙墙连接结构立体图;Fig. 3 is a three-dimensional view of the wall-to-wall connection structure of the embodiment of the present invention;

图4是本发明实施例墙墙连接结构示意图;Fig. 4 is a schematic diagram of the wall-to-wall connection structure of the embodiment of the present invention;

图5是本发明图4中A-A剖视图;Fig. 5 is A-A sectional view among Fig. 4 of the present invention;

图6是本发明实施例卡板开口向上示意图;Fig. 6 is a schematic view showing the opening of the clamping board according to the embodiment of the present invention;

图7是本发明实施例卡板开口向下示意图;Fig. 7 is a schematic diagram showing the opening of the clamping plate downwards according to the embodiment of the present invention;

图8是本发明实施例加强片与墙板连接示意图;Fig. 8 is a schematic diagram of the connection between the reinforcing sheet and the wallboard according to the embodiment of the present invention;

图9是本发明实施例加强片与墙板连接立体图;Fig. 9 is a perspective view of the connection between the reinforcing sheet and the wallboard according to the embodiment of the present invention;

图10是本发明实施例桁架立体图一;Fig. 10 is a three-dimensional view of a truss according to an embodiment of the present invention;

图11是本发明实施例桁架立体图二;Fig. 11 is the second perspective view of the truss of the embodiment of the present invention;

图12是本发明实施例桁架与墙板连接立体图;Fig. 12 is a perspective view of the connection between the truss and the wall panel according to the embodiment of the present invention;

图13是本发明实施例桁架与墙板连接示意图;Fig. 13 is a schematic diagram of the connection between the truss and the wall panel according to the embodiment of the present invention;

图14是本发明实施例围边与墙板体配合立体图;Fig. 14 is a three-dimensional view of the cooperation between the surrounding edge and the wallboard body according to the embodiment of the present invention;

图15是本发明实施例圈钢安装立体图;Fig. 15 is a perspective view of ring steel installation according to the embodiment of the present invention;

图16是本发明实施例浇灌混凝土前立体图;Fig. 16 is a perspective view before pouring concrete according to the embodiment of the present invention;

图17是本发明实施例浇灌混凝土后立体图;Figure 17 is a perspective view of the embodiment of the present invention after pouring concrete;

图18是本发明实施例连接钢筋与墙板体配合示意图;Fig. 18 is a schematic diagram of the cooperation between the connecting steel bar and the wallboard body according to the embodiment of the present invention;

图19是本发明图18中C-C剖视图;Figure 19 is a sectional view of C-C in Figure 18 of the present invention;

图20是本发明图18中D-D剖视图;Figure 20 is a D-D sectional view in Figure 18 of the present invention;

图21是本发明实施例连接钢筋与墙板体安装示意图;Fig. 21 is a schematic diagram of the installation of connecting steel bars and wall panels according to the embodiment of the present invention;

图22是本发明实施例电线管道铺设示意图;Fig. 22 is a schematic diagram of laying wire conduits according to an embodiment of the present invention;

图23是本发明实施例自来水管道铺设示意图;Fig. 23 is a schematic diagram of tap water pipeline laying according to an embodiment of the present invention;

图24是本发明实施例房屋建筑立体图。Fig. 24 is a three-dimensional view of the building of the embodiment of the present invention.

【具体实施方式】【detailed description】

下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with accompanying drawing:

如附图1、2所示,预制装配式轻钢墙板,包括墙板体1,所述墙板体1包括轻钢架101和设于轻钢架101外侧的板体102,所述板体102通过螺钉固定在轻钢架101上,在所述墙板体1内设有填充层13,所述填充层13为轻质混凝土,所述填充层13可以增强墙板体1的隔声性和有效减少墙板体1发生空鼓的现象,所述板体102包括挤塑板1021,在所述挤塑板1021的两侧设有水泥纤维板1022,所述轻钢架101包括至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,如附图21所示,在安装时定位钢筋91插装到第一浇注腔111内,并且在第一浇注腔111内浇灌混凝土浆,使第一墙板体11与定位钢筋91固定连接,同时增强了第一墙板体11的承重力,在所述墙板体1的两侧设有墙墙连接结构2。As shown in accompanying drawings 1 and 2, the prefabricated assembled light steel wall panel includes a wall panel body 1, and the wall panel body 1 includes a light steel frame 101 and a panel body 102 arranged on the outside of the light steel frame 101. The body 102 is fixed on the light steel frame 101 by screws, and a filling layer 13 is arranged inside the wallboard body 1, and the filling layer 13 is lightweight concrete, and the filling layer 13 can enhance the sound insulation of the wallboard body 1 and effectively reduce the phenomenon of hollowing of the wall panel body 1. The panel body 102 includes an extruded board 1021, and cement fiber boards 1022 are arranged on both sides of the extruded board 1021. The light steel frame 101 includes at least one A pouring steel frame 1011 that is vertically arranged and can be filled with concrete slurry inside, the pouring steel frame 1011 includes two bar-shaped light steel 100 with opposite openings arranged in the vertical direction, and the two bar-shaped light steels with opposite openings The steel 100 forms a first pouring cavity 111 for pouring concrete slurry. As shown in Figure 21, the positioning steel bar 91 is inserted into the first pouring cavity 111 during installation, and concrete is poured in the first pouring cavity 111 slurry, so that the first wall panel body 11 is fixedly connected with the positioning steel bars 91, and at the same time, the load-bearing capacity of the first wall panel body 11 is enhanced, and wall-wall connection structures 2 are provided on both sides of the wall panel body 1 .

如附图3、4所示,所述墙墙连接结构2包括竖直设置在墙板体1两侧的开口向外的连接轻钢21,所述连接轻钢21呈“匚”字状,在所述“匚”字的开口端向内延伸形成凸缘211,所述两个开口相对的条型轻钢100的凸缘211通过螺钉固定连接,所述连接轻钢21通过螺钉固定在浇注钢架1011上。As shown in Figures 3 and 4, the wall-to-wall connection structure 2 includes connecting light steel 21 vertically arranged on both sides of the wall panel body 1 with openings outward, and the connecting light steel 21 is in the shape of a "匚", The opening end of the "匚" character extends inwardly to form a flange 211, and the flanges 211 of the two bar-shaped light steel 100 with opposite openings are fixedly connected by screws, and the connecting light steel 21 is fixed on the casting surface by screws. On the steel frame 1011.

所述轻钢架101包括设置于浇注钢架1011两端的横向轻钢110,所述浇注钢架1011与横向轻钢110的连接处设有与第一浇注腔111相通的第一连接孔31。The light steel frame 101 includes transverse light steel frames 110 arranged at both ends of the pouring steel frame 1011 , and a first connection hole 31 communicating with the first pouring cavity 111 is provided at the junction of the pouring steel frame 1011 and the transverse light steel frames 110 .

所述墙墙连接结构2还包括竖直设置在墙板体1上可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,所述第二浇注腔121由两个开口相对的条型轻钢100与设于条型轻钢100外侧的板体102结合而成。同样的,在安装时定位钢筋91可直接插装到第二浇注腔121内,并且在第二浇注腔121内浇灌混凝土浆,使第二墙板体12与定位钢筋91固定连接,同时增强了第二墙板体12的承重力。The wall-to-wall connection structure 2 also includes a connecting steel frame 1211 vertically arranged on the wall panel body 1 and capable of pouring concrete slurry inside, and a second pouring cavity 121 is arranged in the vertical direction of the connecting steel frame 1211, so that The second pouring cavity 121 is formed by combining two bar-shaped light steel 100 with opposite openings and a plate body 102 arranged outside the bar-shaped light steel 100 . Similarly, the positioning reinforcement 91 can be directly inserted into the second pouring cavity 121 during installation, and concrete slurry is poured in the second pouring cavity 121, so that the second wallboard body 12 is fixedly connected with the positioning reinforcement 91, and at the same time strengthens the The load-bearing capacity of the second wallboard body 12.

所述轻钢架101包括设置于连接钢架1211两端的横向轻钢110,所述连接钢架1211与横向轻钢110的连接处设有与第二浇注腔121相通的第二连接孔32。The light steel frame 101 includes transverse light steel frames 110 arranged at both ends of the connecting steel frame 1211 , and the connection between the connecting steel frame 1211 and the horizontal light steel frames 110 is provided with a second connection hole 32 communicating with the second pouring cavity 121 .

如附图24所示,预制装配式房屋建筑,包括墙板体1,所述墙板体1包括轻钢架101和设于轻钢架101外侧的板体102,所述轻钢架101包括至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,所述墙板体1可分为相互连接的第一墙板体11和第二墙板体12,在所述第一墙板体11的两侧竖直设置有开口向外的连接轻钢21,所述连接轻钢21通过螺钉固定在浇注钢架1011上,在所述第二墙板体12的两侧设置有可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,在所述第一浇注腔111和第二浇注腔121内设有可将第一墙板体11及第二墙板体12固定在底座9上的接钢筋91,所述第二浇注腔121由两个开口相对的条型轻钢100与设在条型轻钢100外侧的板体102组合而成,所述连接轻钢21的开口端与连接钢架1211组合形成第三浇注腔112,所述第二浇注腔121与第三浇注腔112之间设有连接件22,在所述第一浇注腔111、第二浇注腔121及第三浇注腔112内设有混凝土层4。As shown in accompanying drawing 24, the prefabricated house construction, comprises wall panel body 1, and described wall panel body 1 comprises light steel frame 101 and the plate body 102 that is arranged on the outside of light steel frame 101, and described light steel frame 101 comprises At least one pouring steel frame 1011 that is vertically arranged and can be poured with concrete slurry inside, the pouring steel frame 1011 includes two bar-type light steel 100 with opposite openings arranged in the vertical direction, and the two bar openings are opposite Type light steel 100 forms a first pouring cavity 111 for pouring concrete slurry, and the wall panel body 1 can be divided into a first wall panel body 11 and a second wall panel body 12 connected to each other. Both sides of the wallboard body 11 are vertically provided with connecting light steel 21 with an opening outward, and the connecting light steel 21 is fixed on the pouring steel frame 1011 by screws, and on both sides of the second wallboard body 12, there are A connecting steel frame 1211 that can pour concrete slurry inside, a second pouring cavity 121 is provided in the vertical direction of the connecting steel frame 1211, and a The first wallboard body 11 and the second wallboard body 12 are fixed on the steel bar 91 on the base 9, and the second pouring cavity 121 is composed of two bar-shaped light steel 100 with opposite openings and a bar-shaped light steel 100 outside. The plate body 102 is combined, the open end of the connecting light steel 21 is combined with the connecting steel frame 1211 to form a third pouring cavity 112, and a connecting piece 22 is provided between the second pouring cavity 121 and the third pouring cavity 112 , the concrete layer 4 is provided in the first pouring cavity 111 , the second pouring cavity 121 and the third pouring cavity 112 .

所述预制装配式房屋建筑还包括混凝土底座9,在所述混凝土底座9上设有可插入第一浇注腔111、第二浇注腔121底部的定位钢筋91,在所述第一浇注腔111及第二浇注腔121内还设有连接钢筋92,所述连接钢筋92的上端伸出第一浇注腔111及第二浇注腔121的上表面。The prefabricated house construction also includes a concrete base 9, on which is provided a positioning steel bar 91 that can be inserted into the bottom of the first pouring cavity 111 and the second pouring cavity 121, and in the first pouring cavity 111 and the bottom of the second pouring cavity 121. The second pouring cavity 121 is also provided with connecting steel bars 92 , the upper ends of the connecting steel bars 92 protrude from the upper surfaces of the first casting cavity 111 and the second casting cavity 121 .

所述两个开口相对的条型轻钢100的连接处通过螺钉固定连接,所述连接轻钢21呈“匚”字状,在所述“匚”字的开口端向内延伸形成凸缘211,所述两个开口相对的条型轻钢100的凸缘211通过螺钉固定连接。The joints of the two bar-shaped light steels 100 with opposite openings are fixedly connected by screws, and the connecting light steels 21 are in the shape of a "匚" character, and a flange 211 is formed by extending inward at the opening end of the "匚" character. , the two flanges 211 of the bar-shaped light steel 100 with opposite openings are fixedly connected by screws.

如附图5-7所示,所述的连接件22为铆钉,铆钉22的尺寸在30mm以上,在所述连接钢架1211上还设有安装槽122,所述安装槽122包话设置在两条型轻钢100之间的间隙与设置在两条型轻钢外侧的板体102组合形成,在所述安装槽122上设有多个安装孔1221,所述连接件22安装在安装孔1221内,在所述连接轻钢100上设有与所述连接件22卡合的卡板1001,在所述卡板1001上设有一端开口的卡槽1002,在安装时,若第一墙板体11先安装,则设置在连接轻钢100上的卡板1001的卡槽1002的开口方向向上,第二墙板体12安装时连接件22从上往下卡入卡槽1002内;若第二墙板体1先安装,则设置在连接轻钢100上的卡板1001的卡槽1002的开口方向向下,第一墙板体11的卡槽1002从上往下卡紧连接件22。所述连接件22的一端置于第三浇注腔112内,另一端置于第二浇注腔121内。在安装时,往第一浇注腔111、第二浇注腔121及第三浇注腔112内浇灌混凝土浆,使第一浇注腔111、第二浇注腔121及第三浇注腔112形成混凝土柱,增强了墙板体1的承重力,同时,由于连接件22一端置于第二浇注腔121内,另一端置于第三浇注腔112内,浇注混凝土浆后,使连接件22的两端同时固定,从而使第二浇注腔121和第三浇注腔112固定连接在一起,结构简单,连接性好。As shown in accompanying drawings 5-7, the connecting piece 22 is a rivet, and the size of the rivet 22 is more than 30mm. The connecting steel frame 1211 is also provided with a mounting groove 122, and the mounting groove 122 is arranged on The gap between the two light steel bars 100 is combined with the plate body 102 arranged on the outside of the two light steel bars. A plurality of mounting holes 1221 are provided on the mounting groove 122, and the connecting piece 22 is installed in the mounting holes. 1221, the connecting light steel 100 is provided with a clamping plate 1001 engaged with the connecting piece 22, and a clamping groove 1002 with one end opening is provided on the clamping plate 1001. During installation, if the first wall When the plate body 11 is installed first, the opening direction of the slot 1002 of the clamp plate 1001 connected to the light steel 100 is upward, and when the second wall panel body 12 is installed, the connector 22 is inserted into the slot 1002 from top to bottom; The second wallboard body 1 is installed first, and then the opening direction of the slot 1002 of the clamping plate 1001 connected to the light steel 100 is downward, and the slot 1002 of the first wallboard body 11 clamps the connecting piece 22 from top to bottom. . One end of the connector 22 is placed in the third pouring cavity 112 , and the other end is placed in the second pouring cavity 121 . During installation, concrete slurry is poured into the first pouring chamber 111, the second pouring chamber 121 and the third pouring chamber 112, so that the first pouring chamber 111, the second pouring chamber 121 and the third pouring chamber 112 form concrete columns to strengthen At the same time, since one end of the connector 22 is placed in the second pouring cavity 121 and the other end is placed in the third pouring cavity 112, after pouring the concrete slurry, the two ends of the connector 22 are fixed at the same time , so that the second pouring cavity 121 and the third pouring cavity 112 are fixedly connected together, the structure is simple, and the connection is good.

所述浇注钢架1011及连接钢架1211的两端分别设有横向轻钢110,在所述浇注钢架1011与横向轻钢110的连接处设有与第一浇注腔111相通的第一连接孔31,在所述连接钢架1211与横向轻钢110的连接处设有与第二浇注腔121相通的第二连接孔32。The two ends of the pouring steel frame 1011 and the connecting steel frame 1211 are respectively provided with transverse light steel 110, and at the junction of the pouring steel frame 1011 and the transverse light steel 110, there is a first connection with the first pouring cavity 111. The hole 31 is a second connection hole 32 communicating with the second pouring cavity 121 at the junction of the connecting steel frame 1211 and the transverse light steel 110 .

如附图8、9所示,在相互连接的墙板体1的连接处的上方设有加强片5,所述加强片5上设有多个通孔51,所述通孔51分别与所述第一浇注腔111、第二浇注腔121及第三浇注腔112对应。所述加强片5为铁片,其通过螺钉固定在墙板体1上,可以增强相邻的墙板体1的连接力。As shown in accompanying drawing 8, 9, be provided with reinforcing piece 5 above the joint of wallboard body 1 that is connected with each other, described reinforcing piece 5 is provided with a plurality of through-holes 51, and described through-hole 51 is respectively connected with the said through-hole 51. The first casting cavity 111 , the second casting cavity 121 and the third casting cavity 112 correspond to each other. The reinforcing sheet 5 is an iron sheet, which is fixed on the wallboard body 1 by screws, so as to enhance the connection force between adjacent wallboard bodies 1 .

如附图10-13所示,在所述墙板体1的上方设有楼板6,所述楼板6包括由多条轻钢100组成的桁架61和设在桁架61上方的楼面板62,所述楼面板62包括泡沫层621,泡沫层621起到减震的作用,在所述泡沫层621的两边设置有复合板层622。在所述桁架61的两端设有多个凸台611,在所述凸台611的下方设有将相邻的凸台611连接的直角架612,所述直角架612的垂直面6121通过螺钉固定在桁架61上,所述直角架612和凸台611置于墙板体1上方,所述直角架612的横向面6122通过螺钉固定在墙板体1上方。As shown in accompanying drawings 10-13, a floor 6 is provided above the wall panel body 1, and the floor 6 includes a truss 61 composed of a plurality of light steel 100 and a floor panel 62 arranged above the truss 61, so The floor panel 62 includes a foam layer 621, and the foam layer 621 plays a role of shock absorption, and composite board layers 622 are arranged on both sides of the foam layer 621. The two ends of described truss 61 are provided with a plurality of bosses 611, and below described bosses 611 are provided with the right-angled frame 612 that adjacent bosses 611 are connected, and the vertical surface 6121 of described right-angled frame 612 is passed screw Fixed on the truss 61, the right-angle frame 612 and the boss 611 are placed above the wallboard body 1, and the transverse surface 6122 of the right-angle frame 612 is fixed above the wallboard body 1 by screws.

如附图14-20所示,所述墙板体1围成多个独立的空间,在每个独立空间的上方设有与其空间大小相对应的楼板6,在所述墙板体1的上方沿墙板体1的外侧边设有围边7,在相邻的楼板6之间、围边7与楼板6之间设有圈钢8,在所述圈钢8的上方设有混凝土层4并使混凝土层4与楼板6处于同一平面。As shown in accompanying drawings 14-20, the wall panel body 1 encloses a plurality of independent spaces, and a floor 6 corresponding to its space size is arranged above each independent space, and above the wall panel body 1 A surrounding edge 7 is provided along the outer side of the wall panel body 1, and a ring steel 8 is provided between adjacent floor slabs 6, between the surrounding edge 7 and the floor 6, and a concrete layer is arranged above the ring steel 8 4 and make the concrete layer 4 and the floor 6 in the same plane.

如附图22、23所示,所述预制装配式房屋建筑还包括电线管道201及自来水管道202,所述电线管道201及自来水管道202分别铺设在墙板体1及楼板6内,在所述电线管道201的接口处设有第一转接头2011,所述第一转接头2011与用电装置连接,所述用电装置包括开关、插座、电灯等,所述自来水管道202的出口处设有第二转接头2021,所述第二转接头2021与用水装置连接,所述用水装置包括水龙头等,在所述墙板体1的顶端还设有屋顶斜板120。As shown in accompanying drawings 22 and 23, the prefabricated house construction also includes wire conduits 201 and tap water conduits 202, and the wire conduits 201 and tap water conduits 202 are respectively laid in the wall panel body 1 and the floor slab 6. The interface of the wire conduit 201 is provided with a first adapter 2011, and the first adapter 2011 is connected to an electrical device, the electrical device includes a switch, a socket, an electric lamp, etc., and the outlet of the tap water pipe 202 is provided with a The second adapter 2021, the second adapter 2021 is connected to the water device, the water device includes a faucet and the like, and a roof sloping plate 120 is also provided on the top of the wall panel body 1 .

预制装配式房屋建筑的建造方法,包括如下步骤:A method for building a prefabricated house, comprising the following steps:

A、先将混凝土底座9装到预定的位置水平固定。A. Install the concrete base 9 to the predetermined position and fix it horizontally.

A1:将所述连接件22安装在安装孔1221上,在所述墙板体1上铺设电线管道201和自来水管道202及与电线管道201连接的第一转接头2011、与自来水管道202连接的第二连接头2021,往墙板体1内浇灌轻质水泥。A1: Install the connector 22 on the installation hole 1221, lay the wire conduit 201 and the tap water conduit 202 and the first adapter 2011 connected to the wire conduit 201 and the first adapter 2011 connected to the tap water conduit 202 on the wallboard body 1. The second connector 2021 pours lightweight cement into the wallboard body 1 .

B、取第一墙板体11,所述第一墙板体11上设有至少一个竖直设置且可在内部灌注混凝土浆的浇注钢架1011,所述浇注钢架1011包括在竖直方向设置的两个开口相对的条型轻钢100,所述两个开口相对的条型轻钢100围合成一个用于灌注混凝土浆的第一浇注腔111,将所述第一墙板体11上的第一浇注腔111对准混凝土底座9上的定位钢筋91插装到混凝土底座9上;用辅助撑杆支撑第一墙板体11使其保持临时稳定。B. Take the first wallboard body 11, the first wallboard body 11 is provided with at least one pouring steel frame 1011 that is vertically arranged and can pour concrete slurry inside, and the pouring steel frame 1011 includes Two bar-shaped light steel bars 100 with opposite openings are provided, and the two bar-shaped light steel bars 100 with opposite openings enclose a first pouring cavity 111 for pouring concrete slurry, and the first wallboard body 11 is placed The first pouring cavity 111 is aligned with the positioning steel bar 91 on the concrete base 9 and inserted on the concrete base 9; the first wallboard body 11 is supported by auxiliary struts to keep it temporarily stable.

C、取第二墙板体12,所述第二墙板体12的两侧竖直设置有可在内部灌注混凝土浆的连接钢架1211,在所述连接钢架1211的竖直方向设置有第二浇注腔121,所述第二浇注腔121由两个开口相对的条型轻钢100与设在条型轻钢100外侧的板体102组合而成,将所述第二墙板体12上的第二浇注腔121对准混凝土底座9上的定位钢筋91插装到混凝土底座9上;用辅助撑杆支撑第二墙板体12使其保持临时稳定。C. Take the second wall panel body 12, the two sides of the second wall panel body 12 are vertically provided with a connecting steel frame 1211 that can pour concrete slurry inside, and the vertical direction of the connecting steel frame 1211 is provided with The second pouring cavity 121, the second pouring cavity 121 is composed of two bar-shaped light steel 100 with opposite openings and the plate body 102 arranged on the outside of the bar-shaped light steel 100, the second wall plate body 12 The second pouring cavity 121 on the top is aligned with the positioning steel bars 91 on the concrete base 9 and inserted on the concrete base 9; the second wallboard body 12 is supported by auxiliary struts to keep it temporarily stable.

C1、将所述连接件22安装到连接孔1221上,所述连接件22的另一端与卡板1001上的卡槽1002卡接,使连接件22的一端置于第二浇注腔121内,另一端置于第三浇注腔112内。C1. Install the connecting piece 22 on the connecting hole 1221, the other end of the connecting piece 22 is engaged with the slot 1002 on the clamping plate 1001, so that one end of the connecting piece 22 is placed in the second pouring cavity 121, The other end is placed in the third pouring cavity 112 .

D、将第一墙板体11和第二墙板体12进行组装,所述第一墙板体11的两侧设有连接轻钢21,所述连接轻钢21的开口端与连接钢架1211的外表面组合形成第三浇注腔112,所述第一墙板体11和第二墙板体12组装完成。D. Assemble the first wallboard body 11 and the second wallboard body 12, the two sides of the first wallboard body 11 are provided with connecting light steel 21, the open end of the connecting light steel 21 is connected with the connecting steel frame The outer surfaces of 1211 are combined to form the third pouring cavity 112, and the assembly of the first wallboard body 11 and the second wallboard body 12 is completed.

D1、将第一墙板体11和第二墙板体12组装完成后在第一墙板体11和第二墙板体12的顶端安装加强片5,所述加强片5的通孔51分别与第一浇注腔111、第二浇注腔121及第三浇注腔21相对应。D1, after assembling the first wallboard body 11 and the second wallboard body 12, install the reinforcement sheet 5 on the top of the first wallboard body 11 and the second wallboard body 12, and the through holes 51 of the reinforcement sheet 5 are respectively It corresponds to the first pouring cavity 111 , the second pouring cavity 121 and the third pouring cavity 21 .

D2、在所述第一浇注腔111、第二浇注腔121内插装连接钢筋92,使所述连接钢筋92的上端伸出第一浇注腔111及第二浇注腔121的上表面。D2. Insert the connecting steel bar 92 into the first pouring cavity 111 and the second pouring cavity 121 , so that the upper end of the connecting steel bar 92 protrudes from the upper surface of the first pouring cavity 111 and the second pouring cavity 121 .

E、往第一浇注腔111、第二浇注腔121及第三浇注腔112内浇灌混凝土浆,使连接件22的两端同时固定在第二浇注腔121及第三浇注腔112内。E. Pour concrete slurry into the first pouring chamber 111 , the second pouring chamber 121 and the third pouring chamber 112 , so that both ends of the connector 22 are fixed in the second pouring chamber 121 and the third pouring chamber 112 at the same time.

F、在墙板体1上方铺楼板6,将所述桁架61两端的凸台611置于墙板体1上方,将楼面板62置于桁架61的上方。F. Lay the floor slab 6 above the wall panel body 1 , place the bosses 611 at both ends of the truss 61 above the wall panel body 1 , and place the floor panel 62 above the truss 61 .

G、在所述墙板体1的上方沿墙板体1的外侧边设置围边7,在相邻的楼板6之间、围边7与楼板6之间铺设圈钢8。G. Set the surrounding edge 7 along the outer side of the wall panel body 1 on the top of the wall panel body 1, and lay the ring steel 8 between the adjacent floor plates 6, and between the wall plate body 7 and the floor plate 6.

H、往所述圈钢8上浇灌混凝土浆,并使混凝土层4与楼板6的表面平齐。H. Pour concrete slurry on the ring steel 8, and make the surface of the concrete layer 4 and the floor 6 flush.

I、在墙板体1上方铺设屋顶斜板120。1. Lay the roof sloping plate 120 above the wallboard body 1.

本发明在墙板体上设置多个第一浇注腔,在安装时定位钢筋可直接插装到第一浇注腔内,并且在第一浇注腔内浇灌混凝土浆,使墙板体与定位钢筋固定连接,同时增强了墙板体的承重力,在墙板体内还浇灌有轻质水泥,可提高墙体的隔声性和有效减少墙板体发生空鼓的现象。In the present invention, a plurality of first pouring cavities are arranged on the wallboard body, and the positioning steel bars can be directly inserted into the first pouring cavities during installation, and concrete slurry is poured in the first pouring cavities, so that the wallboard body and the positioning steel bars are fixed connection, and at the same time enhance the load-bearing capacity of the wallboard body, and light cement is poured in the wallboard body, which can improve the sound insulation of the wall body and effectively reduce the hollowing phenomenon of the wallboard body.

本发明在墙板体的两端设有墙墙连接结构,通过将连接件的两端分别置于第二浇注腔和第三浇注腔内,并通过浇灌混凝土浆使连接件的两端同时固定,从而使第二浇注腔和第三浇注腔固定连接在一起,结构简单,连接性好。In the present invention, a wall-wall connection structure is provided at both ends of the wallboard body, by placing the two ends of the connecting piece in the second pouring cavity and the third pouring cavity respectively, and fixing the two ends of the connecting piece at the same time by pouring concrete slurry , so that the second pouring cavity and the third pouring cavity are fixedly connected together, the structure is simple, and the connection is good.

如上所述是结合具体内容提供的一种实施方式,并不认定本发明的具体实施只局限于这些说明。凡与本发明的方法、结构等近似、雷同,或是对于本发明构思前提下做出若干技术推演或替换,都应当视为本发明的保护范围。The foregoing is an implementation mode provided in conjunction with specific content, and it is not considered that the specific implementation of the present invention is limited to these descriptions. Any approach or similarity to the methods and structures of the present invention, or some technical deduction or replacement under the premise of the concept of the present invention shall be regarded as the scope of protection of the present invention.

Claims (22)

1. prefabricated assembled light steel wallboard, including wall board body (1), the wall board body (1) include light steelframe (101) and located at light steel Plate body (102) on the outside of frame (101), it is characterised in that:The light steelframe (101) including at least one be vertically arranged and can including The cast steelframe (1011) of portion's concrete perfusion slurry, the cast steelframe (1011) is included in two openings of vertical direction setting The light steel of relative stripe shape (100), the relative light steel of stripe shape (100) of described two openings, which encloses one, is used for concrete perfusion slurry First cast chamber (111), the both sides of the wall board body (1) be provided with wall wall attachment structure (2).
2. prefabricated assembled light steel wallboard according to claim 1, it is characterised in that:Wall wall attachment structure (2) bag The light steel of connection (21) for the outward opening for being vertically arranged in wall board body (1) both sides is included, the light steel (21) of connection is in " Contraband " shape, Flange (211), described two the convex of the relative light steel of stripe shape (100) that are open are extended inwardly to form in the openend of " Contraband " word Edge (211) is fixedly connected by screw, and the light steel (21) of connection is fixed by screws on cast steelframe (1011).
3. prefabricated assembled light steel wallboard according to claim 2, it is characterised in that:The light steelframe (101) includes setting It is placed in the laterally light steel (110) at cast steelframe (1011) two ends, the cast steelframe (1011) and the connection of laterally light steel (110) Place is provided with the first connecting hole (31) communicated with the first cast chamber (111).
4. prefabricated assembled light steel wallboard according to claim 1, it is characterised in that:The wall wall attachment structure (2) is also Including be vertically arranged on wall board body (1) can internally concrete perfusion slurry connection steelframe (1211), in the connection steelframe (1211) vertical direction is provided with the second cast chamber (121), and the second cast chamber (121) includes two relative bars of opening The light steel of type (100) is combined into the plate body (102) on the outside of the light steel of stripe shape (100).
5. prefabricated assembled light steel wallboard according to claim 4, it is characterised in that:The light steelframe (101) includes setting It is placed in the laterally light steel (110) at connection steelframe (1211) two ends, the connection steelframe (1211) and the connection of laterally light steel (110) Place is provided with the second connecting hole (32) communicated with the second cast chamber (121).
6. prefabricated assembled light steel wallboard according to claim 1, it is characterised in that:The plate body (102) passes through screw It is fixed on light steelframe (101), packed layer (13) is provided with the wall board body (1).
7. prefabricated assembled light steel wallboard according to claim 4, it is characterised in that:The packed layer (13) is mixed for lightweight Solidifying soil, the plate body (102) includes extruded sheet (1021), and cement fibrolite plate is provided with the both sides of the extruded sheet (1021) (1022)。
8. prefabricated house is built, including wall board body (1), the wall board body (1) includes light steelframe (101) and located at light steel Plate body (102) on the outside of frame (101), it is characterised in that:The light steelframe (101) including at least one be vertically arranged and can including The cast steelframe (1011) of portion's concrete perfusion slurry, the cast steelframe (1011) is included in two openings of vertical direction setting The light steel of relative stripe shape (100), the relative light steel of stripe shape (100) of described two openings, which encloses one, is used for concrete perfusion slurry The first cast chamber (111), the wall board body (1) can be divided into the first wall board body (11) and the second wall board body of interconnection (12) the light steel of connection (21) of outward opening, the light steel of connection, are vertically arranged with the both sides of first wall board body (11) (21) it is fixed by screws on cast steelframe (1011), is provided with and can internally fill in the both sides of second wall board body (12) The connection steelframe (1211) of concrete grout is noted, the vertical direction of the connection steelframe (1211) is provided with the second cast chamber (121), the second cast chamber (121) is by the relative light steel of stripe shape (100) of two openings and is located on the outside of the light steel of stripe shape (100) Plate body (102) combine, the openend of the light steel (21) of the connection combine with connection steelframe (1211) forms the 3rd cast Chamber (112), is provided with connector (22), in the described first cast between the second cast chamber (121) and the 3rd cast chamber (112) Concrete layer (4) is provided with chamber (111), the second cast chamber (121) and the 3rd cast chamber (112).
9. prefabricated house building according to claim 8, it is characterised in that:The prefabricated house building Also include concrete bed (9), provided with pluggable first cast chamber (111), the second cast chamber on the concrete bed (9) (121) spacer bar (91) of bottom, connection steel is additionally provided with the described first cast chamber (111) and the second cast chamber (121) The first upper surface for pouring into a mould chamber (111) and the second cast chamber (121) is stretched out in muscle (92), the upper end of the connection reinforcing bar (92).
10. prefabricated house building according to claim 8, it is characterised in that:The relative bar of described two openings The junction of the light steel of type (100) is fixedly connected by screw, and the light steel (21) of connection is in " Contraband " shape, in " Contraband " word Openend extends inwardly to form flange (211), and the flange (211) of the relative light steel of stripe shape (100) of described two openings passes through spiral shell Nail is fixedly connected.
11. prefabricated house building according to claim 8, it is characterised in that:Described connector (22) is riveting Nail, is additionally provided with mounting groove (122), it is light that mounting groove (122) the bag words are arranged on two stripe shapes on the connection steelframe (1211) Formation is combined in gap between steel (100) with the plate body (102) being arranged on the outside of the light steel of two stripe shapes, in the mounting groove (122) Multiple mounting holes (1221) are provided with, the connector (22) is arranged in mounting hole (1221), in the light steel (100) of connection Provided with the clamp (1001) engaged with the connector (22), the neck of one end open is provided with the clamp (1001) (1002), one end of the connector (22) is placed in the 3rd cast chamber (112), and the other end is placed in the second cast chamber (121).
12. prefabricated house building according to claim 11, it is characterised in that:It is described cast steelframe (1011) and The two ends of connection steelframe (1211) are respectively equipped with laterally light steel (110), in the cast steelframe (1011) and laterally light steel (110) Junction be provided with first cast chamber (111) first connecting hole (31) for communicating, the connection steelframe (1211) with laterally The junction of light steel (110) is provided with the second connecting hole (32) communicated with the second cast chamber (121).
13. prefabricated house building according to claim 12, it is characterised in that:In the wall board body of interconnection (1) top of junction is provided with reinforced sheet (5), and the reinforced sheet (5) is provided with multiple through holes (51), the through hole (51) point It is not corresponding with the described first cast chamber (111), the second cast chamber (121) and the 3rd cast chamber (112).
14. prefabricated house building according to claim 13, it is characterised in that:In the upper of the wall board body (1) Side is provided with floor (6), and the floor (6) includes the truss (61) being made up of a plurality of light steel (100) and is located above truss (61) Floorboard (62), the two ends of the truss (61) be provided with multiple boss (611), be provided with the lower section of the boss (611) The right angle frame (612) that adjacent boss (611) is connected, the vertical plane (6121) of the right angle frame (612) is fixed by screw On truss (61), the right angle frame (612) and boss (611) are placed in above wall board body (1), the horizontal stroke of the right angle frame (612) It is fixed by screws in face (6122) above wall board body (1).
15. prefabricated house building according to claim 14, it is characterised in that:The floorboard (62) includes bubble Foam layer (621), compound flaggy (622) is provided with the both sides of the froth bed (621).
16. prefabricated house building according to claim 15, it is characterised in that:The wall board body (1) surrounds many Individual independent space, is provided with the floor (6) corresponding with its space size, in the wall board body in the top of each separate space (1) outer side edges of the top along wall board body (1) are provided with surrounding edge (7), between adjacent floor (6), surrounding edge (7) and floor (6) Between provided with circle steel (8), the circle steel (8) top is provided with concrete layer (4) and makes concrete layer (4) and floor (6) place In same plane.
17. prefabricated house building according to claim 16, it is characterised in that:The prefabricated house is built Building also includes wireway (201) and water supply pipe (202), and the wireway (201) and water supply pipe (202) are respectively It is laid in wall board body (1) and floor (6), the first adapter (2011), institute is provided with the interface of the wireway (201) State the first adapter (2011) to be connected with power device, the exit of the water supply pipe (202) is provided with the second adapter (2022), second adapter (2022) is connected with water installations, and roof swash plate is additionally provided with the top of the wall board body (1) (120)。
18. the method for construction of prefabricated house building, it is characterised in that comprise the following steps:
A, concrete bed (9) is first attached to predetermined position level fixed;
B, the first wall board body (11) is taken, first wall board body (11) is vertically arranged provided with least one and can internally irrigated The cast steelframe (1011) of concrete grout, two openings that the cast steelframe (1011) is included in vertical direction setting are relative The light steel of stripe shape (100), the relative light steel of stripe shape (100) of described two openings, which encloses one, is used for concrete perfusion is starched first Chamber (111) is poured into a mould, the first cast chamber (111) on first wall board body (11) is aligned to the positioning on concrete bed (9) Reinforcing bar (91) inserting is arrived on concrete bed (9);
C, take the second wall board body (12), the both sides of second wall board body (12) are vertically arranged with and internally can starched concrete perfusion Connection steelframe (1211), it is described connection steelframe (1211) vertical direction be provided with the second cast chamber (121), described second Cast chamber (121) is by two relative light steel of stripe shape (100) of opening and plate body (102) group being located on the outside of the light steel of stripe shape (100) Conjunction is formed, and the second cast chamber (121) on second wall board body (12) is aligned to the spacer bar on concrete bed (9) (91) inserting is arrived on concrete bed (9);
D, the first wall board body (11) and the second wall board body (12) assembled, the both sides of first wall board body (11) are provided with connecting Light steel (21) is connect, the openend of the light steel (21) of connection combines to form the 3rd cast chamber with the outer surface of connection steelframe (1211) (112), first wall board body (11) and the second wall board body (12) are completed;
E, toward the first cast chamber (111), the second cast chamber (121) and the 3rd cast chamber (112) interior placing concrete slurry, make connection The two ends of part (22) are also secured in the second cast chamber (121) and the 3rd cast chamber (112).
19. the method for construction of prefabricated house building according to claim 18, it is characterised in that:In step A and Also comprise the following steps between step B:
A1:The connector (22) is arranged on mounting hole (1221), wireway is laid on the wall board body (1) And water supply pipe (202) and the first adapter (2011) and water supply pipe that are connected with wireway (201) (201) (202) the second connector (2021) of connection, light cement is poured toward wall board body (1) is interior.
20. the method for construction of prefabricated house building according to claim 18, it is characterised in that:Step C it Also comprise the following steps afterwards:
C1, the connector (22) is installed on connecting hole (1221), the other end and clamp of the connector (22) (1001) neck (1002) clamping on, makes one end of connector (22) be placed in the second cast chamber (121), and the other end is placed in the In three cast chambers (112).
21. the method for construction of prefabricated house building according to claim 18, it is characterised in that:In step D and Also comprise the following steps between step E:
D1, the first wall board body (11) and the second wall board body (12) are completed after in the first wall board body (11) and the second wall board body (12) reinforced sheet (5) is installed on top, and the through hole (51) of the reinforced sheet (5) is poured into a mould with the first cast chamber (111), second respectively Chamber (121) and the 3rd cast chamber (21) are corresponding;
D2, described first cast chamber (111), second cast chamber (121) interpolation load connect reinforcing bar (92), make the connection reinforcing bar (92) the first upper surface for pouring into a mould chamber (111) and the second cast chamber (121) is stretched out in upper end.
22. the method for construction of prefabricated house building according to claim 18, it is characterised in that after E steps also Comprise the following steps:
F, the paving floor (6) above wall board body (1), the boss (611) at the truss (61) two ends is placed on wall board body (1) Side, floorboard (62) is placed in the top of truss (61);
G, in outer side edges of the top of the wall board body (1) along wall board body (1) surrounding edge (7) is set, adjacent floor (6) it Between, laying circle steel (8) between surrounding edge (7) and floor (6);
H, toward placing concrete slurry on circle steel (8), and make the flush of concrete layer (4) and floor (6);
I, the laying roof swash plate (120) above wall board body (1).
CN201710580733.0A 2017-07-17 2017-07-17 Prefabricated assembled light steel wallboard, building construction and its method of construction Pending CN107190847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710580733.0A CN107190847A (en) 2017-07-17 2017-07-17 Prefabricated assembled light steel wallboard, building construction and its method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710580733.0A CN107190847A (en) 2017-07-17 2017-07-17 Prefabricated assembled light steel wallboard, building construction and its method of construction

Publications (1)

Publication Number Publication Date
CN107190847A true CN107190847A (en) 2017-09-22

Family

ID=59882666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710580733.0A Pending CN107190847A (en) 2017-07-17 2017-07-17 Prefabricated assembled light steel wallboard, building construction and its method of construction

Country Status (1)

Country Link
CN (1) CN107190847A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386058A (en) * 2018-11-13 2019-02-26 中建集成房屋有限公司 It is bolted the board-like one storey house system of modularization steel frame and its installation method entirely
CN109779035A (en) * 2019-02-22 2019-05-21 上海汉克展览服务有限公司 A kind of exhibition room connecting structure of wall
CN110616850A (en) * 2019-10-18 2019-12-27 酷屋(山东)网络科技有限公司 Assembled wallboard
CN110820989A (en) * 2019-11-26 2020-02-21 安徽福瑞尔铝业科技有限公司 Clamping type steel wallboard and assembling method
CN110886406A (en) * 2019-12-04 2020-03-17 华北理工大学 Assembled light steel frame composite wall with heat insulation layer
CN112996969A (en) * 2018-09-06 2021-06-18 超墙有限公司 Improvements relating to building panels

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201024547Y (en) * 2007-01-12 2008-02-20 杨建平 Fiber cement board grouting wall
CN201372484Y (en) * 2009-03-11 2009-12-30 王建军 Building with light steel structure
US20140090323A1 (en) * 2012-10-03 2014-04-03 Kingspan Insulated Panels, Inc. (USA) Building Wall Panel
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house construction and construction method
CN207646855U (en) * 2017-07-17 2018-07-24 广东草根民墅房屋制造有限公司 Prefabricated light steel wall panels and prefabricated housing construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201024547Y (en) * 2007-01-12 2008-02-20 杨建平 Fiber cement board grouting wall
CN201372484Y (en) * 2009-03-11 2009-12-30 王建军 Building with light steel structure
US20140090323A1 (en) * 2012-10-03 2014-04-03 Kingspan Insulated Panels, Inc. (USA) Building Wall Panel
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house construction and construction method
CN207646855U (en) * 2017-07-17 2018-07-24 广东草根民墅房屋制造有限公司 Prefabricated light steel wall panels and prefabricated housing construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112996969A (en) * 2018-09-06 2021-06-18 超墙有限公司 Improvements relating to building panels
CN109386058A (en) * 2018-11-13 2019-02-26 中建集成房屋有限公司 It is bolted the board-like one storey house system of modularization steel frame and its installation method entirely
CN109386058B (en) * 2018-11-13 2023-07-25 中建集成房屋有限公司 Method for installing full-bolt connection modular steel frame plate type single-layer house system
CN109779035A (en) * 2019-02-22 2019-05-21 上海汉克展览服务有限公司 A kind of exhibition room connecting structure of wall
CN110616850A (en) * 2019-10-18 2019-12-27 酷屋(山东)网络科技有限公司 Assembled wallboard
CN110820989A (en) * 2019-11-26 2020-02-21 安徽福瑞尔铝业科技有限公司 Clamping type steel wallboard and assembling method
CN110886406A (en) * 2019-12-04 2020-03-17 华北理工大学 Assembled light steel frame composite wall with heat insulation layer
CN110886406B (en) * 2019-12-04 2021-07-02 华北理工大学 A prefabricated light steel frame composite wall with thermal insulation layer

Similar Documents

Publication Publication Date Title
CN107190847A (en) Prefabricated assembled light steel wallboard, building construction and its method of construction
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
CN110130527A (en) Modular prefabricated composite wall, prefabricated building structure system and construction method
CN104863290A (en) Combined wall formed by single prefabricated wall sections and construction method
CN207646855U (en) Prefabricated light steel wall panels and prefabricated housing construction
KR101920681B1 (en) Bridge structure using Precast concrete girder bridge with pretension and PC wall
CN217268165U (en) Prefabricated wall body of building engineering heat preservation assembled
KR101219459B1 (en) The water-storage tank of assembly type and method for constructing thereof
KR20130130919A (en) Hollowness light weight concrete panel using paper pipe and method for manufacturing thereof
CN213062620U (en) Prefabricated foam concrete filled double-sided superposed peripheral retaining wall and retaining wall combination
CN100412284C (en) Hollow carcass used for cast-in-situs concrete filling
CN210238850U (en) Hollow prefabricated wallboard convenient to installation
CN109610651B (en) Beam-column connecting structure and mounting method thereof
CN213868411U (en) Can dismantle heat preservation wallboard for combination
CN214461129U (en) Green building frame structure
CN221255893U (en) Assembled wallboard
CN205663074U (en) Prefabricated composite floor
CN205604516U (en) Whole hollow interior wallboard of assembled
CN100402773C (en) Concrete hollow-web member
TW201348562A (en) Structure and construction method of prolonging service lives of beams, columns and floors used by building and integrated jointless outer thermal insulation wall
CN101311470A (en) Formwork component
CN110700470A (en) Assembled composite floor and node structure
KR20200016423A (en) A panel structure in which a plurality of panels are coupled to each other to form a wall, and a wall panel
CN101302816A (en) Cast-in-situ reinforced concrete or prestressed reinforced concrete hollow slab
CN101275414A (en) Cast-in-situ reinforced concrete or prestressed reinforcement concrete hollow slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication