CN103091659A - 电能表动态计量周期电能序列比例分配校验法 - Google Patents
电能表动态计量周期电能序列比例分配校验法 Download PDFInfo
- Publication number
- CN103091659A CN103091659A CN2013100230757A CN201310023075A CN103091659A CN 103091659 A CN103091659 A CN 103091659A CN 2013100230757 A CN2013100230757 A CN 2013100230757A CN 201310023075 A CN201310023075 A CN 201310023075A CN 103091659 A CN103091659 A CN 103091659A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- dynamic load
- ook
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000001360 synchronised effect Effects 0.000 claims abstract description 44
- 230000001052 transient effect Effects 0.000 claims abstract description 9
- 238000012795 verification Methods 0.000 claims description 12
- 238000004364 calculation method Methods 0.000 claims description 5
- 238000007792 addition Methods 0.000 claims 6
- 230000000903 blocking effect Effects 0.000 claims 1
- 238000011002 quantification Methods 0.000 claims 1
- 238000012360 testing method Methods 0.000 abstract description 34
- 229910052710 silicon Inorganic materials 0.000 abstract description 3
- 239000010703 silicon Substances 0.000 abstract description 3
- 238000010200 validation analysis Methods 0.000 abstract 2
- 230000007774 longterm Effects 0.000 description 5
- 230000000737 periodic effect Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000009466 transformation Effects 0.000 description 4
- 230000007274 generation of a signal involved in cell-cell signaling Effects 0.000 description 3
- 238000011056 performance test Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000010891 electric arc Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000013341 scale-up Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Control Of Electrical Variables (AREA)
- Testing Relating To Insulation (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (6)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310023075.7A CN103091659B (zh) | 2013-01-22 | 2013-01-22 | 电能表动态计量周期电能序列比例分配校验法 |
PCT/CN2013/089464 WO2014114150A1 (zh) | 2013-01-22 | 2013-12-15 | 电能表动态计量周期电能序列比例分配校验法 |
KR1020157022963A KR101871216B1 (ko) | 2013-01-22 | 2013-12-15 | 전력량계 동적 측정 주기에서 전력량 시퀀스 비례 분배 검사 방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310023075.7A CN103091659B (zh) | 2013-01-22 | 2013-01-22 | 电能表动态计量周期电能序列比例分配校验法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103091659A true CN103091659A (zh) | 2013-05-08 |
CN103091659B CN103091659B (zh) | 2015-02-11 |
Family
ID=48204462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310023075.7A Expired - Fee Related CN103091659B (zh) | 2013-01-22 | 2013-01-22 | 电能表动态计量周期电能序列比例分配校验法 |
Country Status (3)
Country | Link |
---|---|
KR (1) | KR101871216B1 (zh) |
CN (1) | CN103091659B (zh) |
WO (1) | WO2014114150A1 (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103630870A (zh) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | 一种虚负载式电能表走字架 |
CN103941217A (zh) * | 2014-04-17 | 2014-07-23 | 国家电网公司 | 一种电能计量装置工况模拟平台 |
WO2014114150A1 (zh) * | 2013-01-22 | 2014-07-31 | 国家电网公司 | 电能表动态计量周期电能序列比例分配校验法 |
CN104345294A (zh) * | 2014-11-04 | 2015-02-11 | 国家电网公司 | 一种电能表动态性能测试装置 |
CN104569900A (zh) * | 2013-10-14 | 2015-04-29 | 北京化工大学 | 智能电能表动态误差测试方法与装置 |
CN105093165A (zh) * | 2015-09-08 | 2015-11-25 | 国家电网公司 | 一种数字化电能表脉冲信号的综合测试方法 |
CN106405481A (zh) * | 2016-11-11 | 2017-02-15 | 国网冀北电力有限公司电力科学研究院 | 数字化电能表的非线性负荷计量精度测量方法 |
CN106501755A (zh) * | 2016-10-18 | 2017-03-15 | 国网山东省电力公司烟台供电公司 | 一种基于动态负荷模型的智能电能表动态误差测量方法 |
CN106772207A (zh) * | 2016-12-30 | 2017-05-31 | 北京化工大学 | 电压与电流同步的键控动态功率信号产生装置 |
CN107589396A (zh) * | 2017-10-23 | 2018-01-16 | 国网江西省电力公司电力科学研究院 | 一种基于常规电能校准器的动态性能溯源方法 |
CN107861091A (zh) * | 2017-10-23 | 2018-03-30 | 国网江西省电力公司电力科学研究院 | 一种基于动态电能校准器的动态性能溯源方法 |
CN108375748A (zh) * | 2018-01-30 | 2018-08-07 | 电子科技大学 | 一种基于正弦激励和dft变换的非线性校准方法 |
CN110531299A (zh) * | 2018-05-23 | 2019-12-03 | 北京化工大学 | 电能表动态测试信号电能量值的压缩感知间接测量方法 |
CN111638485A (zh) * | 2020-06-09 | 2020-09-08 | 国网陕西省电力公司电力科学研究院 | 一种基于标准脉冲虚功率源法的直流电能表校准方法及系统 |
CN113609648A (zh) * | 2021-07-12 | 2021-11-05 | 湖南省计量检测研究院 | 基于动态负荷的电能误差计量方法、装置及电子设备 |
CN114355274A (zh) * | 2022-03-14 | 2022-04-15 | 浙江万胜智能科技股份有限公司 | 一种用电信息数据的定期校准方法及系统 |
CN117907924A (zh) * | 2024-01-24 | 2024-04-19 | 国网山西省电力公司阳泉供电公司 | 一种具有自校准功能的广域计量装置及其测量方法 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108490382B (zh) * | 2018-04-04 | 2024-03-15 | 山东计保电气有限公司 | 高压电能表计量板远程在线校验方法及系统 |
CN109856588A (zh) * | 2019-02-28 | 2019-06-07 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 一种满足在线校验过程电能数据无损的数字直流电能表及现场校验系统 |
CN111562537B (zh) * | 2020-04-21 | 2024-06-25 | 北京化工大学 | 电能表动态误差的同步测量方法 |
CN112285637B (zh) * | 2020-11-18 | 2024-04-30 | 国家电网有限公司 | 一种考核尖顶波对电能计量影响的实验方法 |
CN113219395B (zh) * | 2021-04-29 | 2024-01-23 | 云南电网有限责任公司电力科学研究院 | 一种动态负荷电能计量的影响测试系统及方法 |
CN115018209B (zh) * | 2022-08-08 | 2022-11-08 | 国网湖北省电力有限公司营销服务中心(计量中心) | 一种数字化电能计量系统运行误差长期预测方法及设备 |
CN115508767A (zh) * | 2022-08-17 | 2022-12-23 | 山东爱普电气设备有限公司 | 一种基于硬件同步触发的动态负荷电能表检定装置及方法 |
CN115932711B (zh) * | 2023-03-10 | 2023-07-07 | 杭州炬华科技股份有限公司 | 一种电能表计量可信度的数据处理方法、装置及介质 |
CN118152728B (zh) * | 2024-05-10 | 2024-07-16 | 深圳市思达仪表有限公司 | 一种基于上位机的电能表误差监测方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0355559A1 (de) * | 1988-08-19 | 1990-02-28 | Siemens Aktiengesellschaft | Schaltungsanordnung für die Kontrolle und Überwachung der Funktion eines elektronischen Elektrizitätszählers |
US5514958A (en) * | 1994-11-22 | 1996-05-07 | General Electric Company | Electrical energy meters having factory set calibration circuits therein and methods of calibrating same |
CN101526596A (zh) * | 2009-04-21 | 2009-09-09 | 郑州万特电气有限公司 | 动态负荷下单相电能表电能计量误差的测量方法 |
CN101907697A (zh) * | 2010-08-09 | 2010-12-08 | 威胜集团有限公司 | 电能表动态性能测试仪 |
CN101957439A (zh) * | 2010-02-10 | 2011-01-26 | 江西省电力科学研究院 | 采算分离式电能表校验方法与电能表现场参数记录仪 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2917297A (en) * | 1996-05-20 | 1997-12-09 | Southpower Limited | Meter accuracy device |
JPH10142306A (ja) * | 1996-11-11 | 1998-05-29 | Toshiba Corp | 誘導型電力量計の調整方法及びその装置 |
KR100434655B1 (ko) * | 2001-10-22 | 2004-06-07 | (주)누리텔레콤 | 원격검침 시스템 |
CN100520437C (zh) * | 2005-09-06 | 2009-07-29 | 淄博计保互感器研究所 | 高压电能计量装置计量性能的整体检定、测量方法 |
CN200962142Y (zh) * | 2006-08-31 | 2007-10-17 | 武汉国测科技股份有限公司 | 高压电能表校验装置 |
CN103091659B (zh) * | 2013-01-22 | 2015-02-11 | 国家电网公司 | 电能表动态计量周期电能序列比例分配校验法 |
-
2013
- 2013-01-22 CN CN201310023075.7A patent/CN103091659B/zh not_active Expired - Fee Related
- 2013-12-15 WO PCT/CN2013/089464 patent/WO2014114150A1/zh active Application Filing
- 2013-12-15 KR KR1020157022963A patent/KR101871216B1/ko active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0355559A1 (de) * | 1988-08-19 | 1990-02-28 | Siemens Aktiengesellschaft | Schaltungsanordnung für die Kontrolle und Überwachung der Funktion eines elektronischen Elektrizitätszählers |
US5514958A (en) * | 1994-11-22 | 1996-05-07 | General Electric Company | Electrical energy meters having factory set calibration circuits therein and methods of calibrating same |
CN101526596A (zh) * | 2009-04-21 | 2009-09-09 | 郑州万特电气有限公司 | 动态负荷下单相电能表电能计量误差的测量方法 |
CN101957439A (zh) * | 2010-02-10 | 2011-01-26 | 江西省电力科学研究院 | 采算分离式电能表校验方法与电能表现场参数记录仪 |
CN101907697A (zh) * | 2010-08-09 | 2010-12-08 | 威胜集团有限公司 | 电能表动态性能测试仪 |
Non-Patent Citations (2)
Title |
---|
陈金玲等: "冲击性负荷电能表的研制及校验方法探讨", 《2010中国·北京全国电工仪器仪表标准化技术委员会第四届三次全体委员会议暨2010第二十一届"电磁测量技术、标准、产品国际研讨及展会"论文集 》 * |
陈锐民等: "基于量值溯源的数字电能表校验技术", 《电测与仪表》 * |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014114150A1 (zh) * | 2013-01-22 | 2014-07-31 | 国家电网公司 | 电能表动态计量周期电能序列比例分配校验法 |
CN104569900A (zh) * | 2013-10-14 | 2015-04-29 | 北京化工大学 | 智能电能表动态误差测试方法与装置 |
CN104569900B (zh) * | 2013-10-14 | 2017-12-12 | 北京化工大学 | 智能电能表动态误差测试装置 |
CN103630870A (zh) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | 一种虚负载式电能表走字架 |
CN103941217B (zh) * | 2014-04-17 | 2016-01-20 | 国家电网公司 | 一种电能计量装置工况模拟平台 |
CN103941217A (zh) * | 2014-04-17 | 2014-07-23 | 国家电网公司 | 一种电能计量装置工况模拟平台 |
CN104345294A (zh) * | 2014-11-04 | 2015-02-11 | 国家电网公司 | 一种电能表动态性能测试装置 |
CN104345294B (zh) * | 2014-11-04 | 2017-09-29 | 国家电网公司 | 一种电能表动态性能测试装置 |
CN105093165B (zh) * | 2015-09-08 | 2017-06-16 | 国家电网公司 | 一种数字化电能表脉冲信号的综合测试方法 |
CN105093165A (zh) * | 2015-09-08 | 2015-11-25 | 国家电网公司 | 一种数字化电能表脉冲信号的综合测试方法 |
CN106501755A (zh) * | 2016-10-18 | 2017-03-15 | 国网山东省电力公司烟台供电公司 | 一种基于动态负荷模型的智能电能表动态误差测量方法 |
CN106405481A (zh) * | 2016-11-11 | 2017-02-15 | 国网冀北电力有限公司电力科学研究院 | 数字化电能表的非线性负荷计量精度测量方法 |
CN106772207A (zh) * | 2016-12-30 | 2017-05-31 | 北京化工大学 | 电压与电流同步的键控动态功率信号产生装置 |
CN106772207B (zh) * | 2016-12-30 | 2020-05-05 | 北京化工大学 | 电压与电流同步的键控动态功率信号产生装置 |
CN107861091A (zh) * | 2017-10-23 | 2018-03-30 | 国网江西省电力公司电力科学研究院 | 一种基于动态电能校准器的动态性能溯源方法 |
CN107589396A (zh) * | 2017-10-23 | 2018-01-16 | 国网江西省电力公司电力科学研究院 | 一种基于常规电能校准器的动态性能溯源方法 |
CN107589396B (zh) * | 2017-10-23 | 2019-12-06 | 国网江西省电力公司电力科学研究院 | 一种基于常规电能校准器的动态性能溯源方法 |
CN107861091B (zh) * | 2017-10-23 | 2019-12-06 | 国网江西省电力公司电力科学研究院 | 一种基于动态电能校准器的动态性能溯源方法 |
CN108375748A (zh) * | 2018-01-30 | 2018-08-07 | 电子科技大学 | 一种基于正弦激励和dft变换的非线性校准方法 |
CN110531299B (zh) * | 2018-05-23 | 2021-01-01 | 北京化工大学 | 电能表动态测试信号电能量值的压缩感知间接测量方法 |
CN110531299A (zh) * | 2018-05-23 | 2019-12-03 | 北京化工大学 | 电能表动态测试信号电能量值的压缩感知间接测量方法 |
CN111638485A (zh) * | 2020-06-09 | 2020-09-08 | 国网陕西省电力公司电力科学研究院 | 一种基于标准脉冲虚功率源法的直流电能表校准方法及系统 |
CN111638485B (zh) * | 2020-06-09 | 2022-04-26 | 国网陕西省电力公司电力科学研究院 | 一种基于标准脉冲虚功率源法的直流电能表校准方法及系统 |
CN113609648A (zh) * | 2021-07-12 | 2021-11-05 | 湖南省计量检测研究院 | 基于动态负荷的电能误差计量方法、装置及电子设备 |
CN113609648B (zh) * | 2021-07-12 | 2024-04-19 | 湖南省计量检测研究院 | 基于动态负荷的电能误差计量方法、装置及电子设备 |
CN114355274A (zh) * | 2022-03-14 | 2022-04-15 | 浙江万胜智能科技股份有限公司 | 一种用电信息数据的定期校准方法及系统 |
CN114355274B (zh) * | 2022-03-14 | 2022-07-12 | 浙江万胜智能科技股份有限公司 | 一种用电信息数据的定期校准方法及系统 |
CN117907924A (zh) * | 2024-01-24 | 2024-04-19 | 国网山西省电力公司阳泉供电公司 | 一种具有自校准功能的广域计量装置及其测量方法 |
CN117907924B (zh) * | 2024-01-24 | 2024-07-02 | 国网山西省电力公司阳泉供电公司 | 一种具有自校准功能的广域计量装置及其测量方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103091659B (zh) | 2015-02-11 |
WO2014114150A1 (zh) | 2014-07-31 |
KR101871216B1 (ko) | 2018-06-27 |
KR20150141935A (ko) | 2015-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103091659B (zh) | 电能表动态计量周期电能序列比例分配校验法 | |
CN103630871B (zh) | 电子式电能表动态特性测试装置 | |
CN101470154B (zh) | 耐压测试系统 | |
CN104316894B (zh) | 一种电能表实际运行环境的仿真校验方法 | |
CN104345294B (zh) | 一种电能表动态性能测试装置 | |
CN104569900B (zh) | 智能电能表动态误差测试装置 | |
CN103809148B (zh) | 一种测量电能表动态特性的方法及系统 | |
CN108318852B (zh) | 一种智能电能表方波影响试验方法 | |
CN103698735A (zh) | 一种电能表谐波试验装置及其方法 | |
CN106054110A (zh) | 一种智能电能表谐波影响测试方法 | |
CN104569904B (zh) | 一种测试电能表的直流及偶次谐波影响量的试验装置 | |
CN203572959U (zh) | 电子式电能表动态特性测试装置 | |
CN103424734A (zh) | 电子式电能表在线校准方法 | |
CN106501755A (zh) | 一种基于动态负荷模型的智能电能表动态误差测量方法 | |
CN203870168U (zh) | 有源电力滤波器中电抗器电感量的测量装置 | |
CN201540366U (zh) | 一种三相谐波标准校准检定装置 | |
CN203101619U (zh) | 一种多参量电测设备校准系统 | |
CN104914395A (zh) | 一种用于单相智能电能表自动化检定系统的检测质量核查方法 | |
CN103941103B (zh) | 有源电力滤波器中电抗器电感量的测量装置及方法 | |
CN106501754A (zh) | 三相电能表的直流及偶次谐波影响量的试验装置 | |
CN111208468A (zh) | 一种电子式电压互感器谐波性能测试仪 | |
CN104345218A (zh) | 三相电抗器电抗值测量系统及方法 | |
CN204855583U (zh) | 一种精密大电流的暂态升流发生装置 | |
CN204065387U (zh) | 一种同步调解器以及包含此同步解调器的功率标准源 | |
CN109787235B (zh) | 新能源发电机组全功率范围谐波特性模型获取方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: HEILONGJIANG ELECTRIC POWER RESEARCH INSTITUTE Effective date: 20130427 Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: HEILONGJIANG ELECTRIC POWER RESEARCH INSTITUTE Effective date: 20130427 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 150030 HARBIN, HEILONGJIANG PROVINCE TO: 100761 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130427 Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No. Applicant after: State Grid Corporation of China Applicant after: HEILONGJIANG ELECTRIC POWER Research Institute Address before: 150030 Xiangjiang Road, Xiangfang District, Heilongjiang, No. 7, No. Applicant before: Heilongjiang Electric Power Research Institute |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Lu Yibiao Inventor after: Wang Xuewei Inventor after: Han Dong Inventor after: Wang Lin Inventor after: Qi Chuanfeng Inventor after: Lv Hua Inventor after: Li Peng Inventor after: Wan Jing Inventor after: Sun Yang Inventor before: Lu Yibiao Inventor before: Wang Xuewei Inventor before: Han Dong Inventor before: Wang Lin Inventor before: Qi Chuanfeng Inventor before: Lv Hua Inventor before: Li Peng Inventor before: Wan Jing |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LU YIBIAO WANG XUEWEI HAN DONG WANG LIN QI CHUANFENG LV HUA LI PENG WAN JING TO: LU YIBIAO WANG XUEWEI HAN DONG WANG LIN QI CHUANFENG LV HUA LI PENG WAN JING SUN YANG |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150211 Termination date: 20220122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |