[go: up one dir, main page]

CN103091659A - Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method - Google Patents

Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method Download PDF

Info

Publication number
CN103091659A
CN103091659A CN2013100230757A CN201310023075A CN103091659A CN 103091659 A CN103091659 A CN 103091659A CN 2013100230757 A CN2013100230757 A CN 2013100230757A CN 201310023075 A CN201310023075 A CN 201310023075A CN 103091659 A CN103091659 A CN 103091659A
Authority
CN
China
Prior art keywords
electric energy
energy meter
dynamic load
ook
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100230757A
Other languages
Chinese (zh)
Other versions
CN103091659B (en
Inventor
陆以彪
王学伟
韩东
王琳
齐传凤
吕华
李鹏
万静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Priority to CN201310023075.7A priority Critical patent/CN103091659B/en
Publication of CN103091659A publication Critical patent/CN103091659A/en
Priority to KR1020157022963A priority patent/KR101871216B1/en
Priority to PCT/CN2013/089464 priority patent/WO2014114150A1/en
Application granted granted Critical
Publication of CN103091659B publication Critical patent/CN103091659B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)
  • Control Of Electrical Variables (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method belongs to the technical field of electric energy meter dynamic performance measurement. The electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method solves the problem that a power signal source is adopted to produce dynamic load electric energy signals, and therefore measurement tracing error can not be given out in the existing dynamic performance measurement test of an electric energy meter. The electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method adopts synchronous on-off keying (OOK) cycle on-off control signals generated from three-phase steady-state voltages or three-phase steady-state current signals to dynamically distribute the three-phase steady-state current signals, by using a power electronic component, such as controllable silicon, transient state, short time and long time three kinds of periodically-changed dynamic load current signals are controlled to be produced, and dynamic load power is input into the electric energy meter under test in a discrete electric energy sequence mode. Dynamic load measurement validation error of the electric energy meter under the test is calculated by collecting output impulse of a standard electric energy meter and the electric energy meter under the test, and dynamic load measurement test tracing of the electric energy meter under the test can be achieved. The electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method is suitable for validation of electric energy meters.

Description

电能表动态计量周期电能序列比例分配校验法Calibration Method of Proportional Distribution of Electric Energy Sequence in Dynamic Measuring Period of Electric Energy Meter

技术领域technical field

本发明涉及电能表动态计量周期电能序列比例分配校验法,属于电能表动态性能计量技术领域。The invention relates to a method for verifying the proportional distribution of electric energy series in a dynamic measurement period of an electric energy meter, and belongs to the technical field of dynamic performance measurement of electric energy meters.

背景技术Background technique

近些年来,随着工业技术的发展,电力系统中动态用电负荷不断增加,如:电气化铁道中使用的大功率硅整流设备、钢铁企业中使用的交流电弧炉和交流逆变器装置、石化与机械等行业中使用的大功率电力拖动设备和电机变频调速装置、建筑塔吊与焊接设备等。这些动态负荷主要表现为:负荷瞬时电流剧烈、大范围地上下波动、出现随时间变化的次谐波等,使电能表产生了较大的电能计量误差,对供电和用电双方均造成了极大的经济损失。因此,实现对目前广泛使用的电能表在动态负荷下的计量性能测试已成为一项亟待解决的新问题。In recent years, with the development of industrial technology, the dynamic power load in the power system has been increasing, such as: high-power silicon rectifier equipment used in electrified railways, AC electric arc furnaces and AC inverter devices used in iron and steel enterprises, petrochemical High-power electric drive equipment and motor frequency conversion speed control devices, construction tower cranes and welding equipment used in industries such as machinery and machinery. These dynamic loads are mainly manifested as: the instantaneous load current is severe, the fluctuation is large-scale up and down, and the sub-harmonic wave changes with time, etc., which cause the electric energy meter to produce a large electric energy measurement error, which has caused extreme damage to both the power supply and the electricity consumer. large economic loss. Therefore, it has become a new problem to be solved urgently to realize the metering performance test of the electric energy meter widely used at present under the dynamic load.

目前,各种原理的电能表都是针对稳态负荷情况设计、制造、测试和检验的,不包含电能表在动态负荷条件下的试验。针对动态负荷情况,不同厂家生产的电能表的动态计量特性没有得到充分的测试研究。目前对电能表动态特性的研究中,用于电能表动态计量性能测试的动态负荷电能信号均是用功率信号源直接产生的,这种产生动态负荷电能信号的方法缺少对电能表动态计量性能的测试溯源,无法给出计量溯源误差。At present, electric energy meters of various principles are designed, manufactured, tested and inspected for steady-state load conditions, and tests of electric energy meters under dynamic load conditions are not included. For dynamic load conditions, the dynamic measurement characteristics of electric energy meters produced by different manufacturers have not been fully tested and studied. In the current research on the dynamic characteristics of electric energy meters, the dynamic load electric energy signals used in the dynamic measurement performance test of electric energy meters are all directly generated by power signal sources. This method of generating dynamic load electric energy signals lacks the dynamic measurement performance of electric energy meters. The traceability of the test cannot give the measurement traceability error.

发明内容Contents of the invention

本发明是为了解决现有对电能表的动态性能计量测试中,采用功率信号源产生动态负荷电能信号,无法给出计量溯源误差的问题,提供了一种电能表动态计量周期电能序列比例分配校验法。The present invention aims to solve the problem that the power signal source is used to generate the dynamic load electric energy signal in the existing dynamic performance measurement test of the electric energy meter, and the measurement traceability error cannot be given. test method.

本发明所述电能表动态计量周期电能序列比例分配校验法,它采用三相稳态电压信号或三相稳态电流信号通过周期分配电路产生同步通断控制信号OOK,该通断控制信号OOK通过三相动态负荷电流信号产生电路生成动态负荷电流信号,该动态负荷电流信号以离散电能序列的形式输入至被测电能表;所述三相动态负荷电流信号产生电路采用三相稳态电流信号作为工作电源;被测电能表采用三相稳态电压信号作为工作电源;The electric energy meter dynamic metering cycle electric energy sequence proportional distribution verification method of the present invention uses a three-phase steady-state voltage signal or a three-phase steady-state current signal to generate a synchronous on-off control signal OOK through a cycle distribution circuit, and the on-off control signal OOK The dynamic load current signal is generated by a three-phase dynamic load current signal generating circuit, and the dynamic load current signal is input to the measured electric energy meter in the form of a discrete electric energy sequence; the three-phase dynamic load current signal generating circuit adopts a three-phase steady-state current signal As a working power supply; the measured electric energy meter uses a three-phase steady-state voltage signal as a working power supply;

然后采集被测电能表输出的脉冲信号,同时采集标准电能表输出的脉冲信号,所述标准电能表在所述三相稳态电压信号和三相稳态电流信号下工作,采用电能表动态负荷计量校验误差计算电路对被测电能表输出的脉冲信号和标准电能表输出的脉冲信号进行计算,获得被测电能表的动态负荷计量校验误差,实现对被测电能表的动态负荷计量测试溯源。Then collect the pulse signal output by the measured electric energy meter, and collect the pulse signal output by the standard electric energy meter at the same time. The standard electric energy meter works under the three-phase steady-state voltage signal and the three-phase steady-state current signal. The measurement verification error calculation circuit calculates the pulse signal output by the measured electric energy meter and the pulse signal output by the standard electric energy meter, and obtains the dynamic load measurement verification error of the electric energy meter under test, and realizes the dynamic load measurement test of the electric energy meter under test Traceability.

所述同步通断控制信号OOK s(t)为:The synchronous on-off control signal OOK s(t) is:

sthe s (( tt )) == ΣΣ nno aa nno gg (( tt -- nTn )) ,,

式中an为动态负荷电流信号的离散电能序列,n为离散电能序列的序号,an的表达式为:In the formula, a n is the discrete electric energy sequence of the dynamic load current signal, n is the sequence number of the discrete electric energy sequence, and the expression of a n is:

Figure BDA00002762409500022
Figure BDA00002762409500022

t为时间,T为50Hz工频交流电周期,t is time, T is 50Hz power frequency AC cycle,

矩形窗函数

Figure BDA00002762409500023
rectangular window function
Figure BDA00002762409500023

N为自然数;N is a natural number;

同步通断控制信号OOK控制方式下第n个控制周期内的OOK动态负荷时域瞬时电流idn(t)为:The time-domain instantaneous current i dn (t) of the OOK dynamic load in the nth control cycle under the synchronous on-off control signal OOK control mode is:

Figure BDA00002762409500024
Figure BDA00002762409500024

式中Irms为OOK动态负荷时域的电流有效值,ω为OOK动态负荷时域的电流角频率,φn为第n个控制周期内的OOK动态负荷时域瞬时电流idn(t)基波分量或谐波分量的初始角,A为OOK动态负荷时域瞬时电流idn(t)谐波分量幅度,m1和m2均为正整数,的比值为OOK动态负荷时域瞬时电流idn(t)的整数次谐波或分数次谐波;In the formula, I rms is the effective value of the current in the OOK dynamic load time domain, ω is the current angular frequency in the OOK dynamic load time domain, φ n is the instantaneous current in the OOK dynamic load time domain in the nth control cycle i dn (t) base initial angle of the wave component or harmonic component, A is the magnitude of the harmonic component of the instantaneous current i dn (t) in the OOK dynamic load time domain, m 1 and m 2 are both positive integers, The ratio of is the integer or fractional harmonic of the instantaneous current i dn (t) in the OOK dynamic load time domain;

ω=2πf,

Figure BDA00002762409500026
m1,m2∈N*,N*为正自然数的集合,A∈Q*,Q*为正有理数集合,且nT≤t≤(n+1)T,当为整数时,idn(t)中含有整数次谐波电流分量;当为分数时,idn(t)中含有非整数次谐波电流分量;ω=2πf,
Figure BDA00002762409500026
m 1 , m 2N * , N * is a set of positive natural numbers, A ∈ Q * , Q * is a set of positive rational numbers, and nT≤t≤(n+1)T, when When is an integer, i dn (t) contains integer harmonic current components; when When is a fraction, i dn (t) contains non-integer harmonic current components;

动态负荷电流信号以离散电能序列{Edi0(n),Edi1(n),Edi2(n),…,Edin(n)}的形式输入至被测电能表,Edin(n)为同步通断控制信号OOK第n个控制周期内的动态负荷电能,Edin(n)以电能当量的形式表示为:The dynamic load current signal is input to the electric energy meter under test in the form of discrete electric energy sequence {E di0 (n), E di1 (n), E di2 (n), ..., E din (n)}, and E din (n) is The dynamic load electric energy in the nth control cycle of the synchronous on-off control signal OOK, E din (n) is expressed in the form of electric energy equivalent as:

Figure BDA00002762409500031
Figure BDA00002762409500031

式中Urms为OOK动态负荷时域的电压有效值,Eq为量化电能当量,是某一校验输入条件下的量化电能当量;In the formula, U rms is the voltage effective value in the OOK dynamic load time domain, and E q is the quantified electric energy equivalent, which is the quantified electric energy equivalent under a certain verification input condition;

用TA表示在1个同步通断控制信号OOK的导通期间里包含的50Hz正弦电流信号的整周期个数,用TR表示在1个同步通断控制信号OOK的关断期间里包含的50Hz正弦电流信号的整周期个数,Use T A to represent the number of entire cycles of the 50Hz sinusoidal current signal included in the conduction period of a synchronous on-off control signal OOK, and use T R to represent the number of cycles included in the turn-off period of a synchronous on-off control signal OOK The number of whole cycles of the 50Hz sinusoidal current signal,

当被测电能表被输入的动态负荷电流信号为TA、TB条件下的同步通断控制信号OOK时,采集被测电能表输出的脉冲信号个数NA,计算获得与被测电能表输出的脉冲信号个数NA对应的标准电能表的算定脉冲个数m0When the dynamic load current signal input to the electric energy meter under test is the synchronous on-off control signal OOK under the conditions of T A and T B , the number N A of the pulse signal output by the electric energy meter under test is collected, and the calculated value is the same as that of the electric energy meter under test. The number of output pulse signals N A corresponds to the calculated number of pulses m 0 of the standard electric energy meter:

mm 00 == 36003600 ×× 10001000 CC ** KK II ** KK Uu ** KK JJ ** NN AA ** CC 00 ** TT AA ++ TT BB TT AA ,,

式中C为被测电能表输出脉冲常数,单位为P/kWh;KI为校验过程中标准电能表外接的电流互感器变比;KU为校验过程中标准电能表外接的电压互感器变比;KJ为接线系数,C0为标准电能表输出脉冲常数,单位为P/WS;In the formula, C is the output pulse constant of the measured electric energy meter, and the unit is P/kWh; K I is the transformation ratio of the current transformer externally connected to the standard electric energy meter during the calibration process; K U is the voltage mutual inductance externally connected to the standard electric energy meter during the calibration process Transformer ratio; K J is the wiring coefficient, C 0 is the output pulse constant of the standard electric energy meter, and the unit is P/WS;

根据被测电能表在动态负荷电能条件下输出的标准脉冲个数m,获得被测电能表的动态负荷计量校验误差γ为:According to the standard pulse number m output by the measured electric energy meter under the condition of dynamic load electric energy, the dynamic load measurement calibration error γ of the measured electric energy meter is obtained as:

γγ == mm 00 -- mm mm ×× 100100 %% ;;

使被测电能表被输入的同步通断控制信号OOK在全通控制模式下,将三相稳态电压信号和三相稳态电流信号输入被测电能表,采集被测电能表输出的脉冲信号个数NS,计算获得与被测电能表输出的脉冲信号个数NS对应的标准电能表的算定脉冲个数mS0The synchronous on-off control signal OOK input to the measured electric energy meter is in the all-through control mode, and the three-phase steady-state voltage signal and the three-phase steady-state current signal are input to the electric energy meter under test, and the pulse signal output by the electric energy meter under test is collected The number N S is calculated to obtain the calculated pulse number m S0 of the standard electric energy meter corresponding to the number N S of pulse signals output by the measured electric energy meter:

mm SS 00 == 36003600 ×× 10001000 CC ** KK II ** KK Uu ** KK JJ ** NN SS ** CC 00 ,,

根据被测电能表的给定计量稳态电能所对应的标准脉冲个数mS,对被测电能表进行动态负荷计量测试溯源,其溯源误差γS为:According to the standard pulse number m S corresponding to the given measured steady-state electric energy of the measured electric energy meter, trace the source of the dynamic load measurement test of the measured electric energy meter, and its traceability error γ S is:

γγ SS == mm SS 00 -- mm SS mm SS ×× 100100 %% ..

本发明的优点:本发明能够有效反映电能表动态负荷计量性能以及电能表动态负荷计量性能测试溯源。它采用由三相稳态电压或三相稳态电流信号产生的同步OOK周期通断控制信号对三相稳态电流信号进行动态分配,利用可控硅等电力电子器件实现控制产生暂态、短时和长时三种呈周期变化的动态负荷电流信号,将动态负荷电能以离散电能序列的形式输入至被测电能表,通过收集标准电能表和被测电能表的输出脉冲来计算被测电能表的动态负荷计量校验误差,并可实现对被测电能的动态负荷计量测试溯源。The invention has the advantages that the invention can effectively reflect the dynamic load measurement performance of the electric energy meter and trace the source of the dynamic load measurement performance test of the electric energy meter. It adopts the synchronous OOK periodic on-off control signal generated by the three-phase steady-state voltage or three-phase steady-state current signal to dynamically distribute the three-phase steady-state current signal, and uses power electronic devices such as silicon controlled rectifiers to realize control to generate transient, short-term There are three kinds of dynamic load current signals that change periodically, namely long-term and long-term. The dynamic load electric energy is input to the measured electric energy meter in the form of discrete electric energy sequence, and the measured electric energy is calculated by collecting the output pulses of the standard electric energy meter and the electric energy meter under test. The dynamic load measurement calibration error of the meter can be realized, and the traceability of the dynamic load measurement test of the measured electric energy can be realized.

本发明建立了电能表动态负荷计量校验误差的计算方法,可将标准电能表的静态误差过渡到被测电能表的动态误差,通过对比分配到被测电能表的动态负荷电能的理论值、与被测电能表实际计量到的动态负荷电能值来计算给出被测电能表的动态负荷计量误差。The invention establishes a calculation method for the dynamic load measurement verification error of the electric energy meter, which can transition the static error of the standard electric energy meter to the dynamic error of the measured electric energy meter, and compare the theoretical value of the dynamic load electric energy distributed to the measured electric energy meter, The dynamic load measurement error of the measured electric energy meter is calculated by calculating the dynamic load electric energy value actually measured by the electric energy meter under test.

附图说明Description of drawings

图1是本发明所述电能表动态计量周期电能序列比例分配校验法的原理框图。Fig. 1 is a functional block diagram of the electric energy meter dynamic metering cycle electric energy sequence proportional distribution verification method of the present invention.

具体实施方式Detailed ways

具体实施方式一:下面结合图1说明本实施方式,本实施方式所述电能表动态计量周期电能序列比例分配校验法,它采用三相稳态电压信号或三相稳态电流信号通过周期分配电路1产生同步通断控制信号OOK,该通断控制信号OOK通过三相动态负荷电流信号产生电路2生成动态负荷电流信号,该动态负荷电流信号以离散电能序列的形式输入至被测电能表;所述三相动态负荷电流信号产生电路2采用三相稳态电流信号作为工作电源;被测电能表采用三相稳态电压信号作为工作电源;Specific embodiment 1: The present embodiment is described below in conjunction with Fig. 1. The electric energy meter dynamic metering cycle electric energy sequence proportional distribution verification method described in the present embodiment adopts three-phase steady-state voltage signals or three-phase steady-state current signals through periodic distribution The circuit 1 generates a synchronous on-off control signal OOK, and the on-off control signal OOK generates a dynamic load current signal through the three-phase dynamic load current signal generating circuit 2, and the dynamic load current signal is input to the measured electric energy meter in the form of a discrete electric energy sequence; The three-phase dynamic load current signal generating circuit 2 adopts a three-phase steady-state current signal as a working power supply; the measured electric energy meter adopts a three-phase steady-state voltage signal as a working power supply;

然后采集被测电能表输出的脉冲信号,同时采集标准电能表输出的脉冲信号,所述标准电能表在所述三相稳态电压信号和三相稳态电流信号下工作,采用电能表动态负荷计量校验误差计算电路3对被测电能表输出的脉冲信号和标准电能表输出的脉冲信号进行计算,获得被测电能表的动态负荷计量校验误差,实现对被测电能表的动态负荷计量测试溯源。Then collect the pulse signal output by the measured electric energy meter, and collect the pulse signal output by the standard electric energy meter at the same time. The standard electric energy meter works under the three-phase steady-state voltage signal and the three-phase steady-state current signal. The measurement verification error calculation circuit 3 calculates the pulse signal output by the measured electric energy meter and the pulse signal output by the standard electric energy meter, obtains the dynamic load measurement verification error of the measured electric energy meter, and realizes the dynamic load measurement of the measured electric energy meter Test traceability.

本实施方式所述对被测电能表进行校验的方式,可用于对两个被测电能表的测量。只需将周期分配电路1产生同步通断控制信号OOK经过一个与非门来实现控制,即将分配电路1产生的同步通断控制信号OOK直接输入给与一个被测电能表对应的三相动态负荷电流信号产生电路2,分配电路1产生的同步通断控制信号OOK经过与非门变换后的信号输入给另一个被测电能表对应的三相动态负荷电流信号产生电路2。还可根据实际需要对测量情况进行相应的设置。The method for calibrating the electric energy meter under test described in this embodiment can be used for the measurement of two electric energy meters under test. It is only necessary to control the synchronous on-off control signal OOK generated by the cycle distribution circuit 1 through a NAND gate, that is, the synchronous on-off control signal OOK generated by the distribution circuit 1 is directly input to the three-phase dynamic load corresponding to a measured electric energy meter The current signal generation circuit 2 and the synchronous on-off control signal OOK generated by the distribution circuit 1 are input to another three-phase dynamic load current signal generation circuit 2 corresponding to the electric energy meter under test after being transformed by a NAND gate. Corresponding settings can also be made to the measurement situation according to actual needs.

具体实施方式二:下面结合图1说明本实施方式,本实施方式为对实施方式一的进一步说明,本实施方式所述同步通断控制信号OOK s(t)为:Specific embodiment two: the present embodiment is described below in conjunction with Fig. 1, and this embodiment is a further description to embodiment one, and the synchronous on-off control signal OOK s (t) described in this embodiment is:

sthe s (( tt )) == ΣΣ nno aa nno gg (( tt -- nTn )) ,,

式中an为动态负荷电流信号的离散电能序列,n为离散电能序列的序号,an的表达式为:In the formula, a n is the discrete electric energy sequence of the dynamic load current signal, n is the sequence number of the discrete electric energy sequence, and the expression of a n is:

Figure BDA00002762409500052
Figure BDA00002762409500052

t为时间,T为5OHz工频交流电周期,t is time, T is 50Hz power frequency AC cycle,

矩形窗函数

Figure BDA00002762409500053
rectangular window function
Figure BDA00002762409500053

N为自然数;N is a natural number;

同步通断控制信号OOK控制方式下第n个控制周期内的OOK动态负荷时域瞬时电流idn(t)为:The time-domain instantaneous current i dn (t) of the OOK dynamic load in the nth control cycle under the synchronous on-off control signal OOK control mode is:

Figure BDA00002762409500054
Figure BDA00002762409500054

式中Irms为OOK动态负荷时域的电流有效值,ω为OOK动态负荷时域的电流角频率,φn为第n个控制周期内的OOK动态负荷时域瞬时电流idn(t)基波分量或谐波分量的初始角,A为OOK动态负荷时域瞬时电流idn(t)谐波分量幅度,m1和m2均为正整数,

Figure BDA00002762409500055
的比值为OOK动态负荷时域瞬时电流idn(t)的整数次谐波或分数次谐波;In the formula, I rms is the effective value of the current in the OOK dynamic load time domain, ω is the current angular frequency in the OOK dynamic load time domain, φ n is the instantaneous current in the OOK dynamic load time domain in the nth control cycle i dn (t) base initial angle of the wave component or harmonic component, A is the magnitude of the harmonic component of the instantaneous current i dn (t) in the OOK dynamic load time domain, m 1 and m 2 are both positive integers,
Figure BDA00002762409500055
The ratio of is the integer or fractional harmonic of the instantaneous current i dn (t) in the OOK dynamic load time domain;

ω=2πf,

Figure BDA00002762409500056
m1,m2∈N*,N*为正自然数的集合,A∈Q*,Q*为正有理数集合,且nT≤t≤(n+1)T,当为整数时,idn(t)中含有整数次谐波电流分量;当
Figure BDA00002762409500058
为分数时,idn(t)中含有非整数次谐波电流分量;ω=2πf,
Figure BDA00002762409500056
m 1 , m 2N * , N * is a set of positive natural numbers, A ∈ Q * , Q * is a set of positive rational numbers, and nT≤t≤(n+1)T, when When is an integer, i dn (t) contains integer harmonic current components; when
Figure BDA00002762409500058
When is a fraction, i dn (t) contains non-integer harmonic current components;

动态负荷电流信号以离散电能序列{Edi0(n),Edi1(n),Edi2(n),…,Edin(n)}的形式输入至被测电能表,Edin(n)为同步通断控制信号OOK第n个控制周期内的动态负荷电能,Edin(n)以电能当量的形式表示为:The dynamic load current signal is input to the electric energy meter under test in the form of discrete electric energy sequence {E di0 (n), E di1 (n), E di2 (n), ..., E din (n)}, and E din (n) is The dynamic load electric energy in the nth control cycle of the synchronous on-off control signal OOK, E din (n) is expressed in the form of electric energy equivalent as:

Figure BDA00002762409500061
Figure BDA00002762409500061

式中Urms为OOK动态负荷时域的电压有效值,Eq为量化电能当量,是某一校验输入条件下的量化电能当量;In the formula, U rms is the voltage effective value in the OOK dynamic load time domain, and E q is the quantified electric energy equivalent, which is the quantified electric energy equivalent under a certain verification input condition;

用TA表示在1个同步通断控制信号OOK的导通期间里包含的50Hz正弦电流信号的整周期个数,用TB表示在1个同步通断控制信号OOK的关断期间里包含的50Hz正弦电流信号的整周期个数,Use T A to represent the number of whole cycles of the 50Hz sinusoidal current signal included in the conduction period of a synchronous on-off control signal OOK, and use T B to represent the number of cycles included in the turn-off period of a synchronous on-off control signal OOK The number of whole cycles of the 50Hz sinusoidal current signal,

当被测电能表被输入的动态负荷电流信号为TA、TB条件下的同步通断控制信号OOK时,采集被测电能表输出的脉冲信号个数NA,计算获得与被测电能表输出的脉冲信号个数NA对应的标准电能表的算定脉冲个数m0When the dynamic load current signal input to the electric energy meter under test is the synchronous on-off control signal OOK under the conditions of T A and T B , the number N A of the pulse signal output by the electric energy meter under test is collected, and the calculated value is the same as that of the electric energy meter under test. The number of output pulse signals N A corresponds to the calculated number of pulses m 0 of the standard electric energy meter:

mm 00 == 36003600 ×× 10001000 CC ** KK II ** KK Uu ** KK JJ ** NN AA ** CC 00 ** TT AA ++ TT BB TT AA ,,

式中C为被测电能表输出脉冲常数,单位为P/kWh;KI为校验过程中标准电能表外接的电流互感器变比;KU为校验过程中标准电能表外接的电压互感器变比;KJ为接线系数,C0为标准电能表输出脉冲常数,单位为P/WS;In the formula, C is the output pulse constant of the measured electric energy meter, and the unit is P/kWh; K I is the transformation ratio of the current transformer externally connected to the standard electric energy meter during the calibration process; K U is the voltage mutual inductance externally connected to the standard electric energy meter during the calibration process Transformer ratio; K J is the wiring coefficient, C 0 is the output pulse constant of the standard electric energy meter, and the unit is P/WS;

根据被测电能表在动态负荷电能条件下输出的标准脉冲个数m,获得被测电能表的动态负荷计量校验误差γ为:According to the standard pulse number m output by the measured electric energy meter under the condition of dynamic load electric energy, the dynamic load measurement calibration error γ of the measured electric energy meter is obtained as:

γγ == mm 00 -- mm mm ×× 100100 %% ;;

使被测电能表被输入的同步通断控制信号OOK在全通控制模式下,将三相稳态电压信号和三相稳态电流信号输入被测电能表,采集被测电能表输出的脉冲信号个数NS,计算获得与被测电能表输出的脉冲信号个数NS对应的标准电能表的算定脉冲个数mS0The synchronous on-off control signal OOK input to the measured electric energy meter is in the all-through control mode, and the three-phase steady-state voltage signal and the three-phase steady-state current signal are input to the electric energy meter under test, and the pulse signal output by the electric energy meter under test is collected The number N S is calculated to obtain the calculated pulse number m S0 of the standard electric energy meter corresponding to the number N S of pulse signals output by the measured electric energy meter:

mm SS 00 == 36003600 ×× 10001000 CC ** KK II ** KK Uu ** KK JJ ** NN SS ** CC 00 ,,

根据被测电能表的给定计量稳态电能所对应的标准脉冲个数mS,对被测电能表进行动态负荷计量测试溯源,其溯源误差γS为:According to the standard pulse number m S corresponding to the given measured steady-state electric energy of the measured electric energy meter, trace the source of the dynamic load measurement test of the measured electric energy meter, and its traceability error γ S is:

γγ SS == mm SS 00 -- mm SS mm SS ×× 100100 %% ..

本实施方式中,校验过程中标准电能表外接的电流互感器用于进行电流变换和隔离,标准电能表外接的电压互感器用于进行电压变换和隔离。In this embodiment, during the verification process, the current transformer connected externally to the standard electric energy meter is used for current transformation and isolation, and the voltage transformer externally connected to the standard electric energy meter is used for voltage transformation and isolation.

具体实施方式三:本实施方式为对实施方式二的进一步说明,本实施方式所述TA和TB的个数范围均为1~2000。Specific Embodiment 3: This embodiment is a further description of Embodiment 2, and the number of TA and TB described in this embodiment ranges from 1 to 2000.

具体实施方式四:本实施方式为对实施方式一、二或三的进一步说明,本实施方式所述三相动态负荷电流信号产生电路2为三相电流可控硅电路。Embodiment 4: This embodiment is a further description of Embodiment 1, 2 or 3. The three-phase dynamic load current signal generating circuit 2 in this embodiment is a three-phase current thyristor circuit.

具体实施方式五:本实施方式为对实施方式一、二、三或四的进一步说明,本实施方式所述三相动态负荷电流信号产生电路2生成的动态负荷电流信号为暂态、短时和长时的动态负荷电流信号,该暂态、短时和长时的动态负荷电流信号呈周期变化;Embodiment 5: This embodiment is a further description of Embodiments 1, 2, 3 or 4. The dynamic load current signal generated by the three-phase dynamic load current signal generation circuit 2 in this embodiment is transient, short-term and A long-term dynamic load current signal, the transient, short-time and long-time dynamic load current signals change periodically;

暂态动态负荷电流信号为:在同步通断控制信号OOK的一个通断控制周期内,TA为1~5个;The transient dynamic load current signal is: within one on-off control cycle of the synchronous on-off control signal OOK, T A is 1 to 5;

短时动态负荷电流信号为:在同步通断控制信号OOK的一个通断控制周期内,TA为5~50个;The short-term dynamic load current signal is: within one on-off control cycle of the synchronous on-off control signal OOK, T A is 5 to 50;

长时动态负荷电流信号为:在同步通断控制信号OOK的一个通断控制周期内,TA为50~500个。The long-term dynamic load current signal is: in one on-off control cycle of the synchronous on-off control signal OOK, T A is 50-500.

本实施方式采用可控硅等电力电子器件来实现控制产生三相OOK动态负荷电流信号。所产生的三相OOK动态负荷电流信号用于控制产生三种类型的动态负荷电能信号:In this embodiment, a power electronic device such as a thyristor is used to control and generate a three-phase OOK dynamic load current signal. The generated three-phase OOK dynamic load current signal is used to control the generation of three types of dynamic load energy signals:

暂态动态负荷电流信号:在1个OOK通断控制周期内,通周期数TA范围为1~5个,即电流流通时间为20ms~100ms,可反映快速冲击用电设备等的用电状况;Transient dynamic load current signal: within one OOK on-off control cycle, the number of on-cycles T A ranges from 1 to 5, that is, the current flow time is 20ms to 100ms, which can reflect the power consumption status of rapid impact electrical equipment, etc. ;

短时动态负荷电流信号:在1个OOK通断控制周期内,通周期数TA范围为5~50个,即电流流通时间为100ms~1000ms,可反映中速冲击用电设备或波动负荷的用电状况;Short-term dynamic load current signal: within one OOK on-off control cycle, the number of on-cycles T A ranges from 5 to 50, that is, the current flow time is 100ms to 1000ms, which can reflect the impact of medium-speed electrical equipment or fluctuating loads Electricity status;

长时动态负荷电流信号:在1个OOK通断控制周期内,通周期数TA范围为50~500个,即电流流通时间为1s~10s,可反映通断用电设备或慢速波动负荷的用电状况。Long-term dynamic load current signal: within one OOK on-off control cycle, the number of on-cycle T A ranges from 50 to 500, that is, the current flow time is 1s to 10s, which can reflect on-off electrical equipment or slow fluctuating loads power consumption status.

具体实施方式六:本实施方式为对实施方式一、二、三、四或五的进一步说明,本实施方式所述三相稳态电压信号或三相稳态电流信号通过选择控制电路4选择后输出与三相稳态电压信号或三相稳态电流信号对应的同步方波控制信号,该同步方波控制信号输出给周期分配电路1产生同步的通断控制信号OOK。Embodiment 6: This embodiment is a further description of Embodiments 1, 2, 3, 4 or 5. After the three-phase steady-state voltage signal or the three-phase steady-state current signal in this embodiment is selected by the selection control circuit 4 A synchronous square wave control signal corresponding to the three-phase steady-state voltage signal or three-phase steady-state current signal is output, and the synchronous square wave control signal is output to the period distribution circuit 1 to generate a synchronous on-off control signal OOK.

本实施方式中同步通断控制信号OOK可通过周期分配电路1采用以下控制模式产生:In this embodiment, the synchronous on-off control signal OOK can be generated by the cycle distribution circuit 1 using the following control mode:

电压控制模式:由正弦稳态电压信号产生。三相四线接线条件下,由A相或C相相电压整形后的同步电压方波信号产生周期通断控制信号OOK;三相三线条件下,由AB或CB线电压整形后的同步电压方波信号产生周期通断控制信号OOK。Voltage control mode: Generated by a sinusoidal steady-state voltage signal. Under the condition of three-phase four-wire connection, the periodic on-off control signal OOK is generated by the synchronous voltage square wave signal of phase A or C phase voltage shaping; The wave signal generates a periodic on-off control signal OOK.

电流控制模式:由正弦稳态电流信号产生。由A相、B相或C相电流信号整形后的同步电流方波信号产生周期通断控制信号OOK。Current control mode: Generated by a sinusoidal steady-state current signal. The periodic on-off control signal OOK is generated by the synchronous current square wave signal shaped by the A-phase, B-phase or C-phase current signal.

全通控制模式:令可控硅等电力电子器件始终处于导通状态,将稳态三相电流信号输入至被测电能表。All-pass control mode: make power electronic devices such as thyristors always in the conduction state, and input the steady-state three-phase current signal to the electric energy meter under test.

Claims (6)

1. electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check addition, it is characterized in that, it adopts three-phase steady state voltage signal or three-phase steady-state current signal to produce synchronous break-make control signal OOK by period allocated circuit (1), this break-make control signal OOK generates the dynamic load current signal by three phase dynamic load current signal generating circuit (2), and this dynamic load current signal inputs to tested electric energy meter with the form of discrete electric energy sequence; Described three phase dynamic load current signal generating circuit (2) adopts three-phase steady-state current signal as working power; Tested electric energy meter adopts three-phase steady state voltage signal as working power;
Then gather the pulse signal of tested electric energy meter output, gather simultaneously the pulse signal of standard electric energy meter output, described standard electric energy meter is worked under described three-phase steady state voltage signal and three-phase steady-state current signal, adopt electric energy meter dynamic load metering verify error counting circuit (3) that the pulse signal of tested electric energy meter output and the pulse signal of standard electric energy meter output are calculated, obtain the dynamic load metering verify error of tested electric energy meter, realize the dynamic load metrology and measurement of tested electric energy meter is traced to the source.
2. electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check addition according to claim 1, is characterized in that,
Described synchronous break-make control signal OOK s (t) is:
s ( t ) = Σ n a n g ( t - nT ) ,
A in formula nBe the discrete electric energy sequence of dynamic load current signal, n is the sequence number of discrete electric energy sequence, a nExpression formula be:
Figure FDA00002762409400012
T is the time, and T is the 50Hz industrial-frequency alternating current cycle,
Rectangular window function
Figure FDA00002762409400013
N is natural number;
N OOK dynamic load time domain momentary current i that control cycle is interior under synchronous break-make control signal OOK control mode dn(t) be:
Figure FDA00002762409400014
I in formula rmsBe the current effective value of OOK dynamic load time domain, ω is the electric current angular frequency of OOK dynamic load time domain, φ nBe the OOK dynamic load time domain momentary current i in n control cycle dn(t) initial angle of fundametal compoment or harmonic component, A is OOK dynamic load time domain momentary current i dn(t) harmonic component amplitude, m 1And m 2Be positive integer,
Figure FDA00002762409400021
Ratio be OOK dynamic load time domain momentary current i dn(t) integral frequency harmonizing wave or fractional harmoni;
ω=2 π f,
Figure FDA00002762409400022
m 1, m 2∈ N *, N *Be just natural set, A ∈ Q *, Q *Be the positive rational number set, the T of and nT≤t≤(n+1), when
Figure FDA00002762409400023
During for integer, i dn(t) contain the integral frequency harmonizing wave current component in; When
Figure FDA00002762409400024
During for mark, i dn(t) contain the non-integer harmonics current component in;
The dynamic load current signal is with discrete electric energy sequence E di0(n), E di1(n), E di2(n) ..., E din(n) } form inputs to tested electric energy meter, R din(n) be the interior dynamic load electric energy of n control cycle of synchronous break-make control signal OOK, E din(n) form with the electric energy equivalent is expressed as:
Figure FDA00002762409400025
U in formula rmsBe the voltage effective value of OOK dynamic load time domain, E qFor quantizing the electric energy equivalent, it is the quantification electric energy equivalent under a certain verification initial conditions;
Use T ABe illustrated in number complete cycle of the 50Hz sinusoidal current signal that comprises in the conduction period of 1 synchronous break-make control signal OOK, use T BBe illustrated in number complete cycle of the 50Hz sinusoidal current signal that comprises in the blocking interval of 1 synchronous break-make control signal OOK,
The dynamic load current signal that is transfused to when tested electric energy meter is T A, T BDuring synchronous break-make control signal OOK under condition, gather the pulse signal number N of tested electric energy meter output A, calculate the pulse signal number N that obtains with tested electric energy meter output APulse number m is decided in the calculation of corresponding standard electric energy meter 0:
m 0 = 3600 × 1000 C * K I * K U * K J * N A * C 0 * T A + T B T A ,
In formula, C is tested electric energy meter output meter constant, and unit is P/kWh; K IBe the external current transformer ratio of checking procedure Plays electric energy meter; K UBe the external voltage transformer (VT) no-load voltage ratio of checking procedure Plays electric energy meter; K JBe connection factor, C 0Be standard electric energy meter output meter constant, unit is P/WS;
According to the full sized pules number m that tested electric energy meter is exported under dynamic load electric energy condition, the dynamic load metering verify error γ that obtains tested electric energy meter is:
γ = m 0 - m m × 100 % ;
Make synchronous break-make control signal OOK that tested electric energy meter is transfused under the all-pass control model, with three-phase steady state voltage signal and the tested electric energy meter of three-phase steady-state current signal input, gathers the pulse signal number N that tested electric energy meter is exported S, calculate the pulse signal number N that obtains with tested electric energy meter output SPulse number m is decided in the calculation of corresponding standard electric energy meter S0:
m S 0 = 3600 × 1000 C * K I * K U * K J * N S * C 0 ,
The corresponding full sized pules number of given metering stable state electric energy m according to tested electric energy meter S, tested electric energy meter is carried out the dynamic load metrology and measurement traces to the source, its error γ that traces to the source SFor:
γ S = m S 0 - m S m S × 100 % .
3. electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check addition according to claim 2, is characterized in that described T AAnd T BThe number scope be 1~2000.
4. according to claim 2 or 3 described electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check additions, is characterized in that, described three phase dynamic load current signal generating circuit (2) is the three-phase current ghyristor circuit.
5. electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check addition according to claim 4, is characterized in that,
The dynamic load current signal that described three phase dynamic load current signal generating circuit (2) generates is transient state, the dynamic load current signal when long in short-term, and this transient state, the dynamic load current signal when long is the cycle and changes in short-term;
Transient state dynamic load current signal is: in the break-make control cycle of synchronous break-make control signal OOK, and T AIt is 1~5;
The dynamic load current signal is in short-term: in the break-make control cycle of synchronous break-make control signal OOK, and T AIt is 5~50;
When long, the dynamic load current signal is: in the break-make control cycle of synchronous break-make control signal OOK, and T AIt is 50~500.
6. 2,3 or 5 described electric energy meter dynamic measurement cycle electric energy sequence proportional distribution check additions according to claim 1,, it is characterized in that, described three-phase steady state voltage signal or three-phase steady-state current signal are by the output synchronous square wave control signal corresponding with three-phase steady state voltage signal or three-phase steady-state current signal after selecting control circuit (4) to select, and this synchronous square wave control signal is exported to period allocated circuit (1) and produced synchronous break-make control signal OOK.
CN201310023075.7A 2013-01-22 2013-01-22 Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method Expired - Fee Related CN103091659B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201310023075.7A CN103091659B (en) 2013-01-22 2013-01-22 Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method
KR1020157022963A KR101871216B1 (en) 2013-01-22 2013-12-15 Method for checking electric energy sequence proportion distribution in dynamic measurement cycle of electric energy meter
PCT/CN2013/089464 WO2014114150A1 (en) 2013-01-22 2013-12-15 Method for checking electric energy sequence proportion distribution in dynamic measurement cycle of electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310023075.7A CN103091659B (en) 2013-01-22 2013-01-22 Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method

Publications (2)

Publication Number Publication Date
CN103091659A true CN103091659A (en) 2013-05-08
CN103091659B CN103091659B (en) 2015-02-11

Family

ID=48204462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310023075.7A Expired - Fee Related CN103091659B (en) 2013-01-22 2013-01-22 Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method

Country Status (3)

Country Link
KR (1) KR101871216B1 (en)
CN (1) CN103091659B (en)
WO (1) WO2014114150A1 (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103630870A (en) * 2013-12-05 2014-03-12 国家电网公司 Dummy-load-type counting test frame for electric energy meters
CN103941217A (en) * 2014-04-17 2014-07-23 国家电网公司 Electric energy metering device working condition simulation platform
WO2014114150A1 (en) * 2013-01-22 2014-07-31 国家电网公司 Method for checking electric energy sequence proportion distribution in dynamic measurement cycle of electric energy meter
CN104345294A (en) * 2014-11-04 2015-02-11 国家电网公司 Electric energy meter dynamic performance test device
CN104569900A (en) * 2013-10-14 2015-04-29 北京化工大学 Dynamic error testing method and device for intelligent ammeter
CN105093165A (en) * 2015-09-08 2015-11-25 国家电网公司 Comprehensive test method of pulse signals of digitization electric energy meter
CN106405481A (en) * 2016-11-11 2017-02-15 国网冀北电力有限公司电力科学研究院 Nonlinear-load metering precision measuring method for digital electric energy meter
CN106501755A (en) * 2016-10-18 2017-03-15 国网山东省电力公司烟台供电公司 A kind of intelligent electric energy meter dynamic error measuring method based on dynamic load model
CN106772207A (en) * 2016-12-30 2017-05-31 北京化工大学 The keying active power signal generation device of voltage and current synchronization
CN107589396A (en) * 2017-10-23 2018-01-16 国网江西省电力公司电力科学研究院 A kind of dynamic property source tracing method based on conventional power calibration device
CN107861091A (en) * 2017-10-23 2018-03-30 国网江西省电力公司电力科学研究院 A kind of dynamic property source tracing method based on dynamic electric energy calibrator
CN108375748A (en) * 2018-01-30 2018-08-07 电子科技大学 A kind of gamma correction method based on sinusoidal excitation and DFT transform
CN110531299A (en) * 2018-05-23 2019-12-03 北京化工大学 The compressed sensing indirect measurement method of electric energy meter dynamic measuring signal electric energy magnitude
CN111638485A (en) * 2020-06-09 2020-09-08 国网陕西省电力公司电力科学研究院 Direct current electric energy meter calibration method and system based on standard pulse virtual power source method
CN113609648A (en) * 2021-07-12 2021-11-05 湖南省计量检测研究院 Electric energy error metering method and device based on dynamic load and electronic equipment
CN114355274A (en) * 2022-03-14 2022-04-15 浙江万胜智能科技股份有限公司 Regular calibration method and system for electricity consumption information data
CN114779153A (en) * 2022-03-15 2022-07-22 国网江西省电力有限公司供电服务管理中心 Energy meter dynamic error measurement device, system and dynamic error calibration method
CN117907924A (en) * 2024-01-24 2024-04-19 国网山西省电力公司阳泉供电公司 A wide-area measurement device with self-calibration function and a measurement method thereof

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108490382B (en) * 2018-04-04 2024-03-15 山东计保电气有限公司 Remote online verification method and system for high-voltage electric energy meter measuring plate
CN109856588A (en) * 2019-02-28 2019-06-07 中国南方电网有限责任公司超高压输电公司检修试验中心 It is a kind of to meet on-line testing process energy data lossless digital DC electric energy meter and field calibration system
CN111562537B (en) * 2020-04-21 2024-06-25 北京化工大学 Synchronous measurement method for dynamic error of electric energy meter
CN112285637B (en) * 2020-11-18 2024-04-30 国家电网有限公司 An experimental method to examine the influence of peak wave on electric energy measurement
CN113219395B (en) * 2021-04-29 2024-01-23 云南电网有限责任公司电力科学研究院 Dynamic load electric energy metering influence test system and method
CN115018209B (en) * 2022-08-08 2022-11-08 国网湖北省电力有限公司营销服务中心(计量中心) Long-term prediction method and equipment for operation error of digital electric energy metering system
CN115508767A (en) * 2022-08-17 2022-12-23 山东爱普电气设备有限公司 A verification device and method for a dynamic load electric energy meter based on hardware synchronous triggering
CN115809860B (en) * 2022-12-07 2025-06-06 广东电网有限责任公司 A method, device and system for automatic verification of electric energy meter calibration device
CN115932711B (en) * 2023-03-10 2023-07-07 杭州炬华科技股份有限公司 Data processing method, device and medium for metering reliability of electric energy meter
CN118152728B (en) * 2024-05-10 2024-07-16 深圳市思达仪表有限公司 Electric energy meter error monitoring method based on upper computer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0355559A1 (en) * 1988-08-19 1990-02-28 Siemens Aktiengesellschaft Monitoring circuitry for an electronic electricity counter
US5514958A (en) * 1994-11-22 1996-05-07 General Electric Company Electrical energy meters having factory set calibration circuits therein and methods of calibrating same
CN101526596A (en) * 2009-04-21 2009-09-09 郑州万特电气有限公司 Measuring method for energy metering error of single-phase electric energy meter under dynamic load
CN101907697A (en) * 2010-08-09 2010-12-08 威胜集团有限公司 Dynamic property tester of electric energy meter
CN101957439A (en) * 2010-02-10 2011-01-26 江西省电力科学研究院 Sampling and calculating separated type electric energy meter calibrating method and electric energy meter site parameter recorder

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2917297A (en) * 1996-05-20 1997-12-09 Southpower Limited Meter accuracy device
JPH10142306A (en) * 1996-11-11 1998-05-29 Toshiba Corp Method and apparatus for adjusting induction type watthour meter
KR100434655B1 (en) * 2001-10-22 2004-06-07 (주)누리텔레콤 Automatic Meter Reading System
CN100520437C (en) * 2005-09-06 2009-07-29 淄博计保互感器研究所 Integrated detecting and measuring method for metering property of high voltage power meter
CN200962142Y (en) * 2006-08-31 2007-10-17 武汉国测科技股份有限公司 High-voltage power meter correction device
CN103091659B (en) * 2013-01-22 2015-02-11 国家电网公司 Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0355559A1 (en) * 1988-08-19 1990-02-28 Siemens Aktiengesellschaft Monitoring circuitry for an electronic electricity counter
US5514958A (en) * 1994-11-22 1996-05-07 General Electric Company Electrical energy meters having factory set calibration circuits therein and methods of calibrating same
CN101526596A (en) * 2009-04-21 2009-09-09 郑州万特电气有限公司 Measuring method for energy metering error of single-phase electric energy meter under dynamic load
CN101957439A (en) * 2010-02-10 2011-01-26 江西省电力科学研究院 Sampling and calculating separated type electric energy meter calibrating method and electric energy meter site parameter recorder
CN101907697A (en) * 2010-08-09 2010-12-08 威胜集团有限公司 Dynamic property tester of electric energy meter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陈金玲等: "冲击性负荷电能表的研制及校验方法探讨", 《2010中国·北京全国电工仪器仪表标准化技术委员会第四届三次全体委员会议暨2010第二十一届"电磁测量技术、标准、产品国际研讨及展会"论文集 》 *
陈锐民等: "基于量值溯源的数字电能表校验技术", 《电测与仪表》 *

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014114150A1 (en) * 2013-01-22 2014-07-31 国家电网公司 Method for checking electric energy sequence proportion distribution in dynamic measurement cycle of electric energy meter
CN104569900A (en) * 2013-10-14 2015-04-29 北京化工大学 Dynamic error testing method and device for intelligent ammeter
CN104569900B (en) * 2013-10-14 2017-12-12 北京化工大学 Smart Energy Meter Dynamic Error Test Device
CN103630870A (en) * 2013-12-05 2014-03-12 国家电网公司 Dummy-load-type counting test frame for electric energy meters
CN103941217B (en) * 2014-04-17 2016-01-20 国家电网公司 A kind of electric power meter Work condition analogue platform
CN103941217A (en) * 2014-04-17 2014-07-23 国家电网公司 Electric energy metering device working condition simulation platform
CN104345294A (en) * 2014-11-04 2015-02-11 国家电网公司 Electric energy meter dynamic performance test device
CN104345294B (en) * 2014-11-04 2017-09-29 国家电网公司 A kind of electric energy meter dynamic performance and testing
CN105093165B (en) * 2015-09-08 2017-06-16 国家电网公司 A kind of integrated test facility of digitalized electrical energy meter pulse signal
CN105093165A (en) * 2015-09-08 2015-11-25 国家电网公司 Comprehensive test method of pulse signals of digitization electric energy meter
CN106501755A (en) * 2016-10-18 2017-03-15 国网山东省电力公司烟台供电公司 A kind of intelligent electric energy meter dynamic error measuring method based on dynamic load model
CN106405481A (en) * 2016-11-11 2017-02-15 国网冀北电力有限公司电力科学研究院 Nonlinear-load metering precision measuring method for digital electric energy meter
CN106772207A (en) * 2016-12-30 2017-05-31 北京化工大学 The keying active power signal generation device of voltage and current synchronization
CN106772207B (en) * 2016-12-30 2020-05-05 北京化工大学 Voltage and current synchronous keying dynamic power signal generating device
CN107861091A (en) * 2017-10-23 2018-03-30 国网江西省电力公司电力科学研究院 A kind of dynamic property source tracing method based on dynamic electric energy calibrator
CN107589396A (en) * 2017-10-23 2018-01-16 国网江西省电力公司电力科学研究院 A kind of dynamic property source tracing method based on conventional power calibration device
CN107861091B (en) * 2017-10-23 2019-12-06 国网江西省电力公司电力科学研究院 A Dynamic Performance Traceability Method Based on Dynamic Energy Calibrator
CN107589396B (en) * 2017-10-23 2019-12-06 国网江西省电力公司电力科学研究院 A dynamic performance traceability method based on conventional power calibrator
CN108375748A (en) * 2018-01-30 2018-08-07 电子科技大学 A kind of gamma correction method based on sinusoidal excitation and DFT transform
CN110531299B (en) * 2018-05-23 2021-01-01 北京化工大学 Compressed sensing indirect measurement method of electric energy value of dynamic test signal of electric energy meter
CN110531299A (en) * 2018-05-23 2019-12-03 北京化工大学 The compressed sensing indirect measurement method of electric energy meter dynamic measuring signal electric energy magnitude
CN111638485A (en) * 2020-06-09 2020-09-08 国网陕西省电力公司电力科学研究院 Direct current electric energy meter calibration method and system based on standard pulse virtual power source method
CN111638485B (en) * 2020-06-09 2022-04-26 国网陕西省电力公司电力科学研究院 Direct current electric energy meter calibration method and system based on standard pulse virtual power source method
CN113609648A (en) * 2021-07-12 2021-11-05 湖南省计量检测研究院 Electric energy error metering method and device based on dynamic load and electronic equipment
CN113609648B (en) * 2021-07-12 2024-04-19 湖南省计量检测研究院 Dynamic load-based electric energy error metering method and device and electronic equipment
CN114355274A (en) * 2022-03-14 2022-04-15 浙江万胜智能科技股份有限公司 Regular calibration method and system for electricity consumption information data
CN114355274B (en) * 2022-03-14 2022-07-12 浙江万胜智能科技股份有限公司 Regular calibration method and system for electricity consumption information data
CN114779153A (en) * 2022-03-15 2022-07-22 国网江西省电力有限公司供电服务管理中心 Energy meter dynamic error measurement device, system and dynamic error calibration method
CN117907924A (en) * 2024-01-24 2024-04-19 国网山西省电力公司阳泉供电公司 A wide-area measurement device with self-calibration function and a measurement method thereof
CN117907924B (en) * 2024-01-24 2024-07-02 国网山西省电力公司阳泉供电公司 Wide area metering device with self-calibration function and measurement method thereof

Also Published As

Publication number Publication date
CN103091659B (en) 2015-02-11
WO2014114150A1 (en) 2014-07-31
KR20150141935A (en) 2015-12-21
KR101871216B1 (en) 2018-06-27

Similar Documents

Publication Publication Date Title
CN103091659B (en) Electric energy meter dynamic measurement cycle power sequence proportional allocation calibration method
CN103630871B (en) Electronic electric energy meter dynamic characteristic test device
CN101470154B (en) Pressure-resistant test system
CN104316894B (en) A kind of realistically displayed method of electric energy meter actual motion environment
CN103809148B (en) Method and system for measuring dynamic characteristics of electric energy meter
CN104345294B (en) A kind of electric energy meter dynamic performance and testing
CN104569900B (en) Smart Energy Meter Dynamic Error Test Device
CN103698735A (en) Electric energy meter harmonic test device and method thereof
CN103424734A (en) On-line calibration method of electronic watt-hour meter
CN106054110A (en) Intelligent electric energy meter harmonic influence testing method
CN104569904B (en) DC for testing electric energy meter test device for even harmonic influence quantity
CN203572959U (en) Electronic electric energy meter dynamic characteristic testing device
CN106501755A (en) A kind of intelligent electric energy meter dynamic error measuring method based on dynamic load model
CN203870168U (en) Device for measuring inductance of reactor in active power filter
CN203101619U (en) Multi-parameter electrical testing equipment calibration system
CN104914395A (en) Test quality check method for single-phase intelligent electric energy meter automatic verification system
Aurilio et al. AC electronic load for on-site calibration of energy meters
CN103941103B (en) The measurement apparatus of reactor inductance amount and method in Active Power Filter-APF
CN111208468A (en) Harmonic performance tester for electronic voltage transformer
CN104345218A (en) Reactance value measurement system and method for three-phase reactor
CN204855583U (en) Transient state of accurate heavy current rises and flows generating device
CN204065387U (en) A kind of synchronous demodulator and comprise the power standard source of this synchronous demodulator
CN206258570U (en) A kind of non-linear operating condition emulation platform of electric energy meter
CN109787235B (en) Method and system for obtaining harmonic characteristics model of new energy generator set in full power range
CN104914399A (en) Electric energy metering device verification method for single-phase intelligent electric energy meter automatic verification system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: HEILONGJIANG ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20130427

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HEILONGJIANG ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20130427

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 150030 HARBIN, HEILONGJIANG PROVINCE TO: 100761 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130427

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: HEILONGJIANG ELECTRIC POWER Research Institute

Address before: 150030 Xiangjiang Road, Xiangfang District, Heilongjiang, No. 7, No.

Applicant before: Heilongjiang Electric Power Research Institute

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lu Yibiao

Inventor after: Wang Xuewei

Inventor after: Han Dong

Inventor after: Wang Lin

Inventor after: Qi Chuanfeng

Inventor after: Lv Hua

Inventor after: Li Peng

Inventor after: Wan Jing

Inventor after: Sun Yang

Inventor before: Lu Yibiao

Inventor before: Wang Xuewei

Inventor before: Han Dong

Inventor before: Wang Lin

Inventor before: Qi Chuanfeng

Inventor before: Lv Hua

Inventor before: Li Peng

Inventor before: Wan Jing

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LU YIBIAO WANG XUEWEI HAN DONG WANG LIN QI CHUANFENG LV HUA LI PENG WAN JING TO: LU YIBIAO WANG XUEWEI HAN DONG WANG LIN QI CHUANFENG LV HUA LI PENG WAN JING SUN YANG

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

Termination date: 20220122

CF01 Termination of patent right due to non-payment of annual fee