CN102703626B - Intelligent optimal control system for CO2 emission of blast furnace - Google Patents
Intelligent optimal control system for CO2 emission of blast furnace Download PDFInfo
- Publication number
- CN102703626B CN102703626B CN201210204448.6A CN201210204448A CN102703626B CN 102703626 B CN102703626 B CN 102703626B CN 201210204448 A CN201210204448 A CN 201210204448A CN 102703626 B CN102703626 B CN 102703626B
- Authority
- CN
- China
- Prior art keywords
- blast furnace
- control system
- emission
- parameter
- blast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The invention relates to an intelligent optimal control system for CO2 emission of a blast furnace and belongs to the technical field of energy-saving and emission-reducing control of the blast furnace. The intelligent optimal control system comprises an optimizing computer for the CO2 emission of the blast furnace, a material-loading control system, a blast furnace main body control system, a hot blast furnace control system, a blast furnace blasting control system, a coal-spraying control system, a foundation automatic control system, a blast furnace production process and production data collecting system, a CO2 emission report system and a database, wherein the optimizing computer for the CO2 emission of the blast furnace is connected with the database, thereby forming an optimizing platform for the CO2 emission of the blast furnace; the material-loading control system, the blast furnace main body control system, the hot blast furnace control system, the blast furnace blasting control system and the coal-spraying control system are connected with the foundation automatic control system, thereby forming an optimizing control system for the CO2 emission of the blast furnace; the optimizing computer for the CO2 emission of the blast furnace is also connected with the CO2 emission report system, thereby forming an assessing platform for the CO2 emission of the blast furnace; and a CO2 emission-reducing optimizing computer is used for obtaining a real-time data for blast furnace production in the database, calculating and solving a CO2 emission-reducing optimizing model, thereby achieving the CO2 emission-reducing optimization.
Description
Technical field
The invention belongs to energy Conservation of Blast Furnace and reduce discharging control techniques field.Be particularly related to a kind of blast furnace CO
2discharge intelligent optimizing control system.
Technical background
Iron and steel enterprise is the industry to greenhouse gas emission control effect maximum, and its greenhouse gas emission is mainly with CO
2discharge is main.In the carbon emission of China's Iron And Steel Industry, more than 95% carbon emission all comes from energy consumption.Utilize energy-conserving and emission-cutting technology to reduce CO
2discharge, the most feasible also the most effectively reduction of discharging measure be to reduce process energy consumption.Blast furnace ironmaking operation is as the highest operation of energy consumption in Iron and Steel Production operation, and its energy consumption proportion accounts for the more than 50% of whole energy consumptions, and the key that therefore realizes iron and steel enterprise's reduction of greenhouse gas discharge is the energy-saving and emission-reduction of blast furnace ironmaking operation.At present, in blast furnace ironmaking actual production process, energy consumption degree is much higher than its design energy consumption, and its major cause is that the control of high furnace control system is confined to maintain the normal operation of production, and has not given play to the effect of optimal control.Blast furnace CO
2the factor that relates to of discharge is many, and there is no rational mathematical model, therefore in actual production also seldom CO
2discharge index is directly combined in control program as controlled variable.
" system of intelligent blast furnace smelt controlling " that Patent Office of the People's Republic of China 2003 announces (CN02137569.0), " a kind of method of utilizing intelligent control system to control blast-furnace smelting " (CN02137568.1), the optimal control that can find out current blast furnace is mainly the multiple-objection optimization of carrying out for energy consumption, output and quality product, by different optimization aim is set up to Optimized model, utilize computer to be optimized to solve and help to strengthen operational management and the control of blast furnace, realize low consumption, high yield and high-quality in production process.But these technical publicationss all do not have from optimizing CO
2the angle of discharge is set up blast furnace production process CO
2the Emission Optimization model, also just cannot realize the CO of blast furnace production process
2the control of discharge.
Study at present blast furnace CO
2the method of calculation of discharge mainly contain two classes, and a class is based on carbon element balance in blast furnace production process, utilize the carbon element input of blast furnace to deduct the CO that fixed carbon content calculates blast furnace generation
2quantity discharged, this account form is not considered factor and the product carbon discount that fixation of C loss, blast furnace gas are recycled in computation process, so result is higher.One class is by calculating energy expenditure in blast furnace production process, utilizing blast furnace energy expenditure to be converted into standard coal consumption, then the CO of the unit's of utilization standard coal burning
2amount is calculated the CO of whole blast furnace production process
2quantity discharged, in actual production process, different steel mills energy structure is different, and secondary energy utilization ratio is not identical yet, causes like this energy consumption and the CO of blast furnace ton iron
2discharge exists and changes inconsistent situation, so calculation result can not truly reflect CO
2discharge.In fact these account forms have departed from blast furnace actual production process, therefore cannot realize blast furnace CO
2the optimization of discharge.At present for blast furnace production process CO
2the Modeling optimization of discharge, what mainly take is Process Integrated Methodology.Document [C.Wang, M.larsson, C.Ryman, et.A model on CO
2emission reduction in integrated steelmaking by optimization methods, Int.J.Energy Res.2008; 32:1092-1106] and document [Zhang Qi, Yao Tonghui, Cai Jiuju ,Shen peak is full. research and the application of blast furnace ironmaking process Model for Multi-Objective Optimization. and Northeastern University's journal (natural science edition) .Vo1.32, No.2,2011] all mentioned and adopted the method for process integration to realize blast furnace production process CO
2the optimization of discharge, by the Optimization Solution of model, can draw minimum CO in blast furnace production process
2optimization raw material during discharge forms and quality product.Because these documents are being set up CO
2in the model of the Emission Optimization, only considered that input, output matter and energy are to CO
2the impact of discharge, so optimum result is that desirable raw materials for production form and produce product parameters, cannot provide CO to the Controlling System of blast furnace production process
2the Emission Optimization is controlled reference.Therefore want to realize blast furnace CO
2accurate calculating and the optimal control of discharge, must, in conjunction with blast furnace production technique, consider to affect blast furnace ironmaking production process CO
2the various parameters that affect of discharge, set up blast furnace production process CO
2the Emission Optimization model, for CO
2discharge minimum Optimization Solution, provide the optimal control parameter of blast furnace production process.
Summary of the invention
The object of the present invention is to provide a kind of blast furnace CO
2discharge intelligent optimizing control system, adopts advanced measuring technology, field bus technique, Process Integrated Methodology and intelligent control technology.First according to the work characteristics of Iron And Steel Industry blast furnace ironmaking operation, study energy flow, material stream and processing parameter and CO in blast furnace process
2the relation of discharge.Adopt advanced measuring technology, obtain relevant control processing parameter and crude fuel parameter, product quality parameters, emission source data, and data are normalized.Utilize Process Integrated Methodology, Analysis for CO
2reduce discharging objective function and final condition thereof, realize take reducing discharging as controlling the CO of iron and steel enterprise of target
2discharge dynamic modeling.By the CO of iron and steel enterprise
2the Emission Optimization model can calculate blast furnace production process CO
2discharge and generate discharge report.Simultaneously according to CO
2quantity discharged minimum is optimal control target function, and model is optimized and is solved, and obtains the optimal control parameter set(ting)value that energy saving of system reduces discharging, and realizes CO
2the intelligent optimization reducing discharging is controlled.While Real-time Obtaining blast furnace ton iron CO in optimizing process
2discharge report.
What the present invention proposed is for CO
2discharge is the blast furnace production process Optimal Control System of optimization aim, is CO with current Blast Furnace Intelligent Controlling System and blast furnace smelting expert system difference
2discharge is optimized as objective function, by CO
2discharge index realizes production process optimization as controlled variable and controls.Secondly the calculating blast furnace CO setting up
2what discharge method was taked is blast furnace carbon element balance, but different from current traditional calculations carbon element balance method is in computation process, to have considered that carbon loss, blast furnace gas reclaim and product carbon discount, has also utilized blast furnace production process CO2 discharge actual monitoring data simultaneously.The blast furnace CO that this patent is set up
2the Emission Optimization model, the modeling method of taking and document [C.Wang, M.larsson, C.Ryman, et.A model on CO
2emission reduction in integrated steelmaking by optimization methods, Int.J.Energy Res.2008; 32:1092-1106] and document [Zhang Qi, Yao Tonghui, Cai Jiuju, Shen Fengman. research and the application of blast furnace ironmaking process Model for Multi-Objective Optimization. Northeastern University's journal (natural science edition) .Vo1.32, No.2,2011] identical, all adopt process integration modeling method, but with these document differences be this patent by the control processing parameter in blast furnace production process to CO
2the influence factor of discharge adds among model, therefore can provide CO in blast furnace actual production process
2the Emission Optimization is controlled processing parameter optimum value.
The present invention includes blast furnace CO
2the Emission Optimization computer 1, feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6, Basic automation control system 7, blast furnace production process 8, production data acquisition system 9, CO
2discharge reporting system 10, database 11.Blast furnace CO
2the Emission Optimization computer 1 is connected with database 11, forms blast furnace CO
2the Emission Optimization platform; Production data acquisition system 9 is connected with blast furnace production process 8, Basic automation control system 7, feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6 respectively, Real-time Collection blast furnace ironmaking process data, and import data into database 11 by network; Blast furnace CO
2the Emission Optimization computer 1 is connected with feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6 respectively by network, and feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6 are jointly connected with Basic automation control system 7 and form blast furnace CO
2the Emission Optimization Controlling System, controls blast furnace production process; Blast furnace CO
2the Emission Optimization computer 1 is gone back and CO
2discharge reporting system 10 is connected, as blast furnace CO
2emission evaluation platform.
Described blast furnace CO
2in the Emission Optimization computer 1, set up promising blast furnace CO
2emission control systems provides the blast furnace CO of guidance
2the Emission Optimization software module, realizes blast furnace production process CO
2the optimization of discharge, and optimization CO is provided
2blast furnace CO during discharge
2the control parameter of emission control systems.
Described blast furnace CO
2the Emission Optimization software module comprises: production data reception and memory module 12, objective function parameter coefficients calculation block 13, constraint condition computing module 14, CO
2the Emission Optimization problem solver module 15, parameter output module 16.It is characterized in that: production data receives and is connected with objective function parameter coefficients calculation block 13, constraint condition computing module 14 with memory module 12; Common and the CO of objective function parameter coefficients calculation block 13, constraint condition computing module 14
2the Emission Optimization problem solver module 15 is connected, CO
2the Emission Optimization problem solver module 15 is connected with parameter output module 16.Production data receives and memory module 12 is responsible for receiving from the various supplemental characteristics in blast furnace ironmaking production process in database 11, data are carried out to pre-treatment and normalization method, objective function parameter coefficients calculation block 13 and constraint condition computing module 14 are according to the pretreated data of process, calculate parameter coefficient peace treaty bundle condition, CO
2the Emission Optimization problem solver module 15 solves objective function and the constraining equation consisting of parameter, parameter coefficient peace treaty bundle condition, obtains with CO
2discharge minimum is optimized parameter optimization value, and by 16 outputs of parameter output module.
Its blast furnace CO
2the blast furnace CO that the Emission Optimization software module is set up
2the Emission Optimization model, need to be on affecting CO
2the data such as the crude fuel parameter of discharge, operating parameters, product quality parameters, be normalized, and calculating parameter are to CO
2discharge influence coefficient, sets up blast furnace CO
2the Emission Optimization model.This model major function comprises, by Real-time Obtaining blast furnace production process data and control supplemental characteristic, calculates CO
2discharge, sets up CO
2discharge minimum optimization aim, take and produce matter energy balance and technique is constraint condition, solve optimization numerical solution, for Controlling System provides real-time optimal setting.
Set up CO
2the Emission Optimization model formation is as follows:
In formula, x represents the selected CO in blast furnace production process that affects
2the influence factor variable of discharge, comprises crude fuel parameter, controls processing parameter, product quality parameters, other parameters, x
irepresent i variable; C represents to affect in blast furnace production process CO
2the factor of influence of variable, C
irepresent variable x
ifactor of influence.For typical blast furnace ironmaking operation, crude fuel parameter is elected as: agglomerate consumption x
1, pellet consumption x
2, the natural ore deposit of rawore 1() consumption x
3, rawore 2(mixing ore deposit) consumption x
4, coke consumption x
5, injecting coal quantity x
6, coke-oven gas consumption x
7, blast furnace gas consumption x
8; Control processing parameter is elected as: air blast parameter (air quantity x
9, wind-warm syndrome x
10, rheumatism x
11, oxygen enrichment percentage x
12), basicity of slag x
13, charging moisture x
14, CO in coal gas
2content x
15; Product quality parameters: blast furnace gas generating capacity x
16, slag amount x
17, Dust Capacity x
18, the pig iron is containing Fe amount x
19, pig iron C content x
20, pig iron si content x
21, the pig iron is containing Mn amount x
22, pig iron P content x
23, the pig iron is containing S amount x
24; Other parameters: blast furnace gas yield x
25, CO
2discharge amount of collected x
26.The CO of each parametric variable wherein
2discharge factor of influence shows as: raw material CO
2discharge factor of influence=raw material C content * 44/12; Fuel C O
2discharge factor of influence=(remove CO in by-product gas
2outer each carbonaceous component) * 44 * 10/22.4; Pig iron CO
2discharge factor of influence=pig iron C content * 1t * 44/12; Dust CO
2discharge factor of influence=dust C content * 44/12; CO2 amount of collected discharge factor of influence=-1; The CO of all the other parameters
2discharge factor of influence is fixed value, according to blast furnace production material, thermal equilibrium and actual production data, releases.
A in formula
i,jx while representing j constraint condition
icoefficient, A
jbinding occurrence for target.Constraint condition can be divided into Constraints of Equilibrium and process constraint, and concrete constraint condition is: Constraints of Equilibrium comprises (quantity of slag balance, blast furnace gas generating capacity, blast furnace thermal equilibrium, element (Fe, C, S, P) balance, material balance); Process constraint comprises (basicity of slag constraint, the constraint of slag MgO content, the constraint of the pig iron (C, Si) content, slag amount constraint, the constraint of ejection coal dust amount, throat temperature constraint).
Described blast furnace CO
2the Emission Optimization Controlling System is to utilize blast furnace CO
2the optimized operation parameter that the Emission Optimization computer 1 provides, for blast furnace CO
2corresponding Controlling System is set up in discharge: feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6.Blast furnace CO
2basic automatization corresponding to the Emission Optimization Controlling System controlled and comprised that loading sequence is controlled, batch weight/proportioning/load/basicity is controlled, coke moisture revisal is controlled, stockline control, blast volume control, wind-warm syndrome control, blast control, oxygen enrichment control, steam humidification control, injecting coal quantity control, coal powder injection rate-controlling, pressure-controlling.Described CO
2discharge reporting system 10 is mainly blast furnace actual production provides real-time CO
2emissions data and corresponding optimization are assessed.
Accompanying drawing explanation
Fig. 1 is blast furnace CO
2discharge intelligent optimizing control system forms schematic diagram, blast furnace CO in figure
2the Emission Optimization computer 1, feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6, Basic automation control system 7, blast furnace production process 8, production data acquisition system 9, CO
2discharge reporting system 10, database 11.
Fig. 2 is blast furnace CO
2the Emission Optimization software module schematic diagram.Production data reception and memory module 12, objective function parameter calculating module 13, constraint condition computing module 14, CO in figure
2the Emission Optimization problem solver module 15, parameter output module 16.
Embodiment
A kind of blast furnace CO of the present invention
2discharge intelligent optimizing control system, by blast furnace CO
2the Emission Optimization computer 1, feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6, Basic automation control system 7, blast furnace production process 8, production data acquisition system 9, CO
2discharge reporting system 10, database 11 form; It is characterized in that blast furnace CO
2the Emission Optimization computer 1 and database 11, form blast furnace CO
2reduce discharging Optimization Platform; Production data acquisition system 9 is connected 6 with blast furnace production process 8, Basic automation control system 7, feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System, Real-time Collection blast furnace ironmaking procedural information and parameter information, and import database into by network; Blast furnace CO
2the Emission Optimization computer 1 connects feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6 by network, and each Controlling System is connected with Basic automation control system 7 and forms blast furnace CO
2the Emission Optimization Controlling System, controls blast furnace production process 8; Blast furnace CO
2the Emission Optimization computer 1 is gone back and CO
2discharge reporting system 10 is connected, as blast furnace CO
2emission evaluation platform.
Production data acquisition system 9 is equipped in high furnace control system, blast-furnace body, obtains Controlling System processing parameter, crude fuel parameter and product quality parameters in blast furnace ironmaking production process, and the supplemental characteristic of collection is sent to database 11.Blast furnace CO
2the Emission Optimization computer 1 extracts required parameter information from database 11, and design parameter type is by blast furnace CO
2the blast furnace CO that the Emission Optimization computer 1 is set up
2the Emission Optimization software module is determined.Blast furnace CO
2the blast furnace CO that the Emission Optimization Controlling System is set up
2the Emission Optimization model, as follows:
Wherein x represents the selected CO in blast furnace production process that affects
2the influence factor variable of discharge, comprises crude fuel parameter, controls processing parameter, product quality parameters, other parameters, x
irepresent i variable; C represents to affect in blast furnace production process CO
2the factor of influence of variable, C
irepresent variable x
ifactor of influence.For typical blast furnace ironmaking operation, crude fuel parameter is elected as: agglomerate consumption x
1, pellet consumption x
2, the natural ore deposit of rawore 1() consumption x
3, rawore 2(mixing ore deposit) consumption x
4, coke consumption x
5, injecting coal quantity x
6, coke-oven gas consumption x
7, blast furnace gas consumption x
8; Control processing parameter is elected as: air blast parameter (air quantity x
9, wind-warm syndrome x
10, rheumatism x
11, oxygen enrichment percentage x
12), basicity of slag x
13, charging moisture x
14, CO in coal gas
2content x
15; Product quality parameters: blast furnace gas generating capacity x
16, slag amount x
17, Dust Capacity x
18, the pig iron is containing Fe amount x
19, pig iron C content x
20, pig iron si content x
21, the pig iron is containing Mn amount x
22, pig iron P content x
23, the pig iron is containing S amount x
24; Other parameters: blast furnace gas yield x
25, CO
2discharge amount of collected x
26.The CO of each parametric variable wherein
2discharge factor of influence shows as: raw material CO
2discharge factor of influence=raw material C content * 44/12; Fuel C O
2discharge factor of influence=(remove CO in by-product gas
2outer each carbonaceous component) * 44 * 10/22.4; Pig iron CO
2discharge factor of influence=C content * 1t * 44/12; Dust CO
2discharge factor of influence=dust C content * 44/12; CO2 amount of collected discharge factor of influence=-1; The CO of all the other parameters
2discharge factor of influence is fixed value, according to blast furnace production material, thermal equilibrium and actual production data, releases.
A in formula
i,jx while representing j constraint condition
icoefficient, A
jbinding occurrence for target.Constraint condition can be divided into Constraints of Equilibrium and process constraint, and concrete constraint condition is: Constraints of Equilibrium comprises (quantity of slag balance, blast furnace gas generating capacity, blast furnace thermal equilibrium, element (Fe, C, S, P) balance, material balance); Process constraint comprises (basicity of slag constraint, the constraint of slag MgO content, the constraint of the pig iron (C, Si) content, slag amount constraint, throat temperature, the constraint of ejection coal dust amount, throat temperature constraint).
Shown in being specifically calculated as follows:
(1) first gather blast furnace ironmaking actual production data, obtain raw material carbon content, fuel gas composition and blast furnace production constraint condition that blast furnace is produced.Partial data is as shown in table 1, table 2.
(2), according to table 1, table 2, calculate objective function variation coefficient, enumerate partially restrained condition and equilibrium conditions calculation formula:
Part objective function variation coefficient:
C
1=0.5%×44/12=0.018?;
C
2=C
3=C
4=0?;
C
5=3.130,C
6=2.851?;
C
7=0.646,C
8=0.524?;
Other parameters, as the coefficient of Operating parameters and product quality parameters, can, by material balance, thermal equilibrium isoequilibrium condition in blast furnace production process, release and respectively control processing parameter and product quality parameters and CO
2relational expression between discharge, recycling blast furnace production history data are obtained.
Partially restrained condition formula is as follows:
Basicity of slag constraint: 1≤x
13≤ 1.3;
Pig iron C content: x
20=4;
Partial equilibrium constraint calculation formula is as follows:
Fe element balance: (x
1+ x
2+ x
3+ x
4) * Fe content=(x
18+ x
19) * Fe content;
Quantity of slag balance: (x
1+ x
2+ x
3+ x
4) * CaO content-x
18* CaO content=x
17* CaO content;
Blast furnace gas generating capacity: x
16* (CO
2+ CO+CH4) * 12/22.4=(x
1+ x
2+ x
3+ x
4+ x
5+ x
6) * C content-x
18* C content-1t * x
20;
(3) by objective function and constraint condition, form blast furnace CO2 the Emission Optimization model, with CO
2quantity discharged is minimum to be solved for target is optimized, and utilizes linear programming method solving-optimizing model, draws minimum CO
2crude fuel parameter during discharge, control processing parameter, product quality parameters optimum value.Blast furnace actual operation parameters data and parameters optimization data are as shown in table 3.
Blast furnace CO
2the Emission Optimization computer 1 sends to feeding control system 2, blast-furnace body Controlling System 3, Control System of Airheater 4, blast furnace blast Controlling System 5, coal powder injection Controlling System 6 as the control parameter optimal setting of high furnace control system using solving the optimum value drawing, each high furnace control system instructs 7 pairs of blast furnace production process of Basic automation control system to be optimized control according to set(ting)value, thereby reaches CO
2reduce discharging the target of optimizing.
Blast furnace CO
2the Emission Optimization computer 1 utilizes the real-time production data of the blast furnace in database 11 and blast furnace CO
2the Emission Optimization software, calculates real-time CO in blast furnace ironmaking production process
2quantity discharged, is sent to CO
2discharge reporting system 10, to the real-time CO of blast furnace
2statistics and analysis is carried out in discharge.
Table 1 crude fuel carbon content
Kind | Unit (%) |
Agglomerate carbon residue content | 0.5 |
Pellet carbon residue content | 0 |
Natural ore deposit carbon residue content | 0 |
Mix ore deposit carbon residue content | 0 |
Coke carbon content | 85.36 |
Coal powder spray carbon content | 70.39 |
Coke-oven gas (CO, CH4) volume fraction | 32.887 |
Blast furnace gas (CO, CH4) volume fraction | 26.676 |
Table 2 blast furnace production constraint condition
Title | Unit | Constraint condition |
Basicity of slag | - | 1~1.3 |
Pig iron C content | % | 4.0 |
Pig iron si content | % | 0.2~1.0 |
Slag MgO content | % | 10~12 |
Throat temperature | ℃ | 100~300 |
Table 3 blast furnace CO
2the Emission Optimization model optimization variable and actual value, optimal value
Claims (1)
1. a blast furnace CO
2discharge intelligent optimizing control system, comprises blast furnace CO
2the Emission Optimization computer (1), feeding control system (2), blast-furnace body Controlling System (3), Control System of Airheater (4), blast furnace blast Controlling System (5), coal powder injection Controlling System (6), Basic automation control system (7), blast furnace production process (8), production data acquisition system (9), CO
2discharge reporting system (10), database (11); It is characterized in that blast furnace CO
2the Emission Optimization computer (1) is connected with database (11), forms blast furnace CO
2reduce discharging Optimization Platform; Production data acquisition system (9) is connected with blast furnace production process (8), Basic automation control system (7), feeding control system (2), blast-furnace body Controlling System (3), Control System of Airheater (4), blast furnace blast Controlling System (5), coal powder injection Controlling System (6) respectively, Real-time Collection blast furnace ironmaking process data, and import data into database (11) by network; Blast furnace CO
2the Emission Optimization computer (1) is connected with feeding control system (2), blast-furnace body Controlling System (3), Control System of Airheater (4), blast furnace blast Controlling System (5), coal powder injection Controlling System (6) respectively by network, and feeding control system (2), blast-furnace body Controlling System (3), Control System of Airheater (4), blast furnace blast Controlling System (5), coal powder injection Controlling System (6) are jointly connected with Basic automation control system (7) and form blast furnace CO
2the Emission Optimization Controlling System, controls blast furnace production process; Blast furnace CO
2the Emission Optimization computer (1) is gone back and CO
2discharge reporting system (10) is connected, as blast furnace CO
2emission evaluation platform;
Blast furnace CO
2in the Emission Optimization computer (1), set up promising blast furnace CO
2emission control systems provides the blast furnace CO of guidance
2the Emission Optimization software module;
Described CO
2the Emission Optimization software module comprises: production data reception and memory module (12), objective function parameter coefficients calculation block (13), constraint condition parameter calculating module (14), CO
2the Emission Optimization problem solver module (15), parameter output module (16); Production data receives and is connected with objective function parameter coefficients calculation block (13), constraint condition parameter calculating module (14) with memory module (12); Common and the CO of objective function parameter coefficients calculation block (13) and constraint conditional parameter computing module (14)
2the Emission Optimization problem solver module (15) is connected, CO
2the Emission Optimization problem solver module (15) is connected with parameter output module (16); Production data receives and memory module (12) is responsible for receiving the various supplemental characteristics from blast furnace ironmaking production process in database (11), and data are carried out to pre-treatment and normalization method, objective function parameter coefficients calculation block (13) and constraint conditional parameter computing module (14) are according to the pretreated data of process, calculate parameter coefficient peace treaty bundle condition, CO
2the Emission Optimization problem solver module (15) solves objective function and the constraining equation consisting of parameter, parameter coefficient peace treaty bundle condition, obtains with CO
2discharge minimum is optimized parameter optimization value, and by parameter output module (16) output;
Wherein x represents the selected CO in blast furnace production process that affects
2the influence factor variable of discharge, comprises crude fuel parameter, controls processing parameter, product quality parameters, other parameters, x
irepresent i variable; C represents to affect in blast furnace production process CO
2the factor of influence of variable, C
irepresent variable x
ifactor of influence; For typical blast furnace ironmaking operation, crude fuel parameter is elected as: agglomerate consumption x
1, pellet consumption x
2, rawore (1) is natural mining amount x
3, rawore (2) mixes mining amount x
4, coke consumption x
5, injecting coal quantity x
6, coke-oven gas consumption x
7, blast furnace gas consumption x
8; Control processing parameter is elected as: air blast parameter, basicity of slag x
13, charging moisture x
14, CO in coal gas
2content x
15; Product quality parameters: blast furnace gas generating capacity x
16, slag amount x
17, Dust Capacity x
18, the pig iron is containing Fe amount x
19, pig iron C content x
20, pig iron si content x
21, the pig iron is containing Mn amount x
22, pig iron P content x
23, the pig iron is containing S amount x
24; Other parameters: blast furnace gas yield x
25, CO
2discharge amount of collected x
26; The CO of each parametric variable wherein
2discharge factor of influence shows as: raw material CO
2discharge factor of influence=raw material C content * 44/12; Fuel C O
2discharge factor of influence=(remove CO in by-product gas
2outer each carbonaceous component) * 44 * 10/22.4; Pig iron CO
2discharge factor of influence=pig iron C content * 1t * 44/12; Dust CO
2discharge factor of influence=dust C content * 44/12; CO2 amount of collected discharge factor of influence=-1; The CO of all the other parameters
2discharge factor of influence is fixed value, according to blast furnace production material, thermal equilibrium and actual production data, releases;
Described air blast parameter comprises air quantity x
9, wind-warm syndrome x
10, rheumatism x
11, oxygen enrichment percentage x
12;
A in formula
i,jx while representing j constraint condition
icoefficient, A
jbinding occurrence for target.Constraint condition can be divided into Constraints of Equilibrium and process constraint, and concrete constraint condition is:
Constraints of Equilibrium comprises quantity of slag balance, blast furnace gas generating capacity, blast furnace thermal equilibrium, element balance, material balance; Process constraint comprises basicity of slag constraint, the constraint of slag MgO content, the constraint of pig iron content, slag amount constraint, the constraint of ejection coal dust amount, throat temperature constraint;
Described element comprises Fe, C, S, P.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210204448.6A CN102703626B (en) | 2012-06-16 | 2012-06-16 | Intelligent optimal control system for CO2 emission of blast furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210204448.6A CN102703626B (en) | 2012-06-16 | 2012-06-16 | Intelligent optimal control system for CO2 emission of blast furnace |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102703626A CN102703626A (en) | 2012-10-03 |
CN102703626B true CN102703626B (en) | 2014-01-15 |
Family
ID=46896672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210204448.6A Expired - Fee Related CN102703626B (en) | 2012-06-16 | 2012-06-16 | Intelligent optimal control system for CO2 emission of blast furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102703626B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106480248B (en) * | 2015-08-31 | 2018-08-03 | 鞍钢股份有限公司 | Blast furnace operation method with dust, mud, iron and carbon balls as partial furnace burden |
CN106480247B (en) * | 2015-08-31 | 2018-11-06 | 鞍钢股份有限公司 | Blast furnace operation method using thermally consolidated carbon-containing pellets as partial furnace burden |
CN110276531A (en) * | 2019-06-03 | 2019-09-24 | 上海市环境科学研究院 | Material flow analysis method and system, storage medium, and terminal in iron and steel industry |
CN110210678B (en) * | 2019-06-06 | 2021-12-14 | 中国环境科学研究院 | An optimization method for the upgrade path of mobile source emission standards |
CN113219932B (en) * | 2021-06-02 | 2023-09-05 | 内蒙古自治区计量测试研究院 | Digital analysis system for carbon emission in thermal power generation industry |
CN114925899B (en) * | 2022-05-06 | 2023-01-10 | 北京智冶互联科技有限公司 | Blast furnace gas composition prediction method and device, electronic equipment and storage medium |
CN115630268B (en) * | 2022-11-01 | 2023-10-20 | 鞍钢股份有限公司 | Establishment method, assessment method and assessment system of long-flow steel enterprise carbon emission assessment model |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62270712A (en) * | 1986-05-20 | 1987-11-25 | Nippon Kokan Kk <Nkk> | System for detecting condition of blast furnace |
CN1207399C (en) * | 2002-10-17 | 2005-06-22 | 浙江大学 | Intelligent blast furnace smelt controlling system |
CN1224720C (en) * | 2002-10-17 | 2005-10-26 | 浙江大学 | Blast furnace smelt controlling method with intelligent control system |
-
2012
- 2012-06-16 CN CN201210204448.6A patent/CN102703626B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102703626A (en) | 2012-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102703626B (en) | Intelligent optimal control system for CO2 emission of blast furnace | |
Hasanbeigi et al. | Comparison of iron and steel production energy use and energy intensity in China and the US | |
Na et al. | Optimization of energy efficiency, energy consumption and CO2 emission in typical iron and steel manufacturing process | |
CN109583118B (en) | Sintering ratio calculation and sinter cost optimization method | |
CN103194553B (en) | Oxygen usage amount control method for steel smelting blast furnace based on least square support vector machine | |
CN103544273B (en) | Method for assessing integral states of furnace conditions by aid of pattern recognition technology | |
CN102021007B (en) | Low-cost coking coal blending system | |
Na et al. | Multi-process production occurs in the iron and steel industry, supporting ‘dual carbon’target: An in-depth study of CO2 emissions from different processes | |
CN111100961A (en) | Blast furnace smelting method for rapidly obtaining stable index by interchanging common ore and schreyerite | |
CN115630268B (en) | Establishment method, assessment method and assessment system of long-flow steel enterprise carbon emission assessment model | |
Huang et al. | A novel blending principle and optimization model for low-carbon and low-cost sintering in ironmaking process | |
Hu et al. | Multi-objective optimization of energy distribution in steel enterprises considering both exergy efficiency and energy cost | |
CN112226563A (en) | Method and system for source management and control of sulfur dioxide emission in flue gas of iron-making hot blast furnace | |
CN115293453A (en) | Energy efficiency root cause analysis optimization method for thermal system of steel plant | |
CN106467929A (en) | Multiple target blast furnace process operation carbon emission optimization method | |
Sun et al. | Influence of operation parameters on dome temperature of COREX melter gasifier | |
Shen et al. | Iron ores matching analysis and optimization for iron-making system by taking energy consumption, CO 2 emission or cost minimization as the objective | |
CN114925314A (en) | Method for calculating carbon emission in sintering process | |
Lu et al. | Life cycle assessment of carbonaceous pellets used in blast furnaces in the context of “double carbon” | |
CN112989570A (en) | Method for calculating top coal gas volume based on blast furnace conditions | |
CN112766790A (en) | Steel enterprise green degree evaluation method based on AHP-entropy | |
Peng et al. | Optimization and research of the nonlinear programming model of the full cost of pre-ironmaking under carbon emission reduction constraint | |
Stanek et al. | Exergo-ecological assessment of auxiliary fuel injection into blast-furnace | |
CN213951241U (en) | System for controlling emission source of sulfur dioxide in flue gas of iron-making hot blast stove | |
CN115330039A (en) | A method for measuring carbon emissions in all processes of iron and steel smelting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140115 Termination date: 20150616 |
|
EXPY | Termination of patent right or utility model |