[go: up one dir, main page]

CN1011097B - 具有球形工作元件固定堆芯的气体冷却核反应堆 - Google Patents

具有球形工作元件固定堆芯的气体冷却核反应堆

Info

Publication number
CN1011097B
CN1011097B CN87100673A CN87100673A CN1011097B CN 1011097 B CN1011097 B CN 1011097B CN 87100673 A CN87100673 A CN 87100673A CN 87100673 A CN87100673 A CN 87100673A CN 1011097 B CN1011097 B CN 1011097B
Authority
CN
China
Prior art keywords
reactor
neutron
core
nuclear
graphite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CN87100673A
Other languages
English (en)
Other versions
CN87100673A (zh
Inventor
科妮莉亚·冯查泽斯基
迪特里希·莱特纳
赫尔曼·施米特
约瑟夫·舍恩宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochtemperatur Reaktorbau GmbH
Original Assignee
Hochtemperatur Reaktorbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochtemperatur Reaktorbau GmbH filed Critical Hochtemperatur Reaktorbau GmbH
Publication of CN87100673A publication Critical patent/CN87100673A/zh
Publication of CN1011097B publication Critical patent/CN1011097B/zh
Expired legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21GCONVERSION OF CHEMICAL ELEMENTS; RADIOACTIVE SOURCES
    • G21G4/00Radioactive sources
    • G21G4/02Neutron sources
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C1/00Reactor types
    • G21C1/04Thermal reactors ; Epithermal reactors
    • G21C1/06Heterogeneous reactors, i.e. in which fuel and moderator are separated
    • G21C1/07Pebble-bed reactors; Reactors with granular fuel
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C7/00Control of nuclear reaction
    • G21C7/34Control of nuclear reaction by utilisation of a primary neutron source
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Plasma & Fusion (AREA)
  • General Chemical & Material Sciences (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Measurement Of Radiation (AREA)
  • Separation By Low-Temperature Treatments (AREA)
  • Industrial Gases (AREA)

Abstract

本发明涉及一种具有球形工作元件固定堆芯的气体冷却核反应堆,它由在侧壁反射层的通道中可控制的吸收棒调整或停堆,为了保证这种球形反应堆起动可靠所要求的中子源在大功率的球形反应堆中安装在侧壁反射层的孔中,而按本发明是装在固定堆芯中的,因此效率高,而且不必在侧壁反射层占有位置。中子源装在一个或多个石墨球中,这些石墨球的直径与工作元件的直径相同。这些所谓载体球与工作元件一起装入核芯及从核芯中取出,在运行时固定在其位置上。

Description

本发明涉及一种气体冷却核反应堆,它具有球形工作元件(燃料元件、吸收器部件、纯石墨元件)固定堆芯的圆柱形核芯。由顶部反射层、侧壁反射层、底部反射层组成的石墨反射层将该堆芯围住。并具有一个补偿和停堆装置,它由侧壁反射层垂直通道中可控制的吸收棒构成。
德国专利P3518968.1介绍了这样一种类型的核反应堆。它具有结构紧凑、构造简单的优点,由此使所产生的热能成本低廉。运行燃料的固定堆芯可以在满负荷运转的条件下工作约10年至40年。然后更换运行燃料以及吸收棒。具有10至20兆瓦功率的核反应堆主要用来作为供热反应堆。
为了保证核反应堆起动可靠,在核芯还处于停堆状态时,就必须测量中子通量。为此,要求有一个中子源和一个起动通量测量装置。中子源必须满足两个条件:
中子源的中子放射量(源强度)应大到使具有给定灵敏度的起动测量仪表柱中的中子通量探测器每秒至少记录到5个脉冲;
中子源离探测器的距离必须大到,当反应堆的倍增系数为0.99时,在起动测量仪表柱中指示的中子最多只有5%是直接来自中子源。
第一个条件保证,从统计学的概念看,有足够精确的测量信号; 第二个条件保证,测量信号主要取决于核芯而不是取决于中子源。
迄今为止所建造的具有球形工作元件堆芯的核反应堆中,如钍高温反应堆THTR-300兆瓦(所谓球形元件反应堆)中,中子源可调节地安放在侧壁反射层的孔中。专利DE-OS3047098给出一种将起动-中子源送入高温反应堆侧壁反射层中去的传送装置。侧壁反射层的靠近核芯部分的中子源所处位置,从中子物理学方面来说是很不利的,而且为了满足前述的两个条件,要求中子源的源强很大。
中子源最有利的位置是在核芯中央。但这一最佳位置在钍高温反应堆THTR-300兆瓦和其它的这种结构型式的核反应堆中却是无法实现的,因为不管是一次还是多次通过核芯的工作元件在运行期间是循环的。如果工作元件还未循环,则仅在核芯第一次装料时,可以临时在核芯中安放中子源。在这种情况,中子源安装在一根棒中,如像停堆用的吸收棒一样,可以直接插入堆芯中。
在小型的具有固定堆芯的球形反应堆中,没有可直接插入堆芯中的吸收棒,中子源安装在侧壁反射层的孔中,问题是很多的,因为这种反应堆的调节和停堆是由在侧壁反射层中可控制的吸收棒、所谓反射层吸收棒来实现的,所以反射层要求有足够的位置。这种小型反应堆的反射层吸收棒要求效率尽可能高,使之除了调节和停堆之外还能满足反应堆尽可能长的耐用度所要求的剩余反应性。不输入燃料的高耐用度,要求在反应堆核芯周围安放尽可能多的反射层棒。因此,在侧壁反射层的核芯附近没有安放中子源的位置。
本发明的任务在于,在前述类型的核反应堆中,中子源的安装不需要占去反射层吸收棒所要求占有的位置,同时可以实现良好的中子物理学的作用。
本发明是通过下述特征解决这一任务的:
a)固定堆芯至少含有一个石墨球,石墨球中安放了中子放射物质,在运行期间,石墨球固定在其位置上;
b)具有中子放射物质的石墨球(载体球)直径与工作元件的直径相同;
c)具有中子放射物质的石墨球和工作元件一起放入核芯及从核芯中取出。
与较大功率的球形元件反应堆中中子源的结构相比,这里提出的解决措施具有下述优点:
由于中子源安放在核芯中的最佳位置,所以为了保证前面所要求的两个工作条件,中子源源强可以较小。在中子源直接放在核芯中时,所有源中子实际上都在核芯中;而位于侧壁反射层中的中子源却只有约一半的源中子进入核芯。从中子物理学的意义上说,在核芯中央比在周围效果好得多。因此较弱的中子源起动时中子通量测量精度可以很高(因此也比较便宜)。
在起动中子探测器所处的位置上,在来自核芯的中子和直接来自中子源的中子之间存在一个有利的关系,即直接来自中子源的中子所占比例很小。而后装在侧壁反射层中的中子源出来的中子,不穿过核芯就到达了探测器。安放在核芯的中子源不可能使所要求的源中子倍增因子的概率在核芯通过裂变明显地提高。所以,上述的第二个工作条件在所有的地方都自动得到满足。这使起动测量仪表的安装有较多的选择余地。
侧壁反射层中不安放中子源,因此可以尽可能多地安装反射层吸收棒,大大提高了反射层棒的停堆效果,另一方面,使反应堆有 较高的耐用度。
因为在侧壁反射层中没有安装中子源的孔和固定装置,所以侧壁反射层结构简单。由此降低了造价。
不要求移动中子源。没有传动及固定中子源的装置,这样使包围反应堆和石墨反射层的反应堆压力壳的拆除工作简单,而且花费便宜。
本发明的其它具有优点的结构叙述于从属权利要求中,并在下面借助附图对一个实施例的描述进一步加以说明。其中:
图1    本发明核反应堆的纵剖面
图2    作为中子源载体的石墨球
从图1可看出安装于地下的、例如由钢筋混泥土构成的圆柱形压力壳1,以及被压力壳包住的腔体2。压力壳具有一个可拆下的盖板3。核反应堆4安装在腔体2内,其核芯是装有球形工作元件6的固定堆芯5。核芯功率密度总计约为4至6兆瓦/米3,总功率可达10至20兆瓦。堆芯5全部被石墨反射层7包围,它是由顶部反射层8、侧壁反射层9和底部反射层10组成。
顶部反射层8直接装在堆芯5的上面,在其与盖板3之间有一空间11,另一空间12是在底部反射层10和压力壳底之间,在这一空间中安装了金属支撑件13,把核反应堆4支撑在压力壳底上。
致冷气体、最好是氦气从上到下流过堆芯5,利用鼓风机14进行循环。鼓风机的扇叶在空间11中,其拖动电机15安装在盖板3的中心孔16中,外面装有密封件17。
堆芯5的侧面和下面被一个钢制的芯壳18包围住,该芯壳也容纳了侧壁反射层9和底部反射层10的一部分以及整个顶部反射层8。 侧壁反射层和底部反射层可分成内反射层和外反射层两部分。在侧壁反射层9的内反射层中有一竖直通道19,为了补偿和停堆的需要,在通道中装有可控制的吸收棒20。吸收棒20的拖动装置21装在盖板3的孔22中。
在空间11中有气体控制罩23,它将鼓风机14的吸入侧与压力侧分隔开。鼓风机装在芯壳18的上部。鼓风机从空间11抽入冷却气体,将其送入堆芯5。被加热了的冷却气体通过芯壳18和底部反射层10中的孔进入空间12。在空间12中,气体散开进入环形空间24,而后气体又回到空间11中。
在压力壳1的整个内表面安装了冷却系统,该系统由流过冷却水的管子构成,其安置应当使在满负荷状态和排除余热状态下,能可靠地排掉堆芯5中产生的热量。为了防止一次回路中冷却水的扰动,在腔2中冷却系统25前装了气体密封罩26,它构成了环形空间24的外侧壁。
在取掉盖板3之后,芯壳18连同侧壁及底部反射层9、10的内反射层、顶部反射层8、工作元件6和吸收棒20就可以从上方拆出。当工作元件烧尽后,就要进行这种拆除工作。
为了保证核反应堆4能可靠地起动,至少要配置一个中子源及必要的起动测量仪表(后者未在图中示出)。中子源装在工作元件6的堆芯5的内部,它由作为载体球的石墨球27构成,在石墨球中至少装有一种中子放射物质。所有的石墨球27具有和工作元件6同样的直径。在核反应堆4装料时,石墨球和工作元件6一起装入核芯,在反应堆运行期间固定在一定的位置上。在堆芯5的服务期限结束后,石墨球27和工作元件6一起从反应堆4中取出。
在这里给出的例子中,源强较小的四个石墨球27分布在堆芯5中。也可以只有一个载体球。这时,最好以适当的方式将它放在核芯的中央。
图2为一个作为载体球的石墨球27的放大示图。石墨球27的中部有一个圆柱形的空腔29,该空腔用一个由石墨制成的螺纹堵头30封住。在空腔29中放置了两个中子放射物质28,其中一个(31)为第一个堆芯而设置,而第二个(32)为反应堆运行时设置。也可以将第一个堆芯中的中子放射物质和为反应堆运行的中子放射物质分装在不同的载体球中。为前述第一个目的,例如可装入同位素Cf252,为了反应堆运行可采用一种可在中子流中活化的Sb/Be源。
也可以选用与图2中所示的置有紧凑的圆柱体形式的中子放射物质28的中子源,将中子放射物质以细颗粒形式分布在载体球的石墨中。

Claims (7)

1、气体冷却反应堆,它具有一个包括燃料元件吸收器部件和纯石墨元件的球形工作元件固定堆芯的圆柱核芯,该堆芯被一个由顶部、侧壁和底部反射层构成的石墨反射层所包围,上述反应堆还具有一个补偿和停堆装置,该装置由在侧壁反射层的垂直通道中可控制的吸收棒构成,其特征在于:
a)固定堆芯(5)至少包含一个石墨球(27),在石墨球中安放了中子放射物质(28),在运行时,它们停留在其位置上,
b)具有中子放射物质(28)的石墨球(27)(载体球)的直径与工作元件(6)的直径相同,
c)具有中子放射物质(28)的石墨球(27)和工作元件(6)一起放入核芯或一起从核芯中取出。
2、按照权利要求1所述的气体冷却核反应堆,其特征在于:仅设有一个位于核芯中心的具有中子放射物质的石墨球。
3、按照权利要求1所述的气体冷却核反应堆,其特征在于:多个具有较小源强的中子放射物质(28)的石墨球(27)分布在核芯空间中。
4、按照权利要求1、2或3所述的气体冷却核反应堆,其特征在于:石墨球(27)中的中子放射物质(28)安装在中心空腔(29)中,空腔用石墨制成的螺纹堵头(30)封住。
5、按照权利要求1、2或3所述的气冷却核反应堆,其特征在于:中子放射物质分布在一个载体球(或几个载体球)的石墨中。
6、按照权利要求1、2或3所述的气体冷却核反应堆,其特征在于:作为中子放射物质(28),为第一个堆芯所设的中子源(31)和一个为运行时所设的在中子流中可活化的中子源(32)共同放在一个或几个载体球(27)中。
7、按照权利要求1、2或3所述的气体冷却核反应堆,其特征在于:作为中子放射物质,为第一个堆芯所设的中子源和为运行时所设的在中子流中可活化的中子源安放在不同的载体球中。
CN87100673A 1986-02-15 1987-02-12 具有球形工作元件固定堆芯的气体冷却核反应堆 Expired CN1011097B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19863604869 DE3604869A1 (de) 1986-02-15 1986-02-15 Gasgekuehlter kernreaktor mit einer stationaeren schuettung kugelfoermiger betriebselemente
DEP3604869.0 1986-02-15

Publications (2)

Publication Number Publication Date
CN87100673A CN87100673A (zh) 1987-08-26
CN1011097B true CN1011097B (zh) 1991-01-02

Family

ID=6294200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN87100673A Expired CN1011097B (zh) 1986-02-15 1987-02-12 具有球形工作元件固定堆芯的气体冷却核反应堆

Country Status (5)

Country Link
US (1) US5019322A (zh)
JP (1) JPS62192686A (zh)
CN (1) CN1011097B (zh)
DE (1) DE3604869A1 (zh)
TR (1) TR23133A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1319074C (zh) * 2005-03-18 2007-05-30 张育曼 采用套管燃料组件的超临界水核反应堆

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5309492A (en) * 1993-04-15 1994-05-03 Adams Atomic Engines, Inc. Control for a closed cycle gas turbine system
US20040228433A1 (en) * 1999-04-20 2004-11-18 European Community (Ec) Neutron amplifier assembly
FR2806206B1 (fr) * 2000-03-08 2002-04-26 Commissariat Energie Atomique Procede d'incineration d'elements chimiques transuraniens et reacteur nucleaire mettant en oeuvre ce procede
FR2856837A1 (fr) * 2003-06-30 2004-12-31 Commissariat Energie Atomique Procede d'amelioration de la surete des systemes nucleaires hybrides couples, et dispositif mettant en oeuvre ce procede
CN1296939C (zh) * 2005-08-26 2007-01-24 田嘉夫 规则床模块式高温气冷堆及其燃料球布置方法
US9734922B2 (en) 2006-11-28 2017-08-15 Terrapower, Llc System and method for operating a modular nuclear fission deflagration wave reactor
US20090080587A1 (en) * 2006-11-28 2009-03-26 Searete Llc, A Limited Liability Corporation Of The State Of Delaware Nuclear fission igniter
US20090080588A1 (en) * 2006-11-28 2009-03-26 Searete Llc, A Limited Liability Corporation Of The State Of Delaware Nuclear fission igniter
US9214246B2 (en) 2006-11-28 2015-12-15 Terrapower, Llc System and method for operating a modular nuclear fission deflagration wave reactor
US9831004B2 (en) * 2006-11-28 2017-11-28 Terrapower, Llc Controllable long term operation of a nuclear reactor
US9275759B2 (en) * 2006-11-28 2016-03-01 Terrapower, Llc Modular nuclear fission reactor
US20090175402A1 (en) * 2006-11-28 2009-07-09 Searete Llc, A Limited Liability Corporation Of The State Of Delaware Method and system for providing fuel in a nuclear reactor
US8971474B2 (en) * 2006-11-28 2015-03-03 Terrapower, Llc Automated nuclear power reactor for long-term operation
US20080123797A1 (en) * 2006-11-28 2008-05-29 Searete Llc, A Limited Liability Corporation Of The State Of Delaware Automated nuclear power reactor for long-term operation
US7860207B2 (en) 2006-11-28 2010-12-28 The Invention Science Fund I, Llc Method and system for providing fuel in a nuclear reactor
US9230695B2 (en) * 2006-11-28 2016-01-05 Terrapower, Llc Nuclear fission igniter
US20080123795A1 (en) * 2006-11-28 2008-05-29 Searete Llc, A Limited Liability Corporation Of The State Of Delaware Controllable long term operation of a nuclear reactor
CN102696074B (zh) 2009-11-02 2015-11-25 泰拉能源有限责任公司 驻波核裂变反应堆及操作方法
CN101853708B (zh) * 2010-02-08 2013-03-20 清华大学 一种球形物料缓冲输送装置
CN102097144B (zh) * 2010-11-02 2012-11-14 清华大学 应用于高温气冷堆的球形元件单一化输送装置
CN107578833B (zh) * 2017-08-30 2018-10-23 清华大学 一种用于球床堆堆内温度在线测量的快响应式测温石墨球
CN107610792B (zh) * 2017-08-30 2018-10-23 清华大学 一种用于球床堆堆内温度在线测量的测温石墨球

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1127504B (de) * 1957-09-05 1962-04-12 Degussa Kugelfoermiges Brennstoffelement fuer Kernreaktoren
DE1248176B (de) * 1961-03-21 1967-08-24 Sigri Elektrographit Gmbh Kernreaktor-Brennstoffelement fuer hohe Temperaturen
DE1234868B (de) * 1964-03-25 1967-02-23 Arbeitsgemeinschaft Versuchs R Kernreaktor-Brennstoffelement
DE1274748B (de) * 1964-04-28 1968-08-08 Brown Boveri Krupp Reaktor Hochtemperatur-Kernreaktor mit Brennstoffelement-Schuettung
US3360477A (en) * 1965-02-26 1967-12-26 Elick H Acree Neutron source
US3438858A (en) * 1966-09-29 1969-04-15 Union Carbide Corp Fuel elements
US3368979A (en) * 1967-05-03 1968-02-13 Atomic Energy Commission Usa Nuclear fuel composition for multiplication determination in reactors and driving subcritical lattices
US3523869A (en) * 1967-10-03 1970-08-11 Byk Gulden Lomberg Chem Fab Booster-source rods in heavy water moderated reactor
DE2119895A1 (de) * 1971-04-23 1972-11-02 Hochtemperatur-Reaktorbau GmbH, 5000 Köln Verfahren und Vorrichtung zur Regelung eines Kernreaktors
US3778295A (en) * 1972-03-08 1973-12-11 Atomic Energy Commission Chemical plating method of preparing radiation source material
FR2243497B1 (zh) * 1973-09-08 1978-01-27 Kernforschungsanlage Juelich
US4110158A (en) * 1973-09-22 1978-08-29 Kernforschungsanlage Julich Gesellschaft Mit Beschrankter Haftung Core reactor and method of operating same
JPS5263588A (en) * 1975-11-19 1977-05-26 Hitachi Ltd Neutraon source for nuclear reactor
FR2335917A1 (fr) * 1975-12-17 1977-07-15 Commissariat Energie Atomique Source neutronique a fluence variable
DE2735935A1 (de) * 1977-08-10 1979-02-22 Hochtemperatur Reaktorbau Gmbh Verfahren zum erstmaligen beladen eines gasgekuehlten kernreaktors mit betriebselementen
US4208247A (en) * 1977-08-15 1980-06-17 Westinghouse Electric Corp. Neutron source
DE2925861A1 (de) * 1979-06-27 1981-01-22 Hochtemperatur Reaktorbau Gmbh Gasgekuehlter hochtemperaturreaktor
DE3030551A1 (de) * 1980-08-13 1982-03-25 Hochtemperatur-Reaktorbau GmbH, 5000 Köln Gasgekuehlter kernreaktor mit einer schuettung kugelfoermiger brennelemente
JPS5750689A (en) * 1980-09-12 1982-03-25 Tokyo Shibaura Electric Co Auxiliary neutron source for nuclear reactor start-up
DE3047098A1 (de) * 1980-12-13 1982-07-22 Hochtemperatur-Reaktorbau GmbH, 5000 Köln Transportvorrichtung fuer eine neutronen-anfahrquelle in einem hochtemperatur-kernreaktor
EP0130227B1 (en) * 1983-07-01 1987-03-18 Hitachi, Ltd. Method of loading nuclear fuel assemblies
US4588547A (en) * 1983-10-07 1986-05-13 Westinghouse Electric Corp. Method and apparatus for determining the nearness to criticality of a nuclear reactor
US4597936A (en) * 1983-10-12 1986-07-01 Ga Technologies Inc. Lithium-containing neutron target particle
DE3345113A1 (de) * 1983-12-14 1985-06-27 Hochtemperatur-Reaktorbau GmbH, 4600 Dortmund Kernkraftwerk mit einem ht-kleinreaktor
DE3518968A1 (de) * 1985-05-25 1986-11-27 Hochtemperatur-Reaktorbau GmbH, 4600 Dortmund Unterirdisch in der kaverne eines zylindrischen druckbehaelters angeordneter kernreaktor niedriger leistung
DK8600213A (zh) * 1985-09-18 1987-02-20

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1319074C (zh) * 2005-03-18 2007-05-30 张育曼 采用套管燃料组件的超临界水核反应堆

Also Published As

Publication number Publication date
US5019322A (en) 1991-05-28
CN87100673A (zh) 1987-08-26
DE3604869A1 (de) 1987-08-20
JPS62192686A (ja) 1987-08-24
DE3604869C2 (zh) 1992-07-02
TR23133A (tr) 1989-04-10

Similar Documents

Publication Publication Date Title
CN1011097B (zh) 具有球形工作元件固定堆芯的气体冷却核反应堆
US7139352B2 (en) Reactivity control rod for core
US2961393A (en) Power breeder reactor
US5196159A (en) Fast reactor
US4764339A (en) High flux reactor
US5124113A (en) Nuclear reactor with improved efficiency
US4609522A (en) Mechanical drive system for moving fuel
US2940915A (en) High temperature, high power heterogeneous nuclear reactor
US4826652A (en) Low capacity nuclear reactor housed underground in the cavity of a cylindrical pressure vessel
CN1035845C (zh) 脉冲堆
US3914612A (en) Neutron source
US3125760A (en) Fuel locating and suspending system for neutronic reactor core
Saito et al. Present status of the high temperature engineering test reactor (HTTR)
US3211623A (en) Neutronic reactor and fuel element therefor
US3086933A (en) Transportable nuclear reactor power plant
US3638023A (en) Radioisotopic power source
JPS645664B2 (zh)
US4716007A (en) Spectral shift reactor
GB1029712A (en) Improvements in or relating to nuclear reactors
Difilippo et al. A preliminary reactor design for the center for neutron research
US2836554A (en) Air cooled neutronic reactor
EP4481760A1 (en) Modular nuclear battery system and nuclear cell
US4826647A (en) Spectral shift reactor
Feinberg et al. The 50 mw research reactor SM
Kazi Fast-Pulse Reactor Operation with Reflector Control and a 106-mm-diam Glory Hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee