Skip to main content
    • by 
    •   5  
      ChemistrySportswearNettingSocks
    • by 
    •   7  
      Social and Cultural AnthropologyEcological AnthropologyGlobal and Comparative SociologyAnthropology of Kinship
The allocation of cross-border transmission capacities is a basic precondition for cross-border electricity trade. Insufficient transmission capacities are the factor that limits this trade and therefore they must be allocated in the... more
    • by  and +1
    •   4  
      TransmissionAuctionNettingCongestion
Objectives: The paper explains the process and problems of mapping a localised creative industry sector, contrasting the findings of secondary data with primary data from within the field; identifying implications for policy and... more
    • by 
    • Netting
    • by 
    •   7  
      BiologyDensityAquacultureStress response