Skip to main content
Utilizacion de modelos BPMN, IDEF0 y otras herramientas de ingenieria.
    • by 
    •   4  
      BPMNBusiness Process Modeling Notation (BPMN)IDEF0Herramientas de ingenieria
Aplicabilidad de la metodología IDEF0 para optimizar el modelamiento de procesos en las empresas.
    • by 
    • IDEF0
For process of modeling are developed suitable CASE tools. In the course of building this process a standard is used for functional modeling of IDEF0 realized through BPWin tool. Family of integrated IDEF methods presents basic tool of... more
    • by  and +1
    •   3  
      Information SystemsIDEFIDEF0
Organisations willing to succeed in global competition have to integrate their internal and external processes. This especially includes planning and production control (PPC) processes. Optimised allocation of the production resources and... more
    • by 
    •   8  
      ManufacturingSystems AnalysisProduction PlanningEnterprise Modeling
Completed Station REDEVELOPMENT OF VICTORIA TRAIN STATION LEVEL 0 PROCESS MODEL Platform for Future developments Redevelopment of Victoria Train Station
    • by 
    •   6  
      Construction ManagementConstruction Project ManagementRisk Assessment & Risk ManagementProcess Modelling
Suitable CASE tools are developed for modeling processes. When building this process a standard is used for the functional modeling of IDEF0, through the use of the BPWin tool. The family of integrated IDEF methods presents the basic... more
    • by  and +1
    •   4  
      Building Information ModelingFunctional ModelingIDEFIDEF0
Organisations willing to succeed in global competition have to integrate their internal and external processes. This especially includes planning and production control (PPC) processes. Optimised allocation of the production resources and... more
    • by 
    •   5  
      Information SystemsProduction PlanningSystem Analysis and DesignEnterprise Resource Planning (ERP)
There is still a notable underperformance among many mega projects in East Africa. One result from this is waste that’s often reflected in cost and time over runs, health and safety issues, poor quality projects and over all, less value... more
    • by  and +1
    •   11  
      DesignArchitectureLean ConstructionConstruction Project Management
This discussion expands and elaborates the introduction to activation rules for IDEF0 (SADT) activities that is given by Marca & McGowan. As presented here, I have adapted the expression of activation rules to be consistent with the IEEE... more
    • by 
    •   20  
      Business ModelingBPMNBusiness Process ManagementProcess modeling and Monitoring
Advancements in construction project management have necessitated a comprehensive rethink of construction project processes. Gantt charts and critical path analysis have been produced to create a work breakdown structure which can... more
    • by 
    •   8  
      Business Process ImprovementContinuous ImprovementProject Cost ControlKaizen
[Jim Armstrong & Alexander K Bocast]
    • by 
    •   5  
      Systems EngineeringSoftware DevelopmentObject Oriented Analysis and DesignIDEF0