Davis, 2018 - Google Patents
Liquefaction impacts on lifeline systems: Christchurch, New Zealand, examplesDavis, 2018
- Document ID
- 4341576496437531299
- Author
- Davis C
- Publication year
- Publication venue
- International Conference on Geotechnical and Earthquake Engineering 2018
External Links
Snippet
Seismic-induced liquefaction is complicated and involves many aspects within the process, including shaking-induced volumetric strains, increased pore water pressure, ground water migration, reduced effective soil strength, water, and soil ejection potentially resulting in …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealing or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/102—Permanently installed raisable dykes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Dam failure mechanisms and risk assessment | |
Adamo et al. | Dam safety problems related to seepage | |
Tan et al. | Review of cave-in failures of urban roadways in China: A database | |
Yasuda et al. | Uplift of sewage manholes and pipes during the 2004 Niigataken-Chuetsu earthquake | |
YASUDA et al. | Liquefaction-induced damage to structures during the 2011 great east Japan earthquake | |
Bromhead | The Treatment of Landslides. | |
Mohri et al. | Damage to agricultural facilities | |
Davis et al. | Liquefaction induced flooding in Christchurch, New Zealand | |
Tafreshi et al. | Expanded polystyrene geofoam | |
Hamada et al. | Soil liquefaction and countermeasures | |
Davis | Liquefaction impacts on lifeline systems: Christchurch, New Zealand, examples | |
Adamo et al. | Dam safety: Technical problems of aging embankment dams | |
Ahmed et al. | Review About Incidents in Dams and Dike Behaviours Induced by Internal Erosion | |
Tobita et al. | Observed damage of wastewater pipelines and estimated manhole uplifts during the 2004 Niigataken Chuetsu, Japan, earthquake | |
Janssen et al. | Busan-Geoje Link: Immersed tunnel opening new horizons | |
Mohri et al. | New direction of earth reinforcement–disaster prevention | |
Bromhead | Geotechnical structures for landslide risk reduction | |
Yasuda et al. | Uplift of sewage man-hole during 1993 Kushiro-oki EQ., 2003 Tokachi-oki EQ. and 2004 Niigataken Chuetsu EQ | |
Blower | 10. Managing Groundwater in the Engineering Design & Construction of Surface Works | |
Dasaka et al. | Recent RE Wall failures-Lessons learned | |
Dauncey et al. | Chapter 10 Engineering design and construction | |
Young et al. | First Application of Articulated Concrete Block Armoring with a Stabilized Stone Drainage Layer | |
Blower et al. | 3. Problems Caused by Groundwater | |
Towhata | On three-stage mitigation of liquefaction-induced hazards | |
Nguyen | Analysis the Causes of the Slip Embankment Protecting the Slope of Lien Chieu Aviation Petroleum Depot |