Sandanayake, 2014 - Google Patents
Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic …Sandanayake, 2014
- Document ID
- 15976075771536936340
- Author
- Sandanayake D
- Publication year
External Links
- 238000005065 mining 0 title abstract description 256
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
- G06F17/21—Text processing
- G06F17/24—Editing, e.g. insert/delete
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sandanayake | Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic approach | |
Erdogan et al. | Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine | |
Sandanayake et al. | A heuristic approach to optimal design of an underground mine stope layout | |
Manríquez et al. | A simulation–optimization framework for short-term underground mine production scheduling | |
Pourrahimian | Mathematical programming for sequence optimization in block cave mining | |
Afum et al. | A review of models and algorithms for surface-underground mining options and transitions optimization: some lessons learnt and the way forward | |
Pourrahimian et al. | Mixed–Integer Linear Programming formulation for block–cave sequence optimisation | |
Copland et al. | Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations | |
Vasylchuk et al. | Improved grade control in open pit mines | |
Sari et al. | Sublevel stope layout planning through a greedy heuristic approach based on dynamic programming | |
Noriega et al. | Optimisation of life-of-mine production scheduling for block-caving mines under mineral resource and material mixing uncertainty | |
Sotoudeh et al. | Application of sequential gaussian conditional simulation to underground mine design under grade uncertainty | |
Appianing et al. | Underground mining stope layout optimization and production scheduling: A review of existing solvers and algorithms | |
Sari et al. | Clustering-based iterative approach to stope layout optimization for sublevel stoping | |
Deutsch | Open-pit mine planning with operational constraints | |
Ortiz et al. | Improving financial returns from mining through geostatistical simulation and the optimized advance drilling grid at El Tesoro Copper Mine | |
Villalba Matamoros et al. | A value adding approach to hard-rock underground mining operations: balancing orebody orientation and mining direction through meta-heuristic optimization | |
Ruiseco | Dig-limit optimization in open pit mines through genetic algorithms | |
Nhleko | A dual interchange algorithm for three-dimensional stope boundary optimisation for underground mines | |
Saha | Block-cave extraction level and production scheduling optimization under grade uncertainty | |
Afum | Open pit-underground mining options and transitions planning: a mathematical programming framework for optimal resource extraction evaluation | |
Basiri | Stopes layout and production scheduling optimization in sublevel stoping mining | |
Musingwini | Techno-economic optimisation of level and raise spacing range in planning a Bushveld Complex platinum reef conventional breast mining layout | |
Sari | Novel optimization models for surface and underground mine planning | |
Salinas | Calibration of a mixing model for sublevel caving |