Pourrahimian, 2013 - Google Patents
Mathematical programming for sequence optimization in block cave miningPourrahimian, 2013
View PDF- Document ID
- 12269944332512526161
- Author
- Pourrahimian Y
- Publication year
External Links
Snippet
Production scheduling of any mining system has an enormous effect on the operation's economics. The economics of today's mining industry are such that the major mining companies are increasing the use of massive mining methods. Among the mining methods …
- 238000005065 mining 0 title abstract description 210
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5068—Physical circuit design, e.g. layout for integrated circuits or printed circuit boards
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
- G06F17/21—Text processing
- G06F17/24—Editing, e.g. insert/delete
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Investment, e.g. financial instruments, portfolio management or fund management
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pourrahimian | Mathematical programming for sequence optimization in block cave mining | |
US20210208305A1 (en) | Mine planning method and system | |
Yashar et al. | A multi-step approach for block-cave production scheduling optimization | |
Ramazan | The new fundamental tree algorithm for production scheduling of open pit mines | |
O’Sullivan et al. | Optimization-based heuristics for underground mine scheduling | |
Sandanayake et al. | A heuristic approach to optimal design of an underground mine stope layout | |
Manríquez et al. | A simulation–optimization framework for short-term underground mine production scheduling | |
Nhleko et al. | A review of underground stope boundary optimization algorithms | |
Gilani et al. | A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty | |
Khodayari et al. | Mathematical programming applications in block-caving scheduling: a review of models and algorithms | |
Tabesh et al. | A multi–step approach to long–term open–pit production planning | |
Pourrahimian et al. | Mixed–Integer Linear Programming formulation for block–cave sequence optimisation | |
Huang et al. | A stochastic mixed integer programming framework for underground mining production scheduling optimization considering grade uncertainty | |
Chowdu et al. | Operations research in underground mine planning: A review | |
Bai et al. | Automatic generation of feasible mining pushbacks for open pit strategic planning | |
Copland et al. | Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations | |
Khan et al. | A differential evolution based approach for the production scheduling of open pit mines with or without the condition of grade uncertainty | |
Dimitrakopoulos et al. | Stope design and geological uncertainty: quantification of risk in conventional designs and a probabilistic alternative | |
Sandanayake | Stope boundary optimisation in underground mining based on a heuristic approachStope boundary optimisation in underground mining based on a heuristic approach | |
Azadmehr et al. | An application of rock engineering system for assessment of the rock mass fragmentation: a hybrid approach and case study | |
Nezhadshahmohammad et al. | Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling | |
Anisimov et al. | Strategic planning of open pit mining operations using the Micromine Beyond Optimiser | |
Noriega et al. | Optimisation of life-of-mine production scheduling for block-caving mines under mineral resource and material mixing uncertainty | |
Appianing et al. | Underground mining stope layout optimization and production scheduling: A review of existing solvers and algorithms | |
Shenavar et al. | A New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method |