- 239000000725 suspension Substances 0.000 title claims description 32
- 238000004519 manufacturing process Methods 0.000 title claims description 22
- 238000000034 method Methods 0.000 title description 6
- 238000005480 shot peening Methods 0.000 claims abstract description 84
- 230000003247 decreasing effect Effects 0.000 claims abstract description 8
- 238000012545 processing Methods 0.000 claims description 19
- 229910000639 Spring steel Inorganic materials 0.000 claims description 18
- 230000007423 decrease Effects 0.000 claims description 8
- 238000005452 bending Methods 0.000 claims description 5
- 230000006835 compression Effects 0.000 abstract 2
- 238000007906 compression Methods 0.000 abstract 2
- 230000007797 corrosion Effects 0.000 description 63
- 238000005260 corrosion Methods 0.000 description 63
- 230000000052 comparative effect Effects 0.000 description 16
- 238000009826 distribution Methods 0.000 description 13
- 238000010438 heat treatment Methods 0.000 description 10
- 239000002436 steel type Substances 0.000 description 6
- 238000012360 testing method Methods 0.000 description 6
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 description 5
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Substances [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 238000010791 quenching Methods 0.000 description 3
- 230000000171 quenching effect Effects 0.000 description 3
- 150000003839 salts Chemical class 0.000 description 3
- 230000003746 surface roughness Effects 0.000 description 3
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 2
- 229910045601 alloy Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000005261 decarburization Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009661 fatigue test Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000005496 tempering Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000006096 absorbing agent Substances 0.000 description 1
- 238000000137 annealing Methods 0.000 description 1
- 229910052804 chromium Inorganic materials 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 229910052750 molybdenum Inorganic materials 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229910052759 nickel Inorganic materials 0.000 description 1
- 238000007591 painting process Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24C—ABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
- B24C1/00—Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
- B24C1/10—Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods for compacting surfaces, e.g. shot-peening
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24C—ABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
- B24C11/00—Selection of abrasive materials or additives for abrasive blasts
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D7/00—Modifying the physical properties of iron or steel by deformation
- C21D7/02—Modifying the physical properties of iron or steel by deformation by cold working
- C21D7/04—Modifying the physical properties of iron or steel by deformation by cold working of the surface
- C21D7/06—Modifying the physical properties of iron or steel by deformation by cold working of the surface by shot-peening or the like
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/02—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for springs
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16F—SPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
- F16F1/00—Springs
- F16F1/02—Springs made of steel or other material having low internal friction; Wound, torsion, leaf, cup, ring or the like springs, the material of the spring not being relevant
- F16F1/04—Wound springs
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16F—SPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
- F16F2226/00—Manufacturing; Treatments
- F16F2226/02—Surface treatments
Definitions
- the present invention relates to a coil suspension coil spring excellent in corrosion durability used for a suspension mechanism of a vehicle such as an automobile, and a manufacturing method thereof.
- Suspension coil springs are known to be affected by anti-freezing agents spread on the road in winter and the like. Since the antifreezing agent contains salt, it promotes corrosion of the surface of the coil spring made of spring steel. In particular, it has been found that corrosion pits (corrosion holes) have a great influence on the durability of the coil spring. For example, as shown in FIG. 11, a part of the surface 1a of the spring element wire 1 is corroded in the shape of a hole by moisture or salt, whereby the corrosion pit 2 is formed. Although the shape of the corrosion pit 2 is various, for example, there is also a corrosion pit 2 having a cross section schematically shown in FIG.
- the suspension coil spring is desired to be used with higher stress in order to reduce the weight of the vehicle.
- shot peening is performed on a coil spring to impart a compressive residual stress near the surface and enhance durability.
- Japanese Unexamined Patent Publication No. 2000-345238 or Japanese Unexamined Patent Publication No. 2008-106365 discloses multistage shot peening. In multi-stage shot peening, shot peening is performed in a plurality of times.
- Stress peening and warm peening are known as means for generating compressive residual stress from the spring surface to a deep position.
- stress peening a shot is projected with the coil spring compressed.
- warm peening shots are projected with the coil spring heated to around 250 ° C.
- Stress peening and warm peening can develop compressive residual stress to a deeper position in the material, compared to normal shot peening performed at room temperature.
- stress peening requires equipment for compressing the coil spring.
- stress peening projects shots in a state where the coil spring is compressed, the spacing between the spring strands is narrowed. For this reason, there is a problem that it is difficult to hit a shot inside the coil spring or between the spring wires.
- the corrosion resistance of coil springs is improved by adding alloy components such as Ni, Cr, and Mo to spring steel.
- alloy components such as Ni, Cr, and Mo
- spring steel containing such an alloy component is expensive, which causes the cost of the coil spring to increase.
- the coil spring may be broken starting from a fatigue crack generated at the bottom of the corrosion pit.
- An object of the present invention is to provide a vehicle suspension coil spring that can enhance corrosion durability and can be used with higher stress, and a method for manufacturing the same.
- a vehicle suspension coil spring according to the present invention is a vehicle suspension coil spring having a spring wire to which compressive residual stress is applied by shot peening, and includes a residual stress increasing portion, a residual stress peak portion, and a residual stress decreasing portion. have.
- the residual stress increasing portion the compressive residual stress increases in the depth direction from the surface of the spring element wire.
- the compressive residual stress is maximized at the residual stress peak portion.
- the residual stress reducing portion the compressive residual stress is reduced in the depth direction of the spring wire from the residual stress peak portion.
- a portion having a compressive residual stress equivalent to the compressive residual stress on the surface of the spring element wire has a depth exceeding the allowable pit depth of the spring element wire. Existing.
- a compressive residual stress of ⁇ 400 MPa or more extends from the surface of the spring wire to the allowable pit depth. It should be granted.
- the hardness of the spring wire is recommended to be 50 to 56 HRC.
- the position where the compressive residual stress starts to greatly decrease at a position deeper than the residual stress peak is preferably deeper than 0.2 mm from the surface of the spring.
- a compressive residual stress of ⁇ 400 MPa or more is preferably applied from the surface to a depth of 0.3 mm.
- the method for manufacturing a vehicle suspension coil spring according to the present invention includes a bending step, a first shot peening step, and a second shot peening step.
- a spring wire made of spring steel is formed into a spiral shape.
- a compressive residual stress is applied to the spring element by projecting a first shot having a shot size of 1.0 mm or more onto the spring element.
- the second shot peening process is performed after the first shot peening process. In the second shot peening process, a second shot smaller than the first shot is projected onto the spring element wire.
- the residual stress increase portion, the residual stress peak portion, and the residual stress decrease portion are generated in the spring element wire, and the residual stress is reduced.
- a portion having a compressive residual stress equivalent to the compressive residual stress on the surface of the spring element wire in the stress reducing portion is formed to a depth exceeding the allowable pit depth of the spring element wire.
- the first shot peening process and the second shot peening process may be performed at a processing temperature of 150 to 350 ° C. for the spring element wire.
- the processing temperature in the first shot peening process is higher than the processing temperature in the second shot peening process.
- the kinetic energy of the first shot is preferably larger than the kinetic energy of the second shot.
- the suspension coil spring of the present invention even if the corrosion pit grows to a depth close to the allowable pit depth, it is possible to suppress the occurrence of fatigue cracks at the bottom of the corrosion pit and to increase the corrosion durability. . For this reason, the suspension coil spring can be used with higher stress, and the weight of the vehicle can be reduced.
- the manufacturing method of the present invention it is possible to develop a high level of compressive residual stress effective in preventing the occurrence of fatigue cracks and the progress of cracks over a deep region exceeding the allowable pit depth from the surface of the spring wire. it can.
- the difference between the compressive residual stress near the surface of the spring wire and the compressive residual stress near the bottom of the corrosion pit can be reduced. For this reason, it is possible to obtain a compressive residual stress distribution that is highly effective in suppressing the occurrence of fatigue cracks in the corrosion pits.
- FIG. 1 is a side view of a part of an automobile provided with a suspension coil spring according to an embodiment of the present invention.
- FIG. 2 is a perspective view of the suspension coil spring shown in FIG.
- FIG. 3 is a flowchart showing an example of a manufacturing process of the suspension coil spring shown in FIG.
- FIG. 4 is a flowchart showing another example of the manufacturing process of the suspension coil spring shown in FIG.
- FIG. 5 is a graph showing the compressive residual stress distribution of Example 1 according to the present invention.
- FIG. 6 is a graph showing the compressive residual stress distribution of Example 2 according to the present invention.
- FIG. 7 is a graph showing the compressive residual stress distribution of Example 3 according to the present invention.
- FIG. 8 is a graph showing the compressive residual stress distribution of Comparative Example 1.
- FIG. 1 is a side view of a part of an automobile provided with a suspension coil spring according to an embodiment of the present invention.
- FIG. 2 is a perspective view of the suspension coil spring shown in FIG.
- FIG. 9 is a graph showing the corrosion life of Examples 1 and 2 and Comparative Example 1.
- FIG. 10 is a graph showing the corrosion life of Examples 4 and 5 and Comparative Example 2.
- FIG. 11 is a cross-sectional view schematically showing an example of a corrosion pit.
- FIG. 12 is a cross-sectional view schematically showing another example of the corrosion pit.
- FIG. 13 is a cross-sectional view schematically showing a corrosion pit in which a crack has occurred.
- a suspension mechanism 11 of a vehicle 10 shown in FIG. 1 includes a vehicle suspension coil spring 12 (hereinafter simply referred to as a coil spring 12) and a shock absorber 13.
- the spring element wire 20 is formed in a spiral shape.
- the coil spring 12 elastically supports the load of the vehicle 10 while being compressed in the direction of the axis X.
- An example of the coil spring 12 is a cylindrical coil spring.
- An example of the wire diameter d (shown in FIG. 2) of the spring wire 20 is 12.5 mm.
- the average coil diameter D is 110.0 mm, the free length (length under no load) is 382 mm, the effective number of turns is 5.39, and the spring constant is 33.3 N / mm.
- the main wire diameter of the coil spring 12 is 8 to 21 mm, but other wire diameters may be used.
- various types of coil springs such as a barrel coil spring, a drum coil spring, a taper coil spring, an unequal pitch coil spring, and a load axis control coil spring may be used.
- the steel type of the spring wire 20 is highly corrosion-resistant spring steel (referred to as spring steel S for convenience in this specification).
- Spring steel S is a steel type with improved corrosion resistance, and chemical components (mass%) are C: 0.41, Si: 1.73, Mn: 0.17, Ni: 0.53, Cr: 1. 05, V: 0.163, Ti: 0.056, Cu: 0.21, balance Fe.
- FIG. 3 shows a manufacturing process of a hot-formed coil spring.
- the spring wire is a material of the coil spring, austenitizing temperature (A 3 transformation point or higher, 1150 ° C. or less) is heated to.
- the heated spring wire is bent into a spiral shape in a bending step (coiling step) S2.
- heat treatment such as quenching step S3 and tempering step S4 is performed.
- the spring element is tempered by the heat treatment so that the hardness is 50 to 56 HRC.
- a coil spring having a design maximum stress of 1300 MPa is tempered to have a hardness of 54.5 HRC.
- the coil spring having a design maximum stress of 1200 MPa is tempered to have a hardness of 53.5 HRC.
- a load in the axial direction is applied to the coil spring for a predetermined time.
- the hot setting step S5 is performed warm using the residual heat after the heat treatment.
- the first shot peening step S6 is performed.
- a first shot (iron cut wire) having a shot size (particle diameter) of 1.0 mm is used.
- This first shot is projected at a processing temperature of 230 ° C. onto a spring element at a speed of 76.7 m / sec and a kinetic energy of 12.11 ⁇ 10 ⁇ 3 J.
- compressive residual stress is expressed over a deep region in the depth direction from the surface of the spring element wire.
- the distribution of the compressive residual stress will be described in detail later.
- the surface roughness of the spring element wire in the first shot peening step S6 is preferably 75 ⁇ m or less.
- the second shot peening step S7 is performed.
- a second shot smaller than the first shot is used.
- the shot size of the second shot is 0.67 mm. This second shot is projected at a processing temperature of 200 ° C. onto the spring wire at a speed of 46 m / sec and a kinetic energy of 1.31 ⁇ 10 ⁇ 3 J.
- the second shot peening step S7 a shot having a smaller size than that of the first shot peening step S6 is used. Moreover, the shot projection speed in the second shot peening step S7 is lower than the shot projection speed in the first shot peening step S6. For this reason, the surface roughness of the spring wire whose surface roughness after the first shot peening step S6 is large can be reduced by the second shot peening step S7, and the surface condition of the spring wire is improved. Is done.
- a second shot having a shot size of 0.40 mm is processed at a processing temperature of 200 ° C., a speed of 86.7 m / sec, and a kinetic energy of 0.99 ⁇ 10 ⁇ 3 J May be projected.
- Table 1 shows data comparing shot kinetic energy under shot peening conditions. If the shot size is large, the kinetic energy increases even if the projection speed is the same. For example, a large shot with a shot size of 1 mm has a kinetic energy of about 1.5 times that of a 0.87 mm shot. In the case of a large shot with a shot size of 1.1 mm, the kinetic energy is about twice that of a 0.87 mm shot. Conversely, a small shot with a shot size of 0.67 mm has a kinetic energy less than half that of a shot with a 0.87 mm. In a shot with a shot size of 0.4 mm, the kinetic energy is reduced even if the projection speed is about twice that of a shot with a 0.67 mm.
- the kinetic energy of the first shot in the first shot peening step S6 is used as the second shot in the second shot peening step S7. It is larger than the kinetic energy.
- the processing temperature of the first shot peening step S6 and the second shot peening step S7 is suitably 150 to 350 ° C. That is, it is warm peening (hot peening) using residual heat after heat treatment. Moreover, the second shot peening step S7 is performed at a lower processing temperature than the first shot peening step S6.
- a large compressive residual stress can be generated from the surface to a deep position without compressing the coil spring as in the conventional stress peening. For this reason, the equipment which compresses a coil spring like stress peening is unnecessary. Moreover, since the gap between the spring wires does not become narrow unlike stress peening, it is possible to hit the shot sufficiently even inside the coil spring or between the spring wires.
- a pre-setting process S8 and a painting process S9 are performed. Thereafter, an inspection step S10 is performed to inspect the appearance and characteristics of the coil spring. Note that the pre-setting step S8 may be omitted.
- FIG. 4 shows a manufacturing process in the case where the coil spring is cold coiled.
- heat treatment such as a quenching step S11 and a tempering step S12 is performed on the spring wire before coiling in advance.
- This spring wire is formed into a helical shape in the cold in the bending step (coiling step) S13.
- the processing strain generated at the time of molding is removed by leaving the coil spring in an atmosphere at a predetermined temperature for a predetermined time.
- the hot setting step S5 the first shot peening step S6, the second shot peening step S7, the pre-setting step S8, the coating step S9, Inspection process S10 is performed.
- the coil spring may be coiled warm. Note that the pre-setting step S8 may be omitted.
- FIG. 5 shows the distribution of compressive residual stress of the coil spring of Example 1.
- the horizontal axis in FIG. 5 indicates the position in the depth direction from the surface of the spring element wire.
- the vertical axis in FIG. 5 represents the residual stress value, but the compressive residual stress value is represented by minus as a convention in the industry.
- the compressive residual stress of the coil spring of Example 1 has a residual stress increasing portion T1, a high stress portion T2, a residual stress peak portion T3, and a residual stress decreasing portion T4.
- the residual stress increasing portion T1 the compressive residual stress increases in the depth direction from the surface of the spring strand toward the inside of the spring strand.
- the high stress portion T2 the compressive residual stress is maintained at a high level.
- the residual stress peak portion T3 the compressive residual stress is maximized.
- the compressive residual stress decreases from the residual stress peak portion T3 in the depth direction of the spring element wire.
- the portion B having a compressive residual stress of the same size as the compressive residual stress value A on the surface of the spring strand is an allowable pit of the spring strand. It exists at a depth exceeding the depth Rmax .
- the allowable pit depth R max is the suspension coil spring having a compressive residual stress distribution obtained by conventional shot peening, it is likely to breakage fatigue cracks generated in the bottom portion or the like of the corrosion pit as the starting point The maximum pit depth.
- the conventional coil spring breaks with a high probability when the corrosion pit depth approaches 0.2 to 0.25 mm. In this case, the allowable pit depth is 0.25 mm.
- the portion B having a compressive residual stress value equal to the compressive residual stress value A on the surface of the spring wire is the allowable pit depth of the spring wire. It is present in the depth exceeding R max.
- the coil spring of Example 1 has a compressive residual stress of ⁇ 400 MPa or more over a deep region exceeding the allowable pit depth R max from the surface.
- Examples 2 to 5 to be described later also perform two-stage shot peening (warm double shot peening) by the first shot peening process S6 and the second shot peening process S7. That is, by the first shot peening step S6 in the first stage, a peak of compressive residual stress appears at a deep position from the surface, and further, a compressive residual stress occurs at a deep position. Then, the second shot peening process S7 in the second stage can increase the compressive residual stress in the vicinity of the surface as indicated by an arrow h in FIG. Thus, a high stress portion T2 in which the compressive residual stress is maintained at a high level from the vicinity of the surface to a deep region can be obtained.
- two-stage shot peening warm double shot peening
- the surface When the spring wire is heated in the atmosphere, the surface is decarbonized and the hardness is reduced by about 125 HV compared to the inside.
- the magnitude of the compressive residual stress is proportional to the spring hardness. That is, as the spring hardness decreases, the compressive residual stress also decreases.
- the lower limit of the hardness of the spring 50 to 56 HRC (515 HV to 615 HV) is 515 HV, and the minimum hardness of the spring surface where decarburization occurs is 390 HV, and the compressive residual stress value of the surface at that time is about ⁇ 400 MPa.
- Example 2 The steel type of the spring wire is the same highly corrosion-resistant spring steel (spring steel S) as in Example 1.
- the manufacturing process is the same as that of the first embodiment except for the size of the shot used in the first shot peening process S6.
- the first shot with a shot size of 1.1 mm was used in the first shot peening step S6.
- a second shot peening step S7 was performed with a second shot having a shot size of 0.67 mm.
- the shot projection speed and processing temperature are the same as in the first embodiment.
- FIG. 6 shows the compressive residual stress distribution of Example 2.
- the coil spring of the second embodiment also includes a residual stress increasing portion T1, a high stress portion T2, a residual stress peak portion T3, and a residual stress decreasing portion T4.
- the residual stress increasing portion T1 the compressive residual stress increases in the depth direction from the surface of the spring element wire.
- the high stress portion T2 the compressive residual stress is maintained at a high level.
- the residual stress peak portion T3 the compressive residual stress is maximized.
- the residual stress reducing portion T4 the compressive residual stress is reduced from the residual stress peak portion T3 in the depth direction of the spring element wire.
- the portion B having a compressive residual stress of the same magnitude as the compressive residual stress value A on the surface of the spring wire has an allowable pit depth R of the spring wire. It exists at a depth exceeding max . Moreover, it has a compressive residual stress of ⁇ 400 MPa or more over a deep region exceeding the allowable pit depth R max from the surface.
- the steel type of the spring wire is the same highly corrosion resistant spring steel (spring steel S) as in the first embodiment.
- the manufacturing process is the same as that of Example 2 except that high-frequency heating is used for heat treatment of the spring wire.
- the quenching step S3 the surface decarburization is suppressed by heating the spring element wire by high-frequency heating.
- the first shot peening step S6 a first shot having a shot size of 1.1 mm was used.
- the second shot peening step S7 a second shot having a shot size of 0.67 mm was used.
- the shot projection speed and processing temperature are the same as in the first embodiment.
- FIG. 7 shows the compressive residual stress distribution of Example 3.
- the coil spring of the third embodiment also includes the residual stress increasing portion T1, the high stress portion T2, the residual stress peak portion T3, and the residual stress decreasing portion T4. ing.
- the residual stress reduction portion T4, site has a compressive residual stress value A the same magnitude of the compressive residual stress on the surface of the spring wire B is a depth exceeding the allowable pit depth R max of spring wire Existing.
- it has a compressive residual stress of ⁇ 400 MPa or more over a deep region exceeding the allowable pit depth R max from the surface.
- SAE9254 was used for the spring wire.
- the chemical components (mass%) of SAE 9254 are C: 0.51 to 0.59, Si: 1.20 to 1.60, Mn: 0.60 to 0.80, Cr: 0.60 to 0.80, S: maximum 0.040, P: maximum 0.030, balance Fe.
- the manufacturing process of the coil spring is the same as that of the first embodiment.
- a first shot peening process (projection speed: 76 m / sec, processing temperature: 230 ° C.) is applied to a spring wire (hardness: 53.5 HRC) made of SAE 9254 by a first shot having a shot size of 1.0 mm. ).
- a second shot peening process (projection speed: 46 m / sec, treatment temperature: 200 ° C.) was performed with a second shot having a shot size of 0.67 mm.
- Example 5 A coil spring was manufactured by the same manufacturing process as in Example 2 using SAE9254 as the spring element wire. That is, in Example 5, a first shot peening process (projection speed: 76 m / sec, processing temperature: 230 ° C.) is applied to a spring wire (hardness: 53.5 HRC) made of SAE 9254 by a first shot having a shot size of 1.1 mm. ). Thereafter, a second shot peening process (projection speed: 46 m / sec, treatment temperature: 200 ° C.) was performed with a second shot having a shot size of 0.67 mm.
- Comparative Example 1 The same high corrosion resistance spring steel (spring steel S) as in Example 1 was used for the spring wire. The manufacturing process is the same as in Example 1 except for the shot peening conditions. In Comparative Example 1, in the first shot peening process, the first shot having a shot size of 0.87 mm was projected onto the spring wire at a speed of 76 m / sec. The processing temperature is 230 ° C. After that, in the second shot peening process, a second shot having a shot size of 0.67 mm was projected onto the spring wire at a speed of 46 m / sec. The processing temperature is 200 ° C.
- FIG. 8 shows the compressive residual stress distribution of Comparative Example 1.
- the maximum value of the compressive residual stress in Comparative Example 1 is comparable to Examples 1 to 3.
- the portion B ′ where the compressive residual stress equivalent to the compressive residual stress value A ′ on the surface is present is considerably shallower than the allowable pit depth R max (0, 25 mm). For this reason, when the corrosion pit grows to a depth close to the allowable pit (0.25 mm), a fatigue crack may occur at the bottom of the corrosion pit and the coil spring may be broken.
- Comparative Example 2 It is the same as that of the comparative example 1 except using SAE9254 for the steel type of a spring strand.
- a first shot peening process (projection speed: 76 m / sec, treatment temperature: 230 ° C.) is applied to a spring wire (hardness: 53.5 HRC) made of SAE 9254 by a first shot having a shot size of 0.87 mm.
- a second shot peening process (projection speed: 46 m / sec, processing temperature: 200 ° C.) was performed by a second shot having a shot size of 0.67 mm.
- FIG. 9 shows the results of the corrosion fatigue test of Examples 1 and 2 and Comparative Example 1.
- the corrosion endurance test was carried out by spraying salt water (5% NaCl) for 0.5 hours, shaking 3000 times, and holding for 23 hours at 26 ° C and 95% humidity until the coil spring was damaged. The total vibration frequency was measured. The test stress is 1200 MPa.
- Example 1 As shown in FIG. 9, the corrosion life of Example 1 was significantly improved to 123% compared to the corrosion life of Comparative Example 1 (100%). Furthermore, in Example 2, the corrosion life was further improved to 145%.
- the coil spring of the above-mentioned embodiment was able to greatly improve the corrosion durability of the suspension coil spring by warm peening using a large shot having a shot size of 1.0 mm or more.
- FIG. 10 shows the corrosion durability test results of Examples 4 and 5 and Comparative Example 2.
- the corrosion life when the coil spring of Comparative Example 2 was subjected to a corrosion durability test at a test stress of 1100 MPa was set to 100%, the test stress was increased by 100 MPa, and the corrosion life when tested at 1200 MPa was compared.
- the corrosion life decreased to 65%.
- the corrosion life was 104%, which was longer than that of the conventional product.
- Example 5 the corrosion life was significantly improved to 160%.
- the coil springs of Examples 4 and 5 were able to have the corrosion durability equal to or higher than that of the conventional product even when the operating stress was increased by 100 MPa. For this reason, the suspension coil spring can be used with higher stress, and the weight can be reduced.
- a conventional 1100 MPa class spring has a wire diameter of 12.1 mm, a total number of turns of 5.39, and a mass of 2.09 kg
- a spring used at 1200 MPa has a wire diameter of 11.7 mm and a total number of turns of 4.93. The mass is 1.79 kg, and the weight is reduced by 14.4%.
- the wire diameter is 11.4 mm
- the total number of turns is 4.61
- the mass is 1.58 kg
- the weight is reduced by 23.4%.
- a large compressive residual stress ( ⁇ 400 MPa or more) is applied to a depth exceeding the bottom of the corrosion pit.
- the compressive residual stress near the spring surface and the compressive residual stress near the bottom of the corrosion pit are maintained at the same level.
- the effect of each of the embodiments described above has the same tendency regardless of the steel type, and the above-mentioned high corrosion resistance spring steel (spring steel S), SAE9254, and other spring steels conforming to Japanese Industrial Standards (JIS), for example. Similar results were obtained with SUP7 and the like.
- the corrosion durability can be increased by using spring steel that is normally used for the coil spring for suspension, and therefore, there is an effect that the increase in the material cost of the coil spring can be suppressed.
- the coil spring according to the present invention can be applied to suspension mechanisms of various vehicles including automobiles.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Crystallography & Structural Chemistry (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Springs (AREA)
- Wire Processing (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
Description
本発明の製造方法によれば、ばね素線の表面から許容ピット深さを越える深い領域にわたって、疲労亀裂の発生と亀裂の進展を防ぐ上で有効な高いレベルの圧縮残留応力を発現させることができる。しかもばね素線の表面付近の圧縮残留応力と腐食ピットの底部付近の圧縮残留応力との差を小さくすることができる。このため、腐食ピットに疲労亀裂が生じることを抑制する上で効果が大きい圧縮残留応力分布を得ることができる。
図1に示す車両10の懸架機構11は、車両懸架用コイルばね12(これ以降、単にコイルばね12と称する)と、ショックアブソーバ13とを備えている。図2に示すコイルばね12は、ばね素線20が螺旋形に成形されている。このコイルばね12は、軸線X方向に圧縮された状態で、車両10の荷重を弾性的に支持している。
ばね素線20の鋼種は、高耐食性ばね鋼(この明細書では便宜上、ばね鋼Sと称す)である。ばね鋼Sは耐腐食性を高めた鋼種であり、化学成分(mass%)は、C:0.41、Si:1.73、Mn:0.17、Ni:0.53、Cr:1.05、V:0.163、Ti:0.056、Cu:0.21、残部Feである。
ばね素線の鋼種は、実施例1と同じ高耐食性ばね鋼(ばね鋼S)である。製造工程は、第1のショットピーニング工程S6で使用するショットの大きさ以外は実施例1と同様である。この実施例2では、第1のショットピーニング工程S6において、ショットサイズ1.1mmの第1のショットを使用した。第1のショットピーニング工程S6後に、ショットサイズ0.67mmの第2のショットによって第2のショットピーニング工程S7を行なった。ショットの投射速度と処理温度は実施例1と同じである。
ばね素線の鋼種は実施例1と同じ高耐食性ばね鋼(ばね鋼S)である。製造工程は、ばね素線の熱処理に高周波加熱を用いること以外は実施例2と同様である。この実施例3では、焼入れ工程S3において、高周波加熱によってばね素線を加熱することにより、表面の脱炭が抑制されている。第1のショットピーニング工程S6においてショットサイズ1.1mmの第1のショットを使用した。第2のショットピーニング工程S7ではショットサイズ0.67mmの第2のショットを使用した。ショットの投射速度と処理温度は実施例1と同じである。
ばね素線にSAE9254を用いた。SAE9254の化学成分(mass%)は、C:0.51~0.59、Si:1.20~1.60、Mn:0.60~0.80、Cr:0.60~0.80、S:最大0.040、P:最大0.030、残部Feである。コイルばねの製造工程は実施例1と同様である。この実施例4では、SAE9254からなるばね素線(硬さ53.5HRC)に、ショットサイズ1.0mmの第1のショットによって、第1のショットピーニング工程(投射速度76m/sec,処理温度230℃)を行なった。その後、ショットサイズ0.67mmの第2のショットによって、第2のショットピーニング工程(投射速度46m/sec,処理温度200℃)を行った。
ばね素線にSAE9254を用い、実施例2と同様の製造工程によって、コイルばねを製造した。すなわち実施例5では、SAE9254からなるばね素線(硬さ53.5HRC)に、ショットサイズ1.1mmの第1のショットによって、第1のショットピーニング工程(投射速度76m/sec,処理温度230℃)を行なった。その後、ショットサイズ0.67mmの第2のショットによって、第2のショットピーニング工程(投射速度46m/sec,処理温度200℃)を行った。
ばね素線に実施例1と同じ高耐食性ばね鋼(ばね鋼S)を用いた。製造工程は、ショットピーニング条件以外は実施例1と共通である。比較例1では、第1のショットピーニング工程において、ショットサイズ0.87mmの第1のショットを、速度76m/secでばね素線に投射した。処理温度は230℃である。そののち、第2のショットピーニング工程において、ショットサイズ0.67mmの第2のショットを、速度46m/secでばね素線に投射した。処理温度は200℃である。
ばね素線の鋼種にSAE9254を用いること以外は比較例1と同様である。比較例2では、SAE9254からなるばね素線(硬さ53.5HRC)に、ショットサイズ0.87mmの第1のショットによって、第1のショットピーニング工程(投射速度76m/sec,処理温度230℃)を行なった。その後、ショットサイズ0.67mmの第2のショットによって第2のショットピーニング工程(投射速度46m/sec,処理温度200℃)を行った。
図9は、実施例1,2と比較例1の腐食耐久試験(corrosion fatigue test)の結果を示している。腐食耐久試験は、塩水(5%NaCl)の噴霧を0.5時間行ったのち、3000回加振し、さらに26℃,湿度95%で23時間保持するサイクルを、コイルばねが破損するまで行い、総加振数を測定した。試験応力は1200MPaである。
20…ばね素線
T1…残留応力増加部
T2…高応力部
T3…残留応力ピーク部
T4…残留応力減少部
Claims (7)
- ショットピーニングによって圧縮残留応力が付与されたばね素線(20)を有する車両懸架用コイルばね(12)であって、
前記ばね素線(20)の表面から深さ方向に前記圧縮残留応力が増加する残留応力増加部(T1)と、
前記圧縮残留応力が最大となる残留応力ピーク部(T3)と、
前記残留応力ピーク部(T3)から前記ばね素線(20)の深さ方向に前記圧縮残留応力が減少する残留応力減少部(T4)とを有し、かつ、
前記残留応力減少部(T4)において前記ばね素線(20)の表面の圧縮残留応力と同等の大きさの圧縮残留応力を有する部位(B)が、該ばね素線(20)の許容ピット深さ(Rmax)を越える深さに存在することを特徴とする車両懸架用コイルばね。 - 請求項1に記載された車両懸架用コイルばね(12)において、前記許容ピット深さ(Rmax)が0.25mmであり、前記ばね素線(20)の表面から前記許容ピット深さ(Rmax)にわたって-400MPa以上の圧縮残留応力が付与されている。
- 請求項2に記載された車両懸架用コイルばね(12)において、前記ばね素線(20)の硬さが50~56HRCである。
- ばね鋼からなるばね素線(20)を螺旋形に成形する曲げ工程(S2)と、
前記ばね素線(20)にショットサイズ1.0mm以上の第1のショットを投射することによって、前記ばね素線(20)に圧縮残留応力を付与する第1のショットピーニング工程(S6)と、
前記第1のショットピーニング工程(S6)後に前記第1のショットよりも小さい第2のショットを前記ばね素線(20)に投射する第2のショットピーニング工程(S7)とを具備し、
前記第1のショットピーニング工程(S6)と第2のショットピーニング工程(S7)とによって、前記ばね素線(20)の表面から深さ方向に前記圧縮残留応力が増加する残留応力増加部と(T1)、前記圧縮残留応力が最大となる残留応力ピーク部(T3)と、前記残留応力ピーク部(T3)から前記ばね素線(20)の深さ方向に前記圧縮残留応力が減少する残留応力減少部(T4)とを形成するとともに、
前記残留応力減少部(T4)において前記ばね素線(20)の表面の圧縮残留応力と同等の大きさの圧縮残留応力を有する部位(B)を、該ばね素線(20)の許容ピット深さ(Rmax)を越える深さに形成することを特徴とする車両懸架用コイルばねの製造方法。 - 請求項4に記載された製造方法において、前記第1のショットピーニング工程(S6)と前記第2ショットピーニング工程(S7)とを、前記ばね素線(20)が150~350℃の処理温度で行う。
- 請求項5に記載された製造方法において、前記第1のショットピーニング工程(S6)における前記処理温度が、前記第2のショットピーニング工程(S7)における前記処理温度よりも高い。
- 請求項6に記載された製造方法において、前記第1のショットピーニング工程(S6)における前記第1のショットの運動エネルギーが、前記第2のショットピーニング工程(S7)における前記第2のショットの運動エネルギーよりも大きい。
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRPI1001256-7A BRPI1001256B1 (pt) | 2009-06-17 | 2010-02-22 | Mola espiral e método para manufatura de uma mola espiral para suspensão de veículos |
ES10732238T ES2728114T3 (es) | 2009-06-17 | 2010-02-22 | Muelle helicoidal para la suspensión de un vehículo y procedimiento para su fabricación |
KR1020107006561A KR101200694B1 (ko) | 2009-06-17 | 2010-02-22 | 차량 현가용 코일 스프링과 그 제조 방법 |
EP10732238.0A EP2444203B1 (en) | 2009-06-17 | 2010-02-22 | Vehicle suspension coil spring and method for manufacturing same |
CN201080000656.3A CN102481681B (zh) | 2009-06-17 | 2010-02-22 | 车辆悬架用螺旋弹簧及其制造方法 |
US12/732,450 US8308150B2 (en) | 2009-06-17 | 2010-03-26 | Coil spring for vehicle suspension and method for manufacturing the same |
US13/207,046 US8533954B2 (en) | 2009-06-17 | 2011-08-10 | Method for manufacturing a coil spring for vehicle suspension |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009144460A JP5393280B2 (ja) | 2009-06-17 | 2009-06-17 | 車両懸架用コイルばねと、その製造方法 |
JP2009-144460 | 2009-06-17 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/732,450 Continuation US8308150B2 (en) | 2009-06-17 | 2010-03-26 | Coil spring for vehicle suspension and method for manufacturing the same |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010146898A1 true WO2010146898A1 (ja) | 2010-12-23 |
Family
ID=43356228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2010/052659 WO2010146898A1 (ja) | 2009-06-17 | 2010-02-22 | 車両懸架用コイルばねと、その製造方法 |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP2444203B1 (ja) |
JP (1) | JP5393280B2 (ja) |
KR (1) | KR101200694B1 (ja) |
CN (1) | CN102481681B (ja) |
BR (1) | BRPI1001256B1 (ja) |
ES (1) | ES2728114T3 (ja) |
HU (1) | HUE042955T2 (ja) |
TR (1) | TR201908132T4 (ja) |
WO (1) | WO2010146898A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015098182A1 (ja) * | 2013-12-24 | 2015-07-02 | 中央発條株式会社 | 懸架ばね及び懸架ばねの製造方法 |
JP2015224754A (ja) * | 2014-05-29 | 2015-12-14 | 愛三工業株式会社 | 弁体と弁軸の固定方法 |
JP2017062041A (ja) * | 2016-11-11 | 2017-03-30 | 愛三工業株式会社 | 弁体と弁軸の固定方法 |
US11965571B2 (en) | 2018-05-09 | 2024-04-23 | Mitsubishi Steel Mfg. Co., Ltd. | Method for manufacturing spring and spring |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100482821B1 (ko) * | 2002-03-22 | 2005-04-14 | (주) 엠아이알 | 형광 이미지 저장 스크린 판독장치 및 방법 |
JP5064590B1 (ja) | 2011-08-11 | 2012-10-31 | 日本発條株式会社 | 圧縮コイルばねおよびその製造方法 |
KR102011176B1 (ko) * | 2012-07-06 | 2019-08-14 | 반즈 그룹 인크. | 고피로 아치형 스프링 |
JP6063839B2 (ja) | 2013-08-12 | 2017-01-18 | 日本発條株式会社 | 懸架装置用コイルばね |
BR112016002723B1 (pt) * | 2014-05-28 | 2022-11-29 | Nhk Spring Co., Ltd | Mola espiral de suspensão e aparelho |
US9835217B2 (en) * | 2015-02-12 | 2017-12-05 | Nhk Spring Co., Ltd. | Coil spring modeling apparatus and method utilizing a torsion detection to control an actuator unit |
CN106734779A (zh) * | 2017-03-23 | 2017-05-31 | 无锡丰力弹簧有限公司 | 吊簧的生产工艺 |
EP4458499A2 (en) * | 2018-06-29 | 2024-11-06 | AB Sandvik Coromant | Method of treating a cutting tool, and a cutting tool |
CN112720267B (zh) * | 2020-12-21 | 2022-04-05 | 浙江来福谐波传动股份有限公司 | 一种高动能微粒子复合喷丸表面强化工艺 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05140643A (ja) * | 1991-11-18 | 1993-06-08 | Nhk Spring Co Ltd | 高強度ばね |
JPH05177544A (ja) * | 1991-11-26 | 1993-07-20 | Tougou Seisakusho:Kk | コイルばねの製造方法 |
JPH11241143A (ja) * | 1997-11-17 | 1999-09-07 | Chuo Spring Co Ltd | 耐腐食疲労強度を向上させたばね |
JP2000345238A (ja) | 1999-03-31 | 2000-12-12 | Showa Corp | 自動車用懸架ばねの製造方法 |
JP2001082518A (ja) * | 1999-09-09 | 2001-03-27 | Togo Seisakusho Corp | コイルばね及びその製造方法 |
JP2004323912A (ja) * | 2003-04-24 | 2004-11-18 | Chuo Spring Co Ltd | 高強度コイルばね及びその製造方法 |
JP2008106365A (ja) | 1997-11-17 | 2008-05-08 | Chuo Spring Co Ltd | 耐腐食疲労強度を向上させたばね |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6376730A (ja) | 1986-09-18 | 1988-04-07 | Chuo Spring Co Ltd | 弁ばねの製造方法 |
US6022427A (en) * | 1997-02-08 | 2000-02-08 | Fried Krupp | Method for producing helical springs |
US6193816B1 (en) | 1997-11-17 | 2001-02-27 | Chuo Hatsujo Kabushiki Kaisha | Spring with corrosion fatigue strength |
WO2000075381A1 (fr) | 1999-06-08 | 2000-12-14 | Nhk Spring Co., Ltd. | Ressort haute resistance et procede de production associe |
ES2399388T3 (es) * | 2001-12-26 | 2013-04-01 | Nhk Spring Co., Ltd. | Muelle de lámina para vehículo y método para producir el muelle de lámina |
AU2003236070A1 (en) * | 2002-04-02 | 2003-10-13 | Kabushiki Kaisha Kobe Seiko Sho | Steel wire for hard drawn spring excellent in fatigue strength and resistance to settling, and hard drawn spring |
WO2004085685A1 (ja) * | 2003-03-26 | 2004-10-07 | Chuo Hatsujo Kabushiki Kaisha | 高強度ばねの製造方法 |
JP4129203B2 (ja) | 2003-06-09 | 2008-08-06 | 中央発條株式会社 | 高強度スタビライザ |
JP2007224366A (ja) * | 2006-02-23 | 2007-09-06 | Sumitomo Electric Ind Ltd | 高強度ステンレス鋼ばねおよびその製造方法 |
-
2009
- 2009-06-17 JP JP2009144460A patent/JP5393280B2/ja active Active
-
2010
- 2010-02-22 HU HUE10732238A patent/HUE042955T2/hu unknown
- 2010-02-22 EP EP10732238.0A patent/EP2444203B1/en active Active
- 2010-02-22 KR KR1020107006561A patent/KR101200694B1/ko active Active
- 2010-02-22 TR TR2019/08132T patent/TR201908132T4/tr unknown
- 2010-02-22 BR BRPI1001256-7A patent/BRPI1001256B1/pt active IP Right Grant
- 2010-02-22 CN CN201080000656.3A patent/CN102481681B/zh active Active
- 2010-02-22 ES ES10732238T patent/ES2728114T3/es active Active
- 2010-02-22 WO PCT/JP2010/052659 patent/WO2010146898A1/ja active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05140643A (ja) * | 1991-11-18 | 1993-06-08 | Nhk Spring Co Ltd | 高強度ばね |
JPH05177544A (ja) * | 1991-11-26 | 1993-07-20 | Tougou Seisakusho:Kk | コイルばねの製造方法 |
JPH11241143A (ja) * | 1997-11-17 | 1999-09-07 | Chuo Spring Co Ltd | 耐腐食疲労強度を向上させたばね |
JP2008106365A (ja) | 1997-11-17 | 2008-05-08 | Chuo Spring Co Ltd | 耐腐食疲労強度を向上させたばね |
JP2000345238A (ja) | 1999-03-31 | 2000-12-12 | Showa Corp | 自動車用懸架ばねの製造方法 |
JP2001082518A (ja) * | 1999-09-09 | 2001-03-27 | Togo Seisakusho Corp | コイルばね及びその製造方法 |
JP2004323912A (ja) * | 2003-04-24 | 2004-11-18 | Chuo Spring Co Ltd | 高強度コイルばね及びその製造方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015098182A1 (ja) * | 2013-12-24 | 2015-07-02 | 中央発條株式会社 | 懸架ばね及び懸架ばねの製造方法 |
JP2015224754A (ja) * | 2014-05-29 | 2015-12-14 | 愛三工業株式会社 | 弁体と弁軸の固定方法 |
JP2017062041A (ja) * | 2016-11-11 | 2017-03-30 | 愛三工業株式会社 | 弁体と弁軸の固定方法 |
US11965571B2 (en) | 2018-05-09 | 2024-04-23 | Mitsubishi Steel Mfg. Co., Ltd. | Method for manufacturing spring and spring |
Also Published As
Publication number | Publication date |
---|---|
EP2444203A8 (en) | 2012-07-04 |
JP5393280B2 (ja) | 2014-01-22 |
HUE042955T2 (hu) | 2019-07-29 |
EP2444203A4 (en) | 2014-10-22 |
EP2444203B1 (en) | 2019-04-10 |
CN102481681B (zh) | 2014-07-02 |
KR20110021702A (ko) | 2011-03-04 |
JP2011000663A (ja) | 2011-01-06 |
KR101200694B1 (ko) | 2012-11-12 |
ES2728114T3 (es) | 2019-10-22 |
BRPI1001256B1 (pt) | 2020-09-24 |
CN102481681A (zh) | 2012-05-30 |
BRPI1001256A2 (pt) | 2016-07-05 |
EP2444203A1 (en) | 2012-04-25 |
TR201908132T4 (tr) | 2019-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2010146898A1 (ja) | 車両懸架用コイルばねと、その製造方法 | |
US8308150B2 (en) | Coil spring for vehicle suspension and method for manufacturing the same | |
JP5393281B2 (ja) | コイルばねの製造方法 | |
JP5361098B1 (ja) | 圧縮コイルばねおよびその製造方法 | |
WO2018190331A1 (ja) | 圧縮コイルばねおよびその製造方法 | |
WO2012121115A1 (ja) | ばねおよびその製造方法 | |
JP2013036113A (ja) | 圧縮コイルばねおよびその製造方法 | |
WO2015181916A1 (ja) | 懸架用ばね装置と、懸架用コイルばね | |
JP5511067B2 (ja) | コイルばねの製造方法 | |
JP5550359B2 (ja) | 自動車懸架用コイルばね | |
JP7062395B2 (ja) | 圧縮コイルばねの製造方法 | |
JP2003105498A (ja) | 高強度ばねおよびその製造方法 | |
JP7165522B2 (ja) | 圧縮コイルばねおよびその製造方法 | |
JP2009270150A (ja) | コイルばねの製造方法 | |
JP2003193197A (ja) | 高強度コイルばねおよびその製造方法 | |
JP2020111803A (ja) | 表面硬化鋼部品の製造方法 | |
JP5283180B2 (ja) | 金属部品の表面処理方法 | |
WO2023120475A1 (ja) | 圧縮コイルばねおよびその製造方法 | |
WO2014196308A1 (ja) | ばね用鋼、ばね及びばねの製造方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080000656.3 Country of ref document: CN |
|
ENP | Entry into the national phase |
Ref document number: 20107006561 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010732238 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 6037/DELNP/2010 Country of ref document: IN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10732238 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: PI1001256 Country of ref document: BR Kind code of ref document: A2 Effective date: 20100903 |