[go: up one dir, main page]

WO2008022603A1 - Method and apparatus for realizing inter-frequency measurement - Google Patents

Method and apparatus for realizing inter-frequency measurement Download PDF

Info

Publication number
WO2008022603A1
WO2008022603A1 PCT/CN2007/070525 CN2007070525W WO2008022603A1 WO 2008022603 A1 WO2008022603 A1 WO 2008022603A1 CN 2007070525 W CN2007070525 W CN 2007070525W WO 2008022603 A1 WO2008022603 A1 WO 2008022603A1
Authority
WO
WIPO (PCT)
Prior art keywords
inter
frequency measurement
measurement
frequency
user equipment
Prior art date
Application number
PCT/CN2007/070525
Other languages
French (fr)
Chinese (zh)
Inventor
Ju Li
Liyan Yin
Xudong Yang
Original Assignee
Huawei Technologies Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co., Ltd. filed Critical Huawei Technologies Co., Ltd.
Publication of WO2008022603A1 publication Critical patent/WO2008022603A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point

Definitions

  • the present invention relates to the field of communications technologies, and in particular, to a method and apparatus for implementing inter-frequency measurement in a wireless communication network.
  • 3GPP proposes and deploys LTE (Long Term Evolution) system work.
  • the LTE system is a frequency division system, and different users are distinguished by a domain and a frequency domain resource, and all users share one channel.
  • the UE may need to make measurements to determine the way the UE accesses the network due to other factors such as channel quality changes.
  • the measurement process of the UE includes an inter-frequency measurement process, and the UE needs to adjust the receiver frequency after performing the inter-frequency measurement.
  • the corresponding inter-frequency measurement process has not been implemented in the LTE system, so that it is impossible to select an appropriate measurement mode for the UE in the LTE system.
  • An embodiment of the present invention provides a method and an apparatus for implementing inter-frequency measurement, so that an inter-frequency measurement can be performed on a neighboring cell according to a measurement requirement in an LTE system, so as to meet an inter-frequency measurement requirement in an LTE system. Improve the communication performance of the LTE system.
  • An embodiment of the present invention provides a method for implementing inter-frequency measurement, including: [13] In the Long Term Evolution (LTE) system, the user equipment acquires the time interval for performing the inter-frequency measurement;
  • LTE Long Term Evolution
  • the user equipment performs an inter-frequency measurement operation between the acquired inter-frequency measurements.
  • An embodiment of the present invention provides an apparatus for implementing inter-frequency measurement, which is installed in a user equipment of an LTE system, and includes:
  • the inter-frequency measurement inter-time acquisition unit is used to acquire the inter-time measurement of the inter-frequency measurement
  • the inter-frequency measurement execution unit is used to perform the inter-frequency measurement operation during the inter-frequency measurement of the inter-frequency measurement acquisition unit.
  • the embodiments of the present invention provide an implementation scheme for implementing inter-frequency measurement in an LT E system, thereby solving the problem that the existing LTE system cannot be implemented.
  • the problem of the inter-frequency measurement solves the problem that the prior art cannot select a suitable measurement mode for the UE.
  • FIG. 1 is a schematic diagram of a specific implementation process of a method according to an embodiment of the present invention
  • FIG. 2 is a schematic diagram 1 of a domain resource scheduled for a UE according to an embodiment of the present invention
  • FIG. 3 is a schematic diagram 2 of a domain resource scheduled for a UE according to an embodiment of the present invention
  • FIG. 4 is a schematic structural diagram of a specific implementation of an apparatus according to an embodiment of the present invention.
  • An embodiment of the present invention provides an implementation scheme suitable for an inter-frequency measurement by an LTE system UE.
  • the UE performs inter-frequency measurement in a certain measurement gap, and performs inter-frequency measurement. It is necessary to obtain the measured interstices between the gaps in the process.
  • the method for obtaining the measured interstitial interval includes the following:
  • the network side Before performing the inter-frequency measurement, the network side allocates resources to the user terminal (referred to as the user) according to the predefined sequence or the predefined formula. After that, when the inter-frequency measurement is performed, the user according to the network
  • the resources allocated by the side for example, the predefined sequence or the predefined formula can be known to perform the inter-frequency measurement;
  • the network side After performing the inter-frequency measurement, the network side sends the measurement gap (measurement gap) information to tell the UE to perform the inter-frequency measurement;
  • the network side is given according to a predefined sequence or a predefined formula.
  • the user allocates resources, and the measured measurement indication message tells the measured gap (measurement gap) information, and the measurement gap information may represent a certain predefined sequence or a formula, and the UE may learn to perform the execution according to the measured gap information.
  • the sequence indicating the inter-frequency measurement is not fixed.
  • the domain resources allocated to each UE are not arranged according to a fixed sequence or a fixed formula.
  • the time that can be used for the inter-frequency measurement is related to a specific resource scheduling algorithm. For example, it is determined that the UE performs the inter-frequency measurement according to the idle time in the area resource allocated by the UE for the UE.
  • the network side scheduling resources may or may not consider the measurement of the gap.
  • the UE will use different processing methods to implement the inter-frequency measurement operation. Among them, for the above (1) and
  • the time allocated to each UE for inter-frequency measurement may be the same or different, and the frequency allocated to a certain UE in each radio frame is different.
  • the starting time of the measurement or the starting time for the transmission of the service data may be the same or different. Therefore, the UE only needs to start according to the allocated initial time for the inter-frequency measurement or for the service. The start of the data transmission is determined by the time between the execution of the inter-frequency measurement.
  • the inter-frequency measurement process of the user equipment may be triggered by the network side, for example, the network side performs a triggering operation by using the sent measurement indication message, where the measurement indication message includes:
  • the user equipment performs a system message of the inter-frequency measurement or a dedicated measurement control message, and the like, where the system message may be a message sent by the network side when the UE is in an idle state or a connection state, and the measurement control message is sent. It is a control message sent by the UE on the network side to trigger the measurement operation.
  • the inter-frequency measurement processing process may also be triggered by the user equipment itself.
  • the user in an idle state may start the inter-frequency measurement operation according to his/her own needs.
  • the resource scheduling process is performed for the UE before performing the inter-frequency measurement, for example, the UE is allocated correspondingly.
  • the UE performs the inter-frequency measurement in the resource allocation process, and then, after the UE needs to perform the inter-frequency measurement, the UE determines, according to the allocated domain resource, the inter-frequency measurement performed by the UE. And carry out the corresponding inter-frequency measurement operation.
  • Step 11 The network side schedules downlink resources for the UE, for example, allocates the domain resources to the UE according to a predefined sequence or according to a predefined formula;
  • E performs the inter-time information of the inter-frequency measurement, and therefore, by the sequence or formula, the UE can know the time available for the inter-frequency measurement in a certain measurement period;
  • the predefined formula is mainly determined according to the size of the TTI (transmission time interval) or/and the identification data, and the formula needs to indicate or the network side indicates at what time the UE can start.
  • the inter-frequency measurement or/and the transmission of the service data is started, so that the user equipment determines the start time of the specific start of the inter-frequency measurement;
  • the predefined sequence is mainly determined according to the minimum gap (gap) requirement and/or the service type or/and the traffic volume, and the network side determines the predefined sequence, and needs to explain what the UE is.
  • the transmission of the service data is started or the inter-frequency measurement is started in the daytime, so that the user equipment determines the start time of the specific start of the inter-frequency measurement;
  • the representation manner of the predefined sequence may include: each frame or each subsequence (a subsequence may be composed of one or more radio frames) is set to be used for different frequency
  • each frame or each subsequence (a subsequence may be composed of one or more radio frames) is set to be used for different frequency
  • 4 ms of a radio frame or a subsequence is used for transmission of service data, and other time slots can be used for performing inter-frequency measurement operations.
  • the representation of 4ms can be represented by two representations as shown in FIG. 2 and FIG. 3, wherein FIG. 2 shows that the 4 ms inter-turn can be decomposed, and FIG. 3 shows that the 4 ms inter-turn can not be represented differently:
  • Step 12 The network side sends a measurement indication message to start the inter-frequency measurement.
  • the measurement indication message includes: a system message or a dedicated measurement control message, and the information carried in the message may include: the same-frequency neighboring cell, the information of the inter-frequency neighboring cell, the neighboring cell information, and the same layer. At least one of the neighboring cell and the neighboring cell information may further include other information;
  • Step 13 The UE determines the time interval for performing the inter-frequency measurement according to a known sequence or formula; [47] Step 14: The UE performs inter-frequency measurement during the time when the inter-frequency measurement can be performed;
  • Step 15 When the UE determines to end the inter-frequency measurement, it notifies the network side that the inter-frequency measurement process ends. This step is an optional step. For example, the UE may end the processing of the inter-frequency measurement in other manners.
  • the network side allocates corresponding domain resources to the UE, and in the resource allocation process, the UE performs inter-frequency measurement, and then the UE allocates according to the allocation.
  • the domain resource determines that the UE performs inter-frequency measurement, and performs corresponding inter-frequency measurement operations.
  • This embodiment includes the following steps in a specific implementation process:
  • the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to start the inter-frequency measurement process;
  • the information carried in the measurement indication message may include: the same-frequency neighbor cell information, the information of the inter-frequency neighboring cell, the neighbor cell information, the peer-level neighbor cell information, the hetero-layer neighbor cell information, and the measurement gap information. At least one item may also include other information;
  • the determining the gap information may be: assigning a resource to the user according to a sequence or according to a formula
  • the UE determines, according to the measurement gap information therein, that the inter-frequency measurement is performed;
  • the UE may also report to the network side.
  • the information of the inter-frequency measurement process ends, so that the network side determines that the inter-frequency measurement process of the UE ends.
  • the network side does not consider the inter-frequency measurement in the local area resource allocated for the UE. Therefore, when the UE needs to perform inter-frequency measurement, the UE may be allocated according to the area allocated for the UE.
  • the idle time in the resource determines the time during which the inter-frequency measurement is performed to perform the inter-frequency measurement.
  • This embodiment includes the following steps in a specific implementation process:
  • the network side schedules downlink resources for the UE, including the domain and the frequency domain resources;
  • the network side Before the inter-frequency measurement is performed, the network side has allocated corresponding domain resources to the UE, but the inter-frequency measurement is not considered in the process of scheduling resources for the UE; [63] In the second step, when the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, the inter-frequency measurement process is started;
  • a measurement indication message such as a system message or a dedicated measurement control message
  • the information carried in the measurement indication message may include: at least one of a same-frequency neighboring cell, information of a different-frequency neighboring cell, neighboring cell information, a neighboring cell, and a neighboring cell information. Can include other information;
  • the UE demodulates the message, and determines, according to the indication message on the network side, that the inter-frequency measurement operation needs to be performed on the neighboring cell;
  • the embodiment is executed only after the measurement indication message indicates that the inter-frequency measurement needs to be performed.
  • the UE determines, according to the area resource allocated by the network side, the time that can be used for the inter-frequency measurement, for example, the area resource allocated to the user can be used for the inter-frequency measurement, which may be:
  • the inter-frequency measurement requirement may be: a minimum gap
  • the requirements such as the minimum value of the gap length for inter-frequency measurement, must be such that the UE can adjust the receiver to the inter-frequency and synchronize with the target cell.
  • the UE before the UE performs the inter-frequency measurement, the UE has been allocated resources, and the inter-frequency measurement is considered in the processing of the scheduling resource.
  • the specific implementation process of this embodiment includes the following steps: [76] In the first step, the network side schedules downlink resources for the UE, and the resources on the domain are scheduled.
  • the inter-frequency measurement needs to be considered. Specifically, it is necessary to ensure that the gap length in each frame after scheduling is at least greater than the execution difference. The minimum gap requirement for frequency measurement;
  • the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to control the UE to initiate a corresponding inter-frequency measurement operation;
  • a measurement indication message such as a system message or a dedicated measurement control message
  • the information carried in the measurement indication message may include: at least one of an intra-frequency neighboring cell, an information of an inter-frequency neighboring cell, neighboring cell information, a peer-layer neighboring cell, and a hetero-layer neighboring cell information, Can also include other information;
  • the UE demodulates the message, and after determining, according to the indication message on the network side, that the inter-cell measurement operation needs to be performed on the neighboring cell, performing the fourth step;
  • the UE may determine, according to the known allocated resources, the inter-frequency measurement, for example, the UE performs inter-frequency measurement in the gap that can perform the inter-frequency measurement, where the gap is The gap is determined according to each of the downlink resources allocated to the UE by the network side.
  • the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to start the inter-frequency measurement operation of the UE;
  • the information carried in the measurement indication message may include: information about a co-frequency neighboring cell and an inter-frequency neighboring cell.
  • At least one of neighboring cell information, peer neighboring cell, heterogeneous neighbor cell information, and measurement gap information may further include other information;
  • the determining principle of the measured gap information may include: the network side scheduling by using a known inter-day resource scheduled for the UE, and requiring the scheduling time of the scheduling to meet the minimum gap requirement for performing the inter-frequency measurement. Assuming that there are multiple inter-time resources available for gaps in a frame length range, and some gap resources meet the requirements, the network side can deliver the gap message that meets the requirements to the user, or the network side follows the scheduling algorithm. And measuring the gap request to re-schedule the resource to the user, scheduling the inter-day resource that meets the measurement gap requirement to the user, or the network side re-scheduling the resource according to a formula;
  • the UE demodulates the message.
  • the third step is performed.
  • the UE performs inter-frequency measurement according to the indicated measurement gap.
  • the embodiment of the present invention further provides an apparatus for implementing inter-frequency measurement, and the specific implementation structure thereof is as shown in FIG.
  • the device is installed in a user equipment of the LTE system, and specifically includes:
  • This unit is used to obtain the time between the execution of the inter-frequency measurement
  • the inter-frequency measurement inter-time determining unit may be specifically triggered by the measurement indication message receiving unit, where the measurement indication message receiving unit is configured to receive a measurement indication message sent by the network side, and according to the measurement The indication message determines that the inter-frequency measurement needs to be performed, and triggers the inter-frequency measurement inter-turn determination unit; [92] the inter-frequency measurement inter-time determination unit may specifically adopt the method according to the manner of determining the inter-frequency measurement inter-turn Different implementation scenarios, here are two examples of specific applications:
  • Example 1 The specific processing of the inter-frequency measurement inter-day determination unit includes:
  • the predefined sequence is: determined according to a TTI value and/or a manner of identifying data
  • the predefined formula is: determined according to at least one of a minimum gap value, a service type, and a traffic volume (which may also include other information).
  • Example 2 The specific processing of the inter-frequency measurement inter-day determination unit includes:
  • [98] configured to determine idle time information that can meet the inter-frequency measurement requirement in the domain resource allocated for the user equipment, and use the idle time information satisfying the inter-frequency measurement requirement as the time interval for performing the inter-frequency measurement;
  • the device further includes:
  • the judging unit is configured to determine whether the idle time of the domain resource allocated by the network side for the user equipment can meet the inter-frequency measurement requirement, and if all or part of the idle time can meet the inter-frequency measurement requirement, the difference may be satisfied.
  • the idle time required for the frequency measurement may be performed as the time interval for performing the inter-frequency measurement; otherwise, the resource allocation initiation unit needs to be triggered;
  • the resource allocation initiating unit is configured to: after the triggering by the determining unit, the user equipment initiates a resource allocation processing process to the network side, and the network side re-allocates the domain resource, and the user terminal obtains a new resource allocation result. ⁇ , triggering the judging unit again, until the corresponding inter-frequency measurement period is determined, or, according to other predefined conditions, such as processing the inter-turnover, etc., the corresponding inter-frequency measurement is determined accordingly. The process ends.
  • the unit is configured to perform an inter-frequency measurement operation during the inter-frequency measurement performed by the inter-frequency measurement inter-time acquisition unit, specifically, when the corresponding inter-frequency measurement arrives, the user terminal sets the frequency of the receiver. It is adjusted to the frequency of the inter-frequency to be measured, and synchronized with the corresponding target cell, after which the measurement processing of the inter-frequency signal can be performed.
  • the technical solution disclosed in the embodiments of the present invention can be applied to the inter-frequency measurement of the same system, and can also be applied to the inter-frequency measurement in the different system.
  • the implementation of the embodiment of the present invention enables an inter-frequency measurement to be performed on a neighboring cell according to a measurement requirement in an LTE system, so as to meet the inter-frequency measurement requirement in the LTE system, improve communication performance of the LTE system, and solve There is a problem in the prior art that the appropriate measurement method cannot be selected for the UE.
  • the application of the embodiment of the present invention enables the UE to reselect a new channel as a channel for the UE to access the network through the corresponding inter-frequency measurement process, so that the UE can be in the new channel. Conduct business normally.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A method and apparatus for realizing inter-frequency measurement are disclosed. The method includes, in LTE (Long Term Evolution) system, UE obtains time of implementing inter-frequency measurement; UE implements inter-frequency measurement in the time of implementing inter-frequency measurement. The method is implemented so that according to measurement requirement UE can implement inter-frequency measurement for adjacent cell, inter-frequency measurement requirement in LTE system is satisfied, and communication performance in LTE system is improved.

Description

说明书 一种实现异频测量的方法及装置  Method and device for realizing inter-frequency measurement
[I] 技术领域  [I] Technical field
[2] 本发明涉及通信技术领域, 尤其涉及一种无线通信网络中实现异频测量的方法 及装置。  [2] The present invention relates to the field of communications technologies, and in particular, to a method and apparatus for implementing inter-frequency measurement in a wireless communication network.
[3] 发明背景 [3] Background of the invention
[4] 随着通信技术的快速发展, 为了能够促进 3G (第三代) 通信技术的持续发展, [4] With the rapid development of communication technology, in order to promote the sustainable development of 3G (third generation) communication technology,
3GPP提出并部署了 LTE (长期演进) 系统工作。 3GPP proposes and deploys LTE (Long Term Evolution) system work.
[5] 在 LTE系统中, 主要解决的问题包括: 获得更高的用户数据率、 改进系统容量 和覆盖范围以及实现合理灵活的 3G频谱分配方案。 [5] In LTE systems, the main problems addressed are: obtaining higher user data rates, improving system capacity and coverage, and achieving a reasonably flexible 3G spectrum allocation scheme.
[6] 所述的 LTE系统为频分系统, 不同的用户是通过吋域、 频域资源来区分的, 且 所有用户共享一个信道。 [6] The LTE system is a frequency division system, and different users are distinguished by a domain and a frequency domain resource, and all users share one channel.
[7] 在 LTE系统中, 由于 UE (用户设备) 的移动性, 使得其在网络中由于活动区域 的变化可能导致其接收信号质量的改变。 当 UE接收的信号质量变差使得其可能 无法正常开展业务吋, 则需要 UE进行测量操作, 以便于根据测量结果重新选择 接入的方式, 保证 UE可以正常地开展业务。 [7] In the LTE system, due to the mobility of the UE (User Equipment), it may cause a change in the quality of its received signal due to changes in the active area in the network. When the quality of the signal received by the UE is deteriorated, so that the service may not be performed normally, the UE needs to perform the measurement operation, so as to re-select the access mode according to the measurement result, and ensure that the UE can normally perform the service.
[8] 除因 UE的活动区域发生变化导致其接收的信号质量发生变化外, 还可能会因 为信道质量的改变等其他因素导致而 UE需要进行测量, 以重新确定 UE接入网络 的方式。 [8] In addition to changes in the signal quality of the UE due to changes in its active area, the UE may need to make measurements to determine the way the UE accesses the network due to other factors such as channel quality changes.
[9] 在 LTE系统中, UE的测量过程包括异频测量过程, UE在执行异频测量吋需要 调整接收机频率。 目前, 在 LTE系统中还没有实现相应的异频测量过程, 因而使 得在 LTE系统中无法为 UE选择合适的测量方式。  [9] In the LTE system, the measurement process of the UE includes an inter-frequency measurement process, and the UE needs to adjust the receiver frequency after performing the inter-frequency measurement. At present, the corresponding inter-frequency measurement process has not been implemented in the LTE system, so that it is impossible to select an appropriate measurement mode for the UE in the LTE system.
[10] 发明内容  [10] Summary of the invention
[I I] 本发明实施例提供了一种实现异频测量的方法及装置, 从而使得在 LTE系统中 能够实现根据测量需求对邻小区执行异频测量, 以满足 LTE系统中的异频测量需 求, 提高 LTE系统的通信性能。  [II] An embodiment of the present invention provides a method and an apparatus for implementing inter-frequency measurement, so that an inter-frequency measurement can be performed on a neighboring cell according to a measurement requirement in an LTE system, so as to meet an inter-frequency measurement requirement in an LTE system. Improve the communication performance of the LTE system.
[12] 本发明实施例提供了一种实现异频测量的方法, 包括: [13] 在长期演进 LTE系统中, 用户设备获取执行异频测量的吋间; [12] An embodiment of the present invention provides a method for implementing inter-frequency measurement, including: [13] In the Long Term Evolution (LTE) system, the user equipment acquires the time interval for performing the inter-frequency measurement;
[14] 用户设备在获取的所述执行异频测量的吋间, 执行异频测量操作。  [14] The user equipment performs an inter-frequency measurement operation between the acquired inter-frequency measurements.
[15] 本发明实施例提供了一种实现异频测量的装置, 该装置设置于 LTE系统的用户 设备中, 且包括:  An embodiment of the present invention provides an apparatus for implementing inter-frequency measurement, which is installed in a user equipment of an LTE system, and includes:
[16] 异频测量吋间获取单元, 用于获取执行异频测量的吋间; [16] The inter-frequency measurement inter-time acquisition unit is used to acquire the inter-time measurement of the inter-frequency measurement;
[17] 异频测量执行单元, 用于在异频测量吋间获取单元获取的执行异频测量的吋间 执行异频测量操作。  [17] The inter-frequency measurement execution unit is used to perform the inter-frequency measurement operation during the inter-frequency measurement of the inter-frequency measurement acquisition unit.
[18] 由上述本发明实施例提供的技术方案可以看出, 本发明实施例提供了一种在 LT E系统中实现异频测量的实现方案, 从而解决了现有的 LTE系统中无法实现相关 的异频测量的问题, 即解决了现有技术存在的无法为 UE选择合适的测量方式的 问题。  As can be seen from the technical solutions provided by the foregoing embodiments of the present invention, the embodiments of the present invention provide an implementation scheme for implementing inter-frequency measurement in an LT E system, thereby solving the problem that the existing LTE system cannot be implemented. The problem of the inter-frequency measurement solves the problem that the prior art cannot select a suitable measurement mode for the UE.
[19] 附图简要说明  [19] BRIEF DESCRIPTION OF THE DRAWINGS
[20] 图 1为本发明实施例所述的方法的具体实现过程示意图;  FIG. 1 is a schematic diagram of a specific implementation process of a method according to an embodiment of the present invention; FIG.
[21] 图 2为本发明实施例中为 UE调度的吋域资源的示意图一; 2 is a schematic diagram 1 of a domain resource scheduled for a UE according to an embodiment of the present invention;
[22] 图 3为本发明实施例中为 UE调度的吋域资源的示意图二; FIG. 3 is a schematic diagram 2 of a domain resource scheduled for a UE according to an embodiment of the present invention; FIG.
[23] 图 4为本发明实施例所述的装置的具体实现结构示意图。 FIG. 4 is a schematic structural diagram of a specific implementation of an apparatus according to an embodiment of the present invention.
[24] 实施本发明的方式 [24] Mode for carrying out the invention
[25] 本发明实施例提供了一种适用于 LTE系统 UE进行异频测量的实现方案, 在该方 案中, UE是在一定的测量空隙吋间段内执行异频测量, 在执行异频测量过程中 需要获得所述的测量空隙吋间段。  [25] An embodiment of the present invention provides an implementation scheme suitable for an inter-frequency measurement by an LTE system UE. In this solution, the UE performs inter-frequency measurement in a certain measurement gap, and performs inter-frequency measurement. It is necessary to obtain the measured interstices between the gaps in the process.
[26] 本发明实施例提供的获得所述测量空隙吋间段的方法包括以下几种: [26] The method for obtaining the measured interstitial interval provided by the embodiment of the present invention includes the following:
[27] (1) 在执行异频测量前, 由网络侧根据预定义的序列或预定义的公式给用户 终端 (简称用户) 分配资源, 之后, 当执行异频测量吋, 则由用户根据网络侧 分配的资源, 例如, 所述的预定义的序列或预定义的公式可以获知道执行异频 测量的吋间; [27] (1) Before performing the inter-frequency measurement, the network side allocates resources to the user terminal (referred to as the user) according to the predefined sequence or the predefined formula. After that, when the inter-frequency measurement is performed, the user according to the network The resources allocated by the side, for example, the predefined sequence or the predefined formula can be known to perform the inter-frequency measurement;
[28] (2) 在执行异频测量吋, 网络侧下发测量空隙 (测量 gap) 信息, 告诉 UE进 行异频测量的吋间;  [28] (2) After performing the inter-frequency measurement, the network side sends the measurement gap (measurement gap) information to tell the UE to perform the inter-frequency measurement;
[29] 例如当需要执行异频测量吋, 则网络侧根据预定义的序列或预定义的公式给用 户分配资源, 下发的测量指示消息中告诉测量的空隙 (测量 gap) 信息, 该测量 空隙信息可以表示某个预定义的序列或某个公式, UE根据所述的测量 gap信息可 以获知执行异频测量的吋间; [29] For example, when inter-frequency measurement needs to be performed, the network side is given according to a predefined sequence or a predefined formula. The user allocates resources, and the measured measurement indication message tells the measured gap (measurement gap) information, and the measurement gap information may represent a certain predefined sequence or a formula, and the UE may learn to perform the execution according to the measured gap information. Frequency measurement
[30] (3) 根据网络侧为用户分配的资源确定其执行异频测量的吋间;  [30] (3) Determine the time during which the inter-frequency measurement is performed according to the resources allocated by the network side for the user;
[31] 在该情况下, 表示异频测量吋间的序列是不固定的, 例如分配给每个 UE的吋 域资源并不是按照某个固定的序列或固定的公式排列的, 此吋, 具体可以用于 异频测量的吋间与具体的资源调度算法有关, 例如根据网络侧为 UE分配的吋域 资源中的空闲吋间确定 UE执行异频测量的吋间。  [31] In this case, the sequence indicating the inter-frequency measurement is not fixed. For example, the domain resources allocated to each UE are not arranged according to a fixed sequence or a fixed formula. The time that can be used for the inter-frequency measurement is related to a specific resource scheduling algorithm. For example, it is determined that the UE performs the inter-frequency measurement according to the idle time in the area resource allocated by the UE for the UE.
[32] 从上述 (1) 至 (3) 描述的各种确定执行异频测量的吋间的实现方式可以看出 , 网络侧调度资源吋, 可能考虑了测量 gap的情况, 也可能没有考虑。 对于不同 的情况, UE将釆用不同的处理方式实现异频测量操作。 其中, 对于上述 (1) 和 [32] From the various implementations described above (1) to (3) to determine the implementation of the inter-frequency measurement, it can be seen that the network side scheduling resources may or may not consider the measurement of the gap. For different situations, the UE will use different processing methods to implement the inter-frequency measurement operation. Among them, for the above (1) and
(2) 两种处理实现方式中, 分配给每个 UE的可用于异频测量的吋间可能相同, 也可能各不相同, 而且, 每个无线帧中分配给某个 UE的用于异频测量的起始吋 间或者用于业务数据传输的起始吋间可能是相同的, 也可能是不同的, 此吋, U E只需要根据分配的用于异频测量的起始吋间或用于业务数据传输的起始吋间确 定执行异频测量的吋间即可。 (2) In the two processing implementations, the time allocated to each UE for inter-frequency measurement may be the same or different, and the frequency allocated to a certain UE in each radio frame is different. The starting time of the measurement or the starting time for the transmission of the service data may be the same or different. Therefore, the UE only needs to start according to the allocated initial time for the inter-frequency measurement or for the service. The start of the data transmission is determined by the time between the execution of the inter-frequency measurement.
[33] 本发明实施例中, 具体可以由网络侧触发用户设备的异频测量处理过程, 例如 , 网络侧通过下发的测量指示消息实现触发操作, 所述的测量指示消息包括: 用于指示用户设备执行异频测量的系统消息或专用的测量控制消息, 等等, 其 中, 所述的系统消息可以是 UE处于空闲状态或连接状态吋, 网络侧下发的消息 , 所述的测量控制消息是 UE处于连接状态吋网络侧下发的用于触发测量操作的 控制消息。  In the embodiment of the present invention, the inter-frequency measurement process of the user equipment may be triggered by the network side, for example, the network side performs a triggering operation by using the sent measurement indication message, where the measurement indication message includes: The user equipment performs a system message of the inter-frequency measurement or a dedicated measurement control message, and the like, where the system message may be a message sent by the network side when the UE is in an idle state or a connection state, and the measurement control message is sent. It is a control message sent by the UE on the network side to trigger the measurement operation.
[34] 本发明实施例中, 还可以由用户设备自身触发所述的异频测量处理过程, 例如 , 处于空闲状态下的用户可以根据自身需要幵始进行异频测量操作。  In the embodiment of the present invention, the inter-frequency measurement processing process may also be triggered by the user equipment itself. For example, the user in an idle state may start the inter-frequency measurement operation according to his/her own needs.
[35] 为便于对本发明实施例有进一步的理解, 下面将结合附图对本发明实施例的几 种具体实现方式进行说明。  [35] In order to facilitate the understanding of the embodiments of the present invention, several specific implementations of the embodiments of the present invention will be described with reference to the accompanying drawings.
[36] 实施例一  [36] Example 1
[37] 该实施例是在执行异频测量前, 为 UE进行资源调度处理, 例如为 UE分配相应 的吋域资源, 在资源分配过程中考虑到 UE执行异频测量的吋间, 之后, UE在需 要执行异频测量吋, 根据所述分配的吋域资源确定 UE执行异频测量的吋间, 并 进行相应的异频测量操作。 [37] In this embodiment, the resource scheduling process is performed for the UE before performing the inter-frequency measurement, for example, the UE is allocated correspondingly. In the resource allocation process, the UE performs the inter-frequency measurement in the resource allocation process, and then, after the UE needs to perform the inter-frequency measurement, the UE determines, according to the allocated domain resource, the inter-frequency measurement performed by the UE. And carry out the corresponding inter-frequency measurement operation.
[38] 该实施例的具体实现过程如图 1所示, 具体包括以下步骤: [38] The specific implementation process of this embodiment is as shown in FIG. 1, and specifically includes the following steps:
[39] 步骤 11 : 网络侧为 UE调度下行资源, 例如按照某个预定义的序列或按照某个 预定义的公式为 UE分配吋域资源; [39] Step 11: The network side schedules downlink resources for the UE, for example, allocates the domain resources to the UE according to a predefined sequence or according to a predefined formula;
[40] 其中, 所述的预定义的序列或预定义的公式中由于在资源调度过程中考虑了 U[40] wherein the predefined sequence or the predefined formula is considered in the resource scheduling process.
E执行异频测量的吋间信息, 因此, 通过该序列或公式, UE便能够知道某个测量 周期内可用于异频测量的吋间; E performs the inter-time information of the inter-frequency measurement, and therefore, by the sequence or formula, the UE can know the time available for the inter-frequency measurement in a certain measurement period;
[41] 所述的预定义的公式主要是根据 TTI (传输吋间间隔) 的大小或 /和标识数据的 方式确定, 同吋还需要有公式表明或网络侧指示 UE在什么吋间可以开始进行异 频测量或 /和什么吋间开始业务数据的传输, 以便于用户设备确定具体开始执行 异频测量的起始吋间; [41] The predefined formula is mainly determined according to the size of the TTI (transmission time interval) or/and the identification data, and the formula needs to indicate or the network side indicates at what time the UE can start. The inter-frequency measurement or/and the transmission of the service data is started, so that the user equipment determines the start time of the specific start of the inter-frequency measurement;
[42] 所述的预定义的序列主要是根据最小 gap (间隙) 的要求或 /和业务类型或 /和业 务量确定, 而且, 网络侧确定所述的预定义的序列吋, 需要说明 UE什么吋间开 始业务数据的传输或什么吋间开始异频测量, 以便于用户设备确定具体开始执 行异频测量的起始吋间;  [42] The predefined sequence is mainly determined according to the minimum gap (gap) requirement and/or the service type or/and the traffic volume, and the network side determines the predefined sequence, and needs to explain what the UE is. The transmission of the service data is started or the inter-frequency measurement is started in the daytime, so that the user equipment determines the start time of the specific start of the inter-frequency measurement;
[43] 在 LTE系统中, 所述的预定义的序列可能釆用的表示方式包括: 每帧或每个子 序列 (一个子序列可以由一个或多个无线帧构成) 中设置有可用于异频测量的 吋间, 例如, 在图 2和图 3中, 一个无线帧或一个子序列中有 4ms的吋间用于业务 数据的传输, 其他的吋间则可以用于执行异频测量操作, 所述的 4ms的表示方式 可以为如图 2、 图 3所示的两个表示方式, 其中, 图 2表示 4ms的吋间可以分解了 表示, 图 3表示 4ms的吋间不能用不同的表示方式:  [43] In the LTE system, the representation manner of the predefined sequence may include: each frame or each subsequence (a subsequence may be composed of one or more radio frames) is set to be used for different frequency In the case of measurement, for example, in Fig. 2 and Fig. 3, 4 ms of a radio frame or a subsequence is used for transmission of service data, and other time slots can be used for performing inter-frequency measurement operations. The representation of 4ms can be represented by two representations as shown in FIG. 2 and FIG. 3, wherein FIG. 2 shows that the 4 ms inter-turn can be decomposed, and FIG. 3 shows that the 4 ms inter-turn can not be represented differently:
[44] 步骤 12: 网络侧下发测量指示消息, 启动异频测量;  [44] Step 12: The network side sends a measurement indication message to start the inter-frequency measurement.
[45] 所述的测量指示消息包括: 系统消息或专用的测量控制消息等, 所述的消息中 承载的信息可以包括: 同频邻小区、 异频邻小区的信息、 邻小区信息、 同层邻 小区和异层邻小区信息中的至少一项, 还可以包括其他信息;  [45] The measurement indication message includes: a system message or a dedicated measurement control message, and the information carried in the message may include: the same-frequency neighboring cell, the information of the inter-frequency neighboring cell, the neighboring cell information, and the same layer. At least one of the neighboring cell and the neighboring cell information may further include other information;
[46] 步骤 13: UE按照已知的序列或公式确定用于执行异频测量的吋间; [47] 步骤 14: UE在可以进行异频测量的吋间进行异频测量; [46] Step 13: The UE determines the time interval for performing the inter-frequency measurement according to a known sequence or formula; [47] Step 14: The UE performs inter-frequency measurement during the time when the inter-frequency measurement can be performed;
[48] 步骤 15: 当 UE确定结束异频测量吋, 通知网络侧其异频测量过程结束, 该步 骤为可选的步骤, 例如 UE可以以其他方式结束异频测量的处理过程。  [48] Step 15: When the UE determines to end the inter-frequency measurement, it notifies the network side that the inter-frequency measurement process ends. This step is an optional step. For example, the UE may end the processing of the inter-frequency measurement in other manners.
[49] 实施例二 [49] Example 2
[50] 该实施例是在需要执行异频测量吋, 由网络侧为 UE分配相应的吋域资源, 在 资源分配过程中考虑到 UE执行异频测量的吋间, 之后, UE根据所述分配的吋域 资源确定 UE执行异频测量的吋间, 并进行相应的异频测量操作。  [50] In this embodiment, after the inter-frequency measurement needs to be performed, the network side allocates corresponding domain resources to the UE, and in the resource allocation process, the UE performs inter-frequency measurement, and then the UE allocates according to the allocation. The domain resource determines that the UE performs inter-frequency measurement, and performs corresponding inter-frequency measurement operations.
[51] 该实施例在具体实现过程中包括以下步骤:  [51] This embodiment includes the following steps in a specific implementation process:
[52] 第一步, 网络侧下发测量指示消息, 如系统消息或专用的测量控制消息等, 以 启动异频测量过程;  [52] In the first step, the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to start the inter-frequency measurement process;
[53] 所述的测量指示消息中承载的信息可以包括: 同频邻小区信息、 异频邻小区的 信息、 邻小区信息、 同层邻小区信息、 异层邻小区信息和测量 gap信息中的至少 一项, 还可以包括其他信息;  [53] The information carried in the measurement indication message may include: the same-frequency neighbor cell information, the information of the inter-frequency neighboring cell, the neighbor cell information, the peer-level neighbor cell information, the hetero-layer neighbor cell information, and the measurement gap information. At least one item may also include other information;
[54] 其中, 所述的测量 gap信息的确定原则可以为: 按照某个序列或按照某个公式 给用户分配吋域的资源; [54] The determining the gap information may be: assigning a resource to the user according to a sequence or according to a formula;
[55] 第二步, UE收到所述的测量指示消息后, 根据其中的测量 gap信息确定执行异 频测量的吋间; [55] In the second step, after receiving the measurement indication message, the UE determines, according to the measurement gap information therein, that the inter-frequency measurement is performed;
[56] 第三步, 在所述执行异频测量的吋间到达吋, 幵始执行相应的异频测量; [57] 可选地, UE在异频测量结束后, 还可以向网络侧上报其异频测量过程结束的 信息, 以便于网络侧确定该 UE的异频测量过程结束。  [56] In the third step, after the inter-frequency measurement is performed, the corresponding inter-frequency measurement is performed; [57] optionally, after the inter-frequency measurement is ended, the UE may also report to the network side. The information of the inter-frequency measurement process ends, so that the network side determines that the inter-frequency measurement process of the UE ends.
[58] 实施例三 [58] Example 3
[59] 在该实施例中, 网络侧在为 UE分配的吋域资源中并未考虑异频测量的吋间, 因此, 当 UE需要进行异频测量吋, 则可以根据为 UE分配的吋域资源中的空闲吋 间确定执行异频测量的吋间, 以进行异频测量。  [59] In this embodiment, the network side does not consider the inter-frequency measurement in the local area resource allocated for the UE. Therefore, when the UE needs to perform inter-frequency measurement, the UE may be allocated according to the area allocated for the UE. The idle time in the resource determines the time during which the inter-frequency measurement is performed to perform the inter-frequency measurement.
[60] 该实施例在具体实现过程中包括以下步骤: [60] This embodiment includes the following steps in a specific implementation process:
[61] 第一步, 网络侧为 UE调度下行资源, 包括吋域、 频域资源; [61] In the first step, the network side schedules downlink resources for the UE, including the domain and the frequency domain resources;
[62] 例如在执行异频测量之前, 网络侧已经为 UE分配了相应的吋域资源, 但为 UE 调度资源过程中未考虑执行异频测量的吋间; [63] 第二步, 当网络侧下发测量指示消息, 如系统消息或专用的测量控制消息等, 则启动异频测量过程; [62] For example, before the inter-frequency measurement is performed, the network side has allocated corresponding domain resources to the UE, but the inter-frequency measurement is not considered in the process of scheduling resources for the UE; [63] In the second step, when the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, the inter-frequency measurement process is started;
[64] 所述的测量指示消息中承载的信息可以包括: 同频邻小区, 异频邻小区的信息 , 邻小区信息, 同层邻小区, 以及异层邻小区信息中的至少一项, 还可以包括 其他信息;  [64] The information carried in the measurement indication message may include: at least one of a same-frequency neighboring cell, information of a different-frequency neighboring cell, neighboring cell information, a neighboring cell, and a neighboring cell information. Can include other information;
[65] 在所述的测量指示消息中不包含测量 gap的信息;  [65] information about the measurement gap is not included in the measurement indication message;
[66] 第三步, UE侧收到所述的测量指示消息后, 解调该消息, 并根据网络侧的指 示消息确定需要对邻小区的执行异频测量操作;  [66] In the third step, after receiving the measurement indication message, the UE demodulates the message, and determines, according to the indication message on the network side, that the inter-frequency measurement operation needs to be performed on the neighboring cell;
[67] 由于 UE收到的测量指示消息还可能是进行除异频测量之外的其他测量指示信 息, 因此, 只有在所述的测量指示消息指示需要进行异频测量吋, 才执行该实 施例中的后续步骤; [67] Since the measurement indication message received by the UE may also be other measurement indication information except the inter-frequency measurement, the embodiment is executed only after the measurement indication message indicates that the inter-frequency measurement needs to be performed. Next steps in ;
[68] 第四步, UE根据网络侧分配给的吋域资源, 确定可用于异频测量的吋间, 例 如除了分配给用户的吋域资源都可以用来进行异频测量, 具体可以为:  [68] In the fourth step, the UE determines, according to the area resource allocated by the network side, the time that can be used for the inter-frequency measurement, for example, the area resource allocated to the user can be used for the inter-frequency measurement, which may be:
[69] (1) 网络侧所空出的吋间, 例如空闲吋间满足执行异频测量的要求, 则 UE在 该空闲吋间内进行异频测量; [69] (1) When the network side vacates, for example, the idle time meets the requirement of performing inter-frequency measurement, the UE performs inter-frequency measurement in the idle time;
[70] (2) 网络侧所空出的吋间部分满足执行异频测量的要求, 部分不满足, 则 UE 只利用符合异频测量要求的 gap来进行异频测量, 对于有不符合要求的 gap存在, 则放弃, 例如不进行异频测量操作; [70] (2) The inter-turn part vacated on the network side satisfies the requirement of performing inter-frequency measurement, and part of it is not satisfied, then the UE only uses the gap that meets the inter-frequency measurement requirement to perform inter-frequency measurement, for those that do not meet the requirements. If the gap exists, it is discarded, for example, the inter-frequency measurement operation is not performed;
[71] (3) 网络侧所空出的吋间全部都不符合异频测量要求, 则 UE将该情况上报网 络侧, 由网络侧重新分配资源, 以便于根据重新分配的资源进行异频测量吋间 的确定, 从而进行异频测量操作; [71] (3) All the vacancies on the network side do not meet the inter-frequency measurement requirements, then the UE reports the situation to the network side, and the network side re-allocates resources to facilitate inter-frequency measurement based on the re-allocated resources. The determination between the turns, thereby performing the inter-frequency measurement operation;
[72] 其中, 所述的异频测量要求可以为: 最小 gap [72] wherein the inter-frequency measurement requirement may be: a minimum gap
的要求, 例如进行异频测量的空隙长度的最小值, 该值必须可以保证 UE调整接 收机到异频频率上, 并与目标小区取得同步。  The requirements, such as the minimum value of the gap length for inter-frequency measurement, must be such that the UE can adjust the receiver to the inter-frequency and synchronize with the target cell.
[73] 实施例四 [73] Embodiment 4
[74] 在该实施例中, 在 UE执行异频测量之前, 已经为 UE分配资源, 且调度资源的 处理过程中考虑了异频测量的吋间。  [74] In this embodiment, before the UE performs the inter-frequency measurement, the UE has been allocated resources, and the inter-frequency measurement is considered in the processing of the scheduling resource.
[75] 该实施例的具体实现过程中包括以下步骤: [76] 第一步, 网络侧为 UE调度下行资源, 调度吋域上的资源吋需要考虑异频测量 的吋间, 具体需要确保调度后每个帧中留出的 gap长度至少需要大于执行异频测 量的最小 gap的要求; [75] The specific implementation process of this embodiment includes the following steps: [76] In the first step, the network side schedules downlink resources for the UE, and the resources on the domain are scheduled. The inter-frequency measurement needs to be considered. Specifically, it is necessary to ensure that the gap length in each frame after scheduling is at least greater than the execution difference. The minimum gap requirement for frequency measurement;
[77] 第二步, 网络侧下发测量指示消息, 如系统消息或专用的测量控制消息等, 以 控制 UE启动相应的异频测量操作;  [77] In the second step, the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to control the UE to initiate a corresponding inter-frequency measurement operation;
[78] 其中, 所述的测量指示消息中承载的信息可以包括: 同频邻小区、 异频邻小区 的信息、 邻小区信息、 同层邻小区和异层邻小区信息中的至少一项, 还可以包 括其他信息; [78] The information carried in the measurement indication message may include: at least one of an intra-frequency neighboring cell, an information of an inter-frequency neighboring cell, neighboring cell information, a peer-layer neighboring cell, and a hetero-layer neighboring cell information, Can also include other information;
[79] 第三步, UE侧收到所述的测量指示消息后, 解调该消息, 并在根据网络侧的 指示消息确定需要对邻小区执行异频测量操作吋, 执行第四步;  [79] In the third step, after receiving the measurement indication message, the UE demodulates the message, and after determining, according to the indication message on the network side, that the inter-cell measurement operation needs to be performed on the neighboring cell, performing the fourth step;
[80] 第四步, UE按照已知的分配的资源可以确定进行异频测量的吋间, 例如 UE在 可以进行异频测量的 gap吋间内进行异频测量, 所述的 gap吋间是根据网络侧为 U E分配的下行资源中每个帧中的 gap确定。  [80] In the fourth step, the UE may determine, according to the known allocated resources, the inter-frequency measurement, for example, the UE performs inter-frequency measurement in the gap that can perform the inter-frequency measurement, where the gap is The gap is determined according to each of the downlink resources allocated to the UE by the network side.
[81] 实施例五  [81] Embodiment 5
[82] 该实施例的具体实现过程包括以下步骤:  [82] The specific implementation process of this embodiment includes the following steps:
[83] 第一步, 网络侧下发测量指示消息, 如系统消息或专用的测量控制消息等, 以 启动 UE的异频测量操作;  [83] In the first step, the network side sends a measurement indication message, such as a system message or a dedicated measurement control message, to start the inter-frequency measurement operation of the UE;
[84] 所述的测量指示消息中承载的信息可以包括: 同频邻小区、 异频邻小区的信息[84] The information carried in the measurement indication message may include: information about a co-frequency neighboring cell and an inter-frequency neighboring cell.
、 邻小区信息、 同层邻小区、 异层邻小区信息和测量 gap信息中的至少一项, 还 可以包括其他信息; And at least one of neighboring cell information, peer neighboring cell, heterogeneous neighbor cell information, and measurement gap information, and may further include other information;
[85] 其中, 所述的测量 gap信息的确定原则可以包括: 网络侧通过已知的为该 UE调 度的吋间资源来调度, 要求调度的吋间必须满足执行异频测量的最小 gap的要求 , 假设一个帧长范围内, 有多个可用于 gap的吋间资源, 且有部分 gap资源满足要 求, 则网络侧可以把满足了要求的 gap消息下发给用户, 或者, 网络侧按照调度 算法以及测量 gap的要求重新给用户调度资源, 调度出满足测量 gap要求的吋间资 源给用户, 或者, 网络侧按照某公式重新给用户调度资源;  [85] The determining principle of the measured gap information may include: the network side scheduling by using a known inter-day resource scheduled for the UE, and requiring the scheduling time of the scheduling to meet the minimum gap requirement for performing the inter-frequency measurement. Assuming that there are multiple inter-time resources available for gaps in a frame length range, and some gap resources meet the requirements, the network side can deliver the gap message that meets the requirements to the user, or the network side follows the scheduling algorithm. And measuring the gap request to re-schedule the resource to the user, scheduling the inter-day resource that meets the measurement gap requirement to the user, or the network side re-scheduling the resource according to a formula;
[86] 第二步, UE侧收到所述的测量指示消息后, 解调该消息, 当根据网络侧的指 示消息确定需要对邻小区执行异频测量吋, 执行第三步; [87] 第三步, UE按照指示的测量 gap进行异频测量。 [86] In the second step, after receiving the measurement indication message, the UE demodulates the message. When it is determined according to the indication message on the network side that the inter-cell measurement needs to be performed on the neighboring cell, the third step is performed. [87] In the third step, the UE performs inter-frequency measurement according to the indicated measurement gap.
[88] 本发明实施例还提供了一种实现异频测量的装置, 其具体实现结构如图 4所示 [88] The embodiment of the present invention further provides an apparatus for implementing inter-frequency measurement, and the specific implementation structure thereof is as shown in FIG.
, 该装置设置于 LTE系统的用户设备中, 且具体包括: The device is installed in a user equipment of the LTE system, and specifically includes:
[89] (1) 异频测量吋间获取单元 [89] (1) Inter-frequency measurement unit
[90] 该单元用于获取执行异频测量的吋间;  [90] This unit is used to obtain the time between the execution of the inter-frequency measurement;
[91] 所述的异频测量吋间确定单元具体可以由测量指示消息接收单元触发, 所述的 测量指示消息接收单元用于接收网络侧发来的测量指示消息, 且在根据所述的 测量指示消息确定需要执行异频测量吋触发所述的异频测量吋间确定单元; [92] 所述的异频测量吋间确定单元根据确定异频测量吋间的方式的不同, 具体可以 釆用不同的实现方案, 下面将举两个具体应用的实例:  [91] The inter-frequency measurement inter-time determining unit may be specifically triggered by the measurement indication message receiving unit, where the measurement indication message receiving unit is configured to receive a measurement indication message sent by the network side, and according to the measurement The indication message determines that the inter-frequency measurement needs to be performed, and triggers the inter-frequency measurement inter-turn determination unit; [92] the inter-frequency measurement inter-time determination unit may specifically adopt the method according to the manner of determining the inter-frequency measurement inter-turn Different implementation scenarios, here are two examples of specific applications:
[93] 实例一: 所述的异频测量吋间确定单元具体釆用的处理包括: [93] Example 1: The specific processing of the inter-frequency measurement inter-day determination unit includes:
[94] 用于根据网络侧按照预定义的序列或预定义的公式为用户设备分配的吋域资源 信息获取执行异频测量的吋间; [94] for acquiring the inter-frequency resource measurement performed by the network side according to the predefined sequence or the predefined formula for the user equipment;
[95] 其中, 所述的预定义的序列为: 根据 TTI值和 /或标识数据的方式确定; [95] wherein, the predefined sequence is: determined according to a TTI value and/or a manner of identifying data;
[96] 其中, 所述的预定义的公式为: 根据最小吋隙值、 业务类型和业务量中的至少 一项 (还可以包括其他信息) 确定。 [96] wherein the predefined formula is: determined according to at least one of a minimum gap value, a service type, and a traffic volume (which may also include other information).
[97] 实例二: 所述的异频测量吋间确定单元具体釆用的处理包括: [97] Example 2: The specific processing of the inter-frequency measurement inter-day determination unit includes:
[98] 用于在为用户设备分配的吋域资源中确定可以满足异频测量需求的空闲吋间信 息, 并将满足异频测量需求的空闲吋间信息作为执行异频测量的吋间; [98] configured to determine idle time information that can meet the inter-frequency measurement requirement in the domain resource allocated for the user equipment, and use the idle time information satisfying the inter-frequency measurement requirement as the time interval for performing the inter-frequency measurement;
[99] 该实例中, 所述的装置进一步还可以包括: [99] In this example, the device further includes:
[100] 判断单元, 用于判断网络侧为用户设备分配的吋域资源的空闲吋间是否可以满 足异频测量需求, 若全部或部分空闲吋间可以满足异频测量需要, 则将可以满 足异频测量需要的空闲吋间作为执行异频测量的吋间即可, 否则, 需要触发资 源分配发起单元;  [100] The judging unit is configured to determine whether the idle time of the domain resource allocated by the network side for the user equipment can meet the inter-frequency measurement requirement, and if all or part of the idle time can meet the inter-frequency measurement requirement, the difference may be satisfied. The idle time required for the frequency measurement may be performed as the time interval for performing the inter-frequency measurement; otherwise, the resource allocation initiation unit needs to be triggered;
[101] 资源分配发起单元, 用于在判断单元的触发下, 由用户设备向网络侧发起资源 分配处理过程, 并由网络侧重新进行吋域资源的分配, 当用户终端获得新的资 源分配结果吋, 再次触发所述判断单元, 直到确定相应的异频测量吋间, 或者 , 符合其他预定义的条件, 如处理吋间超吋等, 则相应的确定异频测量吋间的 处理过程结束。 [101] The resource allocation initiating unit is configured to: after the triggering by the determining unit, the user equipment initiates a resource allocation processing process to the network side, and the network side re-allocates the domain resource, and the user terminal obtains a new resource allocation result.吋, triggering the judging unit again, until the corresponding inter-frequency measurement period is determined, or, according to other predefined conditions, such as processing the inter-turnover, etc., the corresponding inter-frequency measurement is determined accordingly. The process ends.
[102] (2) 异频测量执行单元 [102] (2) Inter-frequency measurement execution unit
[103] 该单元用于在异频测量吋间获取单元确定的执行异频测量的吋间执行异频测量 操作, 具体为在相应的异频测量吋间到达吋, 用户终端将接收机的频率调整到 待测量的异频频率上, 并与相应的目标小区取得同步, 之后, 便可以进行异频 信号的测量处理。  [103] The unit is configured to perform an inter-frequency measurement operation during the inter-frequency measurement performed by the inter-frequency measurement inter-time acquisition unit, specifically, when the corresponding inter-frequency measurement arrives, the user terminal sets the frequency of the receiver. It is adjusted to the frequency of the inter-frequency to be measured, and synchronized with the corresponding target cell, after which the measurement processing of the inter-frequency signal can be performed.
[104] 需要说明的是, 以上所述各实施例的编号和陈述顺序仅是为了表达, 而并不代 表实施例的优劣顺序, 也不作为对各实施例的限定。  The numbering and the order of the above-described embodiments are merely for the purpose of illustration, and are not intended to limit the order of the embodiments.
[105] 而且, 本发明实施例所揭示的技术方案能够运用在同系统的异频测量, 也能够 运用在异系统的异频测量。  Moreover, the technical solution disclosed in the embodiments of the present invention can be applied to the inter-frequency measurement of the same system, and can also be applied to the inter-frequency measurement in the different system.
[106] 综上所述, 本发明实施例的实现使得在 LTE系统中能够根据测量需求对邻小区 执行异频测量, 以满足 LTE系统中的异频测量需求, 提高 LTE系统的通信性能, 解决现有技术中存在的无法为 UE选择合适的测量方式的问题。 例如, 本发明实 施例的应用使得当 UE使用的信道质量发生变化吋, 便可以通过相应的异频测量 过程重新选择新的信道作为 UE接入网络的信道, 以保证 UE能够在新的信道下正 常开展业务。  [106] In summary, the implementation of the embodiment of the present invention enables an inter-frequency measurement to be performed on a neighboring cell according to a measurement requirement in an LTE system, so as to meet the inter-frequency measurement requirement in the LTE system, improve communication performance of the LTE system, and solve There is a problem in the prior art that the appropriate measurement method cannot be selected for the UE. For example, the application of the embodiment of the present invention enables the UE to reselect a new channel as a channel for the UE to access the network through the corresponding inter-frequency measurement process, so that the UE can be in the new channel. Conduct business normally.
[107] 以上所述, 仅为本发明较佳的具体实施方式, 但本发明的保护范围并不局限于 此, 任何熟悉本技术领域的技术人员在本发明揭露的技术范围内, 可轻易想到 的变化或替换, 都应涵盖在本发明的保护范围之内。 因此, 本发明的保护范围 应该以权利要求的保护范围为准。  The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily think of within the technical scope disclosed by the present invention. Changes or substitutions are intended to be included within the scope of the invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

权利要求书 Claim
[1] 1、 一种实现异频测量的方法, 其特征在于, 包括:  [1] 1. A method for realizing inter-frequency measurement, characterized in that it comprises:
在长期演进 LTE系统中, 用户设备获取执行异频测量的吋间; 用户设备在获取的所述执行异频测量的吋间, 执行异频测量操作。  In the Long Term Evolution (LTE) system, the user equipment acquires the time interval for performing the inter-frequency measurement; the user equipment performs the inter-frequency measurement operation during the acquired inter-frequency measurement.
[2] 2、 根据权利要求 1所述的方法, 其特征在于, 所述的获取执行异频测量的 吋间之前还包括: 接收网络侧发来的测量指示消息, 且根据所述的测量指 示消息执行异频测量。  [2] The method according to claim 1, wherein before the acquiring the inter-frequency measurement, the method further comprises: receiving a measurement indication message sent by the network side, and according to the measurement indication The message performs an inter-frequency measurement.
[3] 3、 根据权利要求 2所述的方法, 其特征在于, 所述的测量指示消息中承载 的信息包括: 同频邻小区信息、 异频邻小区的信息、 邻小区信息、 同层邻 小区信息、 异层邻小区信息和测量间隙 gap信息中的至少一项。  [3] The method according to claim 2, wherein the information carried in the measurement indication message comprises: the same-frequency neighbor cell information, the information of the inter-frequency neighboring cell, the neighbor cell information, the peer-to-peer neighbor At least one of cell information, heterogeneous neighbor cell information, and measurement gap gap information.
[4] 4、 根据权利要求 1、 2或 3所述的方法, 其特征在于, 所述的获取执行异频 测量的吋间的处理包括:  [4] 4. The method according to claim 1, 2 or 3, wherein the processing of acquiring the inter-time measurement of the inter-frequency measurement comprises:
用户设备根据接收到的网络侧指示的测量空隙信息获取执行异频测量的吋 间, 其中, 所述的测量空隙信息为预定义的序列信息或预定义的公式中的 参数信息, 所述的预定义的序列或预定义的公式为网络侧为用户设备分配 吋域资源的依据。  The user equipment obtains the time interval for performing the inter-frequency measurement according to the measurement gap information indicated by the received network side, where the measurement gap information is predefined sequence information or parameter information in a predefined formula, the pre-predetermined The defined sequence or the predefined formula is the basis for the network side to allocate the domain resources to the user equipment.
[5] 5、 根据权利要求 4所述的方法, 其特征在于, 所述预定义的公式为: 根据 传输吋间间隔 TTI值和 /或标识数据的方式确定。  [5] 5. The method according to claim 4, wherein the predefined formula is: determined according to a manner of transmitting a time interval TTI value and/or identifying data.
[6] 6、 根据权利要求 4所述的方法, 其特征在于, 所述预定义的序列为: 根据 最小吋隙值、 业务类型和业务量中的至少一项确定。 [6] 6. The method according to claim 4, wherein the predefined sequence is: determined according to at least one of a minimum gap value, a service type, and a traffic volume.
[7] 7、 根据权利要求 4所述的方法, 其特征在于, 所述的方法还包括: 网络侧 通知用户设备幵始进行异频测量的起始吋间和幵始进行业务数据传输的起 始吋间中的至少一项。 [7] The method according to claim 4, wherein the method further comprises: the network side notifying the user equipment to start the inter-time measurement of the inter-frequency measurement and starting the transmission of the service data. At least one of the beginnings.
[8] 8、 根据权利要求 1、 2或 3所述的方法, 其特征在于, 所述的获取执行异频 测量的吋间的处理包括: 根据为用户设备分配的吋域资源的空闲吋间确定 执行异频测量的吋间。  [8] 8. The method according to claim 1, 2 or 3, wherein the acquiring the processing of the inter-frequency measurement is performed according to the idle time of the regional resource allocated for the user equipment. Determine the day when the inter-frequency measurement is performed.
[9] 9、 根据权利要求 8所述的方法, 其特征在于, 所述的执行异频测量操作包 括: 若网络侧为用户设备分配的吋域资源的空闲吋间可以满足异频测量需求, 则用户设备在满足异频测量需求的空闲吋间内进行异频测量; 和 /或' [9] 9. The method according to claim 8, wherein the performing the inter-frequency measurement operation comprises: If the idle time of the domain resource allocated by the network device for the user equipment can meet the inter-frequency measurement requirement, the user equipment performs the inter-frequency measurement in the idle time that meets the inter-frequency measurement requirement; and/or
若网络侧为用户设备分配的吋域资源的空闲吋间不满足异频测量需要, 则 由用户设备上报网络侧, 并由网络侧重新进行吋域资源的分配, 用户设备 在重新获得的满足异频测量需求的空闲吋间内进行异频测量; 和 /或'  If the idle time of the domain resource allocated by the network device for the user equipment does not meet the need for the inter-frequency measurement, the user equipment reports the network side, and the network side re-allocates the domain resource, and the user equipment regains satisfaction. Inter-frequency measurement in the idle time of the frequency measurement requirement; and / or '
若网络侧为用户设备分配的吋域资源的空闲吋间仅有部分满足异频测量需 求, 则用户设备仅利用满足异频测量需求的空闲吋间执行异频测量。  If only the part of the idle time of the domain resource allocated by the network device for the user equipment satisfies the inter-frequency measurement requirement, the user equipment performs the inter-frequency measurement only by using the idle time that satisfies the inter-frequency measurement requirement.
[10] 10、 根据权利要求 9所述的方法, 其特征在于, 所述的异频测量需求是指执 行异频测量所需要的空隙长度的最小值, 在该最小值确定的吋间值内用户 设备能够实现将接收机频率调整到异频频率, 与目标小区取得同步。  [10] 10. The method according to claim 9, wherein the inter-frequency measurement requirement refers to a minimum value of a gap length required to perform an inter-frequency measurement, and within the inter-turn value determined by the minimum value. The user equipment can adjust the receiver frequency to the inter-frequency frequency to synchronize with the target cell.
[11] 11、 一种实现异频测量的装置, 其特征在于, 该装置设置于 LTE系统的用 户设备中, 且包括:  [11] 11. A device for implementing inter-frequency measurement, wherein the device is installed in a user equipment of an LTE system, and includes:
异频测量吋间获取单元, 用于获取执行异频测量的吋间;  An inter-frequency acquisition unit for acquiring inter-frequency measurements;
异频测量执行单元, 用于在异频测量吋间获取单元获取的执行异频测量的 吋间执行异频测量操作。  The inter-frequency measurement execution unit is configured to perform an inter-frequency measurement operation during the inter-frequency acquisition of the inter-frequency measurement acquisition unit.
[12] 12、 根据权利要求 11所述的装置, 其特征在于, 所述的异频测量吋间获取 单元是由测量指示消息接收单元触发或由用户设备自身触发, 其中, 所述 的测量指示消息接收单元用于接收网络侧发来的测量指示消息, 且在根据 所述的测量指示消息确定需要执行异频测量吋, 触发所述的异频测量吋间 获取单元。 [12] 12. The device according to claim 11, wherein the inter-frequency measurement inter-time acquisition unit is triggered by a measurement indication message receiving unit or triggered by a user equipment itself, wherein the measurement indication is The message receiving unit is configured to receive the measurement indication message sent by the network side, and trigger the inter-frequency measurement time acquisition unit after determining that the inter-frequency measurement needs to be performed according to the measurement indication message.
[13] 13、 根据权利要求 11或 12所述的装置, 其特征在于, 该装置还包括:  [13] 13. The device according to claim 11 or 12, wherein the device further comprises:
判断单元, 用于判断网络侧为用户设备分配的吋域资源的空闲吋间是否可 以满足异频测量需求, 若满足, 则通知所述异频测量吋间获取单元; 资源分配发起单元, 用于根据所述判断单元的判断结果, 在不满足异频测 量需求吋, 由用户设备向网络侧发起资源分配处理过程, 并由网络侧重新 进行吋域资源的分配, 当用户终端获得新的资源分配结果吋, 再次触发所 述判断单元。 a determining unit, configured to determine whether an idle time of the domain resource allocated by the network side for the user equipment can meet the inter-frequency measurement requirement, and if yes, notify the inter-frequency measurement time acquisition unit; and the resource allocation initiation unit is configured to: According to the judgment result of the determining unit, after the inter-frequency measurement requirement is not met, the user equipment initiates a resource allocation process to the network side, and the network side re-allocates the domain resource, and the user terminal obtains a new resource allocation. The result 吋, trigger again Describe the judgment unit.
PCT/CN2007/070525 2006-08-18 2007-08-20 Method and apparatus for realizing inter-frequency measurement WO2008022603A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200610111436.3 2006-08-18
CNA2006101114363A CN101128000A (en) 2006-08-18 2006-08-18 A method and device for realizing different frequency measurement

Publications (1)

Publication Number Publication Date
WO2008022603A1 true WO2008022603A1 (en) 2008-02-28

Family

ID=39095887

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2007/070525 WO2008022603A1 (en) 2006-08-18 2007-08-20 Method and apparatus for realizing inter-frequency measurement

Country Status (2)

Country Link
CN (1) CN101128000A (en)
WO (1) WO2008022603A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110324895A (en) * 2018-03-30 2019-10-11 展讯通信(上海)有限公司 Alien frequencies or inter-system measuring method, device and user equipment

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101635934B (en) * 2008-07-21 2012-06-13 中兴通讯股份有限公司 Method for controlling measurement gaps
CN101686528B (en) * 2008-09-27 2012-08-29 华为技术有限公司 Method for acquiring cellular global identity and method and device for building Iur interface
CN101765122B (en) * 2008-12-22 2012-02-01 鼎桥通信技术有限公司 a scheduling method
CN101772050B (en) * 2009-01-06 2013-01-09 电信科学技术研究院 Carrier selection/channel information measurement and feedback system and method of long-term evolution multi-carrier system
CN101778403B (en) * 2009-01-13 2012-12-19 华为技术有限公司 Method and device for obtaining measurement clearance
CN101925087B (en) * 2009-06-11 2016-05-25 中兴通讯股份有限公司 A kind of measurement report method of closed user group cell
CN101990257B (en) * 2009-07-31 2015-01-28 中兴通讯股份有限公司 Method for acquiring system messages of adjacent cell in wireless network system
CN101998437B (en) * 2009-08-17 2016-05-25 电信科学技术研究院 A kind of definite method and apparatus of measuring opportunity
CN102045760B (en) * 2009-10-16 2013-11-20 电信科学技术研究院 Method, system and equipment for different frequency measurement
CN102149126B (en) * 2010-02-10 2015-10-07 重庆重邮信科通信技术有限公司 A kind of method for controlling pilot frequency/inter-system measuring time interval under connection mode
CN102395139A (en) * 2011-10-08 2012-03-28 中兴通讯股份有限公司 Multimode single-standby terminal different-mode type neighbor cell measurement time distribution method and device
WO2015062011A1 (en) * 2013-10-31 2015-05-07 华为技术有限公司 Measurement configuration method, identification and measurement methods, macro base station and ue
CN105657730B (en) * 2014-12-04 2019-02-05 中国移动通信集团公司 A cell measurement method and device
WO2016169056A1 (en) * 2015-04-24 2016-10-27 华为技术有限公司 Inter-frequency measurement method and device
CN107820263B (en) * 2016-09-13 2020-07-21 北京佰才邦技术有限公司 Information configuration method and device
CN109996283A (en) * 2017-12-29 2019-07-09 普天信息技术有限公司 A kind of method and apparatus that Idle state UE executes alien frequencies SCell measurement
CN110099394B (en) * 2018-01-29 2022-07-29 展讯通信(上海)有限公司 Method and device for realizing pilot frequency measurement and inter-system measurement and user equipment
CN116528258A (en) * 2022-01-21 2023-08-01 华为技术有限公司 Method and device for determining inter-frequency measurement resources and/or time

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1391741A (en) * 1999-09-24 2003-01-15 诺基亚移动电话有限公司 Inter-frequency measurement
CN1406446A (en) * 2000-02-29 2003-03-26 诺基亚有限公司 Defining measurement gaps in inter-frequency measurement
CN1794864A (en) * 2005-04-21 2006-06-28 华为技术有限公司 Different frequency/different system mensuring method in multimedia broadcasting group broadcast service
WO2007089128A1 (en) * 2006-02-03 2007-08-09 Samsung Electronics Co., Ltd. Method and apparatus for mesurement of handover of active mode user equipment in a mobile communication system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1391741A (en) * 1999-09-24 2003-01-15 诺基亚移动电话有限公司 Inter-frequency measurement
CN1406446A (en) * 2000-02-29 2003-03-26 诺基亚有限公司 Defining measurement gaps in inter-frequency measurement
CN1794864A (en) * 2005-04-21 2006-06-28 华为技术有限公司 Different frequency/different system mensuring method in multimedia broadcasting group broadcast service
WO2007089128A1 (en) * 2006-02-03 2007-08-09 Samsung Electronics Co., Ltd. Method and apparatus for mesurement of handover of active mode user equipment in a mobile communication system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"Measurement Gap Control for E-UTRAN", 3GPP TSG-RAN WG2#55, SHARP, SEOUL, KOREA, 9 October 2006 (2006-10-09) - 13 October 2006 (2006-10-13) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110324895A (en) * 2018-03-30 2019-10-11 展讯通信(上海)有限公司 Alien frequencies or inter-system measuring method, device and user equipment
CN110324895B (en) * 2018-03-30 2023-04-07 展讯通信(上海)有限公司 Different-frequency or different-system measurement method and device and user equipment

Also Published As

Publication number Publication date
CN101128000A (en) 2008-02-20

Similar Documents

Publication Publication Date Title
WO2008022603A1 (en) Method and apparatus for realizing inter-frequency measurement
JP6400752B2 (en) Network device, user equipment and base station
EP2702820B1 (en) Generating uplink signals from user equipment nodes to identify interferers to a network node
CN111328050B (en) System and method for D2D communication control plane
KR101710607B1 (en) Method and apparatus for surpporting handover of user equipment in mobile system
JP6382864B2 (en) Node detection in cellular communication networks
CN103384382B (en) Method for radio link management, user equipment and base station
JP5563046B2 (en) Pilot grouping and route protocols in multi-carrier communication systems
CN100469026C (en) Handover system and control method using initial ranging scheme in broadband wireless access communication system
JP2020529158A (en) How to select a carrier wave and devices that support it
CN104244412B (en) Wireless communication device, wireless communication method, and base station
JP6403203B2 (en) Wireless communication system, terminal device, base station device, wireless communication method, and integrated circuit
KR20200012927A (en) Devices and Methods for Cloud-Based Sidelink Scheduling and Base Station Interface for the Same
KR20180119576A (en) Discovery Reference Signal Discovery Window and Discovery Reference Signal Measurement Configuration
KR20120126032A (en) Method and appratus of cell selection in mobile communication system
EP2709406A2 (en) Method and apparatus for cell selection in a wireless communication system
JP2017510187A (en) Techniques for transmitting positioning reference signals in unlicensed radio frequency spectrum bands
JP2017522757A (en) Allocation of communication resources in the unlicensed frequency band to devices operating in the licensed frequency band
JPWO2016186077A1 (en) Terminal device
KR20130037176A (en) Method and appratus of selecting neighbor cells in mobile communication system
EP3639570A1 (en) Handover delay reduction method, wireless communication device, and computer program
CN107040901A (en) A kind of group's different-frequency measure gap configuration method and group system
CN108293234B (en) System and method for measuring signals
CN112753264A (en) Method and device for transmitting data
JP5645021B2 (en) Self-coexistence mechanism for frame acquisition in wireless networks

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07801001

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

122 Ep: pct application non-entry in european phase

Ref document number: 07801001

Country of ref document: EP

Kind code of ref document: A1