WO2000065166A1 - Steel-frame structure and method of construction by using the same - Google Patents

Steel-frame structure and method of construction by using the same Download PDF

Info

Publication number
WO2000065166A1
WO2000065166A1 PCT/KR2000/000382 KR0000382W WO0065166A1 WO 2000065166 A1 WO2000065166 A1 WO 2000065166A1 KR 0000382 W KR0000382 W KR 0000382W WO 0065166 A1 WO0065166 A1 WO 0065166A1
Authority
WO
WIPO (PCT)
Prior art keywords
members
holes
frame structure
steel
construction
Prior art date
Application number
PCT/KR2000/000382
Other languages
French (fr)
Inventor
Kwang-Min So
Original Assignee
So Kwang Min
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by So Kwang Min filed Critical So Kwang Min
Priority to AU41502/00A priority Critical patent/AU4150200A/en
Publication of WO2000065166A1 publication Critical patent/WO2000065166A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8647Walls made by casting, pouring, or tamping in situ made in permanent forms with ties going through the forms

Definitions

  • This invention relates to a frame structure, preferably a steel frame structure and a method of construction by using the same, in which the frame structure is installed as a framework of buildings, and more specifically, to a sectional steel-frame structure and a method of construction by using the same in which the sectional steel-frame structure may be assembled and constructed rapidly and conveniently.
  • the steel- frame structure it is possible to simultaneously perform construction work of interior/exterior materials and insulation boards and concrete pouring work and the removal work of the molds is unnecessary, so that construction time and construction cost may be reduced considerably.
  • reinforcing rods, section steels, beams, and the like are arranged in perpendicular and horizontal directions for inner and outer walls.
  • Interior/exterior molding plates are installed at both sides of the arranged materials.
  • Fresh concrete is poured in a mold formed as above. After the poured concrete is cured in the molds, reinforcing rods are arranged on the cured concrete. Molding plates are installed on the reinforcing rod.
  • Fresh concrete is poured in the molds to form a slab.
  • reinforcing rods, section steels, beams, and the like are arranged on certain portions in the perpendicular and horizontal directions and the arranged reinforcing rods are linked each other.
  • Wooden molds are usually installed on the inner and outer sides of the arranged reinforcing rods.
  • the inner and outer molds may be supported by struts set up on respective outer surfaces of the interior/exterior molding plates or interval keeping means.
  • the conventional steel-frame structure and method of construction by using the same have, however, disadvantages that the struts and the interval keeping means are complicated to use.
  • the struts must be respectively struck with big nails against the molding plates, making the installation and removal of the struts difficult.
  • the interval keeping means must be fixed between the interior/exterior molds by passing through therebetween, which is time consuming.
  • the conventional frame structure and method of construction by using the same have further problems that when the interior/exterior molding plates installed as above are removed after the walls and the slabs are completely cured as a concrete body, it takes a long time to remove the struts, the interval keeping means and the molding plates in order.
  • Korean patent application 96-54011, Reg. No. 189216, (referred to Prior Art) by this applicant has suggested an improvement of the steel-frame structure wherein it is possible to simultaneously construct work of interior/exterior materials and insulation boards with the concrete pouring work upon completion of the steel-frame structure, and as a result, construction time can be reduced.
  • the present invention is made to solve the disadvantages of the prior art and has an object to provide a sectional steel-frame structure and a construction method in simultaneously performing the construction work of the interior/exterior materials and the insulation board in which the interior/exterior plates serving as steel molds are installed for engagement at any position from upper to lower portions and a head of the engagement bolt is not exposed outward to prevent the surface from being rough, thereby considerably reducing construction expenses and labor cost.
  • a steel-frame structure comprising vertical members, horizontal members, connecting members of which center is engaged on the surface of the vertical members, supporting members in engagement with brackets at both end portions of the connecting members, interior/exterior panel plates in engagement with the supporting members, and fastening means engaged on the surface of the panel plates without protruding the head of the fastening means.
  • the insulation board is inserted between the horizontal member and the vertical member, and fresh concrete is poured and cured therebetween with the interior/exterior material plates at both ends of the connecting members.
  • the surface of the interior/exterior plates becomes smooth because the head of the fastening means is not protruded outward.
  • the removal work of the molds is unnecessary, so that construction time and construction cost are reduced considerably.
  • Fig. 1 is a perspective view showing a sectional steel-frame structure according to an embodiment of the present invention
  • Fig. 2A is a plan view illustrating the molding process for simultaneously performing construction of insulation boards and interior/exterior materials by using a steel-frame structure according to the preferred embodiment of the present invention
  • Fig. 2B is a plan view illustrating the molding process for pouring concrete into the structure of Fig. 2A;
  • Fig. 3 a side view showing a sectional steel-frame structure according to an embodiment of the present invention
  • Fig. 4 is a side view showing an engagement of the interior/exterior panel plates and the connecting members
  • Fig. 5A is a perspective view showing a disengagement of the bracket and the connecting members.
  • Fig. 5B is a perspective view showing an engagement of the bracket and the connecting members of Fig. 5A.
  • a sectional steel-frame structure according to the present invention has vertical members 200, horizontal members 100, connecting members 400 of which center is engaged on the surface of the vertical members 200, supporting members 500 in engagement with brackets at both end portions of the connecting members 400 and interior/exterior plates 600a and 600b assembled to the supporting member 500.
  • the vertical members 200 and the horizontal members 100 are section steel materials in the shape of a bracket *U" and have a number of holes perforated along surfaces thereof at regular intervals in a longitudinal direction and a number of holes perforated along two end parts at regular intervals in a longitudinal direction.
  • the insulation board 300 is inserted in the insertion groove of the assembled horizontal members 100 and the vertical members 200 as shown in Fig. 2A.
  • the connecting member 400 has a number of holes 401 perforated on surface thereof at regular intervals in a lateral direction in order to be fixed to the vertical member 200. At both ends of the connecting member 400 brackets 410 are located, each having a hole 411 as shown in Figs. 5A and 5B.
  • the supporting member 500 in the shape of a bracket *U" has a number of holes 511 along two end parts in a longitudinal direction.
  • the holes 511 coincide with the holes 411 perforated on the bracket 410.
  • On surface thereof a number of holes 502 are formed at regular intervals in the longitudinal direction, so that the interior/exterior plates 600a and 600b are engaged through the holes 502.
  • the interior/exterior plates 600a and 600b are formed with two bent end parts.
  • One inner bent end part 601 being in contact with the supporting member 500 is interposed with the other outer bent end part 602 of another interior/exterior plate, while the surface 603 is to be maintained in plane with repeated assembly.
  • the inner and outer bent end parts 601 and 602 have holes 604 and 605 through which the screw 701 can pass but not the body 702.
  • insertion holes 606 are formed to coincide with the holes 604 and 605 through which the head 703 of the fastening "means 700 can pass.
  • a number of vertical members 200 are installed with a predetermined interval on ground.
  • Horizontal members 100 are fixed to coincide the holes 102 and 202 to be engaged by riveting or bolting through the holes.
  • the horizontal members 100 are engaged at desired positions from bottom to top of the vertical members 200, to complete the main frame work.
  • the insulation board 300 is inserted in the space between the horizontal member 100 and the vertical member 200 as shown in Fig. 2A.
  • a number of connecting members 400 are engaged with the vertical members 200 to coincide the hole 401 in the middle of surface thereof with the hole 201 of the vertical member 200 by riveting or bolting through the holes .
  • the supporting member 500 is fixed at the bracket 410 of the upper connecting member 400 and at the bracket 410 of the lower connecting member 400 to coincide with the holes 411 and 501 by riveting or bolting. To repeat this work at the brackets 410 of each rows ensures the engagement of the supporting member 500.
  • the screw 701 of fastening means 700 is nailed to the hole 502 through the groove 605, but the body 702 having larger diameter than the screw is not nailed.
  • the head 703 of the fastening means 700 is fixed to the holes 604 and 605 formed on the interior/exterior plates 600a and 600b, so that the head 703 of the engaging means 700 stops up the insertion hole 606.
  • the preferred length of supporting member 500 according to the present invention is long and the engagement with the interior/ exterior plates 600a and 600b are readily made at any desired position.
  • the length of the supporting member is not restrictive in the invention.
  • the head 703 of the fastening means 700 is not protruded from the interior/exterior plates 600a and 600b and is completely filled with the insertion holes 606 (Fig. 3), which prevents the rough surface. This also functions to prevent the concrete from being leaked through the insertion holes 606.
  • the fresh concrete is poured and filled as shown in Fig. 2B.
  • the concrete is cured with the insulation board 300 therein.
  • the interior/exterior plates 600a and 600b are constructed together with the structure.
  • the insulation construction work may be performed at any time before pouring the concrete, i.e., after assembling the supporting member 500 or after assembling the interior/exterior plates 600a and 600b.
  • the steel-frame structure of the present invention enables to simultaneously perform the insulation work and inner/exterior plates work and it becomes unnecessary to remove the molding, thereby shortening the construction period.
  • the sectional steel-frame structure may be assembled and constructed rapidly and conveniently.
  • the steel- frame structure it is possible to simultaneously perform construction work of interior/exterior materials and insulation boards and concrete pouring work, so that construction time and construction cost may be reduced considerably.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention concerns a steel frame structure and a method of construction by using the same in which the sectional steel-frame structure may be assembled and constructed rapidly and conveniently. The insulation board (300) is inserted between the horizontal members (100) and the vertical members (200), and fresh concrete is poured and cured in the interior/exterior plates (600a, 600b) engaged with both connecting members (400). The surface of the interior/exterior plates (600a, 600b) becomes smooth because the head (703) of the fastening means (700) is not protruded outward. It has an effect to simultaneously perform construction work of interior/exterior materials (600a, 600b) and insulation boards (300) and concrete pouring work during construction of the walls or slab, and removal work of the molds becomes unnecessary, so that construction time and construction cost may be reduced considerably.

Description

STEEL-FRAME STRUCTURE AND METHOD OF CONSTRUCTION
BY USING THE SAME
TECHNICAL FIELD This invention relates to a frame structure, preferably a steel frame structure and a method of construction by using the same, in which the frame structure is installed as a framework of buildings, and more specifically, to a sectional steel-frame structure and a method of construction by using the same in which the sectional steel-frame structure may be assembled and constructed rapidly and conveniently. By using the steel- frame structure, it is possible to simultaneously perform construction work of interior/exterior materials and insulation boards and concrete pouring work and the removal work of the molds is unnecessary, so that construction time and construction cost may be reduced considerably.
BACKGROUND ART
Generally, when construction of a frame structure for a concrete building is performed, reinforcing rods, section steels, beams, and the like are arranged in perpendicular and horizontal directions for inner and outer walls. Interior/exterior molding plates are installed at both sides of the arranged materials. Fresh concrete is poured in a mold formed as above. After the poured concrete is cured in the molds, reinforcing rods are arranged on the cured concrete. Molding plates are installed on the reinforcing rod. Fresh concrete is poured in the molds to form a slab. When the inner and outer walls and slabs are formed completely, removal work of the mold and construction work of the insulation boards and interior/exterior materials are performed in order.
The conventional construction process will now be explained in more detail. In the construction of a building, after foundation work of the ground, reinforcing rods, section steels, beams, and the like are arranged on certain portions in the perpendicular and horizontal directions and the arranged reinforcing rods are linked each other. Wooden molds are usually installed on the inner and outer sides of the arranged reinforcing rods. The inner and outer molds may be supported by struts set up on respective outer surfaces of the interior/exterior molding plates or interval keeping means.
The conventional steel-frame structure and method of construction by using the same have, however, disadvantages that the struts and the interval keeping means are complicated to use. The struts must be respectively struck with big nails against the molding plates, making the installation and removal of the struts difficult. In addition, the interval keeping means must be fixed between the interior/exterior molds by passing through therebetween, which is time consuming. Further, the conventional frame structure and method of construction by using the same have further problems that when the interior/exterior molding plates installed as above are removed after the walls and the slabs are completely cured as a concrete body, it takes a long time to remove the struts, the interval keeping means and the molding plates in order. Labor costs increase greatly in addition to the cost of subsidiary materials such as the molding plates, struts and interval keeping means. Also, the conventional method of construction has still further problems that construction costs increase considerably due to extensions in construction time and the heavy expense of labor costs, since the construction works of the inner and outer walls, the insulation boards, and the interior/exterior materials are performed not simultaneously but separately in such a manner that the insulation boards are installed inside an outer wall after construction work of the inner and outer walls and slabs, the construction work of the insulation work for installing insulation plates inside the outer walls and piling of bricks, and the interior/exterior materials are performed in order.
Korean patent application 96-54011, Reg. No. 189216, (referred to Prior Art) by this applicant has suggested an improvement of the steel-frame structure wherein it is possible to simultaneously construct work of interior/exterior materials and insulation boards with the concrete pouring work upon completion of the steel-frame structure, and as a result, construction time can be reduced.
However, this prior art has another disadvantage that the interior/exterior plates are assembled only at the portions where the brackets having the screw holes are engaged. Further, the engagement bolt is exposed outward the steel interior/exterior material plates, thereby causing the rough surface.
DISCLOSURE OF THE INVENTION The present invention is made to solve the disadvantages of the prior art and has an object to provide a sectional steel-frame structure and a construction method in simultaneously performing the construction work of the interior/exterior materials and the insulation board in which the interior/exterior plates serving as steel molds are installed for engagement at any position from upper to lower portions and a head of the engagement bolt is not exposed outward to prevent the surface from being rough, thereby considerably reducing construction expenses and labor cost.
According to the present invention, there is provided a steel-frame structure comprising vertical members, horizontal members, connecting members of which center is engaged on the surface of the vertical members, supporting members in engagement with brackets at both end portions of the connecting members, interior/exterior panel plates in engagement with the supporting members, and fastening means engaged on the surface of the panel plates without protruding the head of the fastening means. In the present invention, the insulation board is inserted between the horizontal member and the vertical member, and fresh concrete is poured and cured therebetween with the interior/exterior material plates at both ends of the connecting members. The surface of the interior/exterior plates becomes smooth because the head of the fastening means is not protruded outward. In addition, the removal work of the molds is unnecessary, so that construction time and construction cost are reduced considerably.
BRIEF DESCRTPTTON OF THF. DRAWINGS
The present invention will become more fully understood from the detailed description given hereinafter and the accompanying drawing which is given by way of illustration only, and thus is not a limitation of the present invention, and wherein:
Fig. 1 is a perspective view showing a sectional steel-frame structure according to an embodiment of the present invention; Fig. 2A is a plan view illustrating the molding process for simultaneously performing construction of insulation boards and interior/exterior materials by using a steel-frame structure according to the preferred embodiment of the present invention;
Fig. 2B is a plan view illustrating the molding process for pouring concrete into the structure of Fig. 2A;
Fig. 3 a side view showing a sectional steel-frame structure according to an embodiment of the present invention;
Fig. 4 is a side view showing an engagement of the interior/exterior panel plates and the connecting members;
Fig. 5A is a perspective view showing a disengagement of the bracket and the connecting members; and
Fig. 5B is a perspective view showing an engagement of the bracket and the connecting members of Fig. 5A.
BEST MODE FOR CARRYING OUT THE INVENTION
In Fig. 1, a sectional steel-frame structure according to the present invention has vertical members 200, horizontal members 100, connecting members 400 of which center is engaged on the surface of the vertical members 200, supporting members 500 in engagement with brackets at both end portions of the connecting members 400 and interior/exterior plates 600a and 600b assembled to the supporting member 500. The vertical members 200 and the horizontal members 100 are section steel materials in the shape of a bracket *U" and have a number of holes perforated along surfaces thereof at regular intervals in a longitudinal direction and a number of holes perforated along two end parts at regular intervals in a longitudinal direction. The insulation board 300 is inserted in the insertion groove of the assembled horizontal members 100 and the vertical members 200 as shown in Fig. 2A.
The connecting member 400 has a number of holes 401 perforated on surface thereof at regular intervals in a lateral direction in order to be fixed to the vertical member 200. At both ends of the connecting member 400 brackets 410 are located, each having a hole 411 as shown in Figs. 5A and 5B.
The supporting member 500 in the shape of a bracket *U" has a number of holes 511 along two end parts in a longitudinal direction. The holes 511 coincide with the holes 411 perforated on the bracket 410. On surface thereof a number of holes 502 are formed at regular intervals in the longitudinal direction, so that the interior/exterior plates 600a and 600b are engaged through the holes 502.
The interior/exterior plates 600a and 600b are formed with two bent end parts. One inner bent end part 601 being in contact with the supporting member 500 is interposed with the other outer bent end part 602 of another interior/exterior plate, while the surface 603 is to be maintained in plane with repeated assembly. The inner and outer bent end parts 601 and 602 have holes 604 and 605 through which the screw 701 can pass but not the body 702. On the surface 603, insertion holes 606 are formed to coincide with the holes 604 and 605 through which the head 703 of the fastening "means 700 can pass. A method of construction by using the sectional steel-frame structure as above will be explained in more detailed.
<First process to construct the main frame> A number of vertical members 200 are installed with a predetermined interval on ground. Horizontal members 100 are fixed to coincide the holes 102 and 202 to be engaged by riveting or bolting through the holes. The horizontal members 100 are engaged at desired positions from bottom to top of the vertical members 200, to complete the main frame work.
<Second process to insert the insulation board> The insulation board 300 is inserted in the space between the horizontal member 100 and the vertical member 200 as shown in Fig. 2A.
<Third process to engage the supporting member> After completion of the main frame structure, a number of connecting members 400 are engaged with the vertical members 200 to coincide the hole 401 in the middle of surface thereof with the hole 201 of the vertical member 200 by riveting or bolting through the holes .
The supporting member 500 is fixed at the bracket 410 of the upper connecting member 400 and at the bracket 410 of the lower connecting member 400 to coincide with the holes 411 and 501 by riveting or bolting. To repeat this work at the brackets 410 of each rows ensures the engagement of the supporting member 500.
<Fourth process to construct the interior/exterior plates> At both supporting members 500 interior/exterior plates are fixed from the lower parts. Specifically, the inner bent end part 602 of the interior plate 600a is interposed with the outer bent end part 601 of another interior plate 600a, and the inner bent end part 602 of the exterior plate 600b is interposed with the outer bent end part 601 of another exterior plate 600b, so that the fastening means 700 is inserted by nailing to fix therebetween through the holes 604 and 605 which coincide with the hole 502 perforated on the surface of the supporting member 500.
Referring to Fig. 4, the screw 701 of fastening means 700 is nailed to the hole 502 through the groove 605, but the body 702 having larger diameter than the screw is not nailed. The head 703 of the fastening means 700 is fixed to the holes 604 and 605 formed on the interior/exterior plates 600a and 600b, so that the head 703 of the engaging means 700 stops up the insertion hole 606. The preferred length of supporting member 500 according to the present invention is long and the engagement with the interior/ exterior plates 600a and 600b are readily made at any desired position. The length of the supporting member is not restrictive in the invention.
The head 703 of the fastening means 700 is not protruded from the interior/exterior plates 600a and 600b and is completely filled with the insertion holes 606 (Fig. 3), which prevents the rough surface. This also functions to prevent the concrete from being leaked through the insertion holes 606.
<Fifth process to pour the concrete>
After the steel-frame structure as above is completed, the fresh concrete is poured and filled as shown in Fig. 2B. The concrete is cured with the insulation board 300 therein. On the inner and outer sides of the wall the interior/exterior plates 600a and 600b are constructed together with the structure.
The insulation construction work may be performed at any time before pouring the concrete, i.e., after assembling the supporting member 500 or after assembling the interior/exterior plates 600a and 600b.
The steel-frame structure of the present invention enables to simultaneously perform the insulation work and inner/exterior plates work and it becomes unnecessary to remove the molding, thereby shortening the construction period.
It will be appreciated by persons skilled in the art that numerous variations and/or modifications may be made to the invention as shown in the specific embodiments without departing from the spirit or scope of the invention as broadly described. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive.
EFFECT OF THE INVENTION
In a steel-frame structure and a method of construction by using the same according to the present invention, the sectional steel-frame structure may be assembled and constructed rapidly and conveniently. By using the steel- frame structure, it is possible to simultaneously perform construction work of interior/exterior materials and insulation boards and concrete pouring work, so that construction time and construction cost may be reduced considerably.

Claims

1. A steel-frame structure comprising: horizontal members (100) and vertical members (200) of section steel materials in the shape of *U" bracket, assembled by a number of holes (101, 102; 201, 202) perforated on surfaces at regular intervals in a longitudinal direction and two end parts at regular intervals in a longitudinal direction; insulation board (300) inserted in the insertion space between the assembled horizontal members (100) and vertical members (200) ; connecting members (400) with a number of holes (401) perforated on surface thereof at regular intervals to be engaged on surface of the vertical member (200) , and a pair of brackets (410) having a hole (411) to form a lattice by riveting or bolting through the hole; supporting members (500) having a number of holes perforated along surfaces thereof at regular intervals in a longitudinal direction and a number of holes 501 perforated along two end parts at regular intervals in a longitudinal direction, the supporting members being formed from elongated steel sections having a bracket shape; and panel members (600a, 600b) serving as an interior/exterior plates, assembled by fastening means (700) with the supporting members (500) ; wherein the brackets are fixed on the supporting members by riveting or bolting through the holes of the brackets and the holes of the surfaces of the supporting members.
2. A steel-frame structure as claimed in claim 1, wherein said panel members (600a, 600b) have the bent parts (601, 602) to have holes (604, 605) at both ends to ensure a surface (603) to be maintained in plane; insertion holes perforated on the surface (603); and the fastening means (700), said fastening means (700) includes a screw (701) to be engaged with the holes (604, 605), body (702) having a larger diameter than the screw and being stopped up with the bent parts (601, 602) , and a head (703) filled with the insertion hole (606) .
3. A method of constructing using a sectional steel- frame structure, comprising the steps of: first process of assembling the sectional steel- frame structure to form a lattice by installing a number of vertical members (200) on ground to engage with a number of horizontal members (100) at desired positions by riveting or bolting through the holes; second process of inserting the insulation board
(300) in the insertion space between the vertical members (200) and the horizontal members (100); third process of assembling a plurality of connecting members (400) having the brackets (410) at both ends thereof at regular intervals on the surface of the vertical members (200) , and engaging the connecting members (400) with the supporting members (500) in a longitudinal direction; fourth process of repeatedly assembling the panel members (600a, 600b) on the surfaces of both supporting members (500) upon completion of said third process; and fifth process of pouring the fresh concrete into the assembled steel-frame structure.
PCT/KR2000/000382 1999-04-24 2000-04-22 Steel-frame structure and method of construction by using the same WO2000065166A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU41502/00A AU4150200A (en) 1999-04-24 2000-04-22 Steel-frame structure and method of construction by using the same

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR1999/14761 1999-04-24
KR19990014761 1999-04-24
KR10-2000-0020428A KR100412160B1 (en) 1999-04-24 2000-04-18 Structure of steel aggregate for concrete building
KR2000/20428 2000-04-18

Publications (1)

Publication Number Publication Date
WO2000065166A1 true WO2000065166A1 (en) 2000-11-02

Family

ID=26635003

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2000/000382 WO2000065166A1 (en) 1999-04-24 2000-04-22 Steel-frame structure and method of construction by using the same

Country Status (3)

Country Link
KR (1) KR100412160B1 (en)
AU (1) AU4150200A (en)
WO (1) WO2000065166A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU766390B2 (en) * 2001-12-12 2003-10-16 Steel Building Systems Australia Pty Ltd Method of connecting brick tie to steel stud
WO2005014949A1 (en) * 2003-07-29 2005-02-17 Bruno Stoppa Wall, particularly for the construction of buildings
WO2008151355A1 (en) * 2007-06-15 2008-12-18 Tristanagh Pty Ltd Building construction system
US7524555B2 (en) 1999-11-19 2009-04-28 James Hardie International Finance B.V. Pre-finished and durable building material
CN103452187A (en) * 2013-09-30 2013-12-18 烟台金田科技有限公司 Steel structure concrete internal-external thermal insulation integration module house
AU2007202788B2 (en) * 2007-06-15 2014-11-27 Macholdings (Aust) Pty Ltd Building Construction System
US8993462B2 (en) 2006-04-12 2015-03-31 James Hardie Technology Limited Surface sealed reinforced building element
CN104674986A (en) * 2015-02-05 2015-06-03 姚攀峰 Multi-cavity concrete-filled steel tubular wall with internal pre-machined semi-continuous reinforcement cage and construction method
JP2016520738A (en) * 2013-04-22 2016-07-14 ユン インハクYOON, In Hak Ecological building structure, heat insulating structure thereof, and construction method of the heat insulating structure
GB2523766B (en) * 2014-03-04 2019-02-20 Abbey Pynford Holdings Ltd Shuttering system
US20230008578A1 (en) * 2019-12-16 2023-01-12 Knauf Gips Kg Drywall as Well as a Kit and a Method for Constructing a Drywall

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030034379A (en) * 2001-10-23 2003-05-09 정향림 A Wall Frame and a Method for Constructing Buildings Using the Same
KR101277358B1 (en) * 2012-02-06 2013-06-20 윤인학 Ecology building and insulating structure of the same, and building method for the insulating structure
KR101195308B1 (en) 2012-06-15 2012-10-26 송용도 Assembly type wall frame and zenith frame for house construction using said wall frame
KR101413089B1 (en) * 2012-12-17 2014-08-07 신영산업개발 주식회사 Outdoor wall finishing structure and construction method
KR102007947B1 (en) * 2018-12-24 2019-08-06 주식회사 덕신하우징 variable type detachable beam deck and method of constructing the same
KR102089764B1 (en) * 2019-04-02 2020-03-16 한국콘크리트산업 주식회사 Structures using s bar reinforcement and pc member horizontal reinforcement and construction method using them
KR102462960B1 (en) * 2020-11-05 2022-11-04 (주)센벡스 Prefabricated wall module for exterior insulation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2267429A1 (en) * 1974-04-11 1975-11-07 Brun Marcel Le Lost shuttering for walls - has fibrous - cement panels connected by ties and spacer rods
DE7615533U1 (en) * 1976-05-15 1976-09-23 Reimold, Peter, 7519 Eppingen KIT OF COMPONENTS FOR A WALL
DE3418687A1 (en) * 1984-05-19 1985-11-21 Karl-Heinz 4320 Hattingen Strelow Metal wall
DE4308874A1 (en) * 1992-03-21 1993-09-23 Lethe Metallbau Gmbh Prefabricatory wall structure for ships cabins - uses variations on U=shaped sheet with return flanges both ends to form rigid partitions
WO1993022519A1 (en) * 1992-04-30 1993-11-11 Rautaruukki Oy Wall formwork

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4338759A (en) * 1980-07-28 1982-07-13 Universal Component Systems, Inc. Method of building construction using concrete reinforced wall modules
US4918897A (en) * 1987-10-06 1990-04-24 Luedtke Charles W Construction system for detention structures and multiple story buildings
JPH08144401A (en) * 1994-11-16 1996-06-04 Tooami:Kk Wall for building or the like
KR970006702A (en) * 1995-07-31 1997-02-21 소광민 Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials
KR100322412B1 (en) * 1998-11-14 2002-05-13 이종찬,홍윤호,오승훈,성진용 Construction method using prefabricated steel frame wire
JP2001115468A (en) * 1999-10-19 2001-04-24 Tomio Honbo Execution method of concrete structure
KR100448443B1 (en) * 1999-12-23 2004-09-13 주식회사 포스코 Steel panel with steel bar and thermal insulation
JP2001248228A (en) * 1999-12-28 2001-09-14 Tomioka Kengo Steel structure and demolishep concrete-mass recycling construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2267429A1 (en) * 1974-04-11 1975-11-07 Brun Marcel Le Lost shuttering for walls - has fibrous - cement panels connected by ties and spacer rods
DE7615533U1 (en) * 1976-05-15 1976-09-23 Reimold, Peter, 7519 Eppingen KIT OF COMPONENTS FOR A WALL
DE3418687A1 (en) * 1984-05-19 1985-11-21 Karl-Heinz 4320 Hattingen Strelow Metal wall
DE4308874A1 (en) * 1992-03-21 1993-09-23 Lethe Metallbau Gmbh Prefabricatory wall structure for ships cabins - uses variations on U=shaped sheet with return flanges both ends to form rigid partitions
WO1993022519A1 (en) * 1992-04-30 1993-11-11 Rautaruukki Oy Wall formwork

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7524555B2 (en) 1999-11-19 2009-04-28 James Hardie International Finance B.V. Pre-finished and durable building material
AU766390B2 (en) * 2001-12-12 2003-10-16 Steel Building Systems Australia Pty Ltd Method of connecting brick tie to steel stud
WO2005014949A1 (en) * 2003-07-29 2005-02-17 Bruno Stoppa Wall, particularly for the construction of buildings
US8993462B2 (en) 2006-04-12 2015-03-31 James Hardie Technology Limited Surface sealed reinforced building element
AU2007202788B2 (en) * 2007-06-15 2014-11-27 Macholdings (Aust) Pty Ltd Building Construction System
EP2167751A4 (en) * 2007-06-15 2014-05-14 Macholdings Aust Pty Ltd BUILDING CONSTRUCTION SYSTEM
US8769900B2 (en) 2007-06-15 2014-07-08 Macholdings (Aust) Pty Ltd Building construction system
EP2167751A1 (en) * 2007-06-15 2010-03-31 Macform Intellectual Reserve Pty Ltd Building construction system
WO2008151355A1 (en) * 2007-06-15 2008-12-18 Tristanagh Pty Ltd Building construction system
JP2016520738A (en) * 2013-04-22 2016-07-14 ユン インハクYOON, In Hak Ecological building structure, heat insulating structure thereof, and construction method of the heat insulating structure
CN103452187A (en) * 2013-09-30 2013-12-18 烟台金田科技有限公司 Steel structure concrete internal-external thermal insulation integration module house
GB2523766B (en) * 2014-03-04 2019-02-20 Abbey Pynford Holdings Ltd Shuttering system
CN104674986A (en) * 2015-02-05 2015-06-03 姚攀峰 Multi-cavity concrete-filled steel tubular wall with internal pre-machined semi-continuous reinforcement cage and construction method
CN104674986B (en) * 2015-02-05 2017-02-22 姚攀峰 Multi-cavity concrete-filled steel tubular wall with internal pre-machined semi-continuous reinforcement cage and construction method
US20230008578A1 (en) * 2019-12-16 2023-01-12 Knauf Gips Kg Drywall as Well as a Kit and a Method for Constructing a Drywall
US12180703B2 (en) * 2019-12-16 2024-12-31 Knauf Gips Kg Drywall as well as a kit and a method for constructing a drywall

Also Published As

Publication number Publication date
KR20000071725A (en) 2000-11-25
KR100412160B1 (en) 2003-12-31
AU4150200A (en) 2000-11-10

Similar Documents

Publication Publication Date Title
WO2000065166A1 (en) Steel-frame structure and method of construction by using the same
US6023902A (en) Frame structure and method of construction by using the same
US6223480B1 (en) Pre-cast concrete panels for construction of a building
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
KR200481707Y1 (en) The outer wall for easy construction
KR20180094673A (en) Double plate walls and manufacturing method thereof
US5894704A (en) Wall construction process
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR20140112175A (en) Forms integrated construction structure and its construction method
KR100322412B1 (en) Construction method using prefabricated steel frame wire
KR100397580B1 (en) A method of executing a building using an iron reinforcing rod
KR100398707B1 (en) A method of executing a building using an iron reinforcing rod
KR0145358B1 (en) Method of building slabs
KR102595104B1 (en) Permanent form and construction method for pre-cast hollow column using the same
KR100371747B1 (en) Steel frame for structure operation and method for structure operation by using a steel frame
KR100392031B1 (en) Steel frame for structure operation and method for structure operation by using a steel frame
JP3848873B2 (en) Construction method of concrete wall of building and concrete formwork
JPH09264031A (en) Formwork for building concrete structures
KR100504350B1 (en) A method manufacturing of building
KR20170113783A (en) Structure of wall combined rebar and form
JPH0742728B2 (en) Method for connecting wall pillar and beam in PC wall method and method for forming floor using the method
JP2000356000A (en) Formwork unit construction method
JP3010253B2 (en) Formwork equipment
JP3334944B2 (en) How to build a building
JP2002242206A (en) Continuous footing construction method

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP