KR970006702A - Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials - Google Patents
Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials Download PDFInfo
- Publication number
- KR970006702A KR970006702A KR1019950023469A KR19950023469A KR970006702A KR 970006702 A KR970006702 A KR 970006702A KR 1019950023469 A KR1019950023469 A KR 1019950023469A KR 19950023469 A KR19950023469 A KR 19950023469A KR 970006702 A KR970006702 A KR 970006702A
- Authority
- KR
- South Korea
- Prior art keywords
- reinforcement
- construction
- interior
- exterior materials
- insulation
- Prior art date
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 27
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 239000000463 material Substances 0.000 title claims abstract 12
- 238000009413 insulation Methods 0.000 title claims abstract 10
- 238000003780 insertion Methods 0.000 claims abstract 6
- 230000037431 insertion Effects 0.000 claims abstract 6
- 230000003014 reinforcing effect Effects 0.000 claims abstract 6
- 238000004080 punching Methods 0.000 claims 2
- 210000004185 liver Anatomy 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
- 238000009415 formwork Methods 0.000 abstract 3
Landscapes
- Building Environments (AREA)
Abstract
본 발명은 건물의 골조공사를 할 때 조립식 철근배근체를 이용하여 단열시공과 내,외장재를 동시에 시공할 수 있는 구조에 관한 것으로서, 종래에는 철근을 일일이 묶어서 배근하였고 거푸집 설치를 필요로 함으로서 철근의 배근과 거푸집 설치에 소요되는 인력 및 시간 소요가 많았고, 또한 레미콘 양생 후 거푸집을 다시 제거하여야 하면서도 단열시공과 내,외장재의 시공을 레미콘 양생 후에 별도로 하여야 하므로 공사기일이 많이 소요되는 문제점이 있었다.The present invention relates to a structure that can be used at the same time the insulation construction and interior and exterior materials at the same time using the prefabricated reinforcement when the frame of the building, the conventional reinforcement by tying the reinforcing bars and installing the formwork of the rebar It required a lot of manpower and time to install the reinforcement and formwork, and also had to remove the formwork after the curing of the ready-mixed concrete, but the construction work of the insulation and the interior and exterior materials had to be done after the ready-mixed curing.
이에 따라 본 발명은 중앙 프레임(11)의 삽지홈(12)에 단열판(100)이 삽지되는 외벽용 배근체(10)와; 한상의 프레임(21)(21a)내외측에 상기 지지간(40)을 횡으로 접면시켜 체결한 내벽용 배근체(20)와; 레미콘의 유통공(33)이 다수 형성된 프레임(31)의 상하단에 다수의지지간(40)을 결합하여 된 슬라브용 배근체(30)로 배근조립을 하고, 상기 내벽용 배근체(20)와 외벽용 배근체(10)의 양측 지지간(40) 및 슬라브용 배근체(30)의 하측 지지간(40)에 내,외장재(70)(70a)를 드릴나사못(80)으로 체결한 다음 각 배근체에 레미콘을타설하면 내외벽과 슬라브가 성형될 때 단열시공과 내외장재의 시공이 함께 이루어져 공사기일의 단축과 인력을 절감할 수 있어 공사비를 상당히 줄일 수가 있는 것이다.Accordingly, the present invention is an outer wall reinforcement body 10 is inserted into the insulating plate 100 is inserted into the insertion groove 12 of the central frame (11); An inner wall reinforcement body 20 in which the support section 40 is laterally contacted and fastened to the inside and the outside of the frames 21 and 21a of the upper phase; The reinforcement assembly is performed with the slab reinforcement body 30 formed by combining a plurality of support rods 40 at the upper and lower ends of the frame 31 in which a plurality of distribution holes 33 of remicons are formed, and the inner wall reinforcement body 20 and the outer wall. The internal and exterior materials 70 and 70a are fastened with a drill screw 80 to both side support rods 40 of the reinforcement body 10 and the lower support rods 40 of the slab reinforcement body 30, and then each reinforcement. When the ready-mixed concrete is placed on the sieve, when the inner and outer walls and the slab are molded together, the insulation construction and the interior and exterior materials are combined to shorten the construction date and reduce the manpower, thus significantly reducing the construction cost.
Description
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.
제1도는 본 발명의 요부인 외벽용 배근체와 내벽용 배근체 및 슬라브용 배근체의 일부를 예시한 사시도, 제2도는 제1도의 각 배근체들을 시공 상태를 예시한 요부 횡단면도.Figure 1 is a perspective view illustrating a part of the main body of the present invention, the outer wall and the inner wall reinforcement and the slab reinforcement, Figure 2 is a main portion cross-sectional view illustrating the construction state of each of the reinforcement in Figure 1;
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950023469A KR970006702A (en) | 1995-07-31 | 1995-07-31 | Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950023469A KR970006702A (en) | 1995-07-31 | 1995-07-31 | Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials |
Publications (1)
Publication Number | Publication Date |
---|---|
KR970006702A true KR970006702A (en) | 1997-02-21 |
Family
ID=66541813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019950023469A KR970006702A (en) | 1995-07-31 | 1995-07-31 | Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR970006702A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100371747B1 (en) * | 2000-12-30 | 2003-02-12 | 소광민 | Steel frame for structure operation and method for structure operation by using a steel frame |
KR20030034379A (en) * | 2001-10-23 | 2003-05-09 | 정향림 | A Wall Frame and a Method for Constructing Buildings Using the Same |
KR100412160B1 (en) * | 1999-04-24 | 2003-12-31 | 주식회사 기하 동문 건축사사무소 | Structure of steel aggregate for concrete building |
-
1995
- 1995-07-31 KR KR1019950023469A patent/KR970006702A/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100412160B1 (en) * | 1999-04-24 | 2003-12-31 | 주식회사 기하 동문 건축사사무소 | Structure of steel aggregate for concrete building |
KR100371747B1 (en) * | 2000-12-30 | 2003-02-12 | 소광민 | Steel frame for structure operation and method for structure operation by using a steel frame |
KR20030034379A (en) * | 2001-10-23 | 2003-05-09 | 정향림 | A Wall Frame and a Method for Constructing Buildings Using the Same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100189216B1 (en) | Sectional steel house and the executing method thereof | |
KR100412160B1 (en) | Structure of steel aggregate for concrete building | |
KR970006702A (en) | Insulation construction using prefabricated reinforcement and simultaneous construction of interior and exterior materials | |
KR970006704A (en) | Simultaneous Construction of Interior and Exterior Materials Using Prefabricated Reinforcement | |
RU29737U1 (en) | Building module | |
KR20010057968A (en) | Steel panel with steel bar and thermal insulation | |
KR100397580B1 (en) | A method of executing a building using an iron reinforcing rod | |
KR100322412B1 (en) | Construction method using prefabricated steel frame wire | |
KR970011224A (en) | Simultaneous Construction Structure and Construction Method of Prefabricated Reinforcement and Concrete Frame and Interior and Exterior Materials | |
KR100189494B1 (en) | Executing method of the concrete structure work | |
KR200150449Y1 (en) | Construction formwork | |
KR880000073B1 (en) | A method of construction for concrete wall | |
KR0114180Y1 (en) | Tying device for forms | |
JPH0754361A (en) | Construction method of wall for slope face, building, or the like, and built-up reinforcement used therefor | |
JPH0680260B2 (en) | Concrete block assembly wall board | |
KR100398707B1 (en) | A method of executing a building using an iron reinforcing rod | |
KR200271517Y1 (en) | Reinforcing device of forms for constructing buidings and a support thereof | |
KR100392031B1 (en) | Steel frame for structure operation and method for structure operation by using a steel frame | |
KR860002661Y1 (en) | Prefabricated Support Rod for Formwork Fastening | |
RU2162126C2 (en) | Combined wall panel | |
JP2651477B2 (en) | Structure for mounting the outer frame of the building | |
KR960023550A (en) | Assembly structure of reinforcement and interior and exterior materials and construction method using the same | |
KR960003304Y1 (en) | Assembling members | |
JP2003119795A (en) | Foundation execution method by foam synthetic resin form | |
KR200306769Y1 (en) | a mold fixable structure for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 19950731 |
|
PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 19950731 Comment text: Request for Examination of Application |
|
PG1501 | Laying open of application | ||
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 19980514 |
|
NORF | Unpaid initial registration fee | ||
PC1904 | Unpaid initial registration fee |