US1846815A - Process of connecting solidified foundation soil to building structures and the structure produced thereby - Google Patents

Process of connecting solidified foundation soil to building structures and the structure produced thereby Download PDF

Info

Publication number
US1846815A
US1846815A US512378A US51237831A US1846815A US 1846815 A US1846815 A US 1846815A US 512378 A US512378 A US 512378A US 51237831 A US51237831 A US 51237831A US 1846815 A US1846815 A US 1846815A
Authority
US
United States
Prior art keywords
soil
solidified
foundation soil
building structures
structure produced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US512378A
Inventor
Sichardt Willy
Zemlin Carl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Bauunion GmbH
Original Assignee
Siemens Bauunion GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Bauunion GmbH filed Critical Siemens Bauunion GmbH
Application granted granted Critical
Publication of US1846815A publication Critical patent/US1846815A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/26Compacting soil locally before forming foundations; Construction of foundation structures by forcing binding substances into gravel fillings

Definitions

  • connection between the foundation soil and the erected structure is improved and simplified by leaving the tubes, used for the injection of the solidifying substances, in the solidified foundation soil and by embedding their projecting upper ends to the constructional part which is erected on the foundation soil.
  • Figure 1 is a vertical section through a construction according to one embodiment of the invention.
  • Figure 2 is a similar view of anotherembodiment of the invention.
  • FIG. 1 sheet pilings 1 and 2 between which lies the foundation block 3.
  • the foundation body 3 is to be understood as soil material artificially solidified, for example, by the introduction of chemicals which convert the loose soil into artificial rock.
  • iron rods 1 are inserted in the ground which is to be solidified. These iron rods 4 project at their free ends from the foundation body, and may be bent, as indicated at 5, and embedded in the concrete or masonry 6 when V the latter is formed.
  • a structure comprising in combination, artificially solidified foundation soil, the soil having embedded in it pipes through which solidifying material has been introduced into the soil, said pipes having hooked portions projecting beyond the soil, and a building structure connected to said hooked portions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Description

F 1932- w. SlCHARDT ET AL 1,846,815 PROCESS OF CONNECTING SOLIDIFIED FOUNDATIQN SOIL T0 BUILDING STRUCTURES AND THE STRUCTURE PRODUCED THEREBY Filed Jan. 50, 1931 WM Z I Q w BMM+ ejl w Patented Feb. 23, 1932 UNITED STATES PATENT OFFICE WILLY SICHARDT, F BERLIN-STEGLITZ, AND CARL ZEMLIN, OF BERLIN-PANKOW, GERMANY, ASSIGNORS T0 SIEMENS-BAUUNION G. M. B. BL, KOMMANDITGESELL SCHAIT, OF SIEMENSSTADT, NEAR BERLIN, GERMANY, A CORPORATION OF GER- MANY PROCESS OF CONNECTING SOLIDIFIED FOUNDATION I SOIL TO BUILDING STRUCTURES AND THE STRUCTURE PRODUCED THEREBY Application filed January 30, 1931, Serial No. 512,378, and in Germany April 11, 1930.
, crete or of stone, brick or the like, which is n- IJIJ erected on the foundation soil.
In carrying out solidifying work the fastening between the solidified foundation soil and the constructional parts of concrete or stone, brick and the like, which are erected on the foundation soil is deficient in many cases and gives rise to trouble in the structure.
According to the present invention the connection between the foundation soil and the erected structure is improved and simplified by leaving the tubes, used for the injection of the solidifying substances, in the solidified foundation soil and by embedding their projecting upper ends to the constructional part which is erected on the foundation soil. 7
In the accompanying drawings Figure 1 is a vertical section through a construction according to one embodiment of the invention, and
Figure 2 is a similar view of anotherembodiment of the invention.
In Figure 1 are shown sheet pilings 1 and 2 between which lies the foundation block 3. The foundation body 3 is to be understood as soil material artificially solidified, for example, by the introduction of chemicals which convert the loose soil into artificial rock. Before or during the solidification, iron rods 1 are inserted in the ground which is to be solidified. These iron rods 4 project at their free ends from the foundation body, and may be bent, as indicated at 5, and embedded in the concrete or masonry 6 when V the latter is formed.
In Figure 2 a somewhat different embodiment of the invention is illustrated. Instead of the iron rods 4, the pipes 7, which serve for the introduction of the solidification medium, are in this instance simply allowed to remain in the solidified mass, and as in the case of the iron rods in Figure 1 are bent into hooks 8 at their upper ends, where they are I crete as a means of reinforcement is in itself known in the preparation of piles which are prepared in the foundation soil; there is, however, the particular advantage, when carrying out solidifying work, that the said tubes also serve to fasten the constructional part to the foundation soil. Further the tubes for the injection do not have to be pulled out after the solidification has been completed and do not have to be particularly cleaned or repaired. On the contrary the tubes remain in the structure serving as reinforcing iron.
We claim as our invention:
1. The process of connecting foundation soil to building structures which comprises inserting reinforcing members part-way into the soil, solidifying the soil, and erecting a structure on the solidified soil in attachment with the protruding portions of the reinforcing members.
2. The process of connecting foundation soil to building structures which comprises 7 inserting pipes part-way into the soil, introducing solidifying material into the soil through the pipes, and erecting a structure on the solidified soil in attachment with the pipes. I
3. A structure comprising in combination, artificially solidified foundation soil, the soil having embedded in it pipes through which solidifying material has been introduced into the soil, said pipes having hooked portions projecting beyond the soil, and a building structure connected to said hooked portions.
In testimony whereof we aflix our signa- WILLY SICHARDT. CARL ZEMLIN.
tures.
US512378A 1930-04-11 1931-01-30 Process of connecting solidified foundation soil to building structures and the structure produced thereby Expired - Lifetime US1846815A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1846815X 1930-04-11

Publications (1)

Publication Number Publication Date
US1846815A true US1846815A (en) 1932-02-23

Family

ID=7745821

Family Applications (1)

Application Number Title Priority Date Filing Date
US512378A Expired - Lifetime US1846815A (en) 1930-04-11 1931-01-30 Process of connecting solidified foundation soil to building structures and the structure produced thereby

Country Status (1)

Country Link
US (1) US1846815A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124982A (en) * 1976-09-22 1978-11-14 Raymond International Inc. Method of stabilizing soil in pile bearing regions
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124982A (en) * 1976-09-22 1978-11-14 Raymond International Inc. Method of stabilizing soil in pile bearing regions
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure

Similar Documents

Publication Publication Date Title
US4060994A (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
US3753354A (en) Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
KR101701089B1 (en) Method of repairing and reinforcing damaged part of concrete structure using assemblable anchor and panel
US3226935A (en) Retaining wall and method of constructing same
US3848377A (en) Mat foundation
KR101524303B1 (en) The wall members and underground wall, underground wall construction method using the same
US1846815A (en) Process of connecting solidified foundation soil to building structures and the structure produced thereby
US1747038A (en) Retaining wall
US4126001A (en) Method for constructing a soil structure
US3229468A (en) Method of constructing retaining wall
JP7053402B2 (en) Rectangular shaft and its construction method
KR102614942B1 (en) Construction structure for precast exterior panel of soil retaining wall and constructing method thereof
JP3608070B2 (en) Construction method of columnar improvements
US3854294A (en) Method for producing a pile support arrangement
JP2003268771A (en) Dry block, its molding form, its molding method and reinforcing earth structure using the dry block
AT330677B (en) METHOD FOR MANUFACTURING UNDERGROUND WALLS MANUFACTURED BY THE DIAPHRAGM METHOD, AND THE FINISHED PART AND DAM PART FOR PERFORMING THE METHOD
US1829463A (en) Concrete retaining wall
JPS6319648B2 (en)
SU1052625A1 (en) Method of constructing a cast-in-place injector pile
JPH02190517A (en) Retaining wall structure
KR102663031B1 (en) Retaining wall construction method using composite reinforcement unit applied with stiffener and corrugated pipe
JP2811436B2 (en) Construction method of earth retaining or fence and concrete block used in the method
CA1062482A (en) Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided
JP2984728B2 (en) Construction method of cast-in-place concrete pile
JP2565452B2 (en) Construction method of self-supporting retaining wall