TWI783775B - Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss - Google Patents
Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss Download PDFInfo
- Publication number
- TWI783775B TWI783775B TW110141935A TW110141935A TWI783775B TW I783775 B TWI783775 B TW I783775B TW 110141935 A TW110141935 A TW 110141935A TW 110141935 A TW110141935 A TW 110141935A TW I783775 B TWI783775 B TW I783775B
- Authority
- TW
- Taiwan
- Prior art keywords
- inner tube
- recyclable
- environmentally friendly
- cover
- nut
- Prior art date
Links
Images
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Building Environments (AREA)
Abstract
一種屋頂架高可拆裝回收環保隔熱構造及施工方法,包括一外管、一內管、至少一固定組件、一螺絲鎖掛組件、一蓋體及一板體,該外管設於一平面上,該內管容設於外管內部,複數卡扣槽對應開設於該內管之外壁,該固定組件卡設於卡扣槽上並由一基座、一第一固定件及一第二固定件所組成,該第一、二固定件呈交叉重疊設置並於重疊處設有該基座,該基座中央形成一穿孔,該螺絲鎖掛組件由一螺桿及一螺帽組所組成,該螺帽組具有一上螺帽及一下螺帽,該螺桿貫穿該螺帽組以令上、下螺帽分設於螺桿的兩端,並該螺桿同時貫設所述穿孔,該板體架設於所述蓋體上側。A detachable, recyclable, environmentally friendly heat insulation structure and construction method for a high roof frame, including an outer tube, an inner tube, at least one fixing component, a screw locking component, a cover body and a plate body, the outer tube is arranged on a On a plane, the inner tube is accommodated inside the outer tube, and a plurality of buckle slots are correspondingly opened on the outer wall of the inner tube. Composed of two fixing parts, the first and second fixing parts are arranged in a cross-overlapping position and the base is provided at the overlapping place, a perforation is formed in the center of the base, the screw locking assembly is composed of a screw rod and a nut set , the nut set has an upper nut and a lower nut, and the screw runs through the nut set so that the upper and lower nuts are respectively arranged at both ends of the screw, and the screw is simultaneously provided with the perforation, the plate body erected on the upper side of the cover.
Description
本發明係有關於一種屋頂架高之構造,尤指一種具有通風及遮陰隔熱功效之屋頂架高可拆裝回收環保隔熱構造及施工方法。 The present invention relates to a high roof structure, in particular to a detachable, recyclable, environmentally friendly heat insulation structure and a construction method for the high roof with the functions of ventilation, shading and heat insulation.
建築物的防水、隔熱、隔音等需求,一直是業界極欲改善的課題。以屋頂漏水來說,室內發生滲水現象形成壁癌一向是惱人的惡夢,追溯其原因,不外乎是屋頂防水層是否安全;其上方另其鋪蓋水泥隔熱保護層,常擔心熱漲冷縮造成膨脹拱起引起龜裂隆起,故會切割預留伸縮縫,若植物種子掉落其中根部便會紮入其中,造成水泥隔熱保護層破壞,間接造成防水層穿透脫層而致漏水。或受到地震重物穿刺等加諸於建築物之外力,或是建築物經熱脹冷縮或日曬雨淋的緩慢風化,均可導致建築物自然形成裂痕或縫隙,使得建築物或多或少都有滲水的問題。 Waterproofing, heat insulation, and sound insulation of buildings have always been issues that the industry wants to improve. Taking roof leaks as an example, indoor water seepage and wall cancer have always been an annoying nightmare. Looking back on the cause, it is nothing more than whether the roof’s waterproof layer is safe; above it is covered with a cement insulation layer, often worrying about heat and cold Shrinkage causes expansion and arching to cause cracks and uplifts, so the expansion joints will be cut and reserved. If the plant seeds fall into them, the roots will stick into them, causing damage to the cement insulation protection layer, and indirectly causing the waterproof layer to penetrate and delaminate, resulting in water leakage. . Or the external force imposed on the building by the puncture of heavy objects in the earthquake, or the slow weathering of the building through thermal expansion and contraction or sun and rain, can lead to the natural formation of cracks or gaps in the building, making the building more or less There are few problems with water seepage.
以建築物的屋頂舉例來說,以往屋頂的防水、修漏工程可分為硬質保護層及軟質防水材料的施工法,其中硬質材料工法是用於防水層上方保護層以水泥攪拌隔熱砂漿等硬質材料粉刷形成防水保護層;軟質材料施工法則利用瀝青、聚尿樹脂、聚胺基甲酸乙酯(PU)等高分子防水材噴灑、粉刷於屋頂樓板面,以達到阻隔水分滲透的目的。然而,不論何種施工法,皆須靠大量的人力不斷地在地面上來回舖設、粉刷,如此不僅造成人力及材料的耗用之外,施工步驟上也較為繁雜並耗用資金成本。 Take the roof of a building as an example. In the past, the waterproofing and leak repairing works of the roof can be divided into hard protective layer and soft waterproof material construction method. The hard material construction method is used for the protective layer above the waterproof layer, mixing cement and insulating mortar, etc. Hard materials are painted to form a waterproof protective layer; soft materials are constructed by using asphalt, polyurethane resin, polyurethane (PU) and other polymer waterproof materials to spray and paint on the roof and floor surfaces to achieve the purpose of blocking water penetration. However, regardless of the construction method, a large amount of manpower is required to continuously lay and paint the ground back and forth, which not only results in the consumption of manpower and materials, but also complicates the construction steps and consumes capital costs.
是以,要如何解決上述習用之問題與缺失,即為從事此行業之相關廠商所亟欲研究改善之方向所在者。 Therefore, how to solve the above-mentioned conventional problems and deficiencies is the direction that relevant manufacturers in this industry want to study and improve.
爰此,為有效解決上述之問題,本發明之主要目的在於提供一種具有通風及遮陰隔熱功效之屋頂架高可拆裝回收環保隔熱構造。 Therefore, in order to effectively solve the above-mentioned problems, the main purpose of the present invention is to provide a detachable, recyclable, environmentally friendly and heat-insulating structure with a high roof frame that has the functions of ventilation, shading and heat insulation.
本創作之次要目的,在於提供一種易於施工之屋頂架高可拆裝回收環保隔熱構造。 The secondary purpose of this creation is to provide a kind of easy-to-construction roof truss, which can be assembled and disassembled, recycled and environmentally friendly and heat-insulated.
本創作之次要目的,在於提供一種具有園藝造景效果之屋頂架高可拆裝回收環保隔熱構造。 The secondary purpose of this creation is to provide a detachable, recyclable, environmentally friendly and heat-insulating structure for the height of the roof frame with the effect of gardening and landscaping.
本創作之次要目的,在於提供一種具有通風及遮陰隔熱功效之屋頂架高可拆裝回收環保隔熱施工方法。 The secondary purpose of this creation is to provide a detachable, recyclable, environmentally friendly and heat-insulating construction method for the height of the roof frame with the functions of ventilation, shade and heat insulation.
本創作之次要目的,在於提供一種易於施工之屋頂架高可拆裝回收環保隔熱施工方法。 The secondary purpose of this creation is to provide an easy-to-construction roof elevating, detachable, recyclable, environmentally friendly and heat-insulating construction method.
本創作之次要目的,在於提供一種具有園藝造景效果之屋頂架高可拆裝回收環保隔熱施工方法。 The secondary purpose of this creation is to provide a detachable, recyclable, environmentally friendly and heat-insulating construction method for the height of the roof with the effect of horticultural landscaping.
為達上述目的,本發明係提供一種屋頂架高可拆裝回收環保隔熱構造,係包括一外管、一內管、至少一固定組件、一螺絲鎖掛組件、一蓋體及一板體,該外管設於一平面上,其內部填充一建築材料,該內管對應容設於所述外管內部,並令部分之建築材料填充該內管,複數卡扣槽對應開設於該內管之外壁,該一固定組件對應卡設於所述卡扣槽上,該固定組件係由一基座、一第一固定件及一第二固定件所組成,該第一、二固定件呈相交叉重疊設置並於該重疊處設有該基座,該基座中央形成一穿孔,該螺絲鎖掛組件由一螺桿及一螺帽組所組成,該螺帽組具有一上螺帽及一下螺帽,該螺桿貫穿該螺帽組以令所述上、下螺帽分設於螺桿的兩端,並 該螺桿同時貫設所述穿孔,該蓋體與所述內管外周緣相對應蓋合,該板體架設於所述蓋體上側,並該板體之四隅分別形成一缺口,所述螺絲鎖掛組件係外露於該缺口處。 In order to achieve the above purpose, the present invention provides a high roof frame detachable recyclable environmental protection heat insulation structure, which includes an outer tube, an inner tube, at least one fixing component, a screw locking component, a cover and a plate , the outer tube is set on a plane, and its interior is filled with a building material. The inner tube is correspondingly accommodated inside the outer tube, and part of the building material is filled into the inner tube. A plurality of buckle slots are correspondingly opened in the inner tube. On the outer wall of the tube, the fixing component is correspondingly fastened on the buckle groove. The fixing component is composed of a base, a first fixing piece and a second fixing piece. The first and second fixing pieces are in the form of The pedestal is arranged in an overlapping manner, and a perforation is formed in the center of the pedestal. The screw locking component is composed of a screw rod and a nut group, and the nut group has an upper nut and a lower Nut, the screw rod runs through the nut group so that the upper and lower nuts are respectively arranged at the two ends of the screw rod, and The screw rod penetrates the through hole at the same time, the cover body is covered with the outer peripheral edge of the inner tube correspondingly, the plate body is erected on the upper side of the cover body, and a gap is formed in the four corners of the plate body, and the screw lock The hanging component is exposed at the gap.
在一實施例中,所述卡扣槽係開設於所述內管外壁的兩相對處,以令所述第一、二固定件呈X形或十字形卡設於該內管外壁的卡扣槽上。 In one embodiment, the buckle grooves are opened at two opposite sides of the outer wall of the inner tube, so that the first and second fixing parts are X-shaped or cross-shaped and fixed on the buckles on the outer wall of the inner tube. on the slot.
在一實施例中,更具有一墊圈,其係組設於所述上螺帽之下側,該墊圈係用以增加接觸面積藉以防止所述上螺帽鬆脫。 In one embodiment, a washer is provided on the lower side of the upper nut, and the washer is used to increase the contact area so as to prevent the upper nut from loosening.
在一實施例中,所述內管及蓋體係呈正圓筒形,所述板體之其中一隅係架設於該蓋體上側四分之一圓面積位置處。 In one embodiment, the inner tube and the cover system are in the shape of a right cylinder, and one of the corners of the plate body is erected at a position of a quarter circle area on the upper side of the cover body.
在一實施例中,所述板體之一側更形成複數凸塊,所述凸塊係對應設置於所述蓋體上側。 In one embodiment, one side of the board further forms a plurality of protrusions, and the protrusions are correspondingly arranged on the upper side of the cover.
在一實施例中,更具有一塊體,該塊體係對應設置於所述板體下方或上方處。 In one embodiment, there is further a block, and the block system is correspondingly arranged below or above the board.
在一實施例中,更具有一覆蓋層,其係對應鋪設於所述板體上側,於該覆蓋層上更披覆一土壤層。 In one embodiment, a covering layer is further provided, which is correspondingly laid on the upper side of the board body, and a soil layer is further covered on the covering layer.
為達上述目的,本發明係提供一種頂架高可拆裝回收環保隔熱施工方法,係包括以下步驟:S1:提供一外管;S2:提供一螺絲鎖掛組件及一固定組件,將該螺絲鎖掛組件與該固定組件相互組合後卡設於一內管之卡扣槽上;S3:將組合完成的內管對應置入事先倒入加水拌合之水泥砂漿之外管內,藉加水拌合之水泥砂漿吸附力及使用鐳射水平儀調整水平高度即完成定標套接程序; S4:提供一蓋體與所述內管外周緣相對應蓋合;S5:提供一板體架設於該蓋體上側,並令所述螺絲鎖掛組件外露於該板體四隅形成的缺口處。 In order to achieve the above purpose, the present invention provides a high-mounted, detachable, recyclable, environmentally friendly and heat-insulating construction method, which includes the following steps: S1: providing an outer tube; S2: providing a screw locking assembly and a fixing assembly, and the The screw lock assembly and the fixing assembly are combined and then clamped on the buckle groove of an inner pipe; S3: Put the assembled inner pipe into the outer pipe of the cement mortar that has been poured into the water and mixed in advance, and add water The adsorption force of the mixed cement mortar and the use of a laser level to adjust the level height complete the calibration and socketing procedure; S4: providing a cover corresponding to the outer periphery of the inner tube; S5: providing a plate erected on the upper side of the cover, and exposing the screw locking assembly to the gap formed by the four corners of the plate.
在一實施例中,於所述S5:提供一板體架設於該蓋體上側,並令所述螺絲鎖掛組件外露於該板體四隅形成的缺口處之步驟後,更包括:S6:於所述板體上更鋪設一覆蓋層,最後於該覆蓋層上再披覆一土壤層。 In one embodiment, after the step of S5: providing a board to be erected on the upper side of the cover, and exposing the screw locking component to the gaps formed at the four corners of the board, it further includes: S6: A covering layer is further laid on the board body, and finally a soil layer is covered on the covering layer.
透過本發明的結構設計,透過該內管設置於該外管的內部後,再將所述蓋體對應蓋合該內管,接著將所述板體架設於所述蓋體的上側,並透過該蓋體的四隅形成的缺口得以露出該缺口,如此一來,可使該板體連續地拼接以令板體與所述平面相平行且彼此之間形成一空間,藉由該空間進以達到排水及散熱之功效,此外,可於該板體上再鋪設所述覆蓋層後再披覆土壤層,達到園藝造景之效果。 Through the structural design of the present invention, after the inner tube is arranged inside the outer tube, the cover body is correspondingly covered with the inner tube, and then the board is erected on the upper side of the cover body, and through The notch formed by the four corners of the cover can expose the notch, so that the plates can be spliced continuously so that the plates are parallel to the plane and form a space between each other, through which the space can be achieved. The effect of drainage and heat dissipation, in addition, the covering layer can be laid on the board body and then the soil layer can be covered to achieve the effect of gardening and landscaping.
再者,本發明若未來須修繕時,只需扭轉旋開螺絲鎖掛組件,並移開板體就可修繕防水層,完成後再行歸位復原,不會產生事業廢棄物,達到簡易修繕及節能效果。 Furthermore, if the present invention needs to be repaired in the future, the waterproof layer can be repaired only by twisting and unscrewing the screw lock assembly, and removing the plate body, and then return to its original position after completion, so that no industrial waste will be generated, and simple repair can be achieved and energy-saving effect.
此外,若所述板體老化破損時,只需扭轉旋開螺絲鎖掛組件,再更換新的便可簡單操作完成,而且舊料為可回收塑料,交由回收站處理即可,無事業廢棄物的產生問題。 In addition, if the board is damaged due to aging, you only need to twist and unscrew the screw lock assembly, and then replace it with a new one, which can be easily completed. Moreover, the old material is recyclable plastic, which can be disposed of at the recycling station, and there is no business waste The production problem.
本發明另外也免除了習知技術須於防水層92上水泥隔熱保護層,由於習知技術因為會因擔心熱漲冷縮造成膨脹拱起引起龜裂隆起,故會切割預留伸縮縫,若植物種子掉落其中根部便會紮入其中,造成水泥隔熱保護層破壞,間接造成防水層穿透脫層而致漏水,透過本發明因防水層92上無水泥隔熱保護層的結構設計,植物種子無水泥裂縫孔洞縫隙可供根部穿紮固定,必然會枯萎腐爛,無法對防水層92造成破壞。
In addition, the present invention also eliminates the need for a cement heat-insulating protective layer on the
10:外管 10: Outer tube
11:內管 11: inner tube
110:卡扣槽 110: buckle slot
12:固定組件 12: Fixed components
120:基座 120: base
1200:穿孔 1200: perforation
121:第一固定件 121: the first fixing part
122:第二固定件 122: the second fixing piece
13:螺絲鎖掛組件 13: Screw lock assembly
130:螺桿 130: screw
131:螺帽組 131: Nut set
1310:上螺帽 1310: screw cap
1311:下螺帽 1311: Bottom nut
14:蓋體 14: cover body
2:板體 2: board body
20:缺口 20: Gap
3:凸塊 3: Bump
4:凹槽 4: Groove
5:墊圈 5: Gasket
6:塊體 6: block
7:平面 7: Plane
8:空間 8: space
9:建築材料 9: Building materials
90:覆蓋層 90: Overlay
91:土壤層 91: Soil layer
92:防水層 92: waterproof layer
S1~S6:步驟 S1~S6: steps
第1圖係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之結構示意圖;第2圖係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之實施示意圖;第3圖係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之實施示意圖;第4圖係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之俯視放大圖;第5圖係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之俯視圖;第6圖係為本發明屋頂架高可拆裝回收環保隔熱構造第二實施例之實施示意圖;第7圖係為本發明屋頂架高可拆裝回收環保隔熱施工方法第一實施例之步驟流程圖;第8圖係為本發明屋頂架高可拆裝回收環保隔熱施工方法第二實施例之步驟流程圖。 Figure 1 is a structural schematic diagram of the first embodiment of the roof frame height detachable recycling environmentally friendly heat insulation structure of the present invention; Figure 2 is the implementation of the first embodiment of the roof frame height detachable recycling environmental protection heat insulation structure of the present invention Schematic diagram; Figure 3 is a schematic diagram of the implementation of the first embodiment of the roof frame height detachable recycling environmentally friendly heat insulation structure of the present invention; Figure 4 is the first embodiment of the roof frame height detachable recycling environmental protection heat insulation structure of the present invention Figure 5 is a top view of the first embodiment of the high roof rigging, detachable, recyclable, environmentally friendly and heat-insulating structure of the present invention; Figure 6 is the second embodiment of the detachable, recyclable, environmentally friendly and heat-insulating structure of the present invention. Implementation schematic diagram of the embodiment; Fig. 7 is a flow chart of the steps of the first embodiment of the roof elevating detachable recycling environmental protection heat insulation construction method of the present invention; Fig. 8 is a detachable recyclable environmental protection insulation construction method of the present invention A flow chart of the steps of the second embodiment of the thermal construction method.
本發明之上述目的及其結構與功能上的特性,將依據所附圖式之較佳實施例予以說明。 The above-mentioned purpose of the present invention and its structural and functional characteristics will be described based on the preferred embodiments of the accompanying drawings.
在以下,針對本發明有關屋頂架高可拆裝回收環保隔熱構造及施工方法之構成及技術內容等,列舉各種適用的實例並配合參照隨文所附圖式而加以詳細地說明;然而,本發明當然不是限定於所列舉之該等的實施例、圖式或詳細說明內容而已。 In the following, various applicable examples are listed and described in detail with reference to the accompanying drawings for the composition and technical content of the present invention's high, detachable, recyclable, environmentally friendly, heat-insulating structure and construction method; however, Of course, the present invention is not limited to the listed embodiments, drawings or detailed descriptions.
再者,熟悉此項技術之業者亦當明瞭:所列舉之實施例與所附之圖式僅提供參考與說明之用,並非用來對本發明加以限制者;能夠基於該等記載而容易實施之修飾或變更而完成之發明,亦皆視為不脫離本發明之精神與意旨的範圍內,當然該等發明亦均包括在本發明之申請專利範圍。 Furthermore, those who are familiar with this technology should also understand that the listed embodiments and accompanying drawings are only for reference and description, and are not used to limit the present invention; they can be easily implemented based on these records. Inventions completed through modifications or alterations are also considered within the scope of not departing from the spirit and intent of the present invention, and of course such inventions are also included in the scope of the patent application of the present invention.
又,以下實施例所提到的方向用語,例如:「上」、「下」、「左」、「右」、「前」、「後」等,僅是參考附加圖示的方向。因此,使用的方向用語是用來說明,而並非用來限制本發明;再者,在下列各實施例中,相同或相似的元件將採用相同或相似的元件標號。 In addition, the directional terms mentioned in the following embodiments, such as "upper", "lower", "left", "right", "front", "rear", etc., are only referring to the directions attached to the drawings. Therefore, the used directional terms are used to illustrate rather than limit the present invention; moreover, in the following embodiments, the same or similar components will use the same or similar component numbers.
請參閱第1、2、3圖,係為本發明屋頂架高可拆裝回收環保隔熱構造第一實施例之結構示意圖及實施示意圖,如圖所示,一種屋頂架高可拆裝回收環保隔熱構造,係包括一外管10、一內管11、至少一固定組件12、一螺絲鎖掛組件13、一蓋體14及一板體2,該外管10設於一平面7(即地面)上,於該平面7上可事先鋪設一防水層92,並令該外管10內部填充一建築材料9(如:水泥),該內管11對應容設於所述外管10的內部,並令部分之建築材料9填充於該內管11內,複數卡扣槽110對應開設於該內管11之外壁,並令所述卡扣槽110開設於外壁的兩相對處。
Please refer to Figures 1, 2, and 3, which are the structural schematic diagrams and implementation schematic diagrams of the first embodiment of the roof-mounted detachable, recyclable, environmentally-friendly and heat-insulating structure of the present invention. The heat insulation structure includes an
前述固定組件12係由一基座120、一第一固定件121及一第二固定件122所組成,該第一、二固定件121、122呈相交叉重疊設置,使該第一、二固定件121、122呈現X形或十字形之結構態樣,並於該第一、二固定件121、122的交叉重疊處設有所述基座120,該基座120中央貫通形成一穿孔1200,所述固定組件12對應卡設於內管11外壁的卡扣槽110上。
前述螺絲鎖掛組件13係由一螺桿130及一螺帽組131所組成,該螺帽組131更具有一上螺帽1310及一下螺帽1311,該螺桿130貫穿該
螺帽組131以令所述上、下螺帽1310、1311分設於螺桿130的兩端,並該螺桿130同時貫設所述基座120的穿孔1200,此外,於該上螺帽1310之下側更組設有一墊圈5,該墊圈5係用以增加接觸面積藉以防止所述上螺帽1310鬆脫。
The aforementioned
所述蓋體14與所述內管11係呈正圓筒形,得以使得該蓋體14與內管11之外周緣相對應蓋設結合,該蓋體14係提供一拘束力以防止所述建築材料9久置產生外擴,進以避免所述內管11破裂。
The
續請參閱第4、5圖,前述板體2架設於所述蓋體14上側,該板體2之四隅分別形成一缺口20,所述螺絲鎖掛組件13係外露於該缺口20處,更進一步說明,於本實施之較佳實施例中,當所述板體2架設於該蓋體14上側時,所述板體2之其中一隅係架設於該蓋體14上側四分之一圓面積位置處,也就是說,所述蓋體14上側會被四塊板體2相並排覆蓋住,僅外露出組設的螺絲鎖掛組件13。
Please refer to the 4th and 5th figures, the
此外,覆請參閱第3圖,需說明的是,所述板體2之一側更形成複數凸塊3,該凸塊3與該板體2係為一體成形,所述凸塊3係對應設置於所述蓋體14上側,透過該凸塊3的結構設計,使得所述平面7(即地面)與所述板體2相互平行且彼此之間形成一空間8,如此一來,可藉由該空間8進以達到排水及散熱之功效。
In addition, referring to Fig. 3, it should be noted that one side of the
請參閱第6圖,係為本發明屋頂架高可拆裝回收環保隔熱構造第二實施例之實施示意圖,所述屋頂架高可拆裝回收環保隔熱構造部份元件及元件間之相對應之關係與前述屋頂架高可拆裝回收環保隔熱構造相同,故在此不再贅述,惟本屋頂架高可拆裝回收環保隔熱構造與前述最主要之差異為,更具有一塊體6,該塊體6係對應設置於所述板體2下方或上方處,換句話說,該塊體6與該板體2係為分離式部件,透過該塊體6的設置,可使得該
屋頂架高可拆裝回收環保隔熱構造呈現一凹槽4結構態樣,利用該凹槽4的設計,可於其內更鋪設一覆蓋層90,該覆蓋層90可以為不織布,但並不引以為限,接著再於該覆蓋層90上披覆一土壤層91,令該凹槽4處種植草皮、植物等,達到園藝造景之效果。
Please refer to Figure 6, which is a schematic diagram of the implementation of the second embodiment of the roof frame height detachable recycling environmental protection heat insulation structure of the present invention, the roof frame height detachable recycling environmental protection heat insulation structure some components and the relationship between the components The corresponding relationship is the same as the above-mentioned detachable, recyclable, environmentally friendly and heat-insulating structure of the roof truss, so it will not be repeated here. 6. The
請參閱第7圖,係為本發明屋頂架高可拆裝回收環保隔熱施工方法之步驟流程圖,如圖所示,一種屋頂架高可拆裝回收環保隔熱施工方法,係包括以下步驟: Please refer to Figure 7, which is a flow chart of the steps of the roof truss height detachable recycling environmentally friendly heat insulation construction method of the present invention. As shown in the figure, a roof truss high detachable recycling environmental protection heat insulation construction method includes the following steps :
S1:提供一外管;首先,提供一外管10,並將該外管10設置於一平面7(即地面)上,需說明的是,該平面7可事先舖設一防水層92。
S1: Provide an outer pipe; first, provide an
S2:提供一螺絲鎖掛組件及一固定組件,將該螺絲鎖掛組件與該固定組件相互組合後卡設於一內管之卡扣槽上;接著提供一螺絲鎖掛組件13及一固定組件12,該螺絲鎖掛組件13係由一螺桿130及一螺帽組131所組成,該螺帽組131具有一上螺帽1310及一下螺帽1311,該固定組件12係由一基座120、一第一固定件121及一第二固定件122所組成,將該螺桿130貫穿該螺帽組131以令所述上、下螺帽1310、1311分設於螺桿130的兩端,並該螺桿130同時貫設所述基座120的穿孔1200,以令該螺絲鎖掛組件13與該固定組件12相互組合後卡設在內管11的卡扣槽110上。
S2: Provide a screw locking component and a fixing component, the screw locking component and the fixing component are combined and then clamped on the buckle groove of an inner tube; then provide a
S3:將組合完成的內管對應置入事先倒入加水拌合之一建築材料之外管內,藉加水拌合之建築材料吸附力及使用一鐳射水平儀調整水平高度即完成定標套接程序;接著,將一建築材料9(如:水泥)預先加水拌合後,將該拌合完成的建築材料9倒入外管10,再將組合完成的內管11相對應放入該外管10的內部,
藉著加水拌合之建築材料9吸附力並使用一鐳射水平儀調整水平高度即完成定標套接程序。
S3: Put the assembled inner tube into the outer tube of a building material that has been mixed with water in advance, and use the adsorption force of the building material mixed with water and use a laser level to adjust the level to complete the calibration and socketing procedure ; Then, after a building material 9 (such as: cement) is pre-mixed with water, the
S4:提供一蓋體14與所述內管11外周緣相對應蓋合;透過一蓋體14對應與該內管11外周緣相蓋設組合,又該蓋體14與該內管11係呈正圓筒形得以使兩者完整組合,進以提供一拘束力以防止所述建築材料9久置產生外擴,進以避免所述內管11破裂。
S4: Provide a
S5:提供一板體架設於該蓋體上側,並令所述螺絲鎖掛組件外露於該板體四隅形成的缺口處。最後,提供一板體2架設於該蓋體14上側,另外,該板體2之四隅分別形成一缺口20,所述螺絲鎖掛組件13係外露於該缺口20處,當所述板體2架設於該蓋體14上側時,所述板體2之其中一隅係架設於該蓋體14上側四分之一圓面積位置處,也就是說,所述蓋體14上側會被四塊板體2相並排覆蓋住,僅外露出組設的螺絲鎖掛組件13。
S5: providing a board to be erected on the upper side of the cover, and exposing the screw locking components to the gaps formed at the four corners of the board. Finally, a
再者,於所述板體2之一側更形成複數凸塊3,該凸塊3與該板體2係為一體成形,所述凸塊3係對應設置於所述蓋體14上側,透過該凸塊3的結構設計,使得所述平面7(即地面)與所述板體2相互平行且彼此之間形成一空間8,藉由該空間8進以達到排水及散熱之功效。
Furthermore, a plurality of protrusions 3 are formed on one side of the
最後,請參閱第8圖並請一併參閱第6圖,係為本發明屋頂架高可拆裝回收環保隔熱施工方法第二實施例之步驟流程圖,所述屋頂架高可拆裝回收環保隔熱施工方法部份元件及元件間之相對應之關係與前述屋頂架高可拆裝回收環保隔熱施工方法相同,故在此不再贅述,惟本屋頂架高可拆裝回收環保隔熱施工方法與前述最主要之差異為,於所述S5:提供一板體2架設於該蓋體14上側,並令所述螺絲鎖掛組件13外露於該板體2四
隅形成的缺口20處之步驟後,更包括:S6:於所述板體2上更鋪設一覆蓋層90,最後於該覆蓋層90上再披覆一土壤層91。
Finally, please refer to Fig. 8 and Fig. 6 together, which is a flow chart of the steps of the second embodiment of the method of roof sill height detachable, recyclable, environmentally friendly and heat insulation construction according to the present invention. The roof sill height can be disassembled and recycled The construction method of environmental protection heat insulation, some components and the corresponding relationship between the components are the same as the construction method of environmental protection heat insulation that can be disassembled and recycled for the height of the roof frame, so it will not be repeated here. The main difference between the thermal construction method and the above is that in the above S5: provide a
進一步說明本實施例,本發明施工方法,更具有一塊體6,該塊體6係對應設置於所述板體2下方或上方處,換句話說,該塊體6與該板體2係為分離式部件,透過該塊體6的設置,可使得該屋頂架高可拆裝回收環保隔熱構造呈現一凹槽4結構態樣,利用該凹槽4的設計,可於其內更鋪設一覆蓋層90,該覆蓋層90可以為不織布,但並不引以為限,接著再於該覆蓋層90上披覆一土壤層91,令該凹槽4處種植草皮、植物等,達到園藝造景之效果。
Further explaining this embodiment, the construction method of the present invention further has a
再者,本發明若未來須修繕時,只需扭轉旋開螺絲鎖掛組件13,並移開板體2就可修繕防水層92,完成後再行歸位復原,不會產生事業廢棄物,達到簡易修繕及節能效果。
Furthermore, if the present invention needs to be repaired in the future, the
此外,若所述板體2老化破損時,只需扭轉旋開螺絲鎖掛組件13,再更換新的板體2便可簡單操作完成,而且舊料為可回收塑料,交由回收站處理即可,無事業廢棄物的產生問題。
In addition, if the
本發明另外也免除了習知技術須於防水層92上水泥隔熱保護層,由於習知技術因為會因擔心熱漲冷縮造成膨脹拱起引起龜裂隆起,故會切割預留伸縮縫,若植物種子掉落其中根部便會紮入其中,造成水泥隔熱保護層破壞,間接造成防水層穿透脫層而致漏水,透過本發明因防水層92上無水泥隔熱保護層的結構設計,植物種子無水泥裂縫孔洞縫隙可供根部穿紮固定,必然會枯萎腐爛,無法對防水層92造成破壞。
In addition, the present invention also eliminates the need for a cement heat-insulating protective layer on the
綜上所述,本發明相較於習知具有下列優點:1.具有排水及散熱之功效;2.易於施工; 3.具有園藝造景之效果;4.無事業廢棄物的產生問題。 To sum up, the present invention has the following advantages compared with the conventional ones: 1. It has the functions of drainage and heat dissipation; 2. It is easy to construct; 3. It has the effect of gardening and landscaping; 4. There is no problem of industrial waste generation.
11:內管 11: inner tube
110:卡扣槽 110: buckle slot
12:固定組件 12: Fixed components
120:基座 120: base
1200:穿孔 1200: perforation
121:第一固定件 121: the first fixing part
122:第二固定件 122: the second fixing piece
13:螺絲鎖掛組件 13: Screw lock assembly
130:螺桿 130: screw
131:螺帽組 131: Nut set
1310:上螺帽 1310: screw cap
1311:下螺帽 1311: Bottom nut
14:蓋體 14: cover body
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW110141935A TWI783775B (en) | 2021-11-10 | 2021-11-10 | Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW110141935A TWI783775B (en) | 2021-11-10 | 2021-11-10 | Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss |
Publications (2)
Publication Number | Publication Date |
---|---|
TWI783775B true TWI783775B (en) | 2022-11-11 |
TW202319626A TW202319626A (en) | 2023-05-16 |
Family
ID=85794477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW110141935A TWI783775B (en) | 2021-11-10 | 2021-11-10 | Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI783775B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4926586A (en) * | 1986-10-23 | 1990-05-22 | Mutuo Nagamatsu | Box for cultivating plant |
US5588264A (en) * | 1995-02-17 | 1996-12-31 | Buzon; Claude | Method and apparatus for supporting a building surface |
TWM405459U (en) * | 2010-12-16 | 2011-06-11 | ming-zong Liu | Thermal insulation pavement structure for building |
CN201952992U (en) * | 2010-12-21 | 2011-08-31 | 刘明宗 | Building thermal insulation pavement construction |
US20170260750A1 (en) * | 2014-12-09 | 2017-09-14 | Daniel Essig | Roof paver locking system and methods for installing pavers |
US10422139B1 (en) * | 2016-04-07 | 2019-09-24 | Oscar Warmerdam | Systems, devices, and/or methods for managing storm water |
US20210246658A1 (en) * | 2013-10-25 | 2021-08-12 | Mbrico, Llc | Tile and Support Structure |
TWM627220U (en) * | 2021-11-10 | 2022-05-21 | 辛文佐 | Elevated, detachable, recycled and environmentally friendly thermal insulation structure on the roof |
-
2021
- 2021-11-10 TW TW110141935A patent/TWI783775B/en active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4926586A (en) * | 1986-10-23 | 1990-05-22 | Mutuo Nagamatsu | Box for cultivating plant |
US5588264A (en) * | 1995-02-17 | 1996-12-31 | Buzon; Claude | Method and apparatus for supporting a building surface |
TWM405459U (en) * | 2010-12-16 | 2011-06-11 | ming-zong Liu | Thermal insulation pavement structure for building |
CN201952992U (en) * | 2010-12-21 | 2011-08-31 | 刘明宗 | Building thermal insulation pavement construction |
US20210246658A1 (en) * | 2013-10-25 | 2021-08-12 | Mbrico, Llc | Tile and Support Structure |
US20170260750A1 (en) * | 2014-12-09 | 2017-09-14 | Daniel Essig | Roof paver locking system and methods for installing pavers |
US10422139B1 (en) * | 2016-04-07 | 2019-09-24 | Oscar Warmerdam | Systems, devices, and/or methods for managing storm water |
TWM627220U (en) * | 2021-11-10 | 2022-05-21 | 辛文佐 | Elevated, detachable, recycled and environmentally friendly thermal insulation structure on the roof |
Also Published As
Publication number | Publication date |
---|---|
TW202319626A (en) | 2023-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5882586B2 (en) | Floor waterproofing method | |
KR100629782B1 (en) | Rooftop double-floor guided waterproof structure including leveling down of slab edges and rooftop greening structure using the same | |
CN206428710U (en) | A kind of road ecology revetment brick and road ecology bank protection | |
TWI783775B (en) | Detachable, recyclable, environmentally friendly heat insulation structure and construction method of roof truss | |
TWM627220U (en) | Elevated, detachable, recycled and environmentally friendly thermal insulation structure on the roof | |
KR101045807B1 (en) | Lightweight, thin-walled, eco-friendly, double-floor ecology with all the technical features of roofing and artificial ground roofing, including light resistance, heat resistance, water resistance, load resistance, water resistance, root resistance, water resistance, drainage, filtration filter, soil foundation, vegetation, etc. Waterproof structure | |
US8266858B2 (en) | Waterproof heat-insulation construction method and module | |
CN115288195B (en) | Waterproof construction method for foundation pile top of anti-pulling pipe pile with basement | |
CN105863085A (en) | External wall panel waterproof joint | |
KR101388151B1 (en) | water proofing and root proofing structure for vegetation and its construction method | |
CN212027183U (en) | Fixed and improved structure of support frame | |
CN205688675U (en) | A kind of improvement of waterproof structure of roofing | |
CN209958622U (en) | Waterproof and heat-preservation integrated roof | |
CN108071197A (en) | Roofing ultrastrong water-proof structure and construction method | |
JP3669946B2 (en) | Structure greening structure | |
KR100672240B1 (en) | Rooftop Waterproofing | |
CN207110322U (en) | A kind of external wall waterproof structure | |
CN205475360U (en) | Basement secretly buries rubble drainage structures | |
CN219586939U (en) | Component for preventing seepage of internal corner | |
CN206220270U (en) | A kind of Side fascia waterproofing node | |
TWM605543U (en) | Improved structure of track type construction | |
CN222227259U (en) | Drainage plate structure convenient to lay and connect | |
TWI658190B (en) | Drain off the drainage system construction method and apparatus | |
CN213044382U (en) | Dual-purpose planting container of assembled | |
CN205678277U (en) | A kind of body of wall is boxed out the plugging structure of poling |