TWI232384B - Equipment forecast system - Google Patents
Equipment forecast system Download PDFInfo
- Publication number
- TWI232384B TWI232384B TW89115196A TW89115196A TWI232384B TW I232384 B TWI232384 B TW I232384B TW 89115196 A TW89115196 A TW 89115196A TW 89115196 A TW89115196 A TW 89115196A TW I232384 B TWI232384 B TW I232384B
- Authority
- TW
- Taiwan
- Prior art keywords
- machine
- manufacturing company
- server
- supplier
- department
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 claims abstract description 62
- 230000005540 biological transmission Effects 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 18
- 238000012545 processing Methods 0.000 claims description 8
- 230000008569 process Effects 0.000 claims description 7
- 238000012790 confirmation Methods 0.000 claims description 4
- 230000008859 change Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims 2
- 230000005611 electricity Effects 0.000 claims 1
- 230000008054 signal transmission Effects 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 7
- 238000011156 evaluation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 108091023037 Aptamer Proteins 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000000762 glandular Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000010985 leather Substances 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010327 methods by industry Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Description
1232384 五、發明說明(1) 發明領域: 本發明係關於一種機台預報系統,特別是關於一種機 台預報系統的執行方法。。 發明背景: 按,在此競爭激烈的工業社會中,一家工廠產能的調 整應變能力是決定其成功與否的重要因素。當該產業的景 氣較差時,產能的擴充便應減緩,以免機台閒置造成損 失;然而當景氣好轉時,產品的需求通常會急速增加,工 廠的產能便有快速擴充的必要。然而,機台廠商大都採用 接單生產的方式,機台的交期(工廠下機台訂單到廠商交 機所需的期限)通常介於4個月到6個月,半導體廠的大型 機台甚至可能到達8個月以上。因此,工廠機台的擴充根 本趕不上產品需求的快速增加,容易造成工廠接了許多訂 單卻無力生產,無形中減低對商機的掌握,使公司蒙受相 當大的損失。 因此對一個工廠而言,如何建立一套良好的機台預報 系統,在需要機台之前幾個月便能今員知機台的需求並由'採 購部門發出訂單,便成為一相當重要的課題。 傳統的作法,是由機台使用者(製程工程師及設備工 程師)先向工業工程部門(Industrial Engineering)提出 產品需求。經由工業工程部門彙整及評估之後,以手動方1232384 V. Description of the invention (1) Field of the invention: The present invention relates to a machine forecast system, and more particularly to a method for implementing a machine forecast system. . Background of the invention: According to this highly competitive industrial society, the ability to adjust the capacity of a factory is an important factor that determines its success. When the industry's economy is weak, the expansion of production capacity should be slowed down to avoid losses caused by idle machines; however, when the economy improves, the demand for products usually increases rapidly, and the factory's production capacity needs to be rapidly expanded. However, most machine manufacturers use the order-to-order production method. The delivery time of the machine (the time required for the factory to place a machine order and the manufacturer to deliver it) usually ranges from 4 months to 6 months. Large-scale machines for semiconductor factories It may even reach more than 8 months. Therefore, the expansion of the factory equipment could not keep up with the rapid increase in product demand, which easily caused the factory to take many orders but was unable to produce, which substantially reduced the grasp of business opportunities and caused the company to suffer considerable losses. Therefore, for a factory, how to establish a good machine forecasting system, which can know the machine's needs and issue orders by the 'purchasing department' within a few months before the machine is needed, has become a very important subject. . The traditional approach is for the machine users (process engineers and equipment engineers) to first submit product requirements to the Industrial Engineering department. After integration and evaluation by the industrial engineering department,
1232384 五、發明說明(2) 式製作出嫉a 台交期工jI交期工作表。首先請參考圖一,其為所述機 製作而成,ΐ的示意圖,可以由微軟的Excel或其他軟體 供應廢ϊ、ΐ項目包含有機台需求序號、廠別、製程別、 PR)序號等蓉產品型號、採購要求(Purchase requisiti〇n: ▼寻’如圖一所示。 台交表公司的採購::根據工業工程部門提出的機 期控制表,ί国 歸納後整理出-份機台交 品型號為縱軸,、丄“、s ^ : 乂期控制表以廠別和產 門在製作機A丄^日、曰^吊…、月份)為撗軸。當採購部 期一 _ ^:父期控制表時,必須針對每一機台將控管日 的控管表中1以決定採購的流程,並進行機台交期 惟, 公司内部 時連上網 到權限控 外,傳統 頻繁地上 無法區別 地去核對 極耗人力 因為傳統 工業工程 網路的 >司 路修改之 管,更因 作法最大 網去檢查 不同的版 才能發現 ’且作業 作法沒有 服器上, ,以致造 沒有版本 的困難在 機台交期 本,採購 機台交期 時間杈得 警示系統 將所述機台 遇有需要增 成管理上的 的管制而造 於,採購部 工作表是否 部門的工作 工作表的更 报長,並且 ,致使採購 交期工作表 添或修改時 困擾,不但 成許多問題 門的工作人 已被更新, 存放在 ,便隨 難以做 〇此 員必須 而且因1232384 V. Description of the invention (2) Formulated a worksheet for the delivery of jI a delivery project. First, please refer to Figure 1. It is a schematic diagram made by the machine. The diagram can be supplied by Microsoft Excel or other software. The project includes the serial number of the organic machine, serial number, factory type, process type, and PR number. Product model, purchase requirements (Purchase requisiti〇n: ▼ look for 'as shown in Figure 1.' Taiwan company's procurement company: According to the schedule control table proposed by the industrial engineering department, the country will be summarized to sort out the machine-machine delivery The product model is the vertical axis, 丄 ", s ^: The date control table is based on the factory type and the production door in the production machine A 丄 ^ (day, ^ hang ..., month) as the y axis. When the purchasing department period _ ^: In the parental control table, the control table on the control day must be 1 for each machine to determine the procurement process, and the machine must be delivered. However, the company is connected to the Internet outside the authority control, which is traditionally impossible. Distinguish the manpower differently because of the traditional industrial engineering network's management of modification, but also because of the largest network to check different versions to find 'and the operation method is not on the server, making it difficult to create no version Pay at the machine This, the procurement machine delivery time frame warning system will be created when the machine is in need of additional management control, whether the work table of the purchasing department is longer than the department's work table, and leads to procurement Difficulties when adding or revising the delivery worksheet, not only the workers who have become many problems have been updated, stored, and then difficult to do. This staff must also because of
人員必須一項一項 動部分。如此非但 容易出錯。再者, 人員對於發出採購Personnel must move one by one. This is not only error-prone. Furthermore, personnel are
1232384 五 、發明說明(3) 訂單(purchase order)的時機齡齡 干又難積確掌摄 I 在另一方面,採 及預定時,需要頰繁部門在對不同庵 商進行協商,繁瑣的鸯从電子郵件或電 機台進行評選 I以有效地提升工作坆^面作業耗費很大的2許多不同的廠 。 力及時間,難 因此,建立一套 購時間更精確,流程t敦率的機台預報 ί的課題。 噸暢,便成為各工2,使機台的採 項非常重要 發明目的及概述 本發明之主要H太、 4提供-種機台預“ 本發明之另一 κ糸的為提供-種機台 太路昍姐齋 κ ^ 統 丨法。 I 本發明调路一種檣厶 ,、% W %订万 電腦輸入機台需求訊^"預報系統,讓製、& 述機台需求訊號傳适=’該機台預報系統二,司可以藉由 確認之交機日期回傳幾台供應商,所述,由電腦將所 定。該系統包含··〜*所述機台預報系統二供應商再將 送裝置。戶斤述交易資^身料庫、一接收裝置、2】核 供應商之間交易的記庠係用以儲存所述製造八^及一傳 造公司藉由電腦輪入:檣:述接收裝置係用以;:2機台 的钱台需求訊號,以及接收製 _ 斤述機台 、统的執行方1232384 V. Description of the invention (3) The timing of the purchase order is aging and difficult to capture. On the other hand, when purchasing and booking, it is necessary for the cheek propaganda department to negotiate with different vendors, which is cumbersome. Selection from e-mail or electric motor station I to effectively improve the work. 2 Many different factories are expensive. Power and time, it is difficult, therefore, to establish a set of more accurate purchase time, the flow rate of the machine forecasting problem. Ton Chang, it becomes each of the two, making the mining of the machine very important. The purpose of the invention and summary of the main invention of the present invention is to provide a kind of machine. "Another of the invention is to provide a kind of machine. Tai Road Xuan sister fast κ ^ system Shu method I modulation path present invention provides a mast Si ,,% W% Order thousand pcs input machine needs information ^ ". forecast system, so that system, & said machine demand signals pass aptamer = 'This machine forecast system two, the company can return several suppliers by confirming the delivery date, said, will be set by the computer. This system contains ... The device will be sent to the customer. The account of the transaction information ^ body database, a receiving device, 2] records of transactions between nuclear suppliers is used to store the manufacturing company ^ and a transmission company through computer rotation: 樯: The receiving device is used to:: The demand signal of the money machine of 2 machines, and the receiving system
第7頁 1232384 五、發明說明(4) 供應商在收到所述機A + +、 ^ 傳送裝置係用以將所述;ί訊號後所確認的交機曰期所述 訊號,傳送至該dt巧由電腦輸入的機台需求 裝置收到該機台供應商】!二的:台供應•’在所述接收 期回傳給該製造公;商;=機曰期後’並將該交機曰 需求訊號以及確認之交_ ,、甲所述機台 中。 又钱日期會被存入所述交易資料庫 一種機 含一伺 ’讓製 報系統 ’所述 報系統 製造公 該製造 採構要 需求曰 ’並由 不是所 之電子 訊息, 告知所 訂單及 台預報 服器引 造公司 再藉由 機台供 讓所述 司藉由 公司在 求建立 期。接 該系統 述標準 郵件以 則由所 述機台 其所記 系統的 擎、一 可以藉 電腦將 應商再 製造公 一電腦 所述網 新的預 下來將 判斷是 訊息, 告知所 述電子 供應商 載之需Page 7 1232384 V. Description of the invention (4) The supplier shall receive the said machine A + +, ^ The transmission device is used to transmit the signal mentioned in the delivery date confirmed by the signal; dt The machine demand device input by the computer received the machine supplier]! Second: Taiwan's supply • 'will be transmitted back to the manufacturer during the receiving period; =; after the machine's date' and the demand signal and confirmation of the delivery will be delivered to the machine, as described in A. The money date will be stored in the transaction database. A machine contains a server that allows the system to make a report. The report system is made by the manufacturer. The forecast server induces the company to use the machine to supply the company with the company during the demand establishment period. After receiving the standard e-mail from the system, the engine of the system recorded by the machine can be used to re-manufacture the business by a computer. The computer will be judged to be a message and inform the electronic supplier. Need
本發 台預報系 以及至少 求訊號, 傳送至機 回傳至所 執行方法 系統的網 要求,並 訂單上包 所述機台 統的標準 伺服器發 方面若是 警示之電 應商依據 明更揭露 統至少包 一個網頁 該機台預 台供應商 述機台預 為首先該 頁。接著 依據所述 含機台的 預報系統 机息,若 出一警示 所述標準 子郵件以 所述預約 執行方法 電子郵件 由電腦輸 所述機台 將確認之 司核定。 登上所述 頁上建立 約訂單, 所述預約 否為該機 則由所述 述製造公 郵件伺服 。最後所 求日期, ,所述機 伺服器、 入機台需 需求訊號 交機曰期 本發明的 機台預報 新的採購 所述預約 訂單傳至 台預報系 電子郵件 司;另— 器發出一 述機台供 確認可以 1232384 五、發明說明(5) 交機的日期,並將此確認的機台交期傳送至所述機台預報 系統。 主要元件圖號對照 10 網 際 網 路 12 製 造 公 司 14 機 台 供 應 商 18 保 險 公 司 20 祠 服 器 21 網 頁 22 伺 服 器 引 擎 23 處 理 運 算 單 元 24 記 憶 單 元 25 製 造 公 司 資 料庫 26 機 台 供 應 商資料庫 27 電 子 郵 件 伺 服器 28 交 易 資 料 庫 30 製 造 公 司 端 31 使 用 者 32 工 業 工 程 部 門 33 採 購 部 門 34 瀏 覽 器 35 用 戶 辨 識 碼 40 機 台 供 應 商 端 41 瀏 覽 器 42 用 戶 辨 識 碼 發E 洞詳細說明 本發明主要係以一伺服器透過網際網路整合製造公司 和機台供應商,以形成一完善的機台採購輔助系統。首先The station ’s forecast system and at least the signal, the network request sent back to the implemented method and system, and the order server ’s standard server issuance of the system ’s standard server issuance of the warning if the electric supplier should disclose the system At least one webpage is included. The machine preview supplier stated that the machine is preset to the first page. Then according to the machine-based forecasting system, if a warning is issued, the standard sub-mail is executed by the appointment, the email is entered by the computer, and the machine will be confirmed by the company. Log on to the page to establish an order, if the appointment is not the machine, the mail server will be used by the manufacturing company. The last requested date, the machine server, the machine needs a signal to deliver the machine date, the machine forecast of the present invention, the new purchase, the reservation order is transmitted to the Department of E-mail, the forecast department; The machine for confirmation can be 1232384 V. Description of the invention (5) The date of delivery, and the confirmed machine delivery date is transmitted to the machine forecast system. Main component drawing number comparison 10 Internet 12 Manufacturing company 14 Machine supplier 18 Insurance company 20 Temple server 21 Web page 22 Server engine 23 Processing unit 24 Memory unit 25 Manufacturing company database 26 Machine supplier database 27 Email server 28 Transaction database 30 Manufacturing company 31 User 32 Industrial engineering department 33 Purchasing department 34 Browser 35 User ID 40 Machine supplier 41 Browser 42 User ID Sending E-holes A server is used to integrate the manufacturing company and the machine supplier through the Internet to form a complete machine purchasing support system. First of all
1232384 五、發明說明(6) 請參考圖三,為本發明所提供之機台預報系統及其連結之 示意圖。本發明之機台預報系統透過網際網路丨〇以整合製 造公司1 2和複數家機台供應商i 4。當然,在將來無線通訊 的技術成熟之後,本發明在製造公司1 2、伺服器丨〇和機台 供應商1 4之間的資料傳輪亦可運用無線傳輸。 接下來請參考圖四,為本發明所述之機台預報系統之 功能方塊圖。所述機台預報系統之主要架構為一伺服器 20,利用伺服器20執行機台採購資訊之傳遞、溝通以及 網頁傳送到製造公司端30以及機台供應商 器2。具有-處理運算單元23、—記憶單元24、°一 擎(server engine)22、一製造公司資料庫&、一 ^商資料庫26、一電子郵件伺服器27、以及各種的網口頁,' 所延處理運算單 控制所述伺 述記憶單元 伺服器2 〇運 係用以接收 網頁2 1提供 司端30可以 看機台供應 所確認的交 服器20的運作,並進行資料的處理及 24為動態隨機存取記憶體(DRAM),用以 作中所產生出的暫時資#。所 = 入讽口仏應商端4 〇。劁生 藉由所述網頁21傳送機台預報 I = ^ 商的回應,同時批示同音< | ^、、、β心,並監 擤A W。在另古品思Α者回絕機台供應商 機曰期在另一方面’機台供應商端40可以藉 1232384 五、發明說明(Ό 〜~_ 由所述網頁2 1確認交機曰期。所述電子郵 以接收及傳送電子郵件。當製造公司端3G改Up?係用 約、採購要求、或採購訂單的狀態時,電子 口之, 會以電子郵件對各相關的機台供應商送出警示j服器27 一方面,當機台供應商端4 〇確認或變更交機日^ ^。在另 件伺服器2 7會以電子郵件對相關的製造公司送出盤電子郵 號。 印g不訊 所述製造公司資料庫25用以儲存已登錄之製 資料,至少包含其負責人姓名、*利事業統一編號:二2 所在地、年度營業額、年度盈餘等等資料。所^ a廠房 商資料庫26則用以儲存已登錄之機台供應商的資口供應 包含其負責人姓名、營利事業統一編號 '冑房所在至少 度營業,、年度盈餘、冑台類別、機台型號年 標準交期等等資料。 合種機台之 所述機台預報系統之架構耦合至製造公司端3 製造公司# 30包含有機台使用* 3卜工業工程部門;所述 採購.P門33,其電腦上各包含有一瀏覽器34及一 2、和 碼351所述瀏覽器34透過伺服器20上的網頁21,=辨識 業工転門3 2建立新的機讓工 3 3建立新的换睡-Γ留松》 ^ ♦私鱗部門 邛Η 32和:t購 4 #。所述瀏覽器34並可讓工業工 購要I皮木購部門33查閱自動更新後的採購進度(例1程 購要求序號或採購訂單序號等等),同時可以如採 做 造 其 台 1232384 五、發明說明(8) 本的更新資料以免前後版本相混 為用戶的識別,用以登入伺服器述用戶辨言! :司端30之間的通訊可以利用網際二斤述伺服累 他任何形式的通訊方式及通訊協定 無線谓 在另一方面,機台預報系統之架 供應商端40, #亦包含有—_器^合至名 42。所述刹覽器U透過伺服器Μ上的用戶劳 公司確認或更改機台的交期。所述用戶 入飼服1120。所述伺服器2Q和機台供應1232384 V. Description of the invention (6) Please refer to Figure 3 for a schematic diagram of the machine forecast system and its connection provided by the present invention. The machine prediction system of the present invention integrates a manufacturing company 12 and a plurality of machine suppliers i 4 through the Internet. Of course, after the technology of wireless communication matures in the future, the present invention can also use wireless transmission between the data transmission wheel between the manufacturing company 12, server 1, and machine supplier 14. Please refer to FIG. 4 for a functional block diagram of the machine prediction system according to the present invention. The main structure of the machine forecast system is a server 20, which uses the server 20 to perform the transfer, communication, and webpage transfer of machine procurement information to the manufacturing company 30 and the machine supplier 2. It has a processing processing unit 23, a memory unit 24, a server engine 22, a manufacturing company database & a business database 26, an email server 27, and various network port pages, 'The deferred processing operation sheet controls the servo memory unit server 2. The operation system is used to receive the web page 2 1 the provider 30 can watch the operation of the server 20 confirmed by the machine supply, and perform data processing and 24 is a dynamic random access memory (DRAM), which is used to generate temporary resources #. So = sarcasm should be commercial. 4 〇.劁 生 Through the webpage 21, the machine predicts the response of the quotient I = ^, and simultaneously states the homologous < | ^, ,, β heart, and monitors 擤 A W. In other ancient times, those who rejected the machine supplier's opportunity date, on the other hand, the machine supplier side 40 can borrow 1232384 V. Invention description (发明 ~~ _ From the web page 2 1 confirm the delivery date. The e-mail is used to receive and send e-mails. When the 3G of the manufacturing company changes to Up? It is the status of the contract, purchase request, or purchase order. The e-portal will send an alert to the relevant machine suppliers by e-mail. jserver 27 On the one hand, the machine supplier 4 confirms or changes the delivery date ^ ^. At the other server 27, an electronic mail post number will be sent to the relevant manufacturing company by e-mail. The manufacturing company database 25 is used to store the registered manufacturing information, at least including the name of the person in charge, the uniform number of the profit enterprise: 2 2 location, annual turnover, annual surplus, and so on. Therefore, a factory building database 26 materials used to store the registered equipment suppliers include the name of the person in charge, the uniform number of the profit-making business, where the house is at least open, the annual surplus, the type of platform, and the standard delivery period of the machine model And other information. The structure of the machine forecasting system of this kind of machine is coupled to the manufacturing company side 3 Manufacturing company # 30 contains the use of the machine * 3 Industrial engineering department; the procurement. P gate 33, each of which contains a browser 34 And 1, 2, and the code 351 described by the browser 34 through the web page 21 on the server 20, = identification of industrial workers 3 2 to create a new machine for workers 3 3 to create a new sleep change-Γ 留 松 "^ Private Scale department 邛 Η 32 and: t 购 4 #. The browser 34 can allow industrial industrial purchasing department I leather procurement department 33 to check the automatically updated procurement progress (for example, a purchase order number or purchase order number, etc. ), At the same time, you can make its own platform 1232384 V. Invention Description (8) This updated information prevents the previous and subsequent versions from being mixed as the user's identification, used to log in to the server to describe the user's speech! You can use the Internet to describe any form of communication method and communication protocol that the server is tired of. On the other hand, the provider side of the machine forecast system 40, # also contains —_ 器 ^ 合 至 名 42. The brake U is confirmed or changed by the user company on the server M Delivery. Servo into the user 2Q and the server machine 1120. Supply
可以利用網際網路、無線傳輸、或其他 J 式及通訊協定。 U形式# 接下來配合圖五說明製造公司端3 〇建立 單的流程。當製造公司的使用者(製程工程^ 師)在製造公司端3 0藉由所述瀏覽器3 4登上:: 頁21之後(步驟100),便可在系統上建立新的採&貝 (步驟1 0 1 )。根據此採構要求,工業工程部門建立身 約訂單,並利用系統下拉式的選擇功能選擇適用的 號(步驟1 〇 2)。上述適用的機台型號係儲存在機台^ 資料庫2 6中。所述預約訂單包含廠別、製程別、%幾 需求日期等等,並選擇至少一個適用的機台型號。 統會將此訊息傳送至所述伺服器,並由伺服器^斷 本發明機台預報系統的標準訊息(步驟1 〇 6 ),若不』 〃碼3 5則 2 0和製 輸、或 數個機 識竭 向製造 用以登 的通訊 通訊方 採購訂 備工程 2 0的網 ^要求 f的預 機台型 I應商 台別、 此時系 是否為 :,則 1232384 五、發明說明(9) 由所述電子郵件伺服器27發 攀 業工程部門(步驟丨 =*之電子郵件以告知工 發明機台預報夺二i,、隹在另:方面,若伺服器判斷是本 子郵件伺服器27發屮一 預、力汀早由所述電 (步驟1 0 8 ) 〇機/徂 吕不電子郵件以告知機台供應商 之需求曰期,確口^ 可依據此預約訂單及其所記載 認的機台交期二;:二交機…“步驟1()9)’並將此確 力得适至伺服器20 (標誌Α)。 當工業 選擇功 以電子 購部門 建立新 &悉有 誤機台 頻繁地 須一項 °因此 ’本發 存於所 错以計 所述曰 電子郵 在另 利用系統 1 0 2 )之後 驟 1 0 3 ), 述機台交 採購部門 此筆預約 如傳統技 已被更新 工作表的 及作業時 機台需求 機台的標 的日期。 單,貝|J系 一方面, 下拉式的 糸統會 以通知採 期控制表 便可立即 訂單而延 術般必須 ’而且必 更動部分 間。再者 曰期和儲 準交期, 若是到了 統會發出 工程部門 能選擇適 郵件將此 更新機台 的採購訂 新的預約 的採購。 上網去檢 一項地去 ,本發明 明的系統 述機台供 算出採購 期,採購 件以提醒 建立新的預約訂單,並 用的機台型號(步驟 訊息傳給採購部門(步 父期控制表,再根據所 早(步驟1 0 4 )。如此, 訂單,不需擔心因遺漏 同時,採購部門也不需 查機台交期工作表是否 核對才能發現機台交期 的系統可大幅節約人力 可以結合預約訂單中的 應商資料庫26中之各種 部門必須發出採購訂單 部門仍未發出採購訂 採購部門。Can use the Internet, wireless transmission, or other J-style and communication protocols. U form # Next, with reference to Figure 5, the manufacturing company's process of creating a 30 order will be described. When the user of the manufacturing company (process engineering engineer) logs in at the manufacturing company end 30 through the browser 34: After page 21 (step 100), a new mining & shell can be created on the system (Step 1 0 1). According to this procurement requirement, the industrial engineering department establishes a personal order and uses the system's pull-down selection function to select the applicable number (step 102). The applicable machine models mentioned above are stored in machine ^ database 26. The reservation order includes a factory type, a process type, a percentage date, etc., and selects at least one applicable machine model. The system will send this message to the server, and the server will cut off the standard message of the machine prediction system of the present invention (step 10), if not, 〃 code 3 5 then 20 and the system loses, or several The machine exhausted the procurement of the ordering project 2 for the communication and communication parties that used to make the order. The pre-machine type I that required f should be the type of the commercial platform. Is this the case: 1232384 V. Description of the invention (9) The e-mail server 27 sends the Panye Engineering Department (step 丨 = * 's e-mail to inform the industrial machine to forecast the second i). In another aspect, if the server judges that this is the sub-mail server 27, First notice, Li Ting early by the electric (step 108) 〇 machine / 徂 Lu not email to inform the machine supplier of the demand date, confirm ^ can be based on this reservation order and its recorded recognition The second delivery time of the machine: the second delivery machine ... "Step 1 () 9) 'and apply this to the server 20 (mark A). When the industry chooses to establish a new & The station frequently needs one item. Therefore, 'this post is stored in the wrong way. After the system 10 2) and step 10 3), the machine submits the appointment to the purchasing department, such as the traditional technology has been updated on the worksheet and the date when the machine needs the machine's target. Single, shell | J is on the one hand, The pull-down system will notify the purchase date control table to order immediately, and the delay must be changed, and the interval must be changed. Furthermore, the date and storage period, if it is reached, the engineering department can choose the appropriate mail to This update the purchase of the machine to order a new reservation purchase. Go online to check one item, the system of the invention describes the machine for calculating the purchase period, purchase parts to remind the establishment of a new reservation order, and the machine model ( The step information is transmitted to the purchasing department (step parent period control table, and then based on the earlier (step 104). In this way, the order does not need to worry about the omissions, and the purchasing department does not need to check the machine delivery schedule worksheet to check whether it can be checked. It is found that the system of machine delivery can greatly save manpower. It can be combined with various departments in the application database 26 in the appointment order. The purchase order must be issued by the department. The purchase order has not yet been issued. Purchasing department.
第13頁 1232384 五、發明說明(10) 、 此時,使用 以利用網際網路 4 0洽談機台規格 和採購部門3 3可 與機台供應商端 購部Η 3 3可以利 台供應商端4 〇進 的協商及洽談的 庫28中,做為正 <避免傳統作法 議。因此’本系 時間,更可強化 者31、 透過伺 及協商 以利用 4 0進一 用網際 行線上 結論都 式的協 中繁雜 統不僅 採購程 工業工程部門 服器2 0的網頁 教育訓練等事 網際網路透過 步協商並確認 網路透過伺服 的議價。重要 會記錄在所述 商憑證,以避 的書面作業和 可以大幅節約 序的作業流程 32、和 2 1,與 宜。工 伺服器 交機曰 器2 0的 的是, 伺服器 免曰後頻繁且 採購部 採購部門 機台供應 業工程部 2 0的網頁 期。另外 網頁2 1, 上述所有 2 0的交易 生變。如 無效率的 門人力及 3 3可 商端 門32 21,,採與機 線上資料此便會作業 接下 與議價作 據,並對 動更新預 單傳送至 報系統的 件伺服器 P7);在 的楳準訊m ι10)ο 腺器27發 <請繼 業之後 此一機 @的狀 伺服器 標準訊 2 7發出 另 方 息,則 對於未 出一警 :4 $:。當採購部門完成機台的評估 一機台供應商的某-機台型 購訂單(步驟_,系統並自 2〇, ^ , 〇5)。同時,系統將此採購訂 並由伺服器判 再: 息(步驟106),若^: θ為本 機台預 一盤+ ^ 右不疋,則由所述電子郵 面了 電子郵件以告知採購部門(步驟 再區斷是本發明機台預報系統 被挑選的選的機台供應商(步 σ仏應商,由所述電子郵件伺 ’、 郵件給所述未被挑選的機台供應Page 13 12384384 V. Description of the invention (10) At this time, it is used to use the Internet 40 to negotiate machine specifications and procurement departments 3 3 can be used with the machine supplier's purchase departmentΗ 3 3 can be used to benefit the supplier's side In the bank 28 of the 40-day negotiation and negotiation, as a positive < avoid the traditional practice. Therefore, 'this time, you can strengthen the 31, through the consultation and use of 40 to enter the Internet using online conclusions of the Chinese-Chinese complex system not only purchase process industrial engineering department server 20 web education training and other things Internet The network negotiates and confirms the bargaining of the network through the server. Important will be recorded in the business certificate to avoid the written work and the orderly work flow 32, and 21, which is appropriate. The server is delivered to the server 20, the server is free from frequent and the purchase department procurement department machine supply industry engineering department 20 web page period. In addition, on page 21, all the above 20 transactions are changed. If the inefficient door manpower and 3 3 commerce-end door 32 21, the acquisition and online data will be used to receive and negotiate with the evidence, and update the advance order to the server P7); At the moment of the prospective message m ι10) ο the glandular device 27 issued < please follow this job @ the status of the server server standard message 2 7 to issue another interest, then for the absence of a warning: 4 $ :. When the procurement department completes the evaluation of the machine, a machine-type purchase order from a machine supplier (step_, system and since 20, ^, 〇5). At the same time, the system orders this purchase and is judged by the server again (step 106). If ^: θ is a pre-order for this machine + ^ right, then the e-mail has been sent by the e-mail to inform the purchase The department (step re-judgment is the selected machine supplier selected by the machine prediction system of the present invention (step σ 仏 the supplier, the e-mail server, the mail to the unselected machine supply)
第14頁 1232384 五、發明說明(11) ^ (步騾113),通知將先前的預约訂單取消(步驟U4),並 I結束對該未被挑選機台供應商的預约及評估作業。在另一 方=,對於被挑選的機台供應商,由所述電子郵件伺服器 2 7發出一警示之電子郵件給所述被挑選的機台供應商(步 驟1 1 1 )’告知其採購訂單的確定。此被挑選的機台 |便y依據此採購訂單及其所記載之需求曰期,再次確ς ‘ 乂父拽的曰期(步驟1 1 2 ),並將此確認的機台交期 I伺服器20(標誌Α)。 功得k至 、—接下來請參考圖六,其為利用本發明之機台預 $订機台交期協商的流程圖。當機台供應商將確認的機台 =期傳送至伺服器2 〇後(標諸A),系統將該機台交期與 製造公司端30所發出的需求曰期相比較(步 .她 台交期與需求曰期所相矣的天數在一預定:天内右機 如7天),則系統藉由所述電子郵件伺服器 之電子郵件給製造公司端30(步驟2〇1),主s不 獲確定(步驟202)。在另〆方面,若機〇機口父期已 所相差的天數在-預定的天數之;7例°如=與需求曰期 藉由所述電子郵件飼服器2 7發出—警八 天),則系統 公司端30(步驟2 0 3 ),由採購部門決b定不曰之電子郵件給製造 2 〇 4 )。若採購部門決定接受該機台交%疋否接受(步驟 確定(步驟202)。在另〆方面,若’則機台交期亦告 機台交期,則將不接受的訊息傳回词° ]決定不接受該 伺服器27發出一警示之電子郵件給機$器20,由電子郵件 台供應商端(步驟 1232384 五、發明說明(12) 2 0 5 ),要求機台供應商重新確認機台的交期(步驟2 0 6 )。 待機台供應商重新確認機台的交期後,再將結果傳回伺服 器(標誌A),系統再次將新的機台交期與製造公司端3 0 所發出的需求日期做比較(步驟2 0 0 )。 以上所述為本發明之主要架構及方法之實施例,本發 明並不侷限於上述之揭露條件,然而熟悉該項技藝者可以 在本發明之精神下做一均等替換或變更,但仍受限於本發 明。Page 14 1232384 V. Description of the invention (11) ^ (step 113), notify the cancellation of the previous reservation order (step U4), and I end the reservation and evaluation of the unselected machine supplier. On the other side =, for the selected machine supplier, the e-mail server 27 sends an alert email to the selected machine supplier (step 1 1 1) to inform its purchase order OK. The selected machine | Then, according to the purchase order and the recorded date of the demand, confirm the date of the uncle's father (step 1 1 2), and send the confirmed machine to the date I servo Device 20 (marker A). Successes k to,-Please refer to FIG. 6 next, which is a flowchart of pre-booking machine delivery negotiation using the machine of the present invention. When the machine supplier transmits the confirmed machine time to the server 2 (marked A), the system compares the machine delivery time with the demand date issued by the manufacturing company 30 (step. The number of days between the delivery date and the demand date is within a predetermined time: within 7 days, the system will send an email from the email server to the manufacturing company 30 (step 201). Not determined (step 202). On the other hand, if the number of days difference between the parental period of the machine and the machine is between-the predetermined number of days; 7 cases, such as = and the demand date is sent by the email feeder 2 7-the police eight days) Then, the system company end 30 (step 203) is sent to the manufacturing company by the purchasing department's e-mail. If the purchasing department decides to accept the machine delivery%? No (step 202). On the other hand, if 'the machine delivery date is also reported to the machine delivery date, the unacceptable message is returned. ] Decided not to accept a warning e-mail from the server 27 to the machine 20, the e-mail station supplier (step 1232384 V. Invention Description (12) 2 0 5), and asked the machine supplier to reconfirm the machine The delivery time of the machine (step 2 06). After the standby machine supplier reconfirms the delivery time of the machine, the results will be returned to the server (mark A), and the system will again deliver the new machine to the manufacturing company. 0 The requirements date issued is compared (step 2 0 0). The above is an example of the main structure and method of the present invention. The present invention is not limited to the above disclosure conditions, but those skilled in the art can Under the spirit of the invention, an equal replacement or change is made, but it is still limited by the present invention.
第16頁 1232384 圖式簡單說明 圖式簡單說明 本發明的較佳實施例將於往後之說明文字中輔以下列圖形 做更詳細的闡述: 圖一為習知技藝中工業工程部門建立之機台交期工作表的 示意圖。 圖二為習知技藝中採購部門建立之機台交期控制表的示意 圖。 圖三為本發明所提供之機台預報系統及其連結之示意圖。 圖四為本發明所述之機台預報系統之功能方塊圖。Page 1232384 Schematic illustration Schematic illustration of the preferred embodiment of the present invention will be explained in more detail in the following explanatory text with the following figures: Figure 1 is a machine established by the industrial engineering department in the conventional arts Schematic diagram of the worksheet for delivery. Figure 2 is a schematic diagram of the machine delivery control table established by the purchasing department in the conventional arts. FIG. 3 is a schematic diagram of a machine prediction system and its connection provided by the present invention. FIG. 4 is a functional block diagram of the machine prediction system according to the present invention.
圖五為本發明系統中製造公司端建立及傳送採購訂單的流 程圖。 圖六為利用本發明之機台預報系統進行機台交期協商的流 程圖。Fig. 5 is a flowchart of a manufacturing company establishing and transmitting a purchase order in the system of the present invention. Figure 6 is a flow chart of machine delivery negotiation using the machine forecast system of the present invention.
第17頁Page 17
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW89115196A TWI232384B (en) | 2000-07-28 | 2000-07-28 | Equipment forecast system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW89115196A TWI232384B (en) | 2000-07-28 | 2000-07-28 | Equipment forecast system |
Publications (1)
Publication Number | Publication Date |
---|---|
TWI232384B true TWI232384B (en) | 2005-05-11 |
Family
ID=36320016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW89115196A TWI232384B (en) | 2000-07-28 | 2000-07-28 | Equipment forecast system |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI232384B (en) |
-
2000
- 2000-07-28 TW TW89115196A patent/TWI232384B/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107977812B (en) | Automatic production ordering method, device and system | |
US7155439B2 (en) | Modular and customizable process and system for capturing field documentation data in a complex project workflow system | |
US8548877B2 (en) | Expense tracking, electronic ordering, invoice presentment, and payment system and method | |
US7590597B2 (en) | Electronic business transaction system | |
US20030208434A1 (en) | On-line system and method for analyzing vendor proposals in response to a request-for-proposal | |
TW577002B (en) | Server apparatus, the method of logistics management used in the server apparatus, computer readable recording medium, logistics management system, the user side, the production side and the distribution side terminal apparatus used in the logistics | |
US20020013734A1 (en) | Universal internet smart delivery agent | |
WO2002044839A2 (en) | Method and system for completing a lease for real property in an on-line computing environment | |
TW200411484A (en) | Purchase management system and method | |
US20040098321A1 (en) | Integrated inventory management system and method | |
CN111240552A (en) | Method, device and equipment for screening target information | |
CN115775125A (en) | Purchasing management method, platform, server and readable storage medium | |
WO2019212948A1 (en) | Systems and methods for processing reimbursement requests submitted by retail stores to distribution centers | |
CN109377155A (en) | The loan information measures and procedures for the examination and approval and device | |
JP4328557B2 (en) | Information processing apparatus and program | |
KR100733475B1 (en) | Electronic tax invoice issuance system and processing method using mobile | |
US20040254854A1 (en) | Purchase management system and method | |
TWI232384B (en) | Equipment forecast system | |
CN113592374B (en) | Equipment purchasing management system, method, server and storage medium | |
JP2024031943A (en) | Information processing system, information processing method, and program | |
CN106056472A (en) | Online direct-connection service processing method based on online-to-offline service platform | |
JP2004094756A (en) | Material accommodation support system and material accommodation support method | |
JP2020009368A (en) | Information processing device, program, and information processing system | |
JP2003030466A (en) | System and method for material procurement between specific companies | |
JP7193190B1 (en) | Manufacturing consignment support system, manufacturing consignment support program, manufacturing consignment support method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK4A | Expiration of patent term of an invention patent |