SU878858A1 - Ground anchor for erection jobs - Google Patents

Ground anchor for erection jobs Download PDF

Info

Publication number
SU878858A1
SU878858A1 SU792720208A SU2720208A SU878858A1 SU 878858 A1 SU878858 A1 SU 878858A1 SU 792720208 A SU792720208 A SU 792720208A SU 2720208 A SU2720208 A SU 2720208A SU 878858 A1 SU878858 A1 SU 878858A1
Authority
SU
USSR - Soviet Union
Prior art keywords
jobs
erection
ground anchor
platform
angle
Prior art date
Application number
SU792720208A
Other languages
Russian (ru)
Inventor
Василий Егорович Лютенко
Original Assignee
за витель В. Е. Лютенко J
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by за витель В. Е. Лютенко J filed Critical за витель В. Е. Лютенко J
Priority to SU792720208A priority Critical patent/SU878858A1/en
Application granted granted Critical
Publication of SU878858A1 publication Critical patent/SU878858A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

33

в сторону, гфотивоположиую фронту ведени  монтажных работ, и составл ют с вертикалью угол 20-22°.to the side, facing the front of the installation work, and an angle of 20-22 ° with the vertical.

Работа  кор  осуществл етс  следующим образом.The operation of the core is carried out as follows.

flpii монтаже т говое усилие, создаваемое лебедкой G, воспринимаетс  платформой 1, котора  удерживаетс  па месте за счет веса балластных грузов 5 и сопротивлени  грунта перед ребрами 4. При этом ребра 4 за счет их наклона к вертикали нод углом 20-22° полностью врезаютс  в грунт, а выполнение ребер сход щимис  к продольной оси платформы под углом 60-63° обеспечивает стабильное положение платформы и предотвращает ее расшатывание в случае изменени  направлени  горизонтальной составл ющей т гового усили .flpii mounting the traction force generated by the winch G is perceived by platform 1, which is retained on the spot due to the weight of the ballast weights 5 and the resistance of the soil in front of the ribs 4. At the same time, the ribs 4 due to their inclination to the vertical of the node with an angle of 20-22 ° completely cut into the ground, and making the ribs converging to the longitudinal axis of the platform at an angle of 60-63 ° ensures a stable position of the platform and prevents its loosening in the event of a change in the direction of the horizontal component of the pulling force.

Таким образом, в предлагаемом  коре повышаетс  его продольна  и поперечна  устойчивость, что повынкчет его несуп.).ую способность.Thus, in the proposed crust, its longitudinal and transverse stability is increased, which increases its strength.).

Claims (2)

1.Авторское свидетельство СССР № 197924, кл. Е 02D 5/74, 1965.1. USSR author's certificate number 197924, cl. E 02D 5/74, 1965. 2.Авторское свидетельство СССР ,№ 225413, кл. Е 02D 5/74, 1967.2. USSR author's certificate, No. 225413, cl. E 02D 5/74, 1967.
SU792720208A 1979-01-29 1979-01-29 Ground anchor for erection jobs SU878858A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792720208A SU878858A1 (en) 1979-01-29 1979-01-29 Ground anchor for erection jobs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792720208A SU878858A1 (en) 1979-01-29 1979-01-29 Ground anchor for erection jobs

Publications (1)

Publication Number Publication Date
SU878858A1 true SU878858A1 (en) 1981-11-07

Family

ID=20808315

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792720208A SU878858A1 (en) 1979-01-29 1979-01-29 Ground anchor for erection jobs

Country Status (1)

Country Link
SU (1) SU878858A1 (en)

Similar Documents

Publication Publication Date Title
US4146969A (en) Surveyor's rod
US4082162A (en) A-frame ladder extender
SU878858A1 (en) Ground anchor for erection jobs
EA200201029A1 (en) METHOD OF CONSTRUCTION OF CONSTRUCTION FOR USE AS A ROAD OR OF CONSTRUCTION FORESTS ON THE SLOPE
CN211286117U (en) Fireproof wall body with anti-seismic effect
FR2305116A1 (en) Wide boom agricultural sprayer - with hydraulic jack acting on top of frame for damping and inclination
SU905373A1 (en) Pile package
CN208121512U (en) Four-wheel laser machine tenderizer lifting balance device
JPS6233818Y2 (en)
SU785179A1 (en) Semigantry erecting crane
JPS57226A (en) Construction and structure of net pile
CN212306566U (en) Automatic floating fishing platform of adjusting formula
SU691539A1 (en) Covering for buildings and structures
SU753988A1 (en) Method of erecting prefabricated pile in soil
CN220847682U (en) Balance weight and buttress combined retaining wall
US3672105A (en) Arrangement in staying a telescopic tower by means of stay wires
SU617563A1 (en) Arrangement for erecting construction structures
SU592910A1 (en) Trestle overpass
SU1386067A1 (en) Widecut agricultural implement
SU1051154A2 (en) Counter-mudflow arrangement
GB573027A (en) Improvements in and relating to marine structures
SU968306A1 (en) Drilling derric
SU572396A1 (en) Steep slope tractor
SU791845A1 (en) Nachoring device
SU796318A1 (en) Earthquakeproof foundation